Loading...
HomeMy WebLinkAbout7761 RESOLUTION NO 7761 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS ESTABLISHING A FEE AND SERVICE CHARGE REVENUE/COST COMPARISON SYSTEM AND THE AMOUNTS OF FEES LEVIED IN CONNECTION WITH THE CITY'S PROVISION OF REGULATIONS, PRODUCTS AND SERVICES, AND RESCINDING RESOLUTION NO 7671 BE IT RESOLVED by the City Council of the City of Redlands as follows Section 1 Intent Pursuant to article XIIIB of the California Constitution, it is the intent of the City Council of the City of Redlands to iequire the ascertainment of recovery of costs reasonably borne from fees levied therefor in providing the regulations, products of services hereinafter enumerated in the exhibits to this Resolution The fee and service charge revenue/cost comparison system established within this Resolution provides a mechanism to ensure that, pursuant to this Resolution, the fees adopted by the City foi services rendered do not exceed the reasonable estimated costs foi providing the regulations, products of services for which the fees aie charged Accordingly, the City Council, by adoption of this Resolution, adopts the fees desci abed in the attached Exhibit "A" which have been adjusted by CPI in accordance with Section 2, except where the fee has been set by statute or where otherwise deterrnined that no CPI increase is in the best interests of the City for the efficient payment and collection of fees, or un case of Recreation fees, participation in the programs The Recreation fees foi youth annual pass and daily use have been eliminated Section 2 CPI Adtustment The fees referenced within this Resolution shall be increased annually by the City's Finance Director, in July of each fiscal yeas, by an amount reasonably equal to the percent change in the Consumei Price Index—All Urban Users (Los Angeles—Anaheim—Riverside) over the prior year In making such adjustments, the Finance Director may round the amount of the inci eased fee to the nearest dollar foi purposes of facilitating efficient payment and collection Further, the City Manages, or his or her designee, shall undertake periodic reviews of the fees established by this Resolution and provide a written report to the City Council leconimending whether such fees should be adjusted to reflect increased costs or efficiencies in the City's provision of regulations, products and services Section 3 Authority for Administrative Orders The City Managei is hereby delegated the authority to issue administrative orders establishing fee collection and financial procedures for i nplementation of this Resolution All such administrative orders shall be signed by any affected Department Directors and the Finance Di-ectol Section 4 Costs Reasonablv Borne The please "costs reasonably bonne," as used in this Resolution, consists of A All applicable direct costs including, but not limited to, salaries, wages, fi•inge benefits, services and supplies, operation expenses, contracted services, special supplies and any other direct expense incurred -I- I Icderk\ResolutionslRes 7700 7799/7761 fee resolution doex B All applicable indirect costs including, but not Minted to,building maintenance and operations, equipment maintenance, communication, printing and reproduction, and like expenses when distributed on a rational proration system C Fixed asset recovery expenses, consisting of depreciation of fixed assets and additional fixed asset expense recovery chaiges calculated on the current estimated cost of replacement, divided by the approximate life expectancy of the fixed asset A further additional charge to make up the depieciation not previously iecovered and reserved un cash also shall be calculated and considered a cost so as to recovei such urnecovered depreciation over the remaining life of the asset D General over head, expi essed as a percentage, distributing and charging the expenses of the City Council, City Manager, Finance Department, City Clerk, City Treasurer, City Attorney, Human Resources Department and all other staff and support service provided to the entire City oiganrzation E Departinerntal overhead, expiessed as a percentage, distributing and charging the cost of each department director and his or her supporting expenses as enumerated in the above subsections of this section F Debt service costs, consisting of repayment of principal, payment of interest, and trustee fees and administrative expenses fol all applicable bonds, certificates of participation, securities issues of loans Any required coverage factors of added reserves beyond basic debt service costs shall also be considered a cost if required by covenant within any securities, ordinance, resolution, indenture or general law applicable to the City Section 5 Public Hcarrnn Pursuant to California Government Code sections 66016 and 66018, or other applicable statutory i equirements, the City Clerk has caused public notice to be provided as set out in Govenunent Code sections 66016, 66018 and 6062a, and the City Council has received at a regularly scheduled meeting oral and written testimony from staff and members of the public concerriing the new fee pioposed to be established by this Resolution The notice, oral and written presentations and public meeting were provided prior to the City Council taking any action on the new fee established by this Resolution Section 6 Public Data At least ten (10) days prior to the required public hearing described herein, the City Clerk made available to the public data indicating the cost of estimated cost required to support the fee for which the chaige is proposed to be made The data demonstrates that the new fee established by this Resolution is not a tax, that the amount of the fee is necessary to cover the reasonable costs of the City for the Service for which it is imposed, and the manner in which the costs are allocated to a payor bear a fan and reasonable relationship to the payer's burden on, or benefit received from, the City's governmental activities Section 7 Public Notice Notice of the time and place of the public hearing, including a general explanation of the matter to be considered, has been mailed by the City Clerk at least 14 -2- 1 lcclerk\Resoludons\Res 7700 7799/7761 fee resolution docx days prior to the public hearing to all interested parties who have filed written requests with the City for marled notice of ineetmgs relating to new or increased fees Section 8 Actual Costs/Deposits The actual cost for a regulation, product, service or project is detei pined by the affected City Department Dnectois Initial deposits are detennrned by the amount of time historically spent by City staff on similar projects Whenever seventy five percent (75%) of a deposit has been expended and the department deternines that the estimated actual cost of the project of service will exceed the amount deposited, an additional deposit of such estimated excess amounts shall be required When an additional deposit has been requested, work will be suspended on the project or service when eighty percent (80%) of the deposit previously received has been expended Section 9 Protnosition 26 Determination The City Council hereby funds and determines that the fees referenced within this Resolution are not taxes as defined in Article XIII C Section 1(e) of the California Constitution because the fees aie eithei A Imposed fol a specific benefit conferred or privilege gianted directly to the payors, that is not provided to those not charged, and which do not exceed the reasonable costs in the City of cornferring the benefit or gianting the privilege, B Imposed for a specific goveriuneint service or product provided directly to the payoi that is not provided to those changed, and which do not exceed the reasonable costs to the City of providing the service or product, C Imposed for the reasonable regulatory costs to the City for issuing licenses and permits, performing investigations, inspections, or audits, and the admiinistiative enforcement and adjudication thereof, D Imposed for entrance to, or use of, City property, or the purchase, rental of lease of City property, or E Charges imposed as a condition of property development Section 10 Prioi Resolutions Rescuided Resolution No 7671 of the City council of the City of Redlands relating to fees is hereby rescinded on the effective date of this Resolution, except for the fees identified in this Resolution as becoining effective sixty(60) days after Septembei 19, 2017 Foi the fees identified in this Resolution No 7761 as becoming effective sixty (60) days aftei September 19, 2017, such portions of Resolution 7671 shall not be rescinded until sixty(60) days aftei September 19, 2017 Section 11 CEOA Exernption The City Council hereby finds and determines that the adoption of this Resolution is exennpt from review and under the California Environmental Quality Act ("CEQA") pursuant to Public Resources Code Section 21080(b)(8)(1) and CEQA Guidelines Section 15273 because this Resolution relates to fees and charges foi the purpose of meeting the operating expenses of the City -3- 1 Icclerk\Resolut€ons\Res 7700 7799/7761 fee resolution doex Section 12 Severabilitv Should any part or portion of this Resolution be rendered or declared invalid by a court of competent jurisdiction, including any of the fees identified in the Exhibit to this Resolution, such invalidation of such part or portion of this Resolution, or of any fee, shall not invalidate the remaining portions hereof, of the remaining fees, and they shall remain in full force and effect Section 13 Effective Date This Resolution and the fees established by this Resolution shall become effective on September 19, 2017 except for new or modified fees which apply to the "filing, accepting, reviewing, approving, or issuance of an application, permit or entitlement to use" for a development project, as defined in Goverininent Code section 66000,which shall become effective sixty(60) days after September 19, 2017 ADOPTED, SIGNED AND APPROVED this 19th day of September 2017 l aul Foster, Mayor ATTEST _ow, e Donaldson, City Clerk -4-- I IcclerklResolutions\Res 7700 779%7761 fee resolution docx I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certify that the foregoing resolution was adopted by the City Council at a regular meeting thereof held on the 19th day of September, 2017 by the following vote AYES Councilmembers Harrison, Gilbreath, Barich, Mayor Foster NOES Councihneimber Tejeda ABSTAIN None ABSENT None J e Donaldson, City Clerk Resolution No. 7761 Exhibit A Fees LEGEND Fee Deletea Fee Year (effective as of 1 212 012 01 6) Fees as of 911912017 adjusted for 1 7°%CP1 Adj adjusted for 2 7°%CPI Adj PLANNING DIVISION Resolution No 7671 Resolution No 7761 Service Name r Recovery Fee Year 4 Fee Year 5 1 Concept plan 100% 9 672 ,933 2 Concept plan amendment 100% 3,937 4,043 043 3 Specific plan 100% 9 040 9,284 4 Specific plan amendment 100% 4,115 4,226 5 CUP new construction 100% 6,239 6 407 6 CUP no new construction 100% 2,076 2 132 7 CUP time extension 100% 343 352 8 Revised CUP construction 100% 2,930 3,009 9 Revfsed CUP no construction 100% 1,478 1,518 10 CUP daycare home(13+clients) 100% 2,254 2,315 11 Variance-fence committee 100% 588 604 12 Variance SFR 100% 2,579 2,649 13 Variance comm multifamily 100°% 2,880 2 958 14 Variance parking modification 100% 2,117 2,174 15 Building moving-main structure 100% 1 716 1 762 16 Building moving garage/secondary structure 100% 1 625 1 669 17 CRA major>1 acre 100% 7,031 7,221 18 CRA minor 1 acre or less 100% 5,372 5,517 19 CRA-time extension 100% 282 290 20 Minor commission review 100°l0 1,842 1,892 21 CRA revised major 100% 5,624 5 776 22 CRA revised minor 100% 4,849 4,980 23 Parcel map 100% 4,689 4,816 24 Revised parcel map 100% 3,699 3,799 25 Reversion to acreagelmerger 100% 2,615 2,686 26 Tentative tract map 100% 11 612 11,926 27 Revised tentative tract map 100% 7,748 7,957 28 Subdivision time extension 100% 367 _ 377 29 Lot line adjustment 100% 656 674 30 Certificate of compliance 100% 697 716 31 Negative declaration 100% 5,299 5,442 32 Environmental project assessment 100% 751 771 33 Residential Development Allocation(RDA) 100% 3,585 3,682 1 Fees Exhibit A of Reso 7761 Service Name /Recovery Fee Year 4 Fee Year 5 PLANNING DIVISION Continued 34 jResidential Development Allocation(RDA) alteration of approved protect 100%i 566 € 581 - - --- , ._.-_-.--- ---. ...... - --r- - -- -- - -- - --- 35 !Residential Development Allocation(RDA) transfer of development allocation 100% 553 `; 568 - 0 - - - - - 36 !Home occupation permit review 100%1 47 48 - --- - -37 Temporary Events - `- - -- - 100% t63 ' -- 167 -38 Zone Change commission determination 100%' - -- 2 179 -- -- m_ - 2,238 --- - -- - - ...... - -- -- --------- 39 iZone Change ordinance text amendment 100%, 2,744 ',. - 2,$1$ --- - _. -. - - 40 Zone Chan e- - - - ---- - - 3 625 9 -- - - - 100% 3.5301 - - - - - -- - - 41 -1One sign review - - - 700% -- 633 650 - --_ - 42 ISign program 100%11433 1 433 1 472 ----- - -o - - - - 43 i Flag test 100/1 1 375 1 412 ----- -- - - ---4 - _44_,Sign review by-staff--- 700%, _129.- 132 45 4-`Sign program amendment - - -- ---- _100%` -- - 771 i - - 792 j -- -- - -- - -- _ _- 46 ;Annan[banner permit 100/° 125 128 - -V 47 ;Additional banner display ____ t00% 63 65 -- -- -- --- - - - - -Q, - - - - 46 SEarchli9his - - --- - ._ - ---- ---- - -7{)0/0: T'' 125 - 128 j---- - - i-- - T-- 49 - - ,CUP s[ ns>12oSF _ - 100/0 2,479 -- -- -- - - - 2,546 -- - -- ---------- — -- - - - _ _ -- - --- — --- �{----- -- - 50 _!Demolition50y> r old Historic Designated SFR 100% 890 914 51 - -- 00 - - ;Demolition >SO yr old Historic Designated MF Comm Indstrl - - -- 100%, 890 I 914 -- --- - old le - --- - - - -I - - - - - 52 Demolition>50 yr old Historic Designated Accessory Building _ 10_0% 620 637 53 -.Demolition>50 yr otd Single Family Zones 1000/6, 600 616 _- 5-- - cn - - ----- -- -- -100%,.. i- - --- ---- 35 - - - _ } 54 ,Demolition>50 r old-Mutt[Family,Commercial&Industrial - 635 5652 39 j ------ - Y Accessory y --- - - - -- - -- - ------ 55 Demolition>50 r old Accesso Building 100% 525 1 56 Annexation t00% 6,572 6 749 - 57 1 Service plan for annexation 100% 1 275 1,309 58Pre annexation agreement _ t00/ _ 2,364_ 2,448' 9 preserve_ ---- - ------ --2, -1 --------- - --- ----- 2,409 --- - - - - 61 Sireeilvplan at, removal �- --- --- - t00/a - --- 2,34fi II- - -- ------ 60 'General lanamendment 100%% 5,641 5793 ---- 100% ---- 2.419 - - - ----- 2.484 1 - - -- - - --- 62 ;Appeal Various Fees Paid 100%F 2,095 2 152 --. ---- --- - - -- - ---- • - - - - 63 ;Addendum to planning commission t00% - 1 104 1 134 -- -- - - - - - - - -- - 64 !Continued item byapplicant 100% 3441 353 --- - - - 65 ,Verificationletter basic - - too%. 357 367 - mm _ - - - 66 Verification letter research 100%1 - - 634 i __.- - ---- T-- - -- - - -- -- - -- - --- - -- - --- - -— 651 -- ------ 67 (Temporary occupancy too%! _ 186 191 68 News rack impound fee im - - -- -p--- ------ - - - - ---- -- -----• - 700% 350 1---- - - - - �' 359 ' 69 Development agreement - -- 7o0%i 5,678 ! 5,831 ------ ----- 70 -- contract- - -- T --- --- m _ o _ 2,673 i 71 _;Socio Economic Stud ' Williamson c removal !Preliminary72 Review over one acre 700%;; - 3'399 3 117 _ Y _-_- i 00/o - - - -- 410 ry - - -�° - - -- ---------- - _--- - -- - -- __ - 1 309 - - •- -73 !Pre Li ----- - - 317 ' 74 - ----r Certificate ate of A ew nro rattinesacre or s 100/01 3311 340 75 Certificate of Appropriateness 100%I ._-- 572 _ _ _ - 587 , 76 Demolition -- __ - -y _ i. 389 369 ' 6 Y `-er- - -- - -- - - --- -- -- - -- - - -- _._l. .-- _ - 384 78 Demolition Permit<SO yr old_Multi Family Comgmercial-&Industrial ---100%i _ 374. 7 Demolition Permit 50 r old AccessoryBuilding 700% 399 Permitr oSingle ami ones ° 77 -- � y----- - - 410 : 79 Mills Act loo%i 4461 1 - --- - --- 458 , 2 Fees Exhibit A of Rose 7761 IService Name %Recovery Fee Year 4 Fee Year 5 MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT 80 Environmental Impact Review 100% 364 374 81 Environmental IMPact Report by contract 100% contrac[plus20%administration fee 82 Environmental Impact Report Review 100%. 1 726 1,773 83 Tentative Tract Map 100% 1 365 1,402 84 Revised Tract Map 100% 1,365 1 402 85 Final Tract Map 100% 2,386 2,450 86 Tentative Parcel Map 100% 1,365 1 402 87 Revised Parcel Map 100% 1 755 1 802 88 Final Parcel Map 100%, 2 145 2,203 89 Easement/Dedicabon Review 100% 687 706 90 Conditional Use Permit 100% 991 1 018 91 Commission Review and Approval 100% 991 1,018 92 Building Moving Permit 100% 223 229 93 Lot Line Adjustment 100% 641 658 94 Certificate of Compliance 100% 284 292 95 Street Vacation 100% 1 045 1,073 96 Subordination Agreement/Lien Release 100% 665 683 97 Building Permit-Residential 100% 685 703 98 Building Permit Residential in a mapped development under common builder - 99 Building Permit-Commercialllndustrial 100% 991 1,018 100 Building Permit-Room Addition 100% 128 131 101 Building Permit Commercial TI 100% 128 131 102 Plan Check-Grading Base Fee!0-500 c.y 100%1 470 483 103 Plan Check Grading each addtl 500 cy or fraction thereof,501-5,000 c y 100%! 65 67 104 Plan Check Grading,each addtl 5 000 cy or fraction thereof 5 001-50,000 c.y 100%; 75 77 105 Plan Check Grading each addtl 10,000 cy or fraction thereof,50,001 100,000 c.y 100%. 84 86 106 Plan Check Grading each addtl 10 000 cy or fraction thereof 100,001 200 000 c.y 100% 10 107 Plan Check Grading,X200,001 c.y each adi 10,000 cy or fraction thereof 100%. 6 108 Plan Check Erosion Control SFR 100% 540 555 109 Plan Check Erasion Control-Project Base Fee 100% 1 024 1,052 110 ,Plan Check SWPPP SFR 100% 1,000 1,027 111 Plan Check SWPPP-Project Base Fee 100% 1,321 1,357 112 Plan Check SWPPP Subdivision Lot Fee 100% 138 . 142 Act 113 Plan Check SWPPP-Subdivision Acre Fee 100% 138 142 /acre 114 WQMP BMP Inspection Complex Projects 100% 710 729 115 WQMP BMP Inspection Standard Projects 100% 549 564 116 WQMP BMP inspection Basic Project 100% 388 398 117 Plan Check-Preliminary WQMP-SFR 100% 690 709 118 Plan Check Preliminary WQMP-Project Base Fee 100% 770 791 119 Plan Check Preliminary WQMP-Subdivision Lot Fee 100% 190 195 liot 120 Plan Check-Preliminary WQMP-Subdivision Acre Fee 100% 190 195 /acre 121 Plan Check Final WQMP SFR 100% 1,000 1,027 122 Plan Check-Final WQMP Project Base Fee 100% 1 321 1,357 123 Pian Check Final WQMP Subdivision Lot Fee 100%1 138 142 /lot 3 Fees-Fxhibil A of Reso 7761 Service Name %Recovery Fee Year 4 Fee Year 5 (MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT Continued 124 Plan Check Final WQMP Subdivision Acre Fee 100% 138 142 /acre _ 125 Plan Check Parcel Map-Base Fee 100% 3,323 3,413 126 Plan Check Parcel Map Lot Fee 100% 160 164 /lot 127 Plan Check Parcel Map Acre Fee 100% 29 /acre _128 Plan Check Tract Map-Base Fee 100% 3,805 3 908 129 Plan Check Tract Map Lot Fee _ 100% 95 98 /lot 130 Plan Check Tract Map-Acre Fee 100% 29 /acre 131 Plan Check Street Construction Base fee 100% 1 329 1,365 132 Plan Check Street Construction per sheet 100% 531 545 /sheet 133 Plan Check Storm Drains-Base fee 100% 767 788 134 Plan Check-Storm Drains -per sheet 100% 307 315 /sheet 135 Plan Check Hydrology Study 100% 1,373 1,410 136 Plan Check-Street Lights-Base fee 100% 617 634 _137 Plan Check Street Lights-per sheet 100% 350 359 /sheet 138 Plan Check-Sewer Construction Base fee _ 100% 767 788 139 _Plan Check Sewer Construction per sheet 100% 307 315 /sheet 140 Plan Check-Water Construction-Base fee 100% 767 788 141 Plan Check Water Construction per sheet 100% 307 315 /sheet 142 Plan Check-Traffic Signals New Installations 100% 1 570 1,512 143 Plan Check Traffic Signals Modifications 1 100% 1,071 1100 144 Plan Check Street Trees Base fee 100% 512 526 145 Plan Check Street Trees per sheet 100% 255 262 /sheet 146 Plan Check-Signs and Striping-Base fee 100% 767 788 147 Plan Check Signs and Striping per sheet 100% 307 315 /sheet 148 Encroachment Permit Driveway Approach base 100% 80 82 149 Encroachment Permit Driveway Approach-each 100%. 40 41 /each 150 Encroachment Permit Sidewalk base 100% 80 82 151 Encroachment Permit Sidewalk per sq foot up to 300 SF 0.41 0.42 '/sq ft 152 Encroachment Permit Sidewalk each additonal sq foot over 300 SF 010- /sq ft. 153 Encroachment Permit Cross Gutter/Spandrel base 100% 80 82 /each 154 Encroachment Permit Cross Gutter/Spandrel per sq foot 100% 0.81 0.83 /sq ft. 155 Encroachment Permit-Curb and Gutter base 100% 80 82 156 Encroachment Permit Curb and Gutter per linear foot up to 50 LF 3.05 3 13 (lin fi. 157 Encroachment Permit Curb and Gutter each additional LF up to 200 LF 1.53 1 57 'Ain ft 158 Encroachment Permit Curb and Gutter each additional LF over 200 LF 0.77 079 Alin ft 159 Encroachment Permit Curb/Berm -base 100% 80 62 161 Encroachment Permit Curb/Berm per linear foot up to 50 LF 2.03 2,09 ,(lin ft. 162 Encroachment Permit-Curb/Berm -each additional LF up to 200 LF 1 02 1.04 'lin ft. _ 163 Encroachment Permit-Curb/Berm each additional LF over 200 LF 1 0.51 0.52 Ain ft i 164 Encroachment Permit Crushed Aggregate Base base 100% 80 82 _ 165 Encroachment Permit-Crushed Aggregate Base per sq foot 100% 0.08 /sq ft. 166 Encroachment Permit Asphalt Pavement base 100% 80 82 167 Encroachment Permit Asphalt Pavement persq Foot 100%1 008 /sq ft 168 Encroachment Permit Street Light base 100% 80 82 169 Encroachment Permit-Street Light -each 100% 1 40 41 /each 4 Fees-Exhibit A of Reso 7761 Service Name %Recovery Fee Year 4 Fee Year 5 I MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT Continued 170 Encroachment Permit Traffic Signal New base 100% 80 82 171 Encroachment Permit Traffic Signal-New-each 100% 2,387 2,451 leach 172 Encroachment Permit Traffic Signal Modification base 100'/ 80 82 173 Encroachment Permit-Traffic Signal-Modification each 100%I 1,870 1 920 leach 174 Encroachment Permit-Reinforced Concrete base I 100% 80 S2 I 175 Encroachment Permit Reinforced Concrete-per cubic yd 100% 221 124 /cubic yd I 176 Encroachment Permit Storm Drain Pipe-base 100% so 82 177 Encroachment Permit Storm Drain Pipe per linear foot up to 100 LF 4.84 4.98 Ain ft 178 Encroachment Permit Storm Drain Pipe each additional LF 077 0.79 Ain ft. 179 Encroachment Permit Curb Inlet/Outfet_Structures-base 100% 80 82 180 Encroachment Permit Curb Inlet/Outlet Structures each 100% 40 41 /each 181 Encroachment Permit-Storm Drain Manhole/Junction Box-base 100% 80 82 182 Encroachment Permit Storm Drain Manhole/Junction Box-each 100% 40 41 /each 183 Encroachment Permit Curb Core base 100% 80 82 184 Encroachment Permit Curb Core each 100% 40 ' 41 /each 185 Encroachment Permit-Sewer Main base 100% 80 82 186 Encroachment Permit Sewer Main per linear foot up to 50 LF 161 165 Ain ft 187 Encroachment Permit-Sewer Main each additional LF 0.26 0.26 Mn ft 188 Encroachment Permit Sewer Manhole base 100% 80 82 189 Encroachment Permit Sewer Manhole each 100% 40 41 /each 190 Encroachment Permit-Sewer Cleanout base 1013 80 . 82 191 Encroachment Permit-Sewer Cleanout each 100% 40 41 leach 192 Encroachment Permit-Sewer Lateral base 100% 80 82 193 Encroachment Permit-Sewer Lateral each 100% 40 41 leach 194 Encroachment Permit-Water Main-Potable-base 100% 80 82 195 Encroachment Permit-Water Main Potable per linear foot up to 50 LF 1 61 1 65 Ain ft. 196 Encroachment Permit Water Main-Potable each additional LF over 50 LF 0.26 0.26 Ain ft. 197 Encroachment Permit Water Main Non-Potable-base 100% 80 82 198 Encroachment Permit Water Main Non-Potable-per linear foot up to 50 LF 1 61 165 Ain ft. 199 Encroachment Permit Water Main Non Potable each additional LF over 50 LF 0.26 0.26 Ain.ft. 200 Encroachment Permit Water Service Lateral-base 100% 80 82 201 Encroachment Permit Water Service Lateral-each 100% 40 41 /each 202 Encroachment Permit Fire Hydrant Assembly-base 100% 80 S2 203 Encroachment Permit Fire Hydrant Assembly each 100% 40 41 /each 204 Encroachment Permit Water Shutdown-base 100% 80 82 205 Encroachment Permit Water Shutdown each 100°1x, 40 41 /each 206 Encroachment Permit Fire Service-base 100% 80 82 207 Encroachment Permit Fire Service-each 100% 40 41 /each 208 Encroachment Permit Excavation Trench Street Cut base 100% 8082 209 Encroachment Permit Excavation,Trench Street Cut per linear foot up to 50 LF 1 61 1.65 Ain ft. 210 Encroachment Permit Excavation Trench Street Cut each additional LF over 50 LF 0.26 0.26 Ain ft ' 211 Encroachment Permit Street Patch base 107 80 1 82 J 212 Encroachment Permit-Street Patch per sq ft up to 200 SF 017 017 /sq ft. 213 Encroachment Permit Street Patch each additional SF over 200 SF 0 12 /sq ft 5 Fees Exhibit A of Reso 7761 Service Name %Recovery Fee Year 4 Fee Year 5 MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT Continued i 214 Encroachment Permit Processing Fee 100%, 315 324 215 Encroachment Permit SIPJPIA Projects 1°/of bond amount _ 1%of bond amount 216 Grading Permit,Base Feel 0-500 c.y. 100% 541 556 217 Grading Permit each addtl 2,000 cy or fraction thereof,501 10,000 c.y 100% I 65 1 67 218 Grading Permit,each addtl 5,000 cy or fraction thereof 10 001 100,000 c.y 100% 78 80 219 Grading Permit each addtl 10 000 cy or fraction thereof,100,001-200,000 c.y 100% 10 220 Grading Permit,>200,001 c.y each addtl 10 000 c.y or fraction thereof 100% 7 221 Permit Truck Route(up to 5 days) 100% 69 71 222 Permit Wide Load 100% 69 71 223 Permit Outdoor Dining New 100%0 283 291 224 Permit Outdoor Dining-Annual Renewal 100% 154 158 225 Permit Outdoor Display New 100% _ 283 291 226 Permit Outdoor Display-Annual Renewal 100% 154 158 227 Permit Parklet 100% 276 283 228 NPDES Program Fee Industrial-High 100% 160 164 229 NPDES Program Fee,Industrial-Medium 100% 79 81 230 NPDES Program Fee Industrial-Low 100% 33 34 231 NPDES Program Fee Commercial High 100% 160 164 232 NPDES Program Fee Commercial-Medium 100% 79 81 233 NPDES Program Fee Commercial Law 100% 33 34 234 SWPPP preliminary check 100% 2,308 2,370 235 SWPPP final check erosion control pian 100% 2,308 2,370 236 WOMP preliminary check 100% 2,308 2,370 237 WOMP final check erosion plan 100% 2,308 2,370 238 NPDES Inspection Construction-High-Non-rainy season priority once 100% 492 505 239 _NPDES Inspection,Construction High- Rainy season priority monthly 900% 492 505 240 NPDES Inspection Construction Medium Non-rainy season,priority once 100% 245 252 241_ NPDES Inspection,Construction Medium Rainy season priority monthly 100% _ 245 252 242 NPDES Inspection Construction Low Non-rainy season,priority once 100% 245 252 _ 243 NPDES Inspection,Construction Low- Rainy season priority monthly 100% 245 252 244 NPDES Inspection Construction Out of Compliance Site,weekly 1UD% 492 505 245 NPDES Testing Chlorination Removal Discharge Testing per pipeline 100% 124 127 246 NPDES Testing pH testing per discharge per pipeline 100% 125 128 247 Public Improvement Agreement _ 100% 975 1,001 248 Landscape Covenant 100% 854 877 249 Landscape Covenant wlCaltrans Agreement 100% 1096 1,126 250 Water Efficient Landscape plan 100% 775 796 2_51 Pian research records request,per hour 100% 106 109 252 Traffic Commission Request 100% 253 Street Name Sign Installation 100% 550 565 254 Stop Sign Installation 100% 669 687 6 Fees Exhibit A of Reso 7761 Service Name %Recovery Fee Year 4 Fee Year 5 QUALITY OF LIFE DEPARTMENT 255 Vacant ahandoned properly registration 100% 86 88 256 Airport gate card new _ 100% 24 Delete(moved to Airport Fee Reso) 257 Airport gate card-renewal 100% 15 Delete(moved to Airport Fee Reso) 258 Street Tree Permit-Street Tree Removal 5o% 79 81 259 Street Tree Permit Street Tree Trimming 50% 66 68 260 Street Tree Permit Street Tree Planting 500/. 76 78 261 Street Tree Permit-Street Tree Relocation 50% 130 134 262 Street Tree Permit Processing Fee 50% 37 38 263 Park Reservation-Prospect Park Sign 50% 58 60 264 Park Reservation-Redlands Bowl 50% 113 116 265 Park Reservation Sewell Theatre 50% 113 116 266 Park Reservation Sylvan Park 50% 113 116 267 Park Reservation Other Parks 50% 87 89 268 Rental Dwelling Permit <1 acre 100% 78 80 269 Rental Dwelling Permit 1 3 acres 100% 92 94 270 Rental Dwelling Permit 3.01 5 acres 100% 103 106 271 Rental Dwelling Permit >5.01 acres 100% 113 116 272 Rental Dwelling Permit Reinspection 100% 40 41 7 Fees Exhibit A of Reso 7761 Service Name %Recovery Fee Year 4 Fee Year 5 POLICE DEPARTMENT — 273 Film Permits 100% 415 _ 426 274 Film Permits locally owned and operated video production companies 50% 207 213 275 Background Checks 100% 21 276 False alarm response 100°% 197 202 277 Bicycle license 47% 5 278 CCW permit Statute 100 279 CCW permit renewal Statute _25 CCW MocEification Fee Statute 281 Fingerprint-rolling 100% 25 282 Miscellaneous-permits 100% 105 108 283 Miscellaneous photos 100% 62 64 284 Repossession 100% 19_ 285 Vehicle impound-all others 100°% 240 246 286 Vehicle impound DUI 100% 240 246 287 Taw Services Agreement 100°% 75 77 288 Visa Clearance 100°% 11 289 Cat adoption 6"% 7 290 Dog adoption 10% 12 291 Animal boarding 16% 10 292 Cat release owner 33% 20 293 Cat release-owner <4 months 16% 10 294 Dog release owner 49% 31 32 295 Dap release owner <4 months 32% 20 8 Fees-Exhibit A of Reso 7761 Service Name %Recovery Fee Year 4 Fee Year 5 POLICE DEPARTMENT continued 296 Shelter apprehension cat 19% 10 297 Shelter apprehension livestock large 76% 41 42 298 Shelter apprehension livestock-medium 57% 31 32 299 Shelter apprehension livestock small 38% 20 300 Shelter apprehension unaltered 1st _ Statute 35_ 301 Shelter apprehension,unaltered 2nd Statute 50 302 Shelter apprehension unaltered 3rd Statute 100 303 Trap rentals 100% 57 59 304 Dog Vaccine 100% 23 305 Cat Vaccine 65% 15 306 Massage therapist permit 100% 105 108 307 Massage Therapy Business Owner permit-initial 100% 388 398 308 Massage Therapy Business Owner permit-renewal 100% 199 204 309 Solicitor permit 100% 105 108 310 Taxi Driver permit(3 yr permit) 100% 293 301 311 Tow Truck Driver permit 100% 75 77 312 Adult Oriented Business permit 100% 346 355 313 Adult Entertainer permit 100% 105 108 314 Remote Bingo 100% 557 572 315 Cat-Spay 57% 28 316 Cat Neuter 85% 28 317 Dog-Spay (up to 30 lbs) 78% 52 53 318 Dog Spay (31 501bs) 56% _ 52 53 319 Dog Spay (51 to 75 lbs) 51% 52 53 320 Dog Spay (76 100 lbs) 37% 52 53 321 Dog Neuter (up to 30 lbs) 93% 52 53 322 Dog Neuter (31 -50 lbs) 63% 52 53 323 Dog Neuter (51 to 75 lbs) 56% 52 53 324 Dog Neuter (76 100 lbs) 44% 52 53 325 Cost Recovery Delinquent Parking Citations 100% 9 Fees Exhibit A of Reso 7761 Service Name %Recovery Fee Year 4 Fee Year 5 FIRE DEPARTMENT 326 False alarm residential 100%1 147 151 ------------- -------- 327 False alarm commercial 100%! 263 270 ------------ 328 lPlan review consultations(hourly fee) 100% 167 172 329 �Planreview prevention engsnee ring 100%1 288 280 ---------- 330 !Plan review fuel dispensing 100%1304 312 -------- ------------ 331 !,Plan review hood&duct 100%1 267 274 332 i'Plan review medical gas 10* 267 274 i -- -- ----------- ------ ------°-- — — 333 ----- 333 Planreview portables 100%1' 304 ---- ------------ ----- ------- 334 -!Plan review spray booths 100%1- 267 274 STATE MANDATED FIRE MARSHAL INS PS 335 !Insp care facilities/churches 235241 ---------- 336 Insp pre school/school/day care 100%:i 204 ------ --- ------ --- J 337 'Insp high rise 100% 404 1, 415 338 JInsp daycare/foster care(6 or less) 100%, 163 1 167 ---------- 339 PREVENTION INSPECTIONS 340 1lnsp aprtmnt/condo 1 10 units 100%1 187 192 341 Ins aprtmnticondo 11 30 units 100% 224 f 230 342 Ilnsp aprtmnl/condo 31 50 units 100% 1 231 237 343 Insp aprtmnt/condo 57 75 units 1 304 312 344 Insp aprtmnticondo 76 100 units too,/'' 304 312 345 Insp aprtmnt/condo 101+units 100W 379 l 389 346 Insp cert of occupancy ordinary hazard 100W 1 170 175 347 Insp cert of occupancy high hazard t00% 206 212 348 Insp commercial B 2 100%� 149 1531 -------------- --------- ----------- -- ------- 349 ;Insp commercial Xmas tree lom 149 1"53 350 Usp commercial high hazard 100%! 206 1 212 351 :Insp motels 1 20 units 100%i 1,58 1621 352 Insp motels 21 40 units 1000W 194 199 E 4 —----- 353 _Ilnsp motels 41 50 units 100%1 194 199 1 I Insp motels 51+units ---- -'- --l 354 1000/6 231 237 355 linsp-commercial occupancy re inspection 1000/0 mmm- 45 46 ,ENGINE COMPANY INSPECTIONS ----------- 356 Engine company insp ordinary hazard 100%1 1! 137 1 141 357 Engine company insp highhazard 100%1 1 172 177 10 Fees Exhibit A of Reso 7761 Service Name %Recovery Fee Year 4 Fee Year 5 FIRE DEPARTMENT continued - - . _358 PERMIT _359 Aircraft repair hangar permit ' 100% 231 237 _ 360 Aircraft refueling vehicle permit 100% 243 250 361 Compressed gas/LPG permit 100% 243 I 250 362 Covered mall permit 100% 304 312 363 Dry cleaning permit 100% 231 237 364 Dust producing permit 100% 267 274 — 365 Explosives permit 100% 330 339 366 Fruit ripening permit 100% 304 312 367 Fiammablelcombustible liquid permit 100% 255 262 368 Hazardous/toxic!corrosive permit 100% 255 262 369 High piled combustible permit 100% 292 300 370 Junk yard permit 100% 404 415 371 Lumber yard permit 100% _ 330 339 372 Medical gas system permit 100% 267 274 373 Pesticides permit 100% 182 187 374 Pipeline-excavation 1 operation permit 100% 255 262 375 Poison gas permit 100% 255 262 376 Radioactive material permit_ 100% 255 262 _377_ Refrigeration equipt permit 100°! 255 262 378 Repair garage permit 100% 255 262 379 Spray booth permit 100% 255 262 380 Janks permit 100% 381 Welding/cutting permit 100% f 255 262 _ _ _ _ 255 262 382 Bonfire permit 100% 182 187 383 Carnival l fair permit 100% _ 255 262 384 Fireworks permit' 100% 760 _ 781 385 Open flame permit 100% 231 237 ' 386 Parade float permit 100% 158 _ 162 387 Assembly 1000+persons w/stage 100% 330 339 388 Assembly X1000 persons w!stage 100% 330 339 389 Assembly 300+persons no stage 100% 330 339 390 Assembly 50 299 persons no stage 100% 231 237 391 Tents/canopies 100% 231 237 WEED ABATEMENT 392 Weed abatement admin 100/-0 _ _158 235 393 Weed abatement disking" 100% 21 394 Weed abatement mowing-loe* 100% 21 395 Weed abatement hand work"" 100% 21 396 Weed abatement re-inspection 100% 41 42 11 Fees Exhibit A of Reso 7761 �i Service Name %Recovery Fee Year 4 Fee Year 5 FIRE DEPARTMENT continued HYDRANT/HYDRO FLOW TEST 397 Hydrant/Hydro Flow Test Install Hank - - -------- 100%i ---- 317 1 326 ------------- ------- 398 'Hydra nt/Hydro Flow Test Install, 100%1 392 -- ------------ 403 399 'Hydrant/Hydro Flow Test Install 3 tanks100%1 465 478 ----------- ---- --- ---- 400Hydrant/Hydro Flow Test RemGval,ltanks 100* 317 326 ------- -- --------—------ 401 Hydrart/Hydro Flow Test Removal 2 tanks 100% 392 403 402 !Hydrant/Hydro Flow Test Removal,3 tanks -1-00%1 465 478 100W 403 costrecovery 96 ---99 404 Tlow Test Fire Flow 100%j 243 i 250 405-, Inspection/Permit Hourly 100%j 139 143 LIJI-Hourly Permit fees includes 2 inspections For businesses with multiple permits the highest permitted fee will be charged first and then each additional permit fee will be reduced b�! :50% 406 !Alarm System Plan Review Sprinkler monitoring only 100% 147 151 ------------- :Alarm System Plan Review 10 or less initiating devices 100% 407 295 303 408 Warm System Plan Review 11 20 initiating device - 100% 442 ---------- 409 Alarm System Plan Review,20 or more devices -- - 100% 591 607 ------------ 410 ;Sprinkler System Plan Review 25 heads or less 100% 295 303 ------- ------------------ 411 !Sprinkler System Plan Review 26 99 heads 100% 442 454 412 Sprinkler System Plan Review 100 heads or more 100% 591 607 --------- -------- ------------ 413 Smoke Control System Plan Review,review of rational analysis 100% lal , 1,213 --------------- 414 Smoke Control System Plan Review,Design Testing 100% 1 181 1213 415 jInspection 100 000 sq ft or less 100% 147 151 : 416 iInspection 100 000 500 000 sq It 100% - —------ 222 228 417 Inspection 500 001 sq ft and above 100% 295 303 418 �Const Automatic fire extinguishing system,25 heads or less 100% 295 303 ---------- 419 Const Automatic fire extinguishing system 26 99 heads454 442 ------ ------ 591 420 Const Automatic fire extinguishing system 100 heads or more 607 Const Kitchen Hood and Duct t 100%, 295 1 303 422 [Const Clean Agent System 100* 295 E303 ------------ 423 �,Const Battery Systems 100%11 303 424 �Const Compressed Gases 100%1 295 303 ---------- ----- ------ 425 �Const Cryogenicfluids 100%1i 295 303 • --- ------------- ---- ------ 426 Const Alarm and detection systems/equip sprinklers monitoring only 100%� 147 151 --- -------- ------- 427 lConst Alarm and detection systems/equip,1G or less initiating devices 100%ii 295 1 303 -------------- 428 Const Alarm and detect(on systems1equip,11 20 initiatling devices 100%i 591 607 429 Const Alarm and detection systems/equip 20 or more devices 100%i --------------- 886 910 430 'Const Fire pumps and related equipment 10W 591 607 ---------------- --- .;---------- 431 'Const Flammable and combustible liquids 100%� 295 303 432 :Const Hazardous Materials 100W 591 1 607 12 Fees Exhibit A of Reso 7761 Service Name - -- i/Recovery i Fee Year 4 i Fee Year 5 i 433 Const Industrial ovens 1pp4/o - ---- - -- - ---- - - - - -- - 295; - -- -- 4344 --- --- - Const LP gas 100% --- - -- - - 303 442 , ----- 454 --- - -? 435 Const Private fire hydrants 100% ----------- --------- Const Spraying --- - - -- - - - - -- -- - -- -- --- - - -- - 436-1- or d€PP g -, -- --- -- - --------- ---- - [00% ---- - 442 - 454 in --- - _ --------- -- - -- - --- --- _-i - --*-- 437 (Const Standpipe systems tgOc/a ----- ------- — Y- - -------- --------- - ---------- -- — - -< - - - -- - I 442 . 454 ' II 438 (Const Temporary membrane structures and tents t00% 147 151 - , g m _ 9 _- - - �° - - - - -- -- - - - --- - - 439 Includes 3 hours standby - - - _-_ -- ___ - The fee listed is the admninistrative processing fee Any vendor charges will be added to the processing amount _ -High Fire Hazard Area Landscaping in 10010 _ _ 120 123 I *. -- 13 Fees Exhibit A of Reso 7761 Service Name Recovery Fee Year 4 Fee Year 5 RECREATION DIVISION FIELD RENTAL RATES_ Rental Fields. Texonia Park(Texas Street and Lugon!a Ave.) Community Park(Church Street and San Bernardino Ave} - Brookside Park(Brookside Avenue) Grafton Park(Independence Avenue) Clement School Ball Fields and Tennis Courts"(Pennsylvania Avenue) Orangewood School'(Stuart Avenue) Joint Use Agreement with Redlands Unified School District User Groups Group 1 City of Redlands-City operated recreation programs and activities This group receives I , first priority for field use and allocations No rental fee Group 2 Organized Youth Sports--Registered non profit or charitable group with registered non- profit status with the Slate of California complete with tax exempt identification number offering organized youth sports All participants shall be under 18 years of age Fees noted below Group 3 Adult Sports,CDmmunitylBusiness Groups and/or individuals--League or organized sports or activities for participants 18 years of age or over tournaments and other activities requiring _ field reservations Fees noted below Rental Rates 440 GROUP 2 Field Use - - Field Lighting $15.(hour 441 GROUP 3 Field Use $2Wur per field Field Lighting S 301 hour Field Lighting at Crafton Park and Community Park is paid directly to utility provider by user 442 Miscellaneous Staff Call-Out fee is$40 per hour and shall be assessed when city staff $40 per hour is called to a field for any of the following reasons-confirm field reservations,turn lighting onloff clean garbage/debris left by users resolve complaints andlmake repairs resulting from abuse by user 14 Fees-Exhibit A of Reso 7761 Service Name I Recovery Fee Year 4 Fee Year 5 FACILITY RENTAL RATES Facilities. Redlands Community Center(111 W Lugonia Avenue) Redlands Senior Center(111 W Lugonia Avenue) Joslyn Senior Center(21 Grant Avenue) User Groups Group 1 City of Redlands/Public Agency City personnel(for departmental,city and/or regional business) City Sponsored Groups Council Members Council appointed commissions committees and task forces public agencies with reciprocal agreements No fee No Deposit Required Group 2 Redlands Non profit Organization and Community Groups Registered non profit or charitable group with registered non profit status with the State of California complete with tax exempt identification number;offering free membership open to the general public,groups sponsoring activities open to the public free of charge. No fee $200 deposit required Group 3 All non resident individuals or groups,other community groups,businesses and/or individuals groups soliciting donations or charging admission groups sponsoring activities closed Jo the general public Fees noted below $200 deposit required 443 GROUP 3 Facility/Room Rates _ Gym 1!hour $61 1 hour Racquetball Court 01 hour $201 hour Multipurpose Rooms L251 hour $25 1 hour Kitchens 1 flat fee $51 flat fee Computer Class Room 301 hour $301 hour Conference Room _ 15 hour $15 hour Game Room(CC) 5 hour $25 hour Building 07 1-4 hours 5 707 1 4 hours' A& Si each additional hr $51 eachadd= 444 Ford Park Tennis Court Facility Use Fee $251 hour $3 11/2 hour or$511 hour 445 Ford Park Raquetball Courts Use Fee $3 1 112 hour or$511 hour 446 Tennis Court Lighting $2.50 1 hour 447 Tennis Machine Rental $351 hour $101 hour 448 Refundable Security Deposit $50 449 Delivery and Pick-up Fee $50 450 Miscellaneous Charges for All Groups Refundable Cleaning Deposit 400 flat fee $200 flat fee Attendant/Staff Supervision Fee 0 per attendant 5 20 per attendant Fees shall be prepaid to guarantee reservation Refunds will be issued less a 10%administrative fee A processing fee of$10 shall be assessed when applicants and/or participants request deviation from the standard processing time of five business days All user groups shall comply with the City's established field and facility rental policies Rental agreements may be negotiated for continuous use of the fields and/or facilities The rates contained in these agreements may vary from the structure presented above, and shall be approved by City Council. 15 Fees-Exhibit A of Reso 7761 Service Name %Rewvery Fee Year 4 Fee Year 5 RECREATION DIVISION RECREATION SERVICES/PROGRAMS/ACTIVITIES ADULT SERVICES,PROGRAMS AND ACTIVITIES t 451 Adult Open gym 452 Adult_Open Racquetball reon 16 a $1 1 he arson 18 a $2 I ho - [esident resident annual pass resident $25 annual pass resident annual pass-non-resident $35 annual pass non resident 453 Adult Classes 454 Adult Family Trips /o Cost of Trip 100%Cost of Trip 455 Annual Pass TM 1 person 18 and over resident $251 person 1 Band over resident 1 0.,Game Room,Gym Usage, $351 person 18 and over non $351 person 18 and over non-resident Racquetball and Tennis Courts resident $50 for group homes dLP for group homes SENIOR SERVICES,PROGRAMS AND ACTIVITIES — - — 456 Bingo $1350 /ter 457 Senior Tournaments 01 tournament per person $201 tournament per person 0 I tournament per team $100 1 tournament per tea 458 Senior Classes 459 Trips W/O cost of trip 100%cost of trip 460 Senior Transportation Program &JAL person each way $ 1 75 I person each way Bus Pass _ r 10 one�way trips $17 50 for 10 one-way trips Senior Patron A Patron is any senior making a voluntary donation in excess of$20 per year to a ther senior center Patrons shall receive identification cards and shall save$5 on senior services programs and activities YOUTH SERVICES,PROGRAMS AND ACTIVITIES 461 Youth Annual Pass a No Charge for use at Community Center 462 Teen Dances {person $3 1 person 463 Teen Trips Scholarships are available for all youth services,programs and activities To qualify,scholarship recipients shall meet income requirements as established by the Department of Housing and Urban Development for San Bernardino County 16 Fees Exhibit A of Reso 7761 Service Name %Recovery Fee Year 4 Fee Year 5 RECREATION DIVISION MISCELLANEOUS 464 Contract Classes 465 Special Events %cost o 466 Boutique Spaces 01 day per FTUTM $201 day per space with table $20/day per space with table 467 Garden Plot Spaces I,,/. y Gardens $201 year per plot SmileyGardens $201yearperplot ent Gardens$301 year per plot Clement Gardens$301 year per plot ia Gardens $351 year per plot Lugonia Gardens $351 year per plot 468 Program Attendant Fee hour per employee $201 hour per employee 469 Early Registration' discount for individuals and teams registering a minimum of 30 days prior to the close of registration(appliesto at Adult,or Senior Gasses or pgrograms requiring registration.) 470 Multiple Registration iscount for multiple family members registering in the same class or program(applies to all Youth Adult or r classes or pgrograms requiring registration FINANCE DEPARTMENT 471 Business License new 100% 68 70 472 Business License-renewal 100% 23 23 473 Yard Sale Permit 100% 3.45 4,00 474 Returned Check 100% 40 41 475 Dog licensing 100% 23 476 Dog licensing spay/neutered 50% 477 Dog licensing replacement tag 100% 478 State CASp Svc Fee' Statute " SB 1186,Disability Access Legislation(eff 1/1/2013 1213112018) imposes a$1 00 State fee an applicants for new and renewal business licenses with 70%retained by the City an 30%remitted to the State LIBRARY SERVICES 479 Reservation of library materials 26% /item 480 Non resident fee 96% annually OFFICE OF THE CITY CLERK 481 Passport Execution Fee(Set by Stale Department) 100% --- 52 482 Passport Photo Fee 100% 17 Fees Exhibit A of Reso 7761 CITY OF REDLANDS Building Department Schedule of New Construction Fees PLAN CHECK&INSPECTION FEES COMBINED Resolution No 7761 2 7%CPI Adjustment Construction Type Construction Type Construction Type IA,IB IIA,IIB,IIIA,1116,N VA,VB Cost for Cost for Cost for Base Cost @ Each Base Cost 0 Each Base Cost @ Each IBC Project Size Threshold Additional Threshold Additional Threshold Additional Class IBC Occupancy Type Threshold size 100 W, Size 100 sf" Size 100 sf' 477 A-1 Assembly uses usually with fixed seating, 2,000 $7,096 $519 $6,033 $475 $4,970 $4.31 Greater intended for the production and 10,000 $7,510 $12.52 $6413 $10.57 $5,3141 $8.61 Than 50 viewing of the performing arts or 20,000 $8,762 $4A8 $7468 $3.46; $61751 $2.84 Occupant motion pictures 40,000 $9,578 $4.45 $8,161 $375 $6744 $3.05 100,000 $12,250 $1.55 $10,412 $132 $8,5731 $1.09 200,000 $13,801 $6 71 $11 729 $5.67 $96581 $4.64 47L�_A-2 Assembly uses intended for food and/or 1,000 $10152 $1462 $8,603 $13.42 $7,053 $12.23 drink consumption 5,000 $10737 $3312 $9139 $2793 $7,542 $2273 10,000 $12,3939 $1169 $10,536 $9.88 $8,679 $8.07 Restaurant 20,000 $13,563! $12,47 $11,524 $10.51 $9,486 $8.54 50,000 $17,303 $4.22 $14,676 $3.58, $12,050 $2.95 - 100,000 $19,413 $19.03 $16,468 $16.08 $13,524 $1314 47.9 A-3,A-4 Assembly uses intended for worship, 1000 $9 696 $13.85 $8,218 $1270 $6,740 $11.56 Assembly uses intended for viewing 5,000 $10,249 $31 69 $8726 $2672 $7,203 $2176 of outdoor sporting events and activities with 10,000 $11,834 $11 18 $10063 $9.46 $8,291 $773 spectator seating 20,000 $12,957 $11.88 $11 008 $10.01 $9,064 $814 50,000 $16,517 $4.04 $14,011 $3 439 $11,5051 $2.82 100,000 $18,535 $1815 $15,726 $15.34 $12,9181 $12.53 479.1 A-4 See Above 500 $7634, $2212 $6,652 $20.29 $5,470 $18.46 2,500 $8,27T $5075 $7,058 $42.81 $5,8401 $3487 5,000 $9 545 $17.88 $8128 $1512 $6,7111 $12,36 10,000 $10,439. $19 03, $8,885. $16.041 $73291 $13.05 25,000 $13,29 $6,45 $11,290 $5.4T $9,2861 $4.50 50,000 $14,906 $29.04 $12,659 $24.54 $10,4121 $20.05 479,2 A-5 Assembly-Outdoor Activities 1,500 $9 99& $9.54 $8,468 $872 $6,939 $791 Amusement Park Bleacher Stadium 7,500 $10567 $2271 $8,990 $1914 $7,414 $15.57 15,000 $12,270 $7.67 $10,426 $5.49 $8,582 $5.30 3000 $13,421 $8.34 $11 399 $703 $9,377 $5 71 _ 75,000 $17176 $279 $14,561 $2,36 $11.946 $1 94 150,000 $19,267 $12.59 $16,332 $1063 $13,397 $8.67 479.E A A Occupancy Tenant Improvements 1 000 $6,013 $8.40 $6,778 $7.46- $5.5441 $6.53 _ 5,000 $8,348 $25.68 $7,077 $21.65,` $5,8061 $1761 1 10,000 $9,632 $9.41 $8160 $7 97' $6,686 $6,53 20,000 $10,574 $9.54 $8,956 $8.00 $7,339 $6.45 _ 50,000 $13,436 $3.27 $11356 $2.77 $9,274 $2.27 100,000 $15,069 $14.68 $12,740 $12.35; $10,412 $10.02 48Q_B Business-Professional Office _ 1,000 $8,591 $13.32 $7304 $12.35!. $6,018 $11.37 Buildings or spaces for office professional 5,000 $9124 $2731 $7,798 $2311 $6473 $18.91 or service type transactions including 10,000 $10,489 $9,94 $8,953 $8.43 $7,418 $6.93 storage of records and accounts, 20,000 $11,483 $10.36 $9797 $8 75 $8,111 $7 15 Restaurants wl less than 50 occupants 50,000 $14,592 $3.57 $12,424 $3.05 $10,255 $2.53 100 000 $16,379 $15.99 $13,950 $13.56 $11521 $11 t_3 481 B B Occupancy Tenant Improvements 1,000 $7197-1 $780 $6,098 $6.97 $5,000 $6 14 Buildings or spaces for office professional 5,000 $7,509. $2318 $6,378 $19.57 $5,246; $15.95 or service type transactions,including 10 000 $8,668 $8,46 $7,355 $7 17 $6,043 $5.89 storage of records and accounts 20,000 $9,514 $8.53 $8,073 $7.15 $6,63 $578 Restaurants wl less than 50 occupants 50,000 fff $12,072 $2.97 $10,219 $2.53, $8,385- $2.08 100,000 $13,559► $1317 $11,482 $11.09 $9405 $9.02 462 E _ Educational 500 $7,946 $21 83 $6,746 $2001 $5,546 $1818 Bul1d'sngs or rooms used by more than 6 2,500 $8,383 $49.99 $7146 $42.09 $5,909 $3419 persons for educational purposes up to the 5,000 $9,633 $1789 $8,199 $15.08, $6764 $12.27 J12th grade 10,000 $10,527 $1910 $8,952 $16.09 $7,378 $13.08 Day care for 6 or more children older than _ 25,006 $13,392 $6.44 $11 366 $5.47 $9,340 $449 2.5 yearsof age 50,000 $15,002 $29.19 $12733 $24.65' $10,463 $2011 4621 E E Occupancy Tenant improvements 1,000 $7,296 $7.65 $6185 $6.84 $5,072 $6.03 Buildings or rooms used by more than 6 5,000 $7,603 $22.29 $6,458 $18.82 $5,314 $15.35 persons for educational purposes up to the 10,000 $8717 $8.5& $7,400 i $7 2& $6,082 $5.97 12th grade 20,000 $9,575 $8.44 $B 12� $7.08- $6,679 $572 _ Day care for 6 or more children older than 50,000 $12,10% $2.91 $10,249 $2,4$I $8,394 $2.04 zz years of age 100,000 $13,562 $1316 $11,487- $11 08l $9,412 $9.01 18 Resolution No 7761 Fxhibit A Building and Safety Construction Cost Calculations Resolution No 7761 2 7%CPI Adjustment Construction Type Construction Type Construction Type IA,18 IIA,IIB,IIIA,IIIB,N VA,VB Cost for Cost for Cost for Base Cost @ Each Base Cost @ Eacf1 Base Cost @ Each IBC Project Size Threshold Additional Threshold Additional Threshold Additional Class IBC Occupancy Type Threshold size 100 sf' Size 100 sf' Size 100 sf" 483 F 1 Factory Industrial-Moderate Hazard 20 000 $8,026 $3.6-11 $6,863 $317 $5702 $2.66 Factory and industrial uses that include the 50,000 $9128 $3.25 $7,814 $2.77 $6 501 $2,30 fabrication or manufacturing of Moderate 100,000 $10755 $1 15 $9,202 $0.96 $7 649 $0.80 and Low Hazard materials 250000 $12,486 $1 05;, $10,668 $0.8&A $8,851 $072 500,000 $15,105 $0.89 $12,877 $0.75 $10 648 $0,60 1,000,000 $19542 $1 92 $16,605 $1.63, $13,667 $134 483.1 F F Occupancy Tenant Improvements 2,000 $4,694 $51N $4,034 $4.79. $3,375 $4.48 Factory and indusiriai uses that include the 10,000 $5,103 $942 $4,417 $8.01 $3732 $6.61 fabrication or manufacturing of Moderate 20,000 $6,044 $27% $5,218 $2.38r $4,392 $2.00 - and Low Hazard materials 40,000 $6,596 $311 $5595 $2.64, $4792 $2.17 100,000 $8,462 $115-: $7279 $0.99 $6,096' $0.83 200,000 $9,609 $4.65s $8,265 $3,97 $6,927 $3.30 48,k_H1 H-2 High Hazard Detonalion Hazard 1,000 $4,892 $954 $4184 $8.83 $3,475 $812 H 3,H-4 Deflagration hazard or hazard from 5,000 $5,274 $20.89 $4,537 $17.63 $3,801 $14,37 H-5 accelerated burning Maierials that readily _ 10,000 $6,318 $5.42 $5,418 $4,61 $4,520 $3.80 support combustion,Materials that are 20,000 $6,860 $679 $5,880 $574, $4,906 $4.69 - health hazards 50,0_00 $8,897 $2.45; $7601 $210 $6,306 $174 100,000 $10124 $9.81 $8,648 $8.33 $7174 $6.86 484 1 H See Above 1,000 $4993 $10.5okk $4,280 $9.80 $3,566 $911 _5,000 $5,413 $20.63 $4,672 $17.46 $3,929. $14.29 10,000 $6,444 $5.58F $5,545 $476 $4,644 $3.94 20,000 $7003 $6.82 $6,021 $5 78: $5,038 $4.74 50,000 $9,048 $2.48 $7754 $2.12 $6,460 $177 100,000 $10,286 $9.97 $8,816 $8.50 $7,345 $703 465 11 Housing of clients on a 24-hour basis in a 1 000 $6,425 $11 70 $5,472 $10.80 $4,520 $9.91 supervised residenflal environment providing 5,000 $6893 $25,94 $5,904 $21 89 $4,916 $17.83 _personal care services 10,000 $8190 $726 $6,999 $616 $5,808 $5.06 20,000 $8,915 $872 $7,615 $7.36 $6,314 $6.00 50,000 $11,531 $311 $9,823 $2.65. $8115 $219 100000 $13,084 $1277 $11147 $10.81 $9,210 $8.89 48FZ 12 1-3 Medica[ surgical psychiatric,nursing or 1,000 $7,952 $14.62 $6762 $13.50. $5,570 $12.39 custodial care on a 24-hour basis for more 5,000 $8,537 $32.43, $7302 $27.36 $6,066 $22.29 than 6 persons facilities where persons are 10,000 $10,158 $9.07 $8,670 $770, $7181 $6.33 restrained 20,000 $11,066 $10.90 $9439 $9.20 $7813 50,000 $14,335 $3.8& $12,200 $3.31 $10,065 $2.74 100,000 $16,276. $15.9& $13,854 $13.54 $11434 $1112 487 1-4 Day care operations of more than 6 people 1,000 $7482 $13.97 $6,369 $12.96 $5,257 $11 95 - of any age where the care is for less than 5,000 $8,040 $29.27 $6,887 $2473 $5,735 $2019 - 24 hours a day 10,000 $9,504 $8.53 $8,124 $726 $6744 $5.97 20,000 $10,357 $10.05 $8,649 $8.50 $7341 $6.94 _ - 50,000 $13,372 $3.56 $11,398 $3.04 $9,423 $252 100,000 $15151 $14.84 $12,918 $12.60 $10684 $10.37 487 1 I _ I Occupancy Tenant Improvements 1,000 $4,631 $9.93 $3,977 $9.33t $3,323 $8 73 5,00_0 $5,027 $17.8T $4,350 $15.1 G. $3,673 $12.45 10,000 $5,921 $5.20 $5108 $4.44 $4,295 $3.69 20 000 $6,441 $6.08 $5,553k $516 $4,664 $4.25 50,000 $8,268 $2.2.2 $7,102 $191 $5,938 $1.60 100,000 $9,374 $906 $8,056 $774 $6,737' $6.42 488 M Display and sale of merchandise accessible 1 000 $6,887 $13.4& $5,874 $12.53 $4,861 $11.61 to the public 5,000 $7,425 $26.96 $6,376 $22.80 $5,325 $18.65 10,000 $8774 $7.86 $7516 $6.69 $6,258 $5.51 20,000 $9,559 $9.22 $8,184 $7,80 $6,809 $6.39 50000 $12,324 $3,28 $10,525 $2.81 $8724 $2.34 100,000 $13,965 $13.65 $11,929 $11.61 $9,893 $9.58 489 M M Occupancy Tenant Improvements 1,000 $6,526 $13.1T $5,573 $12.29 $4,619 $11.42 5,000 $7,052 $25,68. $6,064 $2174 $5,076 $1779 _- - - 10,000 $8,336 $7.43, $7151 $6.3& $5,966 $5.23 20,000 $9,079 $877 $7784 $7.43 $6,489 $6.08 - 50,000 $11,708 $313' $10,011 $2.68 $8,314 $2.23 100,000 $13,272 $12.96 $11,351 $1104 $9,431 $911 490;R-1,R-2 Transient and nontransient lodging including 2,000 $9,541 $0.61 $8 122 $0,51 $6,702 $0.41 hotels motels apartments and boarding 10,000 $9,590 $15.20 $8,163 $12.67 $6 73a $1014 houses 20,000 $11 110 $3.59 $9,430 $2.99 $7749, $2.39 40,000 $11828 $3.54 $10,028 $2.95 $8,227 $2.36 100,000 $13,951 $1.83 $11797 $1 53 $9643 $1.22 200,000 $15784 $7.36 $13,324 $615 $10,865 $4,921 19 Resolution No 7761 Exhibil A Building and Safety Construction Cost Calculations Resolution No 7761 2 7%CPI Adjustment Construction Type Construction Type Construction Type IA,IB IIA,IIB,]IIA,IIIB,IV VA,V8 Cost for Cost for Cost for Base Cost @ Each Base Cost @ Each Base Cost @ Each IBC project Size Threshold Additional Threshold Additional Threshold Additional Class IBC Occupancy Type Threshold Size 100 sf' Size 100 sf' Size 100 sf 491 R-3,R-3 One and two-family homes Residentially 1 000 $6,318 $4.87' $5,392 $4.06 $4,456 $3.25 R-4 based 24-hour facllity for 6 or fewer clients _ 2,000 $6366 $68.52 $5,433 $571 $4,499 $45.68 of any age Residential care/assisted living3,000 $7051 $4018 $6,004 $33.48 $4,956: $2678 for more than 6 ambulatory clients 4,000 $7,453 $107.6& $8,339 $89.73 $5,223 $7179 5,000 $8,530 515.87 $7,236 $13,22 $5,941 $10.58 10,000 $9,323 $85.59 $7,897 $71.311 $6470 $57.06 492 R-3 REPEAT OF MODEL _ 1,000 $4,683 $3.73 $4030 $311 $3,377 $2.491 One and two family homes 2,000 $4720 $42.64 $4,061 $35.53 $3,401 $28.43 Repeat plan check set at 50%of initial plan 3,000 $5146 $2714 $4,416 $22.62; $3,686 $1810 check per current Master Fee Schedule 4,000 $5,418 $70.20 $4,642 $58.50, $3,867 $46.80 5,000 $6120 $9.69 $5,227 $8.07 $4,335 $6.46 10,000 $6,605 $58411 $5631 $48.67 $4,657 $38.93 49:J,S 1 Storage-Moderate Hazard Repair Garage 500 $4,488. $13.51 $3,829 $12.34 $3 16& $11 17 Motor Vehicles(not High Hazard) 2,500 $4,759 $33.41 $4,075 $28 1 $3,391 $22.89 5,000 $5,594 $9.95 $4779 $8.4Z $3,963, $6.89 10,000 $6,091 $1154 $5,200 $9 72� $4,308 $790 _ 25,000 $7 822- $4.07` $6657 $3,46,. $5,493 $2.86 - 50,000 $8,638 $1704 $7,523 $14.41 $6,207 $1178 494,S-2 Storage-Low Hazard Storage 500 $5,508 $16 76 $4,686 $15.31 $3,866 $13,87 2,500 $5,843 $40.98 $4,992 $34.53 $4143 $28.09 - 5,000 $6,868 $12.40 $5.856 $10.50 $4,844 $8.60 - 10,000 $7,487 $14,25 $6,381 $12.01 $5,275 $976 25,000 $9625 $5.01 $8182 $4.26 $6,739 $3.52 50,000 $10,876 S21 12 $9,247 $17.86, $7,618 $14.60 494.1 S S Occupancy Tenant Improvements 1,000 $4,636 $7.86 $3,960 $7.22 $3,283 $6.59 - 5,000 $4,950 $18.39 $4,249 $15.52 $3,547 $12.65 10,000 $5,869 $519 $5,025 $441 $4180 $3.641 20,000 $6,389 $615 $5,466 $51% $4,54 $4.22 50,000 $8,234 $2,25 $7023 $1mjt� $5,811 $1.60 1001000 $9,359 $9.04 $7985 $7.67 $6612 $6.30 495 U Accessory and miscellaneous structure not 1,000 $4723 $7.53 $4,038 $6.97 $3,352 $6.42 specifically classified 5,000 $5,025 $16.25 $4,316 $13.81 $3,609 $11.37 10,000 $5,83T $5.58 $5,008 $478 $4178 $3.98 20,000 $6,395 $575 $5,485 $4.85 $4,576 $3.96 50,000 $8118 $2.09' $6,941 $179 $5765 $1.50 100,000 $9,159 $8.84 $7836 $752 $6,514 $6.26 SHELL BUILDINGS 49f--BMS I All Shell Buildings 5,000 $5185 $2 11�1 $4,4481 $1 97 $3,711 $1.84 25,000 $5,606 $4 03� $4,842 $3.43 $4,079 $2.83 50,000! $6,614 $1,2& $5701 $1.0 $4788 $0.89 10_0,000! $7,230 $1.35: $6,232 $114 $5,234 $0.94 250,0001 $9,251 $0.541 $7,947 $0.47 $6,643 $0.40 500,000+I $10,607 $2.06� $9128 $17% $7,649 $147 Each additional 100 square feet or portion thereof,up to the next highest project size threshold. 20 Resolution No 7761 Exhibit A Building and Safety Construction Cost Calculations CITY OF REDLANDS Building Department MISCELLANEOUS ITEMS PERMIT FEES Resolution No 7761 2 7%GPI Adjustment Fee Adopted:.,: WorlcltemUnit 911912017:.:. 497 Standard Hourly Rate $ 122 00 Antenna 498 Equipment Container any size each $ 366 00 _ _.,. 499 Cellular/Mobile Phone,free-standing each $ 42700 500 Cellular/Mobile Phone,co-location _ each $.. ,:;,366,00 501 Balcony addition each $ ------- -- - -- -- - ------------------- - 502 Carport MINOR(<or 200 sq ft) each $ _ 305.00' 503 Carport MAJOR(>200 sq ft) each $. 427.00 _ - - - - - 504 Change of Occupancy each $;- 549.00 CloseExisting Openings 505 Interior wall each $__ 244.00 506 Exterior wall each36600 a_ . - ----------- - $_ - 3fi6 00 - 507 Commercial Coach (per unit) each unit $ 508 Compliance Inspection s/Re inspections each $ ... .. '.488.00. -- - -- - - - -- - -- - -- 509 Deck(wood)-up to 200 sq ft each $ 3.05 00. 510 Each additional 100 sq ft each 100 sf $ 244..00. 511 Deck(wood)(with calcs) up to 200 sq ft each $, -.366:00~ ----- 512 Over 200 sq ft each $ 427 00j 513 Demolition-Single Family Dwelling each $. ... 244.00 _ - _ - - - - --------------- 514 ---- ----514 Demolition-Multi Family!Commercial each $ ,',366 00' ...:.:.... 515 New door(residential) each $ 305.00 --- - -- - ------- --- ----- - - - - --_ ----- 516 --516 New door(Commercial/Industrial) each $ Fence or Freestanding Wnt all'ino -masonry};� 517 Any Size $ 305.00 Fence or Freestanding Wap,(masonry) 518 Masonry, (6 8 feet high), pre-engineered up to 100 If $ 366 fl0, 519 Each additional 100 If each 100 If $ 61.00 -- -- ----------------- 520 Masonry, Special Design (6-10`high) up to 100 If .$ 640.00' -- -- 383.00: 521 _Each additional 100 If each 100 If $ 522 Masonry, Special Design (over 10`high) up to 100 If $, V 'v 549 00 523 Each additional 100 If each 100 If $ 1830 0 Fireplace 524 Pre Fabricated 1 Metal each $ 244.00 - - --- - - --- - - -- - ---- ------ --- -- -- ---- m 525 Flag pole(over 30 feet in height) each $ 244.60 21 Resolution No 7761 Building and Safety Miscellaneous Items Resolution No 7761 2 7%CPI Adjustment tree Adopted Work Item: Unit 911912017 Grading (Cut'and Fill) � , ", 526 0 100 Cubic Yards(Cut and Fill) each" $ 183 00 527 101-1,000 CY each 2440. 528 1 000 10,000 CY each .$ 366 00 _ 529 10,001---1-oo 000 CY each 530 100,001 -200,000 CY each 531 Each Add'I 10 000 CY or portion thereof each $ 73.2 0 532 Lighting Pole each $, 244 0o, Partition-Conmereiai 533 Interior(up to 301 f) up to 30 1 f $ 24400 534 Additional partition each 30 1 f 122,00;. Patio;.Cover;"Awning;Canopy, Trellis and Arbors 535 Wood frame(City_Standard) up to 300_9 f $ .24400 536 Wood frame(with calcs) 41 up to 300 s f $ ::....3.05;00 537 Other frame up to 300 s f $ 305:00 - -- - - - _ --------------- 538 Additional Patio up to 300 s f $ 122.001 Enclosure each $ , .305.00 539 SolarEnergy,Systerns Residential 0 10 kW $ . .. ,;;427.00 Residential each additional kW> 10kW $ 12,20: Non-Residential 0-50 kW �$ :97600 _ _ Non-Residential 51 250 kW Ea KW s. 8A7 Non-Residential>250kW Ea_KW_ $ 512 540 Stucco Applications up to 400 s f '$ 183.00 --- -- - - - ___----- ----------- 541 Additional Stucco Application each 400 s f $. 122 00 Repairs 542 For Fire Water Decay&Pests <$10,000 $ 732.00' 543 For Fire,Water, Decay&Pests $10 000-25 000 $ 732 00 544 For Fire,Water, Decay&Pests $25,001 -100,000 :$ .976 00:' - - - - - .. 545 For Fire Water Decay&Pests >$100 000 $ 1,09800 Retaining"Wall(concrete or"masonry) 546 First 50 If up to 501 f $ 366.00 - ----- - --- ---- - ---- --- 547 547 Additional retaining wall each 501 f $ 61 00 - --- - - ---- ---------- 548 548 Special Design 3-10'high(up to 50 If) up to 50 1 f $ 427 00 - - ---------- - 549 Additional retaining wall each 501 f 0 550 Special Design,over 10'high(up to 50 If) up to 50 1 f $ :671.00; 551 Additional retaining wall each 501 f $ 61.00 22 Resolution No 7761 Building and Safety Miscellaneous Items Resolution No 7761 -2 7%CPI Adjustment Fee.Adopted.: Work Item:: Unit .9119/2017 Remodel-"Residential 552 500 s f Single Story up to 500 s f $ 61000 553 501 -1,000 s f 501 to 1,000 s f $ 671 00 - -- - - --- - ----------- -- — --- ------- 554 Additional remodel (each add'I 500 sq ft) each 500 s f $ 244.00. Re roof Single,Family Dwelling"!Duplex " 555 Any Size up to 200 s f $ 366 00 Re-roof.Multi'=FainiIyl.Comm'l.Ind " -_ .: 556 Minor Repair 500 sq ft up to 500 s f $ 1830.0 -- ------ - _. _- ------ 557 501 -3,000 sq ft 501 to 3,000 s f $ .305 00 ___ -------------- ------ 558 ----558 3,001 10,000 sq ft 3,001 to 10k s f $ , .:. 427,00 559 > 10 001 sq ft Each 1 000 sq ft $ ''' 61 00. 560 Roof Structure Replacement up to 500 s f $ 610 00" ----- -- ------- -- - --- - --- ----- --------- 561 --561 Additional roof structure replacement each 500 s f $. 122 00 Residential Additions 562 One StoryT up to 500 s f $ 54900. --- ---- -- ---------- ---- 563 One Story - 501 1,000 s f $ 732.00. >1 000 s f each 564 One Story 500 sgft $ 91:50 565 Sauna steam each $ Siding _ 566 Stone and Brick Veneer(interior or exterior) up to 400 s f $ :244.00 567 Additional siding Each add 400 s f Signs; 568 Monument each m $. .... 488 00; 569 Wall mounted Fixtureeach $ 244.00 570 Free standing each $ 305.00` Skylight 571 Any Size each $. 244 00' Spa or Not 7uh 572 In-ground Private each $ 305.00 Storage,Racks ` 573 Any Height(up to 100 If) first 100 If $ 366 00 574 each additional 100 If each 100 If $ .3050 Swin rn ng,Pool 15pa.:..: 575 Private <800 s f $ 610.06 576 Private >800 s f $ 732.00 577 Heater $ 91..50. 578 Temporary Utility Connection or Occupancy $ 12200 23 Resolution No 7761-Building and Safety Miscellaneous Items Resolution No 7761 -2 7%GPI Adjustment Fee Adopted '. Work Item Unit; 9/1912017 Window or S.Ilding:Glass Door 579 Residential Replacement -- -- - _--- -- --- __.-qty_1"4------___-._ -$.-.. ,. 9. 183.00 580 - - - --- - - qty 5 or more ea Residential Replacement add $ :30.50 581 New Window non structural _ each s . 244.00 582 Service Required in Excess of Standard per hour $ _ ',;.122..00 - - - - 583 Re inspection per hour $ ,122.00' 584 Plan Re-Check per hour $ 122Ao 585 Research per hour $ 122.00 586 Residential Building Reports each $ 6100 587 Off hours inspection(min 3 hours) First hour or portion $ 36600 Off hours inspection(min 3 hours) Ea Add Hour $'. 183.00 588 Landscaping $-. .'' .,610:00. 589 Strong-Motion Instrumentation and Seismic Hazards Mapping Fee' valuation2 X Group R Occupancies one to three stories excluding hotels/motels $00001 All other buildings t) i mm - $ O�D2 --_------- All occupancies-minimum flee $050 590 valuation 2 X California Health&Safety Code Section 18931 6 building permit fee $000004 W _____ ____ Minimum fee $1 __.- 591 General Plan Maintenance Fee $0 101s f of new construction or additions>50%of -- ---- existingfloor area _ 592 Microfilm/Scanning $10+$2/page 1 Pursuant to Californa Public Resources Code Section 2705 2 In accordance with the January 1, 1996 Valuation Data 24 Resolution No 7761-Budding and Safety Miscellaneous Items CITY OF REDLANDS Building Department MECHANICAL, ELECTRICAL & PLUMBING PERMIT FEES Resolution No 7761 -2 7% CPI Adjustment Fee Adopted FEE TYPES FEE TYPES 9/19/2017 $ 122.00 ADMINISTRATIVE AND MISC FEES I Permit issuance Permit Issuance I $ 61.001 (MECHANICAL PERMIT FEES Stand Alone Mechanical Plan Check(hourly rate) Stand Alone Mechanical Plan Check(hourly rate) $ 122.00 UNIT FEES UNIT FEES: Install/Relocate forced air or gravity type furnace or burner(including A/C Residential(each) attached ducts and vents)up to and including 100 000 Btu/h(each) $ 183.00 Heater(Wall) install/Relocate floor furnace including vent(each) $ 183.00 Install/Relocate suspended heater,recessed wall heater,or floor- Appliance Vent/Chimney(only) mounted unit heater(each) $ 183.00 Repair/Alter/Add heating appliance, refrigeration unit cooling unit, absorption unit or each heating cooling,absorption,or evaporative Boiler cooling system, including installation of controls(each) $ 183.00 Install/Relocate boiler or compressor, up to and including 3HP or Chiller absorption system up to and including 100 000 Btulh(each) $ 488.00 Air-handling unit including attached ducts (Note this fee shall not apply to an air-handling unit that is a portion of a factory-assembled appliance, cooling unit,evaporative cooler or absorption unit for Evaporative Cooler which a permit is required elsewhere)(each) $ 183.00 Moisture Exhaust Duct(Clothes Dryer) Evaporative cooler other than portable type(each) $ 183.00 Vent Fan Single Duct(each) Ventilation fan connected to a single duct(each) $ 183.00 Ventilation system that is not a portion of any heating or air- Vent System conditioning system authorized by a permit(each) $ 366.00 Hood installation that is served by mechanical exhaust including the Exhaust Hood and Duct(Residential) ducts for such hood(each) $ 366.00 Non Residential Incinerator Install/Relocate commercial or industrial type incinerator(each) $ 244.00 Appliance or piece of equipment not classed in other appliance categories,or for which no other fee is listed(each) $ 183.00 OTHER FEES OTHER FEES- Installation or relocation of any duct system $ 183.00 For Each Process Piping System of 1 to 2 Outlets $ 122.00 Other Mechanical Inspections(Per half hour) For each additional process piping outlet $ 61.00 Other Mechanical Inspections(per hour) $ 122.00 25 Resolution No 7761 Exhibit A-Building and Safety Mechanical, Electrical Plumbing Permit Fees Fee Adopted FEE TYPES FEE TYPES 9/19/2017 $ 122.00 JPLUMBINGIGAS PERMIT FEES Permit Issuance(one time fee for each plumbing permit issued) $ 61.00 Stand Alone Plumbing Plan Check(hourly rate) Stand Alone Plumbing Plan Check(hourly rate) $ 122.00 UNIT FEES UNIT FEES- Plumbing fixture or trap or set of fixtures on one trap including water drainage piping and backflow protection(each) $ 183.00 Building or tra[ler park sewer(each) $ 183.00 Rainwater system inside building(per drain) $ 183,00 Private sewage disposal system(each) $ 183.00 Water Heater(no issuance fee assessed) $ 183.00 Industrial waste pretreatment interceptor including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps (each) $ 549.00 Underground utilities(sewer,storm,water)Exception Single Family Dwellings $ 183.00 OTHER FEES OTHER FEES: Install/Alter/Repair water piping andlor water treating equipment (each) $ 183.00 For repair or alteration of drainage or vent piping each fixture $ 183.00 For each lawn sprinkler system on any one meter, including backflow protection devices therefor $ 183.00 For atmospheric-type vacuum breakers $ 183.00 1 to 5 $ 61.00 over 5(each) $ 36.60 For each backflow protective device other than atmospheric-type vacuum breakers $ 183.00 For each gas piping system of one to four outlets $ 183.00 For each gas piping system of five or more outlets $ 183.00 Other Plumbing and Gas Inspections(per half hour) Other Plumbing and Gas Inspections(per hour) $ 122.00 26 Resolution No 7761 Exhibit A-Building and Safety Mechanical, Electrical Plumbing Permit Fees Fee Adopted FEE TYPES FEE TYPES 9119/2017 $ 122.04 ELECTRICAL PERMIT FEES Stand Alone Electrical Plan Check(hourly rate) Permit Issuance(one time fee for each electrical permit issued) $ 61 00 Stand Alone Electrical Plan Check $ 122.00 Swimming pools,therapeutic whirlpools spas and alterations to existing swimming pools Use unit fee schedule for itemized work $ 183.00 Temporary power(ea),Temporary power to a permanent location (ea),Temporary service power pole or pedestal including all pole or pedestal-mounted receptacle outlets and appurtenances(ea) $ 183.00 For a temporary distribution system and temporary Ilghting and receptacle outlets for construction sites decorative light Christmas tree lots firework stands,etc $ 183.00 UNIT FEES, Receptacle,Switch,and Light Outlets Receptacle,switch, lighting or other outlets at which current is used or controlled except services feeders and meters First 20 $ 183.00 Each Additional 20 Outlets $ 61.00 Lighting Fixtures For lighting fixtures,sockets or other lamp-holding devices First 20 $ 183.00 Each Additional Outlet $ 61.00 For pole or platform-mounted lighting fixtures $ 61.00 For theatrical-type lighting fixtures or assemblies $ 122.04 Residential Appliances For fixed residential appliances or receptacle outlets for same including wall-mounted electric ovens,counter-mounted cooking tops electrical ranges,self contained room console or through-wall air conditioners space heaters food waste grinders,dishwashers, washing machines,water heaters,clothes dryers or other motor- operated appliances not exceeding 1 horsepower(HP)in rating each For other types of air conditioners and other motor-driven appliances having large electrical rating see POWER APPARATUS $ 183.00 Non Residential Appliances For residential appliances and self-contained factory wired, non- residential appliances not exceeding 1 horsepower(HP),kilowatt (KW),or kilovolt-ampere(KVA) in rating including medical and dental devices food, beverage,and ice cream cabinets,illuminated show cases;drinking fountains vending machines laundry machines or other similar types of equipment,each For other types of air conditioners and other motor-driven appliances having large electrical rating see POWER APPARATUS $ - 27 Resolution No 7761 Exhibit A-Building and Safety Mechanical, Electrical Plumbing Permit Fees Fee Adopted FEE TYPES FEE TYPES 9/19/2017 $ 122.00 ELECTRICAL PERMIT FEES continued Power Apparatus For motors, generators transformers rectifiers,synchronous converters capacitors industrial heating,air conditioners and heat pumps,cooking or baking equipment and other apparatus, as follows Rating in horsepower(HP) kilowatts(KW), kilovolt-amperes(KVA) or kilovolt-amperes-reactive(KVAR). Up to and including 1 $ 183.00 Over 1 and not over 10 $ 183.00 Over 10 and not over 50 $ 244.00 Over 50 and not over 100 $ 366.00 Over 100,each $ 42700 Panelboards Installation or relocation of panelboard (ea) $ 183,00 Busways For trolley and plug-in-type busways each 100 feet or fraction thereof An additional fee will be required for lighting fixtures,motors and other appliances that are connected to trolley and plug-ir, type busways. No fee:s required for portable tools $ 183.00 Signs,Outline Lighting,and Marquees For signs outline lighting systems or marquees supplies from one branch circuit,each $ 183.00 Electrical Services I _ For services of 600 volts or less, up to 1,000amperes in rating each $ 183.00 For services over 600 volts or over 1,000 amperes in rating each $ 488.00 OTHER FEES: For electrical apparatus,conduits and conductors for which a permit is required but for which no fee is herein set forth This fee is not applicable when a fee is paid for one or more services,outlets fixtures, appliances, power apparatus,busways signs or other equipment. $ 183.00 Other Electrical Inspections (per hour) $ 122.00 � $ _ $ - Note This table would be used if,for example,someone wants a permit for just a water heater or electrical panel 28 Resolution No 7761 Exhibit A-Building and Safety Mechanical, Electrical Plumbing Permit Fees