Loading...
HomeMy WebLinkAboutContracts & Agreements_165-2016 AMENDMENT NO. 1 TO CONTRACT NO. 15-1001047 MEMORANDUM OF UNDERSTANDING BETWEEN THE SAN BERNARDINO COUNTY TRANSPORTATION COMMISSION, AND THE CITY OF REDLANDS, FOR THE REDLANDS PASSENGER RAIL PROJECT This AMENDMENT No. 1 to Contract No. 15-1001047, a Memorandum of Understanding, is made and entered into by and between the San Bernardino County Transportation Commission ("SANBAG"), and the City of Redlands ("CITY"). (SANBAG and CITY are each a "Party" and collectively "Parties"). The Effective Date of this AMENDMENT shall be the date upon which SANBAG executes this AMENDMENT. RECITALS WHEREAS, SANBAG and CITY entered into a Cooperative Agreement (SANBAG Contract No. 97-026) October 1, 1996, addressing the roles and responsibilities of the Parties for the implementation of a Passenger Rail Station ("STATION") located in City's downtown area, including but not limited to the requirement that the CITY shall contribute $500,000 toward the construction of the STATION; and WHEREAS, SANBAG and CITY entered into a Memorandum of Understanding (Contract No. 15-1001047) on February 12, 2015, addressing the roles and responsibilities of the Parties for the implementation of the Redlands Passenger Rail Project ("PROJECT"); and WHEREAS, the Memorandum of Understanding provides for the potential that CITY may request SANBAG include PROJECT betterments in the PROJECT design and construction with the cost sharing for betterments being negotiated in good faith on a case-by-case basis; and WHEREAS, CITY has requested SANBAG incorporate station betterments ("BETTERMENTS") above the PROJECT's standard station design criteria for the STATION; and WHEREAS, SANBAG is responsible for implementation of the PROJECT and has received environmental approval through a single Environmental Impact Statement/Environmental Impact Report (EIS/EIR) document, in a manner that addresses the requirements of both the Federal National Environmental Protection Act (NEPA) and the California Environmental Quality Act (CEQA) in March 2015 and has obtained or intends to obtain the necessary clearances, permits, authorizations, and funding to perform the engineering, design, and construction necessary to complete the PROJECT. NOW,THEREFORE, it is mutually understood and agreed to by the Parties as follows: 15-1001047-01 Page 1 of 6 ARTICLE T: TERMS & CONDITIONS The Parties agree that the above referenced RECITALS are true and correct in all respects and shall constitute a substantive part of this AMENDMENT and are incorporated herein by this reference. The Parties agree that the BETTERMENTS are station features that are in addition to the STATION described in the Cooperative Agreement, SANBAG Contract No. 97-026, and CITY's responsibilities to pay for the BETTERMENTS are in addition to CITY contributions for the STATION also described in the Cooperative Agreement, SANBAG Contract No. 97-026. SANBAG will support CITY's desired BETTERMENTS provided these BETTERMENTS: A. Are mutually agreed-upon by both SANBAG and CITY; B. Are cost-neutral to SANBAG; C. Do not diminish or conflict with SANBAG's design criteria with regards to safety, security, and platform height; D. Are consistent with all applicable state, federal, local, and industry regulations codes and standards including but not limited to, the Americans With Disabilities Act (ADA), National Fire Prevention Association (NFPA), the American Public Transportation Association (APTA), the California Public Utilities Commission (CPUC), the Federal Railroad Administration (FRA), and the Federal Transit Administration (FTA); E. Do not require additional right-of-way acquisitions; F. Do not conflict with the PROJECT's approved EIS/EIR document and do not require additional environmental analysis; G. Are designed by SANBAG's engineering and design contractors, managed directly by SANBAG; and H. Are defined in a timely manner and do not delay SANBAG's ability to advertise for construction bids as defined in Exhibit"1-A". ARTICLE 2: FUNDING DESIGN COSTS SANBAG agrees to fund the design of the STATION to the extent of the cost of a standard PROJECT station as defined in the PROJECT design criteria. The standard design costs are already accounted for in the SANBAG's contract for final design. The CITY will fund all costs related to the design of the BETTERMENTS requested by CITY. The CITY has allocated an amount not-to-exceed $150,000 for the design of the BETTERMENTS. These design costs are above and beyond SANBAG's budget for the design of a standard PROJECT station, including the station canopies, which are depicted in Exhibit "1-B". As the design of the BETTERMENTS proceeds, SANBAG will invoice CITY for the BETTERMENT design costs incurred by SANBAG and CITY shall reimburse SANBAG within 30 days of receipt of invoice. 15-1001047-01 Page 2 of 6 SANBAG shall inform CITY when$120,000 of the allocated $150,000 has been expended and the need for additional funding beyond the $150,000 allocated. If CITY determines additional funding will be provided to complete the BETTERMENTS, CITY will provide SANBAG written notice of an additional amount to be allocated towards the design of the BETTERMENTS. If CITY determines no additional funds will be allocated towards the design of the BETTERMENTS, SANBAG shall reserve the right to stop design of the BETTERMENTS once the $150,000 allocation is expended. If design of BETTERMENTS are not complete at the time the $150,000 allocation is expended, CITY shall reimburse SANBAG for any additional costs to SANBAG of redesigning the plans to eliminate the uncompleted BETTERMENTS from the design. CONSTRUCTION AND CONSTRUCTION COSTS During the design process, an engineer's estimate will be prepared by SANBAG and its consultants showing the estimated cost of construction of the identified BETTERMENTS prior to advertising for construction bids. Prior to SANBAG advertising the PROJECT for construction bids, CITY and SANBAG will enter into a separate construction agreement relating to the BETTERMENTS for the STATION, where the CITY shall commit to funding the construction of, and construction-related services for, the BETTERMENTS, which will be in addition to the $500,000 to be contributed by the CITY for the PROJECT as specified in Cooperative Agreement, SANBAG Contract No. 97-026. CITY may elect not to proceed with the BETTERMENTS based upon the engineer's estimate. If CITY elects not to proceed with construction of the BETTERMENTS, CITY shall provide written notification to SANBAG of such election within ten (10) business days of receiving the engineer's estimate and will reimburse SANBAG for any additional cost to SANBAG of redesigning the plans to eliminate the BETTERMENTS. ARTICLE 3: RESPONSIBILITIES OF SANBAG SANBAG agrees to the following responsibilities: A. Act as the lead agency for the PROJECT and shall manage, administer, coordinate, and oversee all work related to it, including design of the agreed upon BETTERMENTS as identified in SANBAG approved contracts; B. Monitor all elements related to the BETTERMENTS to ensure schedules, quality, and budget goals are met, including proper identification of the construction bid items related to the BETTERMENTS in the PROJECT advertisement for construction bids; C. Comply with all notice, funding, reporting, and other obligations it may have under Article 2 above, including providing reasonable backup documentation for reports and invoices; D. Notify CITY in writing of any potential budgetary changes of the BETTERMENTS within 30 days of identifying and confirming these changes; and 15-1001047-01 Page 3 of 6 E. Submit to CITY the 60%, 90%, and 100% BETTERMENTS design packages for review and comments and provide a timely written response to any comments formally received by CITY. ARTICLE 4: RESPONSIBILITIES OF CITY CITY agrees to the following responsibilities: A. Provide to SANBAG written requests for services to be performed by SANBAG or their design contractors under this Agreement, including conceptual examples of the STATION BETTERMENTS; B. Comply with all notice, funding, reporting, and other obligations it may have under Article 2 above; C. Pay for all costs incurred by SANBAG in an amount not-to-exceed $150,000 up to the termination date should this AMENDMENT be terminated in accordance with Article 6 — Additional Provisions, Section A; and D. Provide all comments on the 60%, 90%, and 100% BETTERMENT design submittals in writing within fourteen (14) calendar days of receipt. ARTICLE 5: AUDIT & INSPECTION SANBAG shall maintain a complete set of records in accordance with generally accepted engineering, design and accounting principles. Upon reasonable notice, SANBAG shall permit representatives of CITY to inspect and audit all work, material, payroll,books, accounts, and other data and records related to the BETTERMENTS for a period of five (5) years after final payment or until any on-going audit is completed. ARTICLE 6--ADDITIONAL PROVISIONS A. This AMENDMENT shall continue until terminated as provided below: a. Voluntary or involuntary transfer or assignment by either Party hereto without the consent of the other Party of any of the rights, titles, or obligations set forth in this AMENDMENT; b. Mutual agreement of the Parties to terminate this AMENDMENT; c. Any default or breach of the AMENDMENT by either Party which has not been cured within thirty (30) days after notice of such default by the other Party, or such later time as is reasonably necessary if the default cannot be cured within such thirty (30) day period. B. Notwithstanding paragraph A above, this agreement shall be terminated upon thirty (30) days written notice by SANBAG to CITY, without liability of any kind on the part of SANBAG, in the event that: 15-1001047-01 Page 4 of 6 a. The PROJECT or STATION is, for any reason whatsoever, either not funded or defended by SANBAG or by any funding source upon which SANBAG relies for funding for the project; b. Any necessary governmental approval, permit or authorization for either the PROJECT or the STATION is denied, withheld or revoked, including any such action by SANBAG's Board of Directors; or c. Construction of the PROJECT or the STATION is enjoined or otherwise prevented by order of any court or government agency having jurisdiction. In such a case, SANBAG shall have no further obligation or liability, including reimbursement of funds received from CITY for the design of the BETTERMENTS under this AMENDMENT. 15-1001047-01 Page 5 of 6 IN WITNESS WHEREOF, the Parties have executed this AMENDMENT No. I below, SAN BERNARDINO COUNTY CITY OF REDLANDS TRANSPORTATION COMMISSION By: Z� Raymon,d/Wolfe Paul W. Foster, Mayor SANBAG Executive Director City of Redlands Date: �-ILLLI�l Date Attest: By: Sam Irwin, City Clerk Date: APPROVED AS TO APPROVED AS TO FORM: By: By: Eileen Monaghan Teichert Daniel J. Mc ugh. General Counsel City Attorney Date: f Date: CONCURRENCE- By: JeffeAf, I Procurement Manager 15-1001047-01 Page ot 6 XHBIT 1-B // a�w1'dar r Ali✓�r," ""�w��r�w Option A I la fNNelfrO�'ryP4uFN1R"TNUI�um(tt /Nm'4AAf4�UIDiP✓DF9/N4yOl�/Gi///i0U//Il�pfi l ImrwuuvtpBaulImMUN� !mmUi��ilQDIrAANI�� owwwr�o�✓ mremw�m�ett�uhiarvrumaa� � m Iml iawuuv�mm�mm ✓ � wwwuuuum�ms�!ir�l vl P e fi'1FIWtld Wlrv'.wNmrv�PwIlfW �II�mO � V� ��� �� ��� Option B //✓mr ir�9�l��N17,M)),mrmme¢,r ,,m....I , a^�Y�79�Ilt�r��mvo/I�i7�rmr�r^I r, ,� w✓woni iruP�✓y7m✓r�Iri�djDNi,>yi7�✓nuUr,.a„ MIN, �m100" 71, Rol, mry i r Option C 15-1001047-01 EXHIBIT I-A PROJECT SCHEDULE Milestone Date Environmental CIearance March 2015 Begin Design November 2015 60% Design Submittal December 2016 90% Design Submittal April 2017 100% Design Submittal May 2017 Invitation to Bid for Construction August 2017 Begin Construction April 2018 End Construction May 2020 15-1001047-01