Loading...
HomeSearchMy WebLinkAboutAll American Building Services for 2025 Alley Paving Improvement Project No.211014 Document No. 2025-0305572All Cities EngineeredAll Cities Engineering; 2024 CIP Sewer Replacement Project. Project No. 521032CT&T Concrete Paving for TDA 2021 Transit Stop Access Improvement Project. Project No. S241005CT&T Concrete Paving, Inc., TDA 2021 Transit Stop Access Improvement Project. Project No. S241005, Doc. No. 2024-0255186Delta Electric LLC Cypress Circle Street Lighting Upgrade Project. Project No. FCS08242023JNDelta Electric LLC for Cypress Circle Street Lighting UpgradeProject No. FCS08242023JN. Doc No. 2024-0273027Elegant Construction for Fire Station 262 Remodel. Project No. FCS11072023JN. Document No. 2025-0178985Ferguson Enterprises Automated Metering Infrastructure Project Document No. 2025-0149507Ferguson Enterprises for Water Meter Replacement Project Third and Final Phase Document No. 2025-0149496Garcon Construction for 2025 Sidewalk and ADA Ramp Replacement. Project No. 400033. Document No. 2026-0036190GSE Construction WWTP Primary Clarifier Upgrade Project. Document No. 2025-0149478GSI Redlands Owner, LLC for public improvements for CUP No. 1168: APN:0298-051-07. Document No. 2025-0017135In-N-Out Burgers Public Improvements for CUP No. 1170, APN 0169-341-10 Doc No. 2026-0198710Lennar Homes Correction of Document No. 2025-0122906 correct Tract Map No. is 20257. Document No. 2025-0191905Lennar Homes of Caifornia Public Improvements for Tract Map No. 20244, CRA 914 Document No. 2025-0122906Luxview at Orange LLC Public Improvements Tract Map No. 20244 CRA No. 914Matich Corporation PMP 2025 Street Resurfacing Project No. 211013 Document No. 2026-0167272Matich Corporation; PMP 2024 Street ResurfacingMCC Pipeline for 2023 CIP Water Pipeline and Highline Replacement Project. Document No. 2026-0097507MCC Pipeline for 2025 CIP Water Pipeline Replacement Project No. 501068 Document No. 2026-0268208Metrocell Construction - Palo Alto Storm DrainMetrocell Construction for Redlands Regional Connector (South) Project Document No. 2025-0129538Onyx Paving Company 2025 Citywide Paving Repair for Water Utilities Document No. 2026-0090242Q&E Pipeline Company Recycled Water for California St Orange Groves Project No. S531021 Document No. 2025-0226015R&J Construction for WWTP Hillside Stabilization and Stairway Improvement ProjectRecorded C.R. Contracting for Runway and Apron Pavement Treatmen ProjectRecorded C.R. Contracting for Runway and Apron Pavement Treatment ProjectRedlands Food Hall, CUP 1100, Public Improvements, 330 Third Street, APN No. 0169-281-75Redlands Industrial Owners Devel No. 7 APN 0292-033-18 1101 California St Doc No. 2026-0068639Sierra Pacific Electrical Contracting, Cypress Ave and Cajon St., Traffic Signal Improvement ProjectTESCO Controls Water Distribution SCADA System Upgrade Project Document No. 2025-0149477Tryco General Engineering 2025 CIP Sewer Pipeline Replacement Document No. 2026-0121398Tryco General Engineering for 2023 Alley Paving Improvements Project. Project No. 211009. Document No. 2024-0255242Tryco General Engineering for 2023 Alley Paving Improvment Project. Project No. 211009Tryco General Engineering for 2024 Alley Pavement Improvement Project. Project No. 211910. Document No. 2024-0299336Tryco General Engineering for 2024 Citywide Sidewalk and ADA Ramp Replacement Document No. 2025-0135154Tryco General Engineering for Orange Blossom Trail, Phase 4, Document No. 2026-0138848