Loading...
HomeMy WebLinkAboutContracts & Agreements_2-1947 11 .� r NATIONAL HOUSING AGENCY FEDERAL PUBLIC HOUSING AUTHORITY 760 Market Street San Francisco 2, California January 17, 1947 Maurice Clapp, Mayor City of Redlands Redlands, California Dear Sir;. Attached hereto, is one signed copy of "Notice to Proceed' on Project Number CAL-V-4540, This document is for your files. f for T PLE `DICK Assistant Director for Development & Reutilization Enclosure FQWICTORY SUY VNITEO -ATF.B WAR ONDS STAMPS 1 760 Arket Street San Francisco 2, California. August 30, 1946 In reply please refer to: RVI sCOORDIUATION IT Contract Tko, 11A(VI)vp11-39)-1 Project to. CAL-V-4540 ) George B. Thatcher Co, 4074 Laurel. Canyon Blvd. north Follywood , Calif. Gentlemen: In accordance with the terror of pour Cost-Plus-A—Fixed- Me Contract for Construction dated K ne 5, 1946, to. VA(VI)v h439, particularly Article 10 subparatraphs (a) , (0) , Q) and (g) , you are authorized to proceed with work under ,your Contract, in connection with the c4n— struction of Project No. CAL--V-4540 located in hedlands, n Bernardino County, California and consisting of '72 family dwellin€: units. 1. The effective date of this TSotice to Proceed and for corm.encemant of work under your Contract is September 5, 1046. 2. The number of consecutive calendar days estimated for cOmPletion of all rork on CAL-V-»4540 under your Contract Is 60 t?ays , which establishes Vovember 4, 1946, as the estinateC elate for project completion. S. The structures to be made available for completion of this worm are to be demounted, paekaVed and loaded for shipment at WASI°-4:5147, Port Orchard, :;ashington, by Isley Brothers, Contractors, under separate con- tract, and are as follows: Item A 1 Building 0-3 BI? Units B Units B 4 $16.3 t: n 24 rr n C 3 sr 4-3 rr rt 12 n n D 2 sr 2 3 :r rs 4 u rr 1 rP 10-0 tr n 10 n " it, I ra V..0 to r: ra rr G rr 3-0 rr 1 " 2-0 n n 2 u Gooree 2. Thatcher Co. - 2 Tbu shall , under your Contract;, ship the above structures to thc- erection site as indicated belowe and shall re-erect th.cn in accordance with plans and specifications to be provided you an.? in accord- ance with the foliovinC schedule: It Is planners to re-erect the above buildinLs in the ranner cescribed below. (a) 2011 :inrr in Item A to be combined with eight (0) zero bedroon units to produce Four (nom) buildinFs , 94 feet lonU, each containing- two 2-7R anC two 1-7p units . (b) Buildinrs in 1te- ; to be co-bined with twelve (12) zero bedroon units to produce six (6) build- inCs , 146 feet tonC, each containing four WR units a d. tyro I-BR units . (Six 101 bec'.roor:1 sections to be o7itted and used for naterial. ) (c) 3ua.1c inns In Iter C to be re-erecter, unchanred, each containing four (4) ME units . (d) Duilc inns in Iter D to be con fined aritl four (5) zero bedroom units nroducint two (w) builCin s , TO .feet lone, each containing• two ME and two 1-BR units . 4. The location of tsje site to ti•h icY the structures are to be roved am on ti-_a eb t_.c;y are to be re-erected, together with Aber work in accoMance with your Con- tract, Is in iiedlands , San : ernardino County, Cali- fornia, In accordance with site plans to be furnished you„ 5. A ?ore detailed description of the work to be done which amplifies the ;porn covered :)y article 1, para- " FTanh (al , 1-4 of your Contract ani: explains the in- dividual conCitions and special characteristics of such work will be furnished you. 6. Prevailin;• "ares: (a) The wage rates to be paid in connection with all vor'_c on the erection site are as the attached Schedule of GlassIlIcations ane ' ace Yates titled, "CAL--V-4540, Pedlan s , San Bernardino County, California - General Construction.'' Y GeorCe F. Thatcher Co. - 3 7. The Lstinated (Construction) Cost, in accordance with the Schedule set forte in your Contract , is 03,0€0. , excluding Fixed Overhead and Fixed Fee. C. The fixed Overheat for this work is ti 8,712. 9. The Fixed Fee for this Contract work is 10. Tre followinf sets forth the contputation of: (a) the total X,stirzated (Construction) Cost, (b) the total amount to cover l i.xed Overheat., ant. (c) the total amount of the I'i.xed :'ee , to be pair: to you, in connection !-vith worn cane under this i:otico to Proceed, in accordance rith the provisions of your Contract and the Schedule incorporated therein: ]estimated Pixed I�Ixed Const. Cost Overhead i'ee Total Transport and re-erect 72 FPFA farily units ;.73,080. 8,712. ti 4,596. ti 56,688. 11. Please retain one copy anC return the sixteen re- riaininC copies of this Notice to Proceed, duI7 ac- knowledred and dated by you to this office , atten- tion of the undersigned. TP.t- UITITED STE�T'uS 01 A7 11ICA KXER.AL PLIBLIC i?OUSINICA AUTFOHI N MV"Plow. DICK Assistant Director for Develon,nent ant: 11eutilization NeSion VI ACKITU L-I)GED: cjeorC,e Matcher Co. 4074 Laurel Canyon 71vd. S Orth Yollvwooc.., Calif. 8y Date of receipt �J'/3 1 046 i COIL-Va4540g Rsd1ands fl San Bernardino Cotmty, California General Construction Per dour Air tool op, (Jackhamermen g vibrator) 1.3.5 Asbestos workers 1 .75 tf to Improvers ,- lot mproversrytat year 1.075 2nd 1,,175 3rd 1,30 4th to 1 z 0 Bricklayers 2c,00 Carpenters, journdymen 1„65 Cement finishers 1c775 Electricians 1,10 to apprentices; let 6 months 5% of journey-men's rate 2nd ” to 4.0% 11 It � 5rd 14 4�5% tF to 4th to to 5A% to 0 5th % tQ 6th `� 6�0% 7th c4 €A 70% tc �t tC 8th ao c0 Pl Firemen and oilers 1.325 Glaziers 1,25 Iron workers, reinforcing 1{,775 Laborers, building 1015 Lathers, nail on 107'5 it metal furring IoS5 Mason tenders 1,25 Mortar mixers 1,-25 Painters,, brush 1.50 Plasterers 1:,75 U tenders an25 Plumbers 1,75 to apprent lees o Ist, G months 25% of journeymen's rate 2nd sn ua 3,0% to 11 0 3rd €n ea Z.5% M 69 a3 4th rn a 40% R M ca 5th to to 45% to t4 as 6th to to 50% tate t3 It 7th i8 R 54 t1 GB tti Sth n t0 e�_ 2% 69 CO 15 9th tv 72=1/2%// R 9 (S loth tq to F-O% August 30, 1946 San Bernardino County - 2 Per Hour 'ower equipment operators '. Air compressors � 1045 Concrete mixers, skip 105`75 paving type and movile mixers 1080 Piuupa 1045 Rollers 1065 Tractor hi-lift shovels 11,90 Tractor operators - bulldozersp tamperse scrapersp 1,70 or drag-type shovels or boom attachments 1.775 Trenching machines Universal equipmeut operator (shovela draglineaq 1090 derricks, derrick-barges clamshells or cranes) Roofers, composition 1,43 Sheet metal workers 1°75 Soft floor layers (linoleum) 1050 Drivers of trucks legal payload capacity: Less than 6 t©�:is 1,225 Between 6 and 10 tons 1025 " 10 and 15 tons 1°30 August 30, 1946