Loading...
HomeMy WebLinkAboutContracts & Agreements_209-2017 STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STATE MATCHING GRANT FOR FAA AIRPORT IMPROVEMENT PROGRAM - APPLICATION DOA-0012 (REV 0612011) PLEASE PRINT OR TYPE AND COMPLETE ALL ITEMS PART 1. AIRPORT INFORMATION PUBLBC ENTITY AIRPORT NAME PERMIT NO City of Redlands Redlands Municipal Airport SBD-032 CONTACT NAME TITLE Will Hamilton Airport Supervisor BUSINESS ADDRESS BUSINESS PHONE 35 Capon Street, Suite 222,Redlands,CA 92373 (909)798-7655 PART 11 PROJECT INFORMATION Verify that project is within the Department's most recent Capltal Improvement Plan ® YES ❑ NO If no then project is not eligible for grant funds DES CR{PTIVE TITLE OF APPLICANT'S PROJECT(as shown en page one of the executed grant agreement and in the FEDERAL adopted Capital Improvement Plan) GRANT Attach Additional Sheets If Necessary $150,00000 Construction of the Redlands Airport Light and Sign Plan,Phase 1I1.This final phase will include APPLICANT the PAPI, RE1LS ,distance remaining signs wind cones, segmented circle,and airport beacon FUNDS s9,167 00 STATE FUNDS s7,50000 TOTAL COST OF PROJECT s166,66700 Maximum is 5%of the federal crani amount PART III REQUIRED SUPPORTING DOCUMENTS Pursuant to Public Utilities Code Sections 21681-21684 and Section 4067 of the CAAP Regulations please submit the following documents with this application • Local government approval(resolution or minute order)as described in Section 4067(a) FAA Grant Agreement with FAA and sponsor signatures Verification of full compliance with the California Environmental Quality Act(CEQA)by submitting information to fulfill either 1.or 2 below 1 Copy of Notice of Exemption or provide the Categorical Exemption Class# 15302(c) (CEQA Guidelines Sections 15300 15333) 2 Copy of Notice of Determination or provide the following Information Environmental Impact Report(Title/Date) State Clearinghouse(SCH)# or Negative Declaration(Title/Date) State Clearinghouse(SCH)# or National Environmental Policy Act(NEPA)document(Title/Date) (NEPA documents-Environmental Impact Statement or Finding of No Significant Impact must comply with CEQA provisions) • 11 x 17 inch Drawing or Airport Layout Plan showing project location(s)and dimensions Completed CAAP Certification(Form DOA 0007),if not submitted to the Division of Aeronautics earlier for this fiscal year Additional documentation may be required If Items in the FAA AIP grant are not eligible for CAAP funding PART IV. AUTHORIZATION AU OFFICI SI TLE TITLE Mayor PRINT NAME DATE Paul W Foster /o/ 7 SEND COMPLETED APPLICA I�ANDUPPORTING DOCUMENTS TO. tATTEST: ��c.,�YCALIFORNIA DEPARTMENT OF TRANSPORTATION 3ne Donaldson, City Clerk DIVISION OF AERONAUTICS MS#40 P O BOX 942874 SACRAMENTO,CA 94274-0001 ADA Notice For individuals with sensory disabilities this document is available in alternate formats For information call(916)654-6410 or TDD (916)654-3880 or write Records and Forms Management 1120 N Street,MS-89 Sacramento CA 55814 RESOLUI ION NO 6969 A RESOLUTION OF THE CITY COUNCIL OFTHE CITY OF REDLANDS DESIGNATING AUTHORIZED CITY REPRESENTATIVES FO APPLY FOR FUTURE FEDERAL AVIAT ION ADMINIS rRATION GRAN1 S WHEREAS, discretionary and entitlement grant funding is available for the City of Redlands' ("City") Municipal Airport to fund on-going, capital improvements proposed in accordance with the City's Airport Master Plan, and WHEREAS, the City is presently engaged in the pursuit of grant funding to add to and improve the facilities at the Redlands Municipal Airport, and WHEREAS, the City is required to formally designate City representatives who shall be authorized to execute grant-related documents in accordance with federal assistance and grant funding guidelines, and WHEREAS the successful implementation of grant funded projects will not only provide immediate benefit to the airport users, but will also enhance the viability of the Redlands Municipal Airport as an asset to the City and the commuiuty, NOW, THEREFORE, BF 1T RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDLANDS AS FOLLOWS Section 1 That the Mayor of the City of Redlands, and any member of the Redlands City Council, is authorized to execute in the naive of the City of Redlands all applications, contracts, agreements and amendments for the purpose of securing grant funds for improvements to be funded by the FAA and/or other agencies at the Redlands Municipal Airport, and the City Manager, and the City Manager's designee, is authorized to review, prepare, and approve in the name of the City of Redlands all necessary payment requests, progress reports and final reports to implement and carry out the purposes specified for such grants ADOPTED, SIGNED AND APPROVED this 20th day of July,2010 Mayor of the City of Redlands A 11 EST City Clerk 1 1, Sam Irwin, City Clerk of the City of Redlands, hereby certify that the foregoing Resolution No 5969 was duly adopted by the City Council at a regular meeting thereof, held on the 20th day of July,2010,by the following vote AYES Councilmembers Bean, Harrison, Gallagher, Aguilar, Mayor Gilbreath NOES None ABSTAIN None ABSENT None Sam Irwin, City Clerk Redlands, California 2 t Us Department Airports Division FAA LAX ADO of Tronsportcihon Western-Pacific Region 115000 Aviation Boulevard Federal Aviation California Room 3000 Administration Lawndale CA 80261 August 17, 2017 Mr Chris Boatman 35 Cajon Street Suite 222 Redlands, CA 92373 Dear Mr Boatman We are attaching the original PDF document of the Grant Offei for Airport Improvement Program(AIP) Project No 3-06-0195-016-2017 at Redlands Municipal in Redlands, California This letter outlines expectations£oi success PIease read the conditions and assurances carefully To properly enter into this agreement,you must do the following a The governing body must provide authority to execute the grant to the individual signing the grant, i e the sponsor's authorized representative b The sponsor's authorized representative must execute the grant, followed by the attorney's certification,no later than August 30,2017, in order for the grant to be valid • The date of the attorney's signature must be on or after the date of the sponsor's authorized representative's signature • All signatures must be made with blue of black ink, Signature stamps will not be accepted c You may not make any modification to the text,terms or conditions of the grant offer d Aftei you properly execute the grant agreement • Return one executed original Grant Agreement to oui office via US mail or commercial courier • Retain one copy of the executed Grant Agreement for your records • Forward one copy of the executed Grant Agreement to your associated State Aviation Official, if applicable e Because time is now critical for entering the executed grant into the FAA system.,we request you send a copy of the signed agreement to our office by facsimile of email (pdf document)prior to sending the hardcopy document through U S mail or commercial courier Subject to the requirements in 2 CFR§200 305, each payment request for reimbursement under this grant must be made electronically via the Delphi elnvoicmg System Please see the attached Grant Agreement for more information regarding the use of this System The terms and conditions of this agreement require you to complete the project without undue delay We will be monitoring your progress to ensure proper stewardship of these Federal funds We expect you to submit navment reauests for reimbursement of allowable incurred nroiect expenses consistent with oroiect iii ogress. Should you fail to male draws oil a regulai basis gout grant may be placed in ' inactive statliS, WhICIl will aflect your ability to receive Future grant offers Until the ;rant is completed and closed. you are responsible fol Submitting Formal reports as follows • A signed/dated SP-270 (no n-consti tic tion projects)or SF-271 of equivalent (construction projects) acid SF- 125 annually,due 90 days after the end of each federal fiscal yeas in which this grant is open (clue Deeeinbei 31 of each yeas this grant is open), and • Pei Formance Reports,which are due within 30 days of- the end of a reporting period as follows- 1 Non-construction project Due at the end of each fiscal quartet 2 Construction project Submit FAA form 5370-1, Construction Progress and Inspection Report bi-weekly when applicable As a condition of receiving Federal assistance iindet this award.you must comply With audit requirements as established under 2 C17R part 200 Subpart I- requires non-Federal entities that expend $750,000 of more in I ederal awards to conduct a single of program specific audit for that yeas Note that this includes Federal e\penditLires made andel other Federal-assistance programs Please take appropiiate and necessary action to assure your organization will comply with applicable audit requirements and standards Once the project(s) is completed and all costs are determined, we ask that you close the project without delay and submit the necessary final closeout documentation as required by your Region/Airports District Office Kiinchi I loang at (310) 725-3617. is the assigned program nlanagei tot this grant and is readily available to as5lst you and your designated representative with the requirements stated herein We sincerely value yoLii cooperation in these efforts and look Forward to working with you to complete tilts Inlpol'lant project Sincerely David 1liiilg Managei Los Angeles Airports District Of�fic.e 3 -06 -0195 -016 2017 US Department of Transportation Federal Aviation Administration GRANTAGREEMENT PART I—OFFER Date of Offer August 17, 2017 Airport/Planning Area Redlands Municipal Airport AIP Grant Number 3 06-0195-016 2017 DUNS Number 094712205 TO City of Redlands (herein called the"Sponsor") FROM The United States of America(acting through the Federal Aviation Administration, herein called the "FAA") WHEREAS,the Sponsor has submitted to the FAA a Project Application dated May 8,2017,for a grant of Federal funds for a project at or associated with the Redlands Municipal Airport,which is included as part of this Grant Agreement,and WHEREAS,the FAA has approved a project for the Redlands Municipal Airport(herein called the"Project") consisting of the following Install Runway Distance-To Go Signs, Install Runway Vertical/Visual Guidance System which is more fully described in the Project Application NOW THEREFORE,According to the applicable provisions of the former Federal Aviation Act of 1958,as amended and recodified,49 U S C §40101,et seq ,and the former Airport and Airway improvement Act of 1982 (ARIA),as amended and recodified,49 U S C §47101,et seq, (herein the AAIA grant statute is referred to as"the Act"),the representations contained in the Project Application, and in consideration of (a)the Sponsor's adoption and ratification of the Grant Assurances dated March 2014,and the Sponsor's acceptance of this Offer, and, (b)the benefits to accrue to the United States and the public from the accomplishment of the Project and compliance with the Grant Assurances and conditions as herein provided THE FEDERAL AVIATION ADMINISTRATION,FOR AND ON BEHALF OF THE UNITED STATES,HEREBY OFFERS AND AGREES to pay ninety(90) percent of the allowable costs incurred accomplishing the Project as the United States share of the Project This Offer is made on and SUBJECT TO THE FOLLOWING TERMS AND CONDITIONS CONDITIONS 1. Maximum Obligation The maximum obligation of the United States payable under this Offer is$150,000 The following amounts represent a breakdown of the maximum obligation for the purpose of establishing allowable amounts for any future grant amendment,which may increase the foregoing maximum 1 3 06 -0195 016 2017 obligation of the United States under the provisions of 49 US C §47108(b) $0 for planning $150,000 for airport development $0 for land acquisition 2 Period of Performance The period of performance begins on the date the Sponsor formally accepts this agreement Unless explicitly stated otherwise in an amendment from the FAA,the end date of the period of performance is 4 years(1,460 calendar days)from the date of formal grant acceptance by the Sponsor The Sponsor may only charge allowable costs for obligations incurred prior to the end date of the period of performance(2 CFR§200 309) Unless the FAA authorizes a written extension,the sponsor must submit all project closeout documentation and liquidate(pay off)all obligations incurred under this award no later than 90 calendar days after the end date of the period of performance (2 CFR§200 343) The period of performance end date does not relieve or reduce Sponsor obligations and assurances that extend beyond the closeout of a grant agreement 3 Ineligible or Unallowable Costs The Sponsor must not include any costs in the project that the FAA has determined to be ineligible or unallowable. 4 Indirect Costs-Snonsor Sponsor may charge indirect costs under this award by applying the indirect cost rate identified in the project application as accepted by the FAA,to allowable costs for Sponsor direct salaries and wages 5 Determining the Final Federal Share of Costs The United States'share of allowable project costs will be made in accordance with the regulations, policies,and procedures of the Secretary Final determination of the United States'share will be based upon the final audit of the total amount of allowable project costs and settlement will be made for any upward or downward adjustments to the Federal share of costs 6 Comoleting the Protect Without Delav and in Conformance with Reauirements The Sponsor must carry out and complete the project without undue delays and in accordance with this agreement,and the regulations, policies,and procedures of the Secretary The Sponsor also agrees to comply with the assurances which are part of this agreement 7 Amendments or Withdrawals before Grant Acceptance The FAA reserves the right to amend or withdraw this offer at anytime prior to its acceptance by the Sponsor B. Offer Expiration Date This offer will expire and the United States will not be obligated to pay any part of the costs of the project unless this offer has been accepted by the Sponsor on or before August 30,2017, or such subsequent date as may be prescribed in writing by the FAA 9 Imnroner Use of Federal Funds.The Sponsor must take all steps, including litigation if necessary,to recover f=ederal funds spent fraudulently,wastefully,or in violation of Federal antitrust statutes,or misused in any other manner for any project upon which Federal funds have been expended For the purposes of this grant agreement,the term"Federal funds" means funds however used or dispersed by the Sponsor,that were originally paid pursuant to this or any other f=ederal grant agreement The Sponsor must obtain the approval of the Secretary as to any determination of the amount of the Federal share of such funds The Sponsor must return the recovered Federal share, including funds recovered by settlement,order,or judgment,to the Secretary.The Sponsor must furnish to the Secretary,upon request, all documents and records pertaining to the determination of the amount of the Federal share or to any settlement,litigation,negotiation,or other efforts taken to recover such funds All settlements or other final positions of the Sponsor,in court or otherwise, involving the recovery of such Federal share require advance approval by the Secretary 2 3 -06 -0195 016 -2017 10 United States Not Liable for Damage or Iniury The United States is not responsible or liable for damage to property or injury to persons which may arise from,or be incident to,Compliance with this grant agreement 11. Svstem for Award Management(SAM) Registration And Universal Identifier. A Requirement for System for Award Management(SAM) Unless the Sponsor is exempted from this requirement under 2 CFR 25 110,the Sponsor must maintain the currency of its information in the SAM until the Sponsor submits the final financial report required underthis grant, or receives the final payment,whichever is later This requires that the Sponsor review and update the information at least annually after the initial registration and more frequently if required by changes in information or another award term Additional information about registration procedures may be found at the SAM website (currently at http//www sam gov) B Data Universal Numbering System DUNS number means the nine digit number established and assigned by Dun and Bradstreet, Inc (D&B)to uniquely identify business entities A DUNS number may be obtained from D &B by telephone (currently 566-705-5771)or on the web(currently at http//fedaov dnb corn/webform) 12 Electronic Grant Pavmentfs) Unless otherwise directed by the FAA, the Sponsor must make each payment request under this agreement electronically via the Delphi elnvoicing System for Department of Transportation (DOT) Financial Assistance Awardees 13 Informal Letter Amendment of AIP Proiects if,during the life of the project,the FAA determines that the maximum grant obligation of the United States exceeds the expected needs of the Sponsor by$25,000 or five percent(5%),whichever is greater,the FAA can issue a letter amendment to the Sponsor unilaterally reducing the maximum obligation The FAA can also issue a letter to the Sponsor increasing the maximum obligation if there is an overrun in the total actual eligible and allowable project costs to cover the amount of the overrun provided it will not exceed the statutory limitations for grant amendments The FAA's authority to increase the maximum obligation does not apply to the "planning"component of condition No 1 The FAA can also issue an informal letter amendment that modifies the grant description to correct administrative errors or to delete work items if the FAA finds it advantageous and in the best interests of the United States An informal letter amendment has the same force and effect as a formal grant amendment 14 Air and Water Qualitv The Sponsor is required to comply with all applicable air and water quality standards for all projects in this grant If the Sponsor fails to comply with this requirement,the FAA may suspend, cancel,or terminate this agreement 15. Financial Reporting and Pavment Reauirements The Sponsor will comply with all federal financial reporting requirements and payment requirements,including submittal of timely and accurate reports 16 Buv American Unless otherwise approved in advance by the FAA,the Sponsor will not acquire or permit any contractor or subcontractor to acquire any steel or manufactured products produced outside the United States to be used for any project for which funds are provided under this grant The Sponsor will include a provision implementing Buy American in every contract. 17 Maximum Obligation Increase For Nonorimary Airoorts.ln accordance with 49 U S C §47108(b),as amended,the maximum obligation of the United States,as stated in Condition No 1 of this Grant Offer A May not be increased for a planning project, B May be increased by not more than 15 percent for development projects, 3 3 -06-0195 016-2017 C May be increased by not more than 15 percent or by an amount not to exceed 25 percent of the total increase in allowable costs attributable to the acquisition of land or interests in land,whichever is greater, based on current credible appraisals or a court award in a condemnation proceeding 18 Audits for Public Sponsors The Sponsor must provide for a Single Audit or program specific audit in accordance with 2 CFR part 200 The Sponsor must submit the audit reporting package to the Federal Audit Clearinghouse on the Federal Audit Clearinghouse's Internet Data Entry System at htty//harvester census sov/facweb/ Provide one copy of the completed audit to the FAA if requested 19 Suspension or Debarment.When entering into a"covered transaction" as defined by 2 CFR§180 200,the Sponsor must A Verify the non-federal entity is eligible to participate in this Federal program by 1 Checking the excluded parties list system (EPLS)as maintained within the System for Award Management(SAM)to determine if the non-federal entity is excluded or disqualified,or 2 Collecting a certification statement from the non-federal entity attesting they are not excluded or disqualified from participating,or 3 Adding a clause or condition to covered transactions attesting individual or firm are not excluded or disqualified from participating B Require prime contractors to comply with 2 CFR§180 330 when entering into lower-tier transactions (e g Sub contracts) C Immediately disclose to the FAA whenever the Sponsor(1) learns they have entered into a covered transaction with an ineligible entity or(2)suspends or debars a contractor, person, or entity 20 Ban on Textini"While Driving A In accordance with Executive Order 13513, Federal Leadership on Reducing Text Messaging While Driving,October 1, 2009,and DOT Order 3902 10,Text Messaging While Driving, December 30,2009, the Sponsor is encouraged to 1 Adopt and enforce workplace safety policies to decrease crashes caused by distracted drivers including policies to ban text messaging while driving when performing any work for,or on behalf of,the Federal government, including work relating to a grant or subgrant 2 Conduct workplace safety initiatives in a manner commensurate with the size of the business,such as a Establishment of new rules and programs or re-evaluation of existing programs to prohibit text messaging while driving,and b Education,awareness,and other outreach to employees about the safety risks associated with texting while driving. B The Sponsor must insert the substance of this clause on banning texting while driving in all subgrants, contracts and subcontracts 21 AIP Funded Work Included in a PFC Application, Within 90 Clays of acceptance of this award,Sponsor must submit to the Federal Aviation Administration an amendment to any approved Passenger Facility Charge(PFC) application that contains an approved PFC project also covered under this grant award The airport sponsor may not make any expenditure under this award until project work addressed under this award is removed from an approved PFC application by amendment 4 3 06 0195 -016-2017 22 Exhibit"A"Property Map The Exhibit"A" Property Map dated 10/16/2030,is incorporated herein by reference or is submitted with the project application and made part of this grant agreement 23 Emglovee Protection from Re rp_ sa[ A Prohibition of Reprisals- 1 In accordance with 41 U S C §4712,an employee of a grantee or subgrantee may not be discharged, demoted, or otherwise discriminated against as a reprisal for disclosing to a person or body described in sub paragraph (A)(2), information that the employee reasonably believes is evidence of• i Gross mismanagement of a Federal grant, n Gross waste of Federal funds, iii An abuse of authority relating to implementation or use of Federal funds, iv A substantial and specific danger to public health or safety,or v A violation of law, rule,or regulation related to a Federal grant 2 Persons and bodies covered The persons and bodies to which a disclosure by an employee is covered are as follows I A member of Congress or a representative of a committee of Congress, n An Inspector General, III The Government Accountability Office, Iv A Federal office or employee responsible for oversight of a grant program, V A court or grand jury, Vi A management office of the grantee or subgrantee,or vii A Federal or State regulatory enforcement agency 3 Submission of Complaint—A person who believes that they have been subjected to a reprisal prohibited by paragraph A of this grant term may submit a complaint regarding the reprisal to the Office of Inspector General(OIG)for the U S Department of Transportation 4 Time Limitation for Submittal of a Complaint A complaint may not be brought under this subsection more than three years after the date on which the alleged reprisal took place 5 Required Actions of the Inspector General—Actions, limitations and exceptions of the Inspector General's office are established under 41 U S C §4712(b) 6 Assumption of Rights to Civil Remedy-Upon receipt of an explanation of a decision not to conduct or continue an Investigation by the Office of Inspector General,the person submitting a complaint assumes the right to a civil remedy under4l U S C §4712(c) 24 Lighting The Sponsor must operate and maintain the lighting system during the useful life of the system in accordance with applicable FAA standards 25 Plans and Specifications Prior to Bidding The Sponsor agrees that it will submit plans and specifications for FAA review and approval prior to advertising for bids 26 Plans and Specifications Approval Based Won Certification.The FAA and the Sponsor agree that the FAA approval of the Sponsor's Plans and Specification is based primarily upon the Sponsor's certification to carry out the project in accordance with policies,standards,and specifications approved by the FAA The Sponsor understands that A The Sponsor's certification does not relieve the Sponsor of the requirement to obtain prior FAA approval for modifications to any AIP standards or to notify the FAA of any limitations to competition within the project, 5 3 - 06 0195 016 2017 B The FAA's acceptance of a Sponsor's certification does not limit the FAA from reviewing appropriate project documentation forthe purpose of validating the certification statements, and, C If the FAA determines that the Sponsor has not complied with their certification statements,the FAA will review the associated project costs to determine whether such costs are allowable under AIP 6 3 06 0 19 5 016-2017 The Sponsor's acceptance of this offer and ratification and adoption of the Project Application incorporated herein shall be evidenced by execution of this instrument by the Sponsor,as hereinafter provided,and this Offer and Acceptance shall comprise a Grant Agreement,as provided by the Act, constituting the contractual obligations and rights of the United States and the Sponsor with respect to the accomplishment of the Project and compliance with the assurances and conditions as provided herein Such Grant Agreement shall become effective upon the Sponsor's acceptance of this Offer UNITED STATES OF AMERICA FEDERAL AVIATION ADMINISTRATION (Signature) David F Cushing (Typed Name) Los Angeles Airports district Office (True of FAA Official) 7 3 - 06 0 19 5 016 - 2017 PART II-ACCEPTANCE The Sponsor does hereby ratify and adopt all assurances, statements, representations, warranties, covenants,and agreements contained in the Project Application and Incorporated materials referred to in the foregoing Offer, and does hereby accept this Offer and by such acceptance agrees to comply with all of the terms and conditions in this Offer and in the Project Application I declare under penalty of perjury that the foregoing is true and correct ' Executed this ?}y` day of ),,A- Z-0I --7 City of Redlands ..........._....__..... .... ................-. ............ ._......... (Name of Sponsor) (Signature of Sponsor's Authorized Official) By Paul W. Foster --..._...._.._. __....... --.---................-...--- ........._... ._.... .. _.. (Typed Nome of Sponsor's Authorized Official) Title Mayor - --............... --._ ...._........_................... ......._............._....... (rifle of Sponsor's Authorized Official ATTEST. �.� J e Donaldson, City Clerk CERTIFICATE OF SPONSOR'S ATTORNEY I, -Cut)le r (Y)L HLL 't acting as Attorney for the Sponsor do hereby certify That In my opinion the Sponsor is empowered to enter into the foregoing Grant Agreement under the laws of the State of California Further, I have examined the foregoing Grant Agreement and the actions taken by said Sponsor and Sponsor's official representative has been duly authorized and that the execution thereof Is in all respects due and proper and In accordance with the laws of the said State and the Act. In addition, for grants involving projects to be carried out on property not owned by the Sponsor, there are no legal impediments that will prevent full performance by the Sponsor Further, It is my opinion that the said Grant Agreement constitutes a legal and binding obligation of the Sponsor in accordance with the terms thereof, �,! /] Dated at zG�I�r f(�S(locatlon) this '3 5t day of PgU3Lk 7 BY (Sign "of Sponsor's Attorney) 'Knowingly and willfully providing false information to the Federal government is a violation of 18 U S C Section 1001 (False Statements) and could subject you to fines, imprisonment, or both 8 " State of Califomia-Department of Fish and Wildlife 2016 ENVIRONMENTAL FILING PEE CASH RECEIPT � ;- DFW 753 5a (Rev 12115115) Previously DFG 753 5a RECEIPT NUMBER 36 -- 01262016— 34 STATE CLEARINGHOUSE NUMBER(If applicable) SEE INSTRUCTIONS ON REVERSE TYPE OR PRINT CLEARLY NIA LEAD AGENCY LEADAGENCY EMAIL DATE City of Redlands NIA 01/2612016 COUNTYISTATE AGENCY OF FILING DOCUMENT NUMBER San Bernardino NIA PROJECT TITLE Redlands Airfield Lighting and Sign Plant PROJECT APPLICANT NAME PROJECT APPLICANT EMAIL PHONE NUMBER City of Redlands NIA (909)798-7655 PROJECT APPLICANT ADDRESS CITY STATE ZIP CODE 35 Caton St Redlands ICA 92373 PROJECT APPLICANT(Check appropna€e box) 0 Local Public Agency ❑School District ❑Other Special District ❑State Agency ❑Private Entity CHI=CK APPLICABLE FEES ❑ Environmental Impact Report(EIR) $3,070.00 $ 000 ❑ Mitigated/Negative Declaration(MND)(ND) $2 210.25 S 000 ❑ Certified Regulatory Program document(CRP) $1,04375 S 000 0 Exempt from fee Q Notice of Exemption(attach) ❑ CDFW No Etfert Determination(attach) ❑ Fee previously paid(attach previously issued cash receipt copy) ❑ Water Right Application or Petition Fee(State Water Resources Control Board only) $85000 $ 000 Q County documentary handling fee s 5000 ❑ Other $ PAYMENT METHOD El Cash ❑ Credit ❑ Check ❑ Other TOTAL RECEIVED $ 5000 SIGNATU E µ } GENCY OF FILING PRINTED NAME AND TITLE 0 � X yif Melissa Crowell, Deputy Clerk ORIGINAL PROJECTAPPLICANT COPY CDFWIASe COPY LEAD AGENCY COPY COUNTYCLERK DFW753.5a(Rev 20151235) ` State of California Department of Fish and Wildlife 2016 ENVIRONMENTAL FILING FEE CASH RECEIPT DFW 753 5a(Rev 12115/15) Previously DFG 753 5a NOTICE Each project applicant shall remit to the county clerk the environmental filing fee before or at fhe time of filing a Notice of Determination(Pub Resources Code,§21152 Fish&G Code §711 4 subdivision(d) Cal Code Regs. tit 14 §753.5) Wdhoul the appropriate fee,statutory or categorical exemption or a valid No Effect Determination issued by the California Department of Fish and Wild`ife(CDFW),the Notice of Determination is not operative,vested,or final,and shall not be accepted by the county clerk COUNTY DOCUMENTARY HANDLING FEE The county clerk may charge a documentary handling fee of fifty dollars($50)per filing in addition to the environmental filing fee(Fish&G Code,§7114.subd (e),Cal Code Regs,tit 14,§753.5,subd (g)(1)) A county board of s-tpervisors shall have the authority to increase or decrease the fee of charge,that is otherwise authorized to be levied by another provision of law in the amount reasonably necessary to recover the cost of providing any product or service or the cost of enforcing any regulation for which The fee or charge s levied(Gov Code,§54985, subd (a)) COLLECTION PROCEDURES FOR COUNTY GOVERNMENTS Filling Notice of Determination(NOD) ❑ Collect environmental filing fee pT copy of previously issued cash receipt (Do not collect fee if project applicant presents a No Effect Determinagan signed by CDFW An additional fee is required for each separate environmental document An addendum is not considered a separate environmental document Checks should be made payable to the county.) ❑ Issue cash receipt to project applicant ❑ Attach copy of cash receipt and,if applicable previously issued cash receipt to NOD If the project applicant presents a No Effect Determination signed by CDFW,also ❑ Attach No Effect Determination to NOD(no environmental riling fee is due) Filing Notice of Exemption(NOE)(Statutorily or categorically exempt project(Cal Code Pegs,tit 14,§§15260-15285, 15300-15333)) Issue cash receipt to project applicant D Attach copy of cash receipt to NOE(no environmental filing fee is due) Within 30 days after the end of each month in which the envrronmental filing fees are collected,each county shall summarize and record the amount collected on the monthly State of California Form No CA25(TC31)and remit the amount collected to the State Treasurer Identify the remittance on Form No CA25 as"Environmental Document Filing Fees`per Fish and Game Code section 7114 The county clerk shall mail the following documents to CDFW on a monthly basis ✓ A photocopy of the monthly State of California Form No CA25(TC31), ✓ CDFVWASB copies of all cash receipts(including all voided receipts), ✓ A copy of all CDFW No Effect Determinations filed in lieu of fee payment, ✓ A copy of all NODs filed with the county during the preceding month,and ✓ A list of the name,address and telephone number of all project applicants for which an NOD has been filed If this information Is contained on the cash receipt filed with CDFW urider California Code of Regulations title 14 section 753 5 subdivision(e)(6),no additional information Is required DOCUMENT RETENTION The county shall retain two copies of the cash receipt(for lead agency and county clerk)and a copy of all documents described above for at least 12 months RECEIPT NUMBER # The first two digits automatically populate by making the appropriate selection in the CountylState Agen(.y of Filing drop down menu # The next eight digits automatically populate with the current month day and year # The last three digits correspond with the sequential order of issuance for each calendar year For example,the first receipt number issued on January 1 should end in 001 If a county issued 252 receipts for the year ending on December 31 the:last receipt number should end in 252 CDFW recommends that counties and state agencies save a local copy of this form Each time the form is opened on the same computer,the last three digits will automatically populate in sequence However,CDFy'l recommends that counties track receipt numbers on a spreadsheet tabbed by month to ensure accuracy DO NOT COMBINE THE ENVIRONMENTAL FEES WITH THE STATE SHARE OF FISH AND WILDLIFE FEES Mail to California Department of Fish and Wildlife Accounting Services Branch 1416 9th Street 12th Floor Suite 1266 Sacramento,California 95817 ORIGINAL PROJECTAPPLICANT COPY c1)FW"3 COPY LEADAGENCY COPY COUNTYCLERK DFW753.5a(Rev 20151215) Print Form Notice of Exemption Appendix E To Office of Planning and Research From (Public Agency) City of Redlands P.0 Box 3044,Room 113 35 Cajon Street Sacramento CA 95812 3044 Redlands,CA 92,373 County Cleric County of San Bernardino (Address) 385 N Arrowhead Avenue San Bernardino,CA 92415 Project Title, Redlands Airfield Lighting and Sign Plan Project Applicant City of Redlands Project Location Specific Redlands Municipal Airfield(REI) Project Location City Redlands Project Location-County San Bernardino Description of Nature,Purpose and Beneficiaries of Project Project involves the replacement and installation of runway and taxiway edge lights and signs,and'mstallation of new light cans light fixtures,conduit and cable for elevated and in-pavement taxiway edge lights,runway end identifier lights,and runway edge lights to increase safety for the pilots when operating at night Name of Public Agency Approving Project City of Redlands Name of Person or Agency Carrying Out Project City of Redlands Exempt Status (check one) ❑ Ministerial(Sec 21080(b)(1),15268), ❑ Declared Emergency(Sec 21080(b)(3),15269(a)), ❑ Emergency Project(Sec 21080(b)(4),115269(b&)) IN Categorical Exemption State type and section number Class 2 Section 15302(c) ❑ Statutory Exemptions State code number- Reasons why project is exempt Project involves the replacement of existing lights with minimal installation of new lights,which serve the same function as existing lights,to provide pilot safety for night operations Lead Agency Will Hamilton (909)798.7653 Contact Person Area CodeFrelephone/E:xtension If filed by ajipticant. 1 Attach certified document of exemption finding 2 Has a Notice of Exemption been filed by the public agency approving the project? ❑Yes El No ool Signature ,_„W, �--- Date /�`vl 4k Title Ae'd„a" °����n Aray4�- IN Signed by Lead Agency 13 Signed by Applicant Authority cited Sections 21083 and 21110,Pubitc Resources Code Date Received for piing at OPR Reference Sections 21108 21152 and 211521 Public Resources Cade DATE FILE PO E Past—Ck3' 3 �` 10 Revised 2411 RWMW '.1..., rept".15�- B`03q 1 2 I 3 I 4 I 5 D D s 8 33 G�E93 NWW 1or,9e.I -.12 -- '14- - 7B-" "- 13- ----2ff __...... 22 N Zia ?a f�- ' .7 —Z-- 3E 3e .. . e. .. ..4a. 42 44 49 43 56 52 54 - �FA-�+--f--�r-�r- �r--ter- �r - �r � - •I—+- '�—r- -.-ter ,�i—r --ter--ter -�f -�---F -.�r -��- �F - �� -�� -_.�f - TWA RAMP APRON C AVAT10N DRIVE E n n 0 Distance Remaining Signs B PAPI B Segmented Circle REILs moo" DO m Beacon TO a — — r REDLANDS AIRPORT i CITY OF REDLAND5 P `u RW 6-26 LIGHTING AND SIGNAGE IMPROVEMENTS N A BASIS OF BEARINGS A BASIS OF BEARINGS Lu a N rn PLANS PREPARED UNDER SVPERMION OF 1111`1{ 5,.s APPmwd BV (17 DIG.�RT OR SS DISK IN R U%GS X-518 ikAN ESS/ , _ 1 Oe.9 AT RE LAN IN CONCRETE FWNON O AT WE COR NANCAfF A@ S INC Y I oplr. I-pdfi ante: • AT REDLArnS AiAPC9T IL'}MN t1K fk1NANGE Ryy�.�+ A ppJq$OJ I I R.ow .._ � fhirNed hy. w LNCA710N: r SP BwNcx�tHOFF Only, 1-2616 I Ou N�tV RI LII Dk.ctr AT THE REaLANDS AIRPSRr,AT THE NORNEAST CORNER CE A NANCW IN NE TCP OE A LEOGE.ON TUE EAST CONCNETE LT.N.447ED x 9iee1 4 1 42 SNeet. N Two nN 1A MET s V OF TUE ENTRANCE TO AN OFRCE EYR.O 11T '. 51 E Vanderbllt Wpr Skit, 200 Spm H.--d;- CA lk- r JOW.JN 2a FEET SwN OF T NeRNEAST CORNER 1r nE HANGAR, ? TES_r'.., see TC4 EA%: ODS Sag 1614 1-'_016 E1.4 D.7 FOOT EAST OF A SLIDING DOOR,AVO ABWT LEVE1 N. L.1t.: ancrlpSlR, ilplr Initld inTlbi OAI✓. gnsxTnq Ne, I- NE ASPWIyT APRON, '2TE.CIV VI - R D,Cp A qF 5-3-17 pI..cE.a pr s.u.:Hm¢ As s.ovn vert NONE `•�� ELEVATION. 1569.80 NAVD Sa Cy9T FN..AM R.CE N. "TIRO E.P.3-31-18 Revisions Oule: MARCH 2015 Baal Pace 4 p.I W..I . .. I 2 I 3 I 4 I 5