HomeMy WebLinkAbout6914 RESOLUTION NO 6914
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS
ESTABLISHING TRAFFIC REGULATIONS PURSUANT TO TITLE 10 OF THE
REDLANDS MUNICIPAL CODE AND RESCINDING RESOLUTION NO 6850
WHEREAS, pursuant to studies made under the authority of Title 10 of the Redlands
Municipal Code, and the presentation of information contained in such studies, the City Council
of the City of Redlands ("this City Council") has determined that certain traffic regulations
should be established to protect the public health, safety and welfare;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF REDLANDS
Section 1 Pursuant to Section 10 24 010 of the Redlands Municipal Code, a traffic
engineering investigation was conducted by Al Grover & Associates to determine the speed
limits for various streets throughout the City of Redlands, which was summarized in an
"Engineering and Traffic Surveys Report" dated May 2009, with Summary Sheets, Segment
Spot Speed Survey, and Speed Sign Postings, which are attached hereto as Exhibits "A," "E,"
and "C," respectively The recommended speed limits are hereby established for such streets and
found appropriate to facilitate the orderly movement of traffic, and the speed limits are
determined to be reasonable and safe, with the exception of that portion of Alta Vista Street
between Florida Street and Sunset Drive, for which a 35MPH speed limit is hereby established
Section 2 Resolution No 6850 is hereby rescinded.
Section 3 This City Council further determines that the approval of this Resolution
is exempt from review under the California Environmental Quality Act ("CEQA") pursuant to
CEQA Guidelines section 15061(b )(3) which provides that CEQA applies only to projects
which have the potential for causing a significant effect on the environment. This City Council
finds that it can be seen with certainty that there is no possibility that the approval of this
Resolution may have a significant effect on the environment
ADOPTED, SIGNED AND APPROVED this 15th day of December, 2009
Pat Gilbreath, Mayor
ATTEST.
Lor�Poyzer, C e k
1. Lome Poyzer, City Clerk of the City of Redlands, hereby certify that the foregoing Resolution
No 6914 was duly adopted by the City Council at a regular meeting thereof held on the 15th day
of December, 2009, by the following vote
AYES� Couneilmembers Bean, Harrison, Gallagher, Aguilar, Mayor Gilbreath
NOES Councilmember Harrison and Councilmember Aguilar
ABSENT None
ABSTAIN None
Lor �Ployze-r, City` 1
Ik
EXHIBIT "C"
Speed Sign Postings
It is recommended that the following streets be posted as indicated below
Alabama Street— Post 40 mph signs for northbound traffic
200 feet north of Park Avneue
Just north of the existing railroad crossing
Post 40 mph signs for southbound traffic
Just south of Lugoma Avenue
Just south of Industrial Park Avenue
Just south of Redlands Boulevard
Alta Vista Drive - Post 40 mph signs for eastbound traffic
Just east of Sunset Drive
Just east of Highview Drive
Post 40 mph signs for westbound traffic
Just west of Florida Street
Just west of Highview Lane
Barton Road- Post 45 mph signs for eastbound traffic
Just east of the westerly city limit
Post 45 mph signs for westbound traffic
Just west of Terracma Boulevard
Post 40 mph signs for eastbound traffic
Just east of Alabama Street
Post 40 mph signs for westbound traffic
Just west of Lakeside Avenue
Brockton Avenue—Post 30 mph signs for eastbound traffic
Just east of New York Street
Post 30 mph signs for westbound traffic
Just west of Texas Street
Post 35 mph signs for eastbound traffic
Just east of Texas Street
Just east of Orange Street
Just east of Church Street
Just east of University Street
Just east of Judson Street
Just east of Lincoln Street
Just east of Dearborn Street
Post 35 mph signs for westbound traffic
Just west of Wabash Avenue
Just west of Dearborn Street
Just west of Lincoln Street
Just west of Judson Street
Just west of University Street
Just west of Church Street
Just west of Orange Street
Brookside Avenue—Post 35 mph signs for eastbound traffic
Just east of Center Street
Post 35 mph signs for westbound traffic
Just west of Eureka Street
Center Street- Post 35 mph signs for southbound traffic
Just south of Crescent Avenue
Post 35 mph signs for northbound traffic
Just north of Ridge Street
Central Street- Post 25 mph signs for eastbound traffic
Just east of University Street
Just east of Grove Street
Post 25 mph signs for westbound traffic
Just west of Judson Street
Just west of Cook Street
Colton Avenue - Post 45 mph signs for eastbound traffic
Just east of Dearborn Street
Post 45 mph signs for westbound traffic
Just west of Wabash Street
Cypress Avenue - Post 45 mph signs for eastbound traffic
Just east of Terracma Boulevard
Just east of Lakeside Avenue
Just east of San Mateo Street
Just east of Esther Way
Just east of Capon Street
Just east of Roosevelt Road
Just east of University Street
Post 45 mph signs for westbound traffic
Just west of Citrus Avenue
Just west of I-10
Just west of University Street
Just west of Redlands Boulevard
Just west of Capon Street
Just west of Center Street
Just west of Lakeside Avenue
Just west of Sunnyside Avenue
Dearborn Street- Post 25 mph signs for northbound traffic
Just north of Lugoma Avenue
Midblock between Lugoma Avenue and San Bernardino Avenue
Post 25 mph signs for southbound traffic
Just south of San Bernardino Avenue
Midblock between Lugoma Avenue and San Bernardino Avenue
Post 30 mph signs for northbound traffic
Just north of San Bernardino Avenue
Approximately 800 feet north of San Bernardino Avenue
Post 30 mph signs for southbound traffic
Just south of Sessums Drive
Approximately 1000 feet south of Sessums Drive
Elizabeth Street—Post 35 mph signs for northbound traffic
Just north of Garden Street
Just north of Henrietta Street
Just north of Fountain Avenue
Post 35 mph signs for southbound traffic
Just south of Crescent Avenue
Just south of Elizabeth Crest
Fifth Avenue— Post 45 mph signs for eastbound traffic
Just east of Ford Street
Post 45 mph signs for westbound traffic
Just west of Dearborn Street
Ford Street - Post 35 mph signs for northbound traffic
Just north of Marcia Street
Just north of South Avenue
Post 35 mph signs for southbound traffic
Just south of Sunset Drive
Just south of South Avenue
Post 40 mph signs for northbound taffic
Just north of Sunset Drive
Just north of Reservoir Road
Just north of Crestview Drive
Just north of Highland Avenue
Just north of Fernwood Drive
Post 40 mph signs for southbound traffic
Just south of Citrus Avenue
Just south of Fernwood Drive
Just south of Fifth Avenue
Just south of Crestview Drive
Just south of Oak Street
Judson Street - Post 40 mph signs for northbound traffic
Just north of Citrus Avenue
Just north of Laramie Avenue
Just north of Sylvan Boulevard
Just north of Colton Avenue
Just north of Brockton Avenue
Post 40 mph signs for southbound traffic
Just south of Lugoma Avenue
Just south of Brockton Avenue
Just south of Colton Avenue
Just south of Sylvan Avenue
Lugoma Avenue—Post 40 mph signs for eastbound traffic
Just east of Alabama Street
Manposa Drive - Post 35 mph signs for eastbound traffic
Just east of Westwood Drive (west)
Post 35 mph signs for westbound traffic
Just west of Country Club Drive
New York Street—Post 35 mph signs for northbound traffic.
Just north of Colton Avenue
Just north of Brockton Avenue
Post 35 mph signs for southbound traffic
Just south of Lugoma Avenue
Just south of Brockton Avenue
Orange Street- Post 40 mph signs for northbound traffic
Just north of Lugoma Avenue
Just north of Pennsylvania Avenue
Just north of San Bernardino Avenue
Post 40 mph signs for southbound traffic
Just south of Pioneer Avenue
Just south of San Bernardino Avenue
Just south of Pennsylvania Avenue
Post 55 mph signs for northbound traffic
Just north of Pioneer Avenue
Post 55 mph signs for southbound traffic
Just south of Hubbard Court
Palo Alto Drive - Post 35 mph signs for westbound traffic
Just west of Sunset Drive
Just west of Wabash Avenue
Post 35 mph signs for eastbound traffic
Just east of Country Club Drive
Just east of Mirasol Drive
Pioneer Avenue - Post 35 mph signs for westbound traffic
Just west of Dearborn Avenue
Just west of Judson Avenue
Just west of Tivoli Drive
Just west of Church Street
Just west of Orange Street
Just west of Webster Street
Post 35 mph signs for eastbound traffic
Just east of Texas Street
Just east of Webster Street
Just east of Orange Street
Just east of Church Street
Just east of Tivoli Drive
Just east of Judson Street
San Timoteo Canyon Road—Post 45 mph signs for northbound traffic
Just north of Fern Avenue
Just north of Nevada Street
Post 45 mph signs for southbound traffic
Just south of Barton Road
Just south of Nevada Street
Texas Street - Post 40 mph signs for northbound traffic
Just north of Redlands Boulevard
Just north of Colton Avenue
Just north of Lugoma Avenue
Post 40 mph signs for southbound traffic
Just south of San Bernardino Avenue
Just south of Pennsylvania Avenue
Just south of Lugoma Avenue
Just south of Colton Avenue
Post 30 mph signs for northbound traffic
Just north of San Bernardino Avenue
Just north of Pioneer Avenue
Post 30 mph signs for southbound traffic
Just south of Domestic Avenue
Just south of Pioneer Avenue
University Street—Post 30 mph signs for northbound traffic
Just north of Lugoma Avenue
Just north of Pennsylvania Avenue
Post 30 mph signs for southbound traffic
Just south of San Bernardino Avenue
Just south of Pennsylvania Avenue
Wabash Avenue - Post 45 mph signs for northbound traffic
Just north of Fifth Avenue
Post 45 mph signs for southbound traffic
Just south of Citrus Avenue
Just south of Highland Avenue
Post 40 mph signs for southbound traffic-
Just south of Colton Avenue
EXHIBIT "B"
2009 City of Redlands - Segment Spot Speed Survey
:Posted Recommended
Street w No Direction Date. Speed.Limit Speed Limit
(mph) (mob)
Alabama St I Barton Rd to Park Ave N/S 119/2009 45 45
2 Park Ave to Lugonia Ave N/S 1/9/2009 35 40
j
Alta Vista Dr 3 Florida St to Sunset Dr E/W 2/5,12009 35 40
Barton Rd 4 W City Limit to Terracma Blvd E/W 1/9/2009 55 45
5 Terracina Blvd to Alabama St E/W 1/9/2009 45 45
6 Alabama St to Lakeside Ave E/W 1/9/2009 35 40
Brockton Ave 7 New York St to Texas St E/W 1/30/2009 25 30
8 Texas St to Church St E!W 1/30/2009 30 35
9 Church St to Judson St E/W 1/30/2009 30 35
10 Judson St to Wabash Ave E/W 2/12/2009 30 35
Brookside Ave 11 Lakeside Ave to Center St E/1W 1/30/2009 35 35
12 Center St to Eureka St I E/W 1/30/2009 30 )5
Center St 13 State St to Brookside Ave E/W 1/9/2009 3. 35
14 Brookside Ave to Cypress Ave E/W 1/9/2009 35 35
15 Cypress Ave to Crescent Ave E/W 1/9/2009 35 35
16 = Crescent Ave to Ridge St E/W 2/12/2009 30 35
Central St 17 University St to Judson St E/W 2/12/2009 30 25
Colton Ave 18 Dearborn St to Wabash Ave E/W 2/12/2009 35 45
Crescent Ave 19 Serpentine Dr to Ramona Dr ( E/W 1/12/2009 35 35
Crestview Rd 20 Ford St to Buckingham Dr E/W 2/12/2009 25 25
Cypress Ave 21 Terracina Blvd to Center St E/W 1/9/2009 40 45
22 ; Center St to Redlands Blvd E/W 1/9/2009 40 45
23 Redlands Blvd to Citrus Ave E/W 1/9/2009 40 45
s Dearborn St 24 - Colton Ave to Lugoma Ave N/S 1/30/2009 30 30
25 Lugoma Ave to San Bernardino Ave N/S 2/27/2009 NP 25
26 San Bernardino Ave to Sessums Dr N/S 2/27/2029 NP 30
Elizabeth St 27 Garden St to Crescent Ave I E/W 2/6/2009 30 35
Fern Ave 28 Redlands Blvd to Cajon St E/W 1/16/2009 40 40
29 Cajon St to Center St E/W 1/16/2009 40 40
30 Center St to San Mateo St EiW 1/16/2009 40 40
31 San Mateo St to Terracma Blvd E/W 1/16/2009 35 35
Fifth Ave 32 Ford St to Dearborn St E/W 3;5/2009 35 45
33 . Dearborn St to Wabash Ave E;W 3/5/2009 45 45
Ford St 34 Citrus Ave to Fifth Ave N/S 1/29,2009 35 40
35 Fifth Ave to Reservoir Rd NIS 1/29/2009 35 40
36 Reservoir Rd to Sunset Dr N,S 1/29/2009 35 40
37 Sunset Dr to Garden Hill Dr N/S 1/29/2009 30 35
Grove St 38 Hiehland Ave to Citrus Ave N/S 3,`5/2009 30 30
39 Citrus Ave to Brockton Ave N/S 3/5/2009 30 30
Judson St 40 Citrus Ave to Colton Ave N/S 1;16/2009 3-) 40
41 Colton Ave to Lugoma Ave N/S 1/16,2009 35 40
42 Lugoma Ave to Pioneer Ave N/S 1/16/2009 35 35
EXHIBIT "B"
2009 City of Redlands - Segment Spot Speed Survey
Posted Recammended
Street tiv io ;Direction Date. Spe'ed.Liini't Speed Limit
(-Pb) {mph).
Lugonia Ave 43 1500 W/o Research Ave to California St E/W 1/9/2009 45 45
44 Cahforma St to Alabama St E/W 1/9/2009 45 45
45 Alabama St to Tennessee St E/W 1/9/2009 45 40
46 Tennessee St to Texas St E/W 2/27/2009 45 45
47 Texas St to Orange St E/W 2/27/2009 40 40
Mariposa Dr 48 Wabash Ave to Country Club Dr E/W 2/5/2009 25 25
49 Country-Club Dr to Garden St EJW 2/6/2009 30 35
50 Halsey St to Dwight St E/W 2/6/2009 20 20
Mountain View Ave 51 Lugoma Ave to San Bernardino Ave N/S 3/5/2009 45 45
New York St 52 Colton Ave to Lugoma Ave NIS 3/6/2009 NP 35
Olive Ave 53 Citrus Ave to San Mateo St E/W 3/6/2009 30 30
54 San Mateo St to Terracina Blvd E/W 3/6/2009 35 35
Orange St 55 Lugoma Ave to Pioneer Ave N/S 3/6/2009 35 40
56 Pioneer Ave to Hubbard Ct N/S 3/6/2009 50 55
Orange Tree Ln 57 California St to Alabama St E/W 1/9/2009 30 30
Palo Alto Dr 58 Country Club Dr to Mirasol Dr E/W 2/5/2009 30 35
59 Mirasol Dr to Sunset Dr E/Vb 2/5/2009 30 35
Pioneer Ave 60 Texas St to Orange St E/W 1/16/2009 30 35
61 Orange St to Occidental Dr E/W 1/16/2009 30 35
62 Occidental Dr to Dearborn St E/W 2/27/2009 30 35
Reservoir Rd 63 Ford St to Wabash Ave E/W 3/6/2009 45 45
San Bernardino Ave 64 Mountain View Ave to California St E/W 2/20/2009 45 45
San Timoteo Canyon Rd 65 Barton Rd to Fern Ave N/S 3/6/2009 40 45
Sunset Dr 66 Vinton Way to Alta Vista Dr N/S 1/29/2009 30 30
67 Alta Vista Dr to Panorama Point N/S 1/29/2009 30 30
Terracina Blvd 68 Barton Rd to Olive Ave N/S 3/6/2009 45 45
69 Olive Ave to Cypress Ave N/S 3/6/2009 35 35
Texas St 70 Redlands Blvd to Lugoma Ave NIS 1/16/2009 35 40
71 Lugoma Ave to San Bernardino Ave N/S 1/16/2009 35 40
72 San Bernardino Ave to Domestic Ave NIS 2/27/2009 N/A 30
University St 73 Cypress Ave to Colton Ave/Redlands Blvd N/S 2/20/2009 30 30
74 Colton Ave/Redlands Blvd to Lugoma Ave N/S 2/20/2009 30 30
75 Lugoma Ave to San Bernardino Ave NIS 2/20/2009 25 30
Wabash Ave 76 Fifth Ave to Citrus Ave N/S 1130,2009 35 45
77 Citrus Ave to Colton Ave N/S 1/30/2009 30 40
78 Colton Ave to Sessums Dr N/S 1/30/2009 35 35
,1
ENGINEERING AND TRAFFIC SURVEYS
IN THE
NO
CITY OF REDLANDS
2008
Prepared For
CITY OF REDLANDS
Engineering Department
May 2009
11 t
,.f 4 056 $
Submitted By
ALBERT
COVER
fes `. : . t,{ c , Ali <, : C", _, � :.
TABLE OF CONTENTS
SECTION PAGE
1 0 INTRODUCTION 1
20 STUDY METHODOLOGY 2
30 SURVEY RESULTS 3
3 1 Street Surveillance 3
3 2 Accident Rate Analysis 3
3 3 Spot Speed Survey 4
40 SURVEY FINDINGS AND RECOMMENDATIONS 8
41 Speed Limit Signing 8
5 0 SUMMARY AND CONCLUSIONS 13
LIST OF TABLES
TABLE
1 Speed Zone Survey—Accident Survey Analysis 6
2 Segment Spot Speed Survey Summary 10
APPENDICES
APPENDIX
A Speed Zoning Regulations from Caltrans MUTCD 2003 California Supplement
"Traffic Manual" and Definitions of Terms
B Regulations Governing Speed Limits (Excerpts from California Vehicle Code)
I
Albert Grover&Associates Introduction
SECTION 1.0
INTRODUCTION
The purpose of this report is to document the results of an engineering and traffic survey conducted
to update the speed limits on City of Redlands arterial (principal/minor), collector, and local street
network The overall study was conducted to comply with existing State regulations concerning the
increasing or decreasing of speed limits within City boundaries
It is a common belief that posting of speed limit traffic signs will influence drivers to drive at that
speed However, the facts indicate otherwise
Driver behavioral research conducted in many parts of this country over a span of several decades
shows that the average driver is influenced by the appearance of the highway itself and the
prevailing traffic conditions in choosing the speed at which he or she drives Recognizing this, the
California Vehicle Code (CVC) requires that speed limits be established in accordance with
appropriate engineering practice and methods
This report contains sufficient information to document that the conditions of the latest edition of the
California Vehicle Code Section 627 have been satisfied and that other conditions not readily
apparent to a motorist are properly identified To legally use radar for speed enforcement, Section
40802(b) of the CVC requires that limits be established per Sections 22357 and 22358 of the CVC,
the limits must be justified by an engineering and traffic survey conducted within five years prior to
the date of the alleged violation However, the time span can be extended up to seven to ten years
depending on specific criteria These changes are expanded on in Appendix B The latest edition of
the CVC has highlighted bicycle and pedestrian safety as part of the traffic and engineering survey,
and this aspect was considered
According to the City records, the last speed zone surveys were conducted in 2003 The current
study will verify, increase or decrease existing speed limits within the City of Redlands based on the
data and the results of this survey
At 78 locations on the City's arterial and secondary arterial street network, spot speed surveys
were taken in conformance with the State law for conducting engineering and traffic surveys for
the purpose of establishing prima facie speed limits The data was collected per the California
Manual of Uniform Traffic Control Devices (MUTCD) Sections of the MUTCD detailing
regulations for conducting the required "Engineering and Traffic Survey" are presented in
Appendix A Also in Appendix A are definitions of terms used in speed zone surveys Excerpts
from the CVC regarding regulations governing speed limits are presented in Appendix B
The actual speed zone surveys were conducted by Albert Grover and Associates (AGA) The
streets were driven by a California registered traffic engineer from AGA
1
Albert Grover&Associates Study Methodology
SECTION 2 0
STUDY METHODOLOGY
The study involved three mayor categories of data and analysis The three mayor components are (1)
geometric and characteristic street surveillance, (2) spot speed survey, and(3)accident rate analysis
The arterial and secondary arterial streets were surveyed by field observation to determine the
existing roadway characteristics, condition and placement of signs and markings, adjacent land uses,
pedestrian and bicycle activity, and to identify roadway characteristics that are not readily apparent
to vehicle drivers
Spot speed surveys, utilizing a calibrated radar gun, were conducted at 78 locations to determine
existing vehicular travel speeds A minimum of 100 observations (when possible)were recorded, 50
for each direction of travel, on all the arterial and secondary arterial streets This data was used to
calculate statistical information such as the 85`'' percentile speed, 50th percentile speed, 10 mile per
hour pace speed, percent of vehicles within the 10 mile per hour pace, median speed and other
pertinent data for analysis
Accident data was tabulated from the City's Accident Records (Crossroads) for the period from
January 1, 2004 to December 31, 2006 (3 years) for each roadway segment The accident rate was
calculated and considered in recommending the speed limit
2
Albert Grover&Associates Summary and Conclusions
SECTION 3.0
SURVEY RESULTS
31 Street Surveillance
"Speed Limit and Zones," Section 2B 116 of the California MUTCD latest edition, states that the
speed lirmt should be established at the nearest five mile per hour increment to the 85th percentile
speed recorded during the spot speed survey However, in matching existing conditions with the
traffic safety needs of the community, engineering judgment may indicate the need for a further
reduction in speed Whenever such factors are considered to establish the speed limit, they should be
documented on the speed survey or in the accompanying engineering report
The survey streets were driven by Mr Mark Miller, P E, Principal-in-Charge, who is a registered
Civil and Traffic Engineer in the State of California The roadway characteristics, location of speed
limit signs, conditions not readily apparent to the driver, type of area adjoining the street
(commercial, residential, school zone, parks, etc) and type of roadway (divided, undivided, number
of lanes, etc) were recorded as part of the study The roadway characteristics recorded were used to
determine if any physical conditions warranted consideration of an additional five mile per hour
reduction of the recommended speed in accordance with CVC Section 627
The speed survey segment roadway characteristics for each segment are indicated on the speed zone
spot survey data forms in Appendix D
32 Accident Rate Analvsis
The accident rate for each speed survey segment was determined by using the most recent accident
records as required by CVC Section 627 Based on a review of the Crossroads collision database
from January 1, 2004 to December 31, 2006,mid-block accident rates were calculated for each street
surveyed
The results of the accident rate calculations, including the Average Expected Accident Rates for
each type of roadway facility are shown in Table 1 and in the Engineering and Traffic Survey
Summary(Appendix D) The Average Expected Accident Rates are based on the latest average rate
for each type of roadway in the City of Redlands per the Crossroads database
♦ Two and three lanes Urban Roadway— 198
♦ Four or more lanes Undivided Urban Roadway—3 55
♦ Four or more lanes Divided Urban Roadway—2 30
The mid-block accident rate in terms of"accidents per 1,000,000 vehicle miles of travel" for each
street surveyed was calculated and is shown on the Engineering and Traffic Survey summary sheets
The following shows a sample calculation
3
Albert Grover&Associates Summary and Conclusions
Accident Rate Calculation
The rate was calculated using the following equation
Accident Rate= Number of Midblock accidents per near x 106
24-hour volume x 365 x segment length x 2 years
Where Number of mid-block accidents per year based on one year (January
1, 2004 to December 1, 2006), 24-hour volume (both directions) in
the survey segment and segment length in miles
Example-
Accident rate on Barton Road between Alabama Street and Lakeside Avenue
Accident Rate = 1 x 106(4)
17,508 x 0 45 x 365 x 3
0.50 accidents per million vehicle miles (AJMV I)
The Expected Accident Rate for the segment is 2 30 The calculated accident rate of 0 50 is well
below the expected rate for this segment
33 Spot Speed Survev
Spot speed surveys were conducted at each street segment to establish a reasonable and effective
speed limit based on the premise that the speed limit thus established conforms to the actual
behavior of the majority of motorists The speed limit should normally be established at or near the
85th percentile speed recorded for the surveyed segment and not below the 50`h percentile However,
engineering judgment and other factors such as Street Surveillance (Section 3 1) and accident rates
(Section 3 2) may indicate the need for further reduction in establishing reasonable and effective
speed limits
The criteria used in conducting the radar survey are listed in Appendix A
Appendix D contains the spot speed survey data sheets for each of the 78 sections surveyed The
information collected and data calculated for the radar speed survey are as follows
♦ Posted speed linut
♦ Direction of survey
♦ Date and time of speed survey
♦ 50th Percentile speed
♦ 85th Percentile speed
♦ 10 mph pace speed
♦ Percent over pace speed
♦ Range of speeds
4
Albert Grover&Associates Summary and Conclusions
♦ Number of vehicles observed
♦ Average speed
♦ Accident History
♦ Accident Rate
♦ Average Daily Traffic
♦ Road Description
♦ Pedestrian and Bicycle activity
The summary contains information about vehicular speed data observed, accident data, street
classification, and any unusual conditions at the location
5
Page 1 of 2
City of Redlands
Table 1 2009 Speed Zone Survey - Accident Survey Analysis I
f Distance Distance 2008 Accidentsi Accident ExpectedStreet 'So Location (Miles) (Feet) ADT (3 Y- �o0a1] Rate Ace Rate
Alabama St I Barton Rd to Park Ave 0.82 4,330 15 491 4 0.29 3 55
2 Park Ave to Lugoma Ave 076 4,013 18,309 13 0.8.) 3 55
I
Alta Vista Dr 3 Florida St to Sunset Dr 0.66 3,485 1 000 1 1 38 1 98
Barton Rd 4 W City Limit to Terracina Blvd 0?' 1 426 19 782 1 0 17 2.30
5 Terracma Blvd to Alabama St 0.34 1 795 19 782 2 0.27 2.30
6 Alabama St to Lakeside Ave 042 2,218 17 508 4 0.50 2.30
Brockton Ave 7 New York St to Texas St 0.2-� 1 320 1 708 1 2 14 1 98
8 Texas St to Church St 1 00 5,280 2,267 3 121 1 98
9 Church St to Judson St 1 00 5,280 2,267 6 2.42 1 98
10 Judson St to Wabash Ave 1 00 5 280 2,267 1 040 1 98
Brookside Ave 11 Lakeside Ave to Center St 076 4,013 12,654 6 0.57 1 98
12 Center St to Eureka St 0.37 1,954 12 654 5 0.98 1 98
Center St 13 State St to Brookside Ave 0.38 2,006 4,250 1 057 1 98
14 Brookside Ave to Cypress Ave 075 3,960 4,250 5 1 43 1 98
15 Cypress Ave to Crescent Ave 0.67 3,538 4,250 - 0 0.00 1 98
16 Crescent Ave to Ridge St 0.34 1,795 15,491 0 000 1 98
Central St 17 University St to Judson St 0.60 3 168 2000 6 4.57 1 98
Colton Ave 18 Dearborn St to Wabash Ave 0.50 2,640 9 1:9 2 0.40 l 98
Crescent Ave 19 Serpentine Dr to Ramona Dr 1 01 5,333 728 2 248 1 98
Crestview Rd 20 Ford St to Buckingham Dr 0.92 4,858 1 000 0 0.00 1 98
Cypress Ave 21 Terracma Blvd to Center St 1 26 6,653 7,671 2 0 19 3.55
22 Center St to Redlands Blvd 0.86 4,541 7 671 1 0 14 3.55
23 Redlands Blvd to Citrus Ave 0.66 3 485 7 671 4 072 1 98
Dearborn St 24 Colton Ave to Lugonia Ave 0.53 2 798 3 128 1 0.55 1 98
25 Lugoma Ave to San Bernardino Ave 0.90 4 752 3 128 0 0.00 1 98
26 San Bernardino Ave to Sessums Dr 0.36 1 901 3 128 0 0.00 198
Elizabeth St 27 Garden St to Crescent Ave 0.97 5,122 1,912 2 0.98 1 98
Fern Ave 28 Redlands Blvd to Cajon St 0.35 1 848 6 811 2 077 198
29 Cajon St to Center St 0.50 2,640 6,811 1 0.27 1 98
30 Center St to San Mateo St 0.50 2,640 6 811 0 0.00 1 98
31 San Mateo St to Terracma Blvd 0 71 3 749 6,811 1 0 19 1 98
Fifth Ave 32 Ford St to Dearborn St 0.50 2,640 6 720 3 0.82 3.:)5
33 Dearborn St to W abash Ave 0.50 2 640 6 720 0 0.00 1 98 '
Ford St 34 Citrus Ave to Fifth Ave 0.42 2,218 8,235 2 0.�-3 355
35 Fifth Ave to Reservoir Rd 0.55 2,904 8,235 0 0.00 1 98
36 Reservoir Rd to Smnset Dr 0.46 2,429 3 822 1 0.�)2 2.30
37 Sunset Dr to Garden Hill Dr 0.55 2,904 8,235 2 0.40 198
Grove St 38 Highland Ave to Citrus Ave 0.49 2,c87 1,184 1 1 57 1 98
39 Citrus Ave to Brockton Ave 0 75 3 960 1 184 1 1 03 1 98
Judson St 40 Citrus Ave to Colton Ave 0.50 2,640 5 080 1 0.�6 3.55
41 Colton Ave to Lugoma Ove 0.50 2,640 -�080 2 072 1 98
I
42 Lugoma Ave to Pioneer Ave 0 75 3,960 5,080 0 0.00 1 98
Lugonia Ave 43 1500 W;o Research We to California St 1 03 5,438 4,109 4 0.86 1 98
44 California St to Alabama St 1 00 5,280 6,082 13 1 95 1 98
45 Alabama St to Tennessee St 0 56 2,957 12 070 2 0.27 355
46 Tennessee St to Texas St 0.45 2,376 12,070 1 0 17 355
47 Texas St to Orange St 0 50 2,640 12,070 1 015 3..�5
I
Mariposa Dr 48 Wabash Ave to Country Club Dr 0.38 2,006 1 224 0 0.00 1 98
49 Country Club Dr to Garden St 0.50 2,640 1 224 1 1 49 1 98
:�0 Halsey St to Dwight St 0.37 1 954 1 224 0 0.00 1 98
Mountain View Ave 51 Lugonia Ave to San Bernardino Ave 0.42 2,218 11 740 0 0.00 1 98
New York St 52 Colton Ave to Lugoma Ave 0.53 2 798 1 000 0 0.00 1 98
'Accident Data from 11112004 to 1/1/2007 1 -vu'r'Pr rrs:Redh nd 9601,;Sped Survey(19 R p I R,1,111 A Acad1 r and Scb is yr Spon ta
'Source Caltrans 2006
5/13/'Go9
Page 2 of 2
City of Redlands
Table 1 2009 Speed Zone Survey - Accident Survey Analysis
Distance Distance 2008 Accidents: Accident Expected'
Street No Location (3 veep rn�otl
(Miles) (Feet) ADT I Rate I Acc Rate
Olive Ave 53 Citrus Ave to San Mateo St 1 26 6,653 3,238 3 0.67 198
54 San?!Mateo St to Terracma Blvd 0 80 4,224 3 238 2 � 071 198
111 Orange St 55 Lugonia Ave to Pioneer Ave 1 60 8 448 10 719 12 0.64 3 55
-�6 Pioneer Ave to Hubbard Ct 0.-�0 2,640 7 940 1 15 198
Orange Tree Ln b? California St to Alabama St 1 50 7,920 5,000 4 0.49 3.55
Palo Alto Dr 58 Country Club Dr to Mirasol Dr 0.27 1 426 1,266 0 0.00 1 98
b9 Mirasol Dr to Sunset Dr 0.68 3,590 1,266 1 1 06 1 98
Pioneer Ave 60 Texas St to Orange St 0.50 2 640 2,007 2 1 82 1 98
61 Orange St to Occidental Dr 075 3 960 1,081 1 1 13 1 98
62 Occidental Dr to Dearborn St 1 23 6,494 2,000 4 1 48 1 98
Reservoir Rd 63 Ford St to Wabash Ave 1 11 ,)861 1 000 1 0.82 198
San Bernardino Ave 64 Mountain View Ave to California St 1 00 5 280 6,963 3 0.39 2.30
San Timoteo Canyon Rd 65 Barton Rd to Fem Ave 1 34 7 075 5 639 8 097 1 98
Sunset Dr 66 Vinton Way to Alta Vista Dr 0.49 2,587 2 642 0 0.00 1 98
67 Alta Vista Dr to Panorama Point 1 13 5 966 708 2 2.28 1 98
Terracina Blvd 68 Barton Rd to Olive Ave 077 4,066 17 103 6 0.42 198
69 Olive Ave to Cypress Ave 048 2,534 17 103 3 0.33 1 98
Texas St 70 Redlands Blvd to Lugonia Ave 0.86 4,541 10,019 3 0.32 3.55
71 Lagoma Ave to San Bernardino Ave 0.50 2,640 10 019 1 018 1 98
72 San Bernardino Ave to Domestic Ave 0.51 2,693 1 351 0 0.00 1 98
I
University St 73 Cypress Ave to Colton Ave/Redlands Blvd 0.69 3,643 1 518 10 8 72 198
74 Colton Ave/Redlands Blvd to Lugonia Ave 0.50 2,640 1 518 3 3 61 1 98
75 Lugonia Ave to San Bernardino Ave 0.50 2,640 1,207 0 000 1 98
Wabash Ave 76 Fifth Ave to Citrus Ave 049 2,587 4,800 0 0.00 198
77 Citrus Ave to Colton Ave 0.--,l 2,693 5,365 2 0.67 1 98
78 Colton Ave to Sessams Dr 142 7 498 906 0 0.00 1 98
'Accident Data from 1112004 to 11172007 Server's Pi�r r.R<-land,196-001 Sped 1u ey 09R,po t Redtnnd. lectdeni and Jebmcm Spor Tahle,.'!,
Source Caltrans 2006 5/13/'009
Albert Grover&Associates Summary and Conclusions
SECTION 4 0
SURVEY FINDINGS AND RECOMMENDATIONS
In accordance with the State-imposed speed limit establishment regulation, as defined by CVC
Section 627 described in Appendix A, there are several factors that may be considered to justify
setting the prima facie speed limits more than five miles per hour below the observed 85th percentile
speed
It should be noted that the regulations in Appendix A also state that the maximum permissible
lowering of the proposed speed limit from the 85th percentile is 10 miles per hour
The factors to be considered are
♦ Most recent accident record(mid-block)
♦ Roadway design speed
♦ Safe stopping sight distance
♦ Superelevation
♦ Grades
♦ Shoulder condition
♦ Profile condition
♦ Intersection spacing offsets
♦ Commercial driveway characteristics (land use)
♦ Pedestrian traffic with and without sidewalks
♦ Pedestrian and Bicycle safety
The above factors for each roadway segment surveyed are listed on the spot speed survey data forms
in Appendix D The 85th percentile speed and the above factors were considered in venfying
existing speed limits and recommending speed limit changes (increase or decrease) Additionally,
discussions were held with City staff in making decisions with respect to changing existing speed
limits This allowed for consideration of any special knowledge of the segment Table 2 shows the
surveyed road segments with posted and recommended speed limits, including any increases or
decreases
41 Speed Limit Sienin2
All California motorists are required to know the basic 15, 25, and 55 MPH speed laws and are
tested on the subject when applying for a driver's license Consequently, speed limit signs covering
these conditions need not be posted on City streets However, although not required by law, speed
limit signs for these situations may be posted on streets that have significant daily vehicular traffic
volumes, a by-pass traffic situation, the continued violation of a residential 25 MPH speed zone, or
with other applicable warrants
8
Albert Grover&Associates Summary and Conclusions
It is normal policy to recommend the posting of speed limit signs only of streets that have been
covered by the City speed limit ordinance or by warranted situations covered above
Speed limit signs should be installed at about one-half mile intervals on the City streets which have
been speed zoned Signs are normally installed on the exit side of traffic signal controlled
intersections and the more important intersections where there is high side street vehicle entry It is
important that motorists be given adequate information while not oversignmg, which tends to
confuse the motorist
Enforcement problems can occur when, (a) the highway is posted with inappropriate speed limit
signs, (b) the highway is improperly or inadequately posted, or, (c) the highway is not posted nor
covered by ordinance and therefore falls under the basic speed law In any of these events, the result
is a debatable validity that may be questioned in court cases where citations are issued and contested
9
Table 2: 2009 City of Redlands - Segment Spot Speed Survey Page,of
10-Mile %in 50th 85th Posted Recommended
Street No No Direction Date Pace 10-Mile %751e /.Tile Speed Limit Speed Limit Comments
(mph) Pace (mph) (mph) (mph) (mph)
Alabama St 1 Barton Rd to Park Ave N/S 1/9/2009 36-45 694 42 47 45 45 No change
2 Park Ave to 1 ugoma Ave N/S 1/9/2009 3241 698 36 41 35 40 Increase low accident rate
Alta Vista Dr 3 Florida St to Sunset Dr E/W 2/5/2009 3544 570 41 47 35 40 Increase,no curb,sidewalk,curves,low accident
Barton Rd 4 W City Luna to Terracina Blvd E/W 1/9/2009 40-49 796 43 47 5.5 45 Decrease 85th percentile
5 Terracina Blvd to Alabama St E/W 1/9/2009 3847 78.5 42 46 45 45 No change
6 Alabama St to Lakeside Ave E/W 1/9/2009 36-45 76.9 41 45 35 40 Increase,low accident rate
Brockton Ave 7 New York Si to Texas St F.,/W 1/30/2009 30 39 81.2 34 39 25 30 Increase residential
8 'Texas St to Chinch St E/W 1/30/2009 29-38 89.3 33 36 30 35 Increase low accident rate
9 Church St to Judson St E/W 1/30/2009 30-39 84.0 34 38 30 35 Increase low accident rate
10 Judson St to Wabash Ave E/W 2/12/2009 27 36 776 32 37 30 35 Increase low accident rate
Brookside Ave 11 1 akeside Ave to Center St h/W 1/30/2009 32 41 89.5 37 41 35 35 No change,low accident rate continuity ol'speed
12 Center St to Eureka St EAN 1/30/2009 29-38 679 35 42 30 35 Increase,low accident rate,multiple pedestrian zings
(,enter St 13 State St to Brookside Ave E/W 1/9/2009 3241 83 8 36 39 35 35 No change low accident rate
14 Brookside Ave to Cypress Ave E/W 1/9/2009 32 41 73 1 35 40 35 35 No change continuity of speed low accident rate
15 Cypress Ave to Crescent Ave E/W 1/9/2009 30 39 790 34 39 35 35 No change,continuity of speed,loH accident rate
16 Crescent Ave to Ridge St E/W 2/12/2009 25 34 817 30 37 30 35 Increase continuity of speed low accident rate
Central St 1.7 University St to Judson St E/W 2/12/2009 25 34 74.4 30 35 30 25 Decrease local street
Colton Ave 18 Dearborn St to Wabash Ave E/W 2/12/2009 3746 702 40 45 35 45 Increase low accident rate
Crescent Ave 19 Serpentine Dr to Ramona Dr h/W 1/12/2009 31 40 58.5 33 41 35 35 No change no sidewalks driveways
Crestview Rd 20 Ford St to Buckingham Dr E/W 2/12/2009 30 39 674 36 42 25 25 No change local street
Cypress Ave 21 Terracina Blvd to Center St E/W 1/9/2009 3847 72.4 43 48 40 45 Increase multiple driveways low accident rate
22 Center St to Redlands Blvd E/W 1/9/2009 4049 70.8 43 48 40 45 Increase low accident rate
23 Redlands Blvd to Citrus Ave E/W 1/9/2009 36-45 627 41 46 40 45 Increase low accident rate
Dearborn St 24 Colton Ave to I ugonia Ave N/S 1/30/2009 23 32 84 7 28 32 30 30 No change
25 1 ugoma Ave to San Bernardino Ave N/S 2/27/2009 28 37 88.0 31 36 NP 25 Local street
26 San Bernardino Ave to Sessums Dr N/S 2/27/2029 23 32 100.0 29 31 NP 30 Establish
Elizabeth St 27 Garden St to Crescent Ave E/W 2/6/2009 33 42 68.0 38 44 30 35 Increase no curb gutters sidewalks low accident
Fern Ave 28 Redlands Blvd to Cajon St E/W 1/16/2009 3039 842 36 39 40 40 No change
29 Cajon St to Center St E/W 1/16/2009 28 37 951 33 36 40 40 No change
30 Center St to San Mateo St E/W 1/16/2009 32 41 777 37 42 40 40 No change
31 San Mateo St to Terraema Blvd E/W 1/16/2009 26-35 89.2 31 34 35 35 No change
Fifth Ave 32 Pord St to Dearborn St E/W 3/5/2009 36-45 752 41 45 35 45 Increase 85th percentile low accident rate
33 Dearborn St to Wabash Ave F,/W 3/5/2009 39-48 754 43 48 45 45 No change
5.13r1W9
--5e,a+xlr.fla�ccu:ReAm�-15&IIQ!SpaQSrzz}04'Rrym'N<Aae�A:ndem and Seyr.er35pd tatA«Js
Table 2 2009 City of Redlands - Segment Spot Speed Survey Paye
10-Mile %in 50th 85th Posted Recommended
Street No No Direction Date Pace 10-Stile %Tile %Tile Speed Limit Speed Limit Comments
(mph) Pace (mph) (mph) (mph) (mph)
Ford St 34 Citrus Ave to Fifth Ave N/S 1/29/2009 38 47 73 0 41 46 35 40 Increase continuity of speed low accident rate
35 Fifth Ave to Reservoir Rd N/S 1/29/2009 30 39 78,6 35 40 35 40 hicreasc,low accident rate
36 Reservoir Rd to Sunset Dr N/S 1/29/2009 3241 66.3 37 42 35 40 Increase low accident rate
37 Sunset Dr to Garden Hill Dr N/S 1/29/2009 28-37 58.0 34 40 30 35 Increase wide street low accident rate
Grove St 38 Highland Ave to Citrus Ave N/S 3/5/2009 26-35 75.9 30 37 30 30 No change
39 Citrus Ave to Brockton Ave N/S 3/5/2009 28 37 779 34 37 30 30 No change
Judson St 40 Citrus Ave to Colton Ave N/S 1/16/2009 33-42 892 37 41 35 40 Increase low accident rate
41 Colton Ave to Lugonia Ave N/S 1/16/2009 29 38 72.8 35 40 35 40 Increase,low accident rate
42 Lugoma Ave to Pioneer Ave N/S 1/16/2009 28 37 771 31 36 35 35 No change
I ugonia Ave 43 1500'W/o Research Ave to California St E/W 1/9/2009 40-49 84.0 45 48 4.5 45 No change
44 California St to Alabama St 13/W 1/9/2009 35-44 74.8 40 44 45 45 No change
45 Alabama St to Tennessee St E/W 1/9/2009 2837 86.8 32 36 45 40 Decrease
46 Tennessee St to Texas St E/W 2/27/2009 3342 75.2 39 44 45 45 No change
47 Texas St to Orange St E/W 2/27/2009 3544 841 38 42 40 40 No change
Mariposa Dr 48 Wabash Avg to Country Club Dr 1'11/W 2/5/2009 1928 92.5 23 27 25 25 No change
49 Country Club Dr to Garden St E/W 2/6/2009 3140 78.0 37 40 30 35 Increase no sidewalks low accident rate
50 Halsey St to Dwight St E/W 2/6/2009 15-24 90.0 19 22 20 20 No change
Mountain View Ave 51 1 ugoma Ave to San Bernardmit Ave N/S 3/5/2009 34 43 70.0 37 43 45 45 No change 85th per
New York St 52 Colton Ave to Lugonia Ave N/S 3/6/2009 2938 670 35 39 NP 35 Establish 85th percentile low accident rate
Olive Ave 53 Citrus Ave to San Mateo St E/W 3/6/2009 2736 69.0 29 35 30 30 No change 85th percentile low accident rate
54 San Mateo St to Terracina Blvd E/W 3/6/2009 28-37 634 34 41 35 35 No change 85th percentile low accident rate
Orange St 55 Lugonia Ave to Pioneei Ave N/S 3/6/2009 33-42 77 1 37 42 35 40 Increase 85th percentile low accident rate
56 Pioneer Ave to Hubbard Ct N/S 3/6/2009 51 60 70.5 53 60 50 55 Increase 851h percentile low accident rate
Orange Tree Ln 57 California St to Alabama St E/W 1/9/2009 1726 95.0 22 25 30 30 No change
Palo Alto Dr 58 Country Club Dr to Mirasol Dr E/W 2/5/2009 26 35 71.6 32 38 30 35 Increase low accident rate
59 Muasol Dr to Sunset Dr E/W 2/5/2009 2937 72.0 33 38 30 35 Increase low accident rate
Pioneer Ave 60 Texas St to Orange St E/W 1/16/2009 31.40 86.5 35 38 30 35 Increase,low accident rate
61 Orange It to Occidental Dr E/W 1/16/2009 25 34 76,9 31 35 30 35 Increase low accident rate
62 Occidental Dr to Dearborn St E/W 2/27/2009 28 37 84,0 33 37 30 35 Increase low accident rate
Reservoir Rd 63 Ford St to Wabash Ave E/W 3/6/2009 3847 799 44 48 45 45 No change
San Bernardino Ave 64 Mountain View Ave to California St E/W 2/20/2009 38-47 84.2 44 47 45 45 No change
San T'imoteo Canyon Rd 65 Barton Rd to Fern Ave N/S 3/6/2009 37 46 78.8 41 45 40 45 Increase 85th percentile low accident rate
Sunset Dr 66 Vinton Way to Alta Vista Dr N/S 1/29/2009 28-37 76.2 33 38 30 30 No change curvilinear no sidewalks
67 Alta Vista Dr to Panorama Point N/S 1/29/2009 2433 84.0 29 32 30 30 No change,curvilinear no sidewalks
9i3'XAB
is«.ar< �weimm:ncmi syua se...mx�xaam nKa<w aes�,.++spw rw�.t4
Table 2 2009 City of Redlands - Segment Spot Speed Survey Page 3ot3
10-Mile %to 50th 85th Posted Recommended
Street No No Direction Date Pace 10-dile %-1 He 'A'rile Speed Limit Speed Limit Comments
(mph) Pace (mph) (mph) (mph) (mph)
Terracuta Blvd 68 Barton Rd to Olive Ave N/S 3/6/2009 39-48 827 43 47 45 45 No change
69 Olive Ave to Cypress Ave N/S 3/6/2009 28-37 85 6 32 36 35 35 No change
Texas St 70 Redlands Blvd to 1 ugonia Ave N/S 1/16/2009 36-45 76.2 40 45 35 40 Increase continuity of speed low accident rate
71 1 ugonia Ave to San Bernardino Ave N/S 1/16/2009 30-39 853 34 38 35 40 Increase low accident rate
72 San Bernardino Ave to Domestic Ave NIS 2/27/2009 25 34 96.3 30 33 N/A 30 Establish
University St 73 Cypress Ave to Colton Ave/Redlands Blvd NIS 2/20/2009 27 36 90S 31 35 30 30 No change high accident rate
74 Colton Ave/Redlands Blvd to Lugonia Ave N/S 2/20/2009 28 37 806 32 36 30 30 No change high accident rate
75 Lugonia Ave to San Bernardino Ave N/S 2/20/2009 28-37 897 33 37 25 30 Increase,tow accident rate continuity of speed
Wabash Ave 76 Filth Ave to Citrus Ave N/S 1/30/2009 28 37 792 42 48 35 45 Increase low accident rate
77 Citrus Ave to Colton Ave N/S 1/30/2009 31 40 65 1 37 43 30 40 Increase,low accident rate
78 Colton Ave to Sessums Dr N/S 1/30/2009 28 37 78.8 33 37 35 35 No change
5'1]rtOpB
Smv IdJ4apmRsMds-IAS-0111 Spse4 Suer-O4RnymJleArrax Ac..ih.0 mA tiegmuu Spu ialdew..v1
Albert Grover&Associates Summary and Conclusions
SECTION 5 0
SUMMARY AND CONCLUSIONS
1 The radar survey and the raw data collection was conducted per CVC Section 627
2 A total of 78 sections on the City's arterial, collector, and local street network were surveyed
3 The accident rate(Table 1) for the majority of the street segments is well below the expected
accident rate obtained from the City's Crossroads database for various types of roadway
facilities
4 It was concluded that the existing speeds on arterial, collector, and local roadways in the City
of Redlands can remain unchanged, except on the following roadway segments
♦ Alabama Street- Park Avenue to Lugoma Ave, it is recommended that the existing
posted speed limit of 35 mph be increased to 40 mph based on the 85th percentile speed
and low accident rate
♦ Alta Vista Drive Florida Street to Sunset Drive, it is recommended that the existing
posted speed limit of 35 mph be increased to 40 mph based on the 85th percentile speed
and low accident rate
♦ Barton Road West City Limit to Terracma Boulevard, it is recommended that the
existing posted speed linut of 55 mph be decreased to 45 mph based on the 85th
percentile speed
♦ Barton Road Alabama Street to Lakeside Avenue, it is recommended that the existing
posted speed limit of 35 mph be increased to 40 mph based on the 85th percentile speed
and low accident rate
♦ Brockton Avenue New York Street to Texas Street, it is recommended that the existing
posted speed limit of 25 mph be increased to 30 mph based on the 85th percentile speed
♦ Brockton Avenue Texas Street to Wabash Avenue, it is recommended that the existing
posted speed lurut of 30 mph be increased to 35 mph based on the 85th percentile speed
and low accident rate
♦ Brookside Avenue Center Street to Eureka Street, it is recommended that the existing
posted speed limit of 30 mph be increased to 35 mph based on the 85`h percentile speed,
low accident rate, and multiple pedestrian crossings
♦ Center Street. Crescent Avenue to Ridge Street, it is recommended that the existing
posted speed limit of 30 mph be increased to 35 mph based on the 85`h percentile speed,
continuity of speed, and low accident rate
♦ Central Street University Street to Judson Street, it is recommended that the existing
posted speed limit of 30 mph be decreased to 25 mph based on the Local Street status
13
Albert Grover&Associates Summary and Conclusions
♦ Colton Avenue Dearborn Street to Wabash Avenue, it is recommended that the existing
posted speed limit of 35 mph be increased to 45 mph based on the 85th percentile speed
and low accident rate
♦ Cypress Avenue Terracing Boulevard to Citrus Avenue, it is recommended that the
existing posted speed limit of 40 mph be increased to 45 mph based on the 85th percentile
speed and low accident rate
♦ Dearborn Street Lugoma Avenue to San Bernardino Avenue, it is recommended that
the speed limit be established at 25 mph based on the Local Street status
♦ Dearborn Street San Bernardino Avenue to Sessums Drive, it is recommended that the
speed limit be established at 30 mph based on the Local Street status
♦ Elizaheth Street: Garden Street to Crescent Avenue, it is recommended that the existing
posted speed limit of 30 mph be increased to 35 mph based on the 85th percentile speed
and low accident rate
♦ Fifth Avenue- Ford Street to Dearborn Street, it is recommended that the existing posted
speed limit of 35 mph be increased to 45 mph based on the 85`h percentile speed and low
accident rate
♦ Ford Street Citrus Avenue to Sunset Drive, it is recommended that the existing posted
speed limit of 35 mph be increased to 40 mph based on the 85`h percentile speed,
continuity of speed,and low accident rate
♦ Ford Street Sunset Drive to Garden Hill Drive, it is recommended that the existing
posted speed limit of 30 mph be increased to 35 mph based on the 85th percentile speed
and low accident rate
♦ Judson Street Citrus Avenue to Lugoma Avenue, it is recommended that the existing
posted speed limit of 35 mph be increased to 40 mph based on the 85th percentile speed
and low accident rate
♦ Lugoma Avenue Alabama Street to Tennessee Street, it is recommended that the
existing posted speed linut of 45 mph be decreased to 40 mph based on the 85th
percentile speed
♦ Mariposa Drive Country Club Drive to Garden Street, it is recommended that the
existing posted speed hnut of 30 mph be increased to 35 mph based on the 85th percentile
speed and low accident rate
♦ New York Street- Colton Avenue to Lugoma Avenue, it is recommended that the speed
limit be established at 35 mph based on 85th percentile speed and low accident rate
♦ Orange Street: Lugoma Avenue to Pioneer Avenue, it is recommended that the speed
limit of 35 mph be increased to 40 mph based on the 85`h percentile speed and low
accident rate
♦ Orange Street Pioneer Avenue to Hubbard Court, it is recommended that the existing
posted speed limit of 50 mph be increased to 55 mph based on the 85th percentile speed
and low accident rate
14
Albert Grover&Associates Summary and Conclusions
♦ Palo Alto Drive: Country Club Drive to Sunset Drive, it is recommended that the
existing posted speed limit of 30 mph be increased to 35 mph based on the 85`h percentile
speed and low accident rate
♦ Pioneer Avenue: Texas Street to Dearborn Street, it is recommended that the existing
posted speed limit of 30 mph be increased to 35 mph based on the 85`h percentile speed
and low accident rate
♦ San Timoteo Canyon Road Barton Road to Fern Avenue, it is recommended that the
existing posted speed limit of 40 mph be increased to 45 mph based on the 85`h percentile
speed and low accident rate
♦ Texas Street Redlands Boulevard to San Bernardino Avenue, it is recommended that
the existing posted speed limit of 35 mph be increased to 40 mph based on the 85`h
percentile speed, continuity of speed, and low accident rate
♦ Texas Street San Bernardino Avenue to Domestic Avenue, it is recommended that the
speed limit of 30 mph be established based on the Local Street status
♦ University Street Lugoma Avenue to San Bernardino Avenue, it is recommended that
the existing posted speed limit of 25 mph be increased to 30 mph based on the 85`h
percentile speed, continuity of speed, and low accident rate
♦ Wabash Avenue. Fifth Avenue to Citrus Avenue, it is recommended that the existing
posted speed limit of 35 mph be increased to 45 mph based on the 85`h percentile speed
and low accident rate
♦ Wabash Avenue: Citrus Avenue to Colton Avenue, it is recommended that the existing
posted speed limit of 30 mph be increased to 40 mph based on the 85`h percentile speed
and low accident rate
Projects\RedlandsA 196-001�Report\Report.doc
15
Speed Zoning Regulations from
California Manual on Uniform
Traffic Control Devices (MUTCD)
(FHWA's MUTCD 2003 Edition as amended for use in California)
and Definition of Terms
Section 2B.116 Speed Limits and Zones
Support
Speed limits in California are governed by the California Vehicle Code (CVC), Sections
22348 through 22413, also, pertinent sections are found in Sections 627 and 40802 and others
referenced in this section See Section IA 11 for information regarding this publication Refer to
Section 2B 13 for speed limit signs Refer to Part 6 (Section 6C 01) for speed linut signs in
temporary traffic control areas Refer to Part 7 for speed limit signs in school areas
Basic Speed Law and Prima Facie Speed Limits—See CVC 22350 & 22352
Support
The basic speed law states "No person shall drive a vehicle upon a highway at a speed
greater than is reasonable or prudent having due regard for weather, visibility, the traffic on, and
the surface and width of, the highway, and in no event at a speed which endangers the safety of
persons or property"
Standard
Prima facie speed limits are specific limits and shall apply unless changed based
upon an engineering and traffic survey and signs are posted that display the new speed
limit
Option
Prima facie speed limits may be preempted by the basic speed law, when roadway,traffic
or weather conditions warrant a lower speed
Use of Metric System Designations—See CVC 213513
Option
Dual units for speed limits on signs may be placed on local streets and roads in both
Metric and English units
Guidance
If used, dual unit speed limits should be rounded to the nearest 10 km/h for Metric and 5
mph for English units for posting on signs on local streets and roads
Support
Refer to AASHTO's Traffic Engineering Metric Conversion Factors See Section lA 11
for information regarding this publication
Standard
Metric speed limits shall not be placed on State highways For use in this
Supplement, 70 mph shall be shown as a metric equivalent of 110 km/h, neither of which
shall be used on any local street or road
Leeal Authoritv for Establishme Speed Limits
Support
Delegation of Legal authority to set speed limits on State highways is given to Department of
Transportation's District Directors The District Director of each transportation district is
authorized to issue orders regulating the speed of traffic, up to 110 km/h (65 mph) on State
highways The Director of the MUTCD Department of Transportation retains the authority to
approve variable,minimum, and maximum speeds up to 110 km/h(70 mph) on State freeways
20 km/h (15 mph)-See CVC 22352 a 1
Standard
The following speed limits shall apply, unless changed, based upon an engineering and
traffic survey
• At a railroad grade crossing with an obstructed view.
•At an uncontrolled highway intersection with an obstructed view
• On an alley.
20 &30 km/h(15 &20 mph)-See CVC 22358 3 & 22358 4
Standard
1
The following speed limits shall apply, unless changed upon the basis of an engineering and
traffic survey
• Based upon an engineering and traffic survey where the prima facie speed of 40
km/h(25 mph) is more than is reasonable or safe
• Due to a narrow street not exceeding 7 6 in(25 ft), other than a State highway, in a
business or residential area or in a public park
• Near a school or senior center facility
40 km/h(25 mph)- See CVC 22352 a 2 & 22357 1
Standard.
The following speed limits shall apply, unless changed, based upon an engineering and
traffic survey
• On any highway other than a State highway in any business or residence district.
• In a school zone
• When passing a facility primarily used by senior citizens and contiguous to a street
other than a State highway
• Adjacent to a children's playground in a public park, but only during particular
hours or days when children are expected to use the facilities This limit is
effective when signs giving notice of the speed limit are posted
40 to 100 km/h(25 to 60 mph)on State hiehways- See CVC 22354 & 22354 5
Option
The following speed limits may apply
• Whenever the Department of Transportation determines based upon an engineering and
traffic survey that the limit of 110 km/h (65 mph) is more than is reasonable or safe
upon a State highway, the Department may determine and post a prima facie speed
limit of 100, 90, 80 70, 60, 60, 50, 40 km/hr (60, 55, 50, 45, 40, 35, 30, 25 mph)
whichever is found most appropriate to facilitate the orderly movement of traffic and is
reasonable and safe
• Local city council or county board of supervisors may conduct a public hearing on
proposed increases or decreases to posted speed hunts and the Department shall take
into consideration the results of the public hearing
40 to 110 km/h(30 to 65 mph) on Local Streets& Roads- See CVC 22357
Option
The following speed limits may apply
Whenever a local authority determines based upon an engineering and traffic survey
that a speed greater than 40 km/h (25 mph) would facilitate the orderly movement of
vehicular traffic and would be reasonable and safe upon any street other than a State
highway otherwise subject to a prima facie limit of 40 km/h (25 mph), the Local
authority may by ordinance post a prima facie speed limit of 50, 60, 60, 70, 80, 90, or
100 km/h (30, 35, 40, 45, 50, 55, or 60 mph), or 110 km/h (65 mph), whichever is
found most appropriate to facilitate the orderly movement of traffic and is reasonable
and safe
30 to 80 km/h (20 to 50 mph)for Trucks-See CVC 22407
Option
The following speed hrmts may apply
• Whenever the Department of Transportation or local authority determines based upon
engineering studies and a traffic survey that the speed of 90 km/h (55 mph) is more
than is reasonable or safe for vehicles mentioned in CVC 22406 with specified weight
requirements, the department or local authority, with respect to highways under their
respective jurisdiction, may determine and post a speed limit of 80, 70, 60, 60, 50, 40
or 30 km/h (50, 45, 40, 35, 30, 25 or 20 mph), whichever is found most appropriate to
2
facilitate the orderly movement of traffic and is reasonable and safe when appropriate
signs are posted upon the highway
90 km/h(55 mph)—See CVC 22349 b & c and 22406
Option
The following speed limits may apply
• On a two-lane,undivided highway
• On any highway if driving any of the following vehicles
a A motortruck or truck tractor having three or more axles or any motortruck or
truck tractor drawing any other vehicle
b A passenger vehicle or bus towing any other vehicle
c A schoolbus transporting any school pupil
d A farm labor vehicle when transporting passengers
e A vehicle transporting explosives
f A trailer bus
110 km/h(65 mph)Maximum Speed Limit-See CVC 22349(a)&CVC 22349
Option
The following speed limits may apply
• On any highway, or portion thereof, posted at 110 km/h (65 mph) based upon an
engineering and traffic survey
110 km/h(70 mph)Maximum Freewav Speed Limit- See CVC 22356
Option
The following speed limits may apply
• Whenever the Department of Transportation, after consultation with the California
Highway Patrol (CHP), determines based upon an engineering and traffic survey on
existing freeway segments that are otherwise subjected to a maximum speed limit of
110 km/h (65 mph), or upon the basis of appropriate design standards and projected
traffic volumes in the case of newly constructed freeway segments,that a speed greater
than 110 km/h(65 mph) would facilitate the orderly movement of vehicular traffic and
would be reasonable and safe, the Department, with the approval of the CHP, may
declare and post a higher maximum speed of 110 km/h (70 mph) for vehicles not
subject to CVC 22406
Variable Speed Limits on Freeways- See CVC 22355
Option
The following speed limits may apply
• Whenever the Department of Transportation determines based upon an engineering and
traffic survey that the safe and orderly movement of traffic upon any freeway segment
will be facilitated by the establishment of variable speed limits
• The Department may erect, regulate, and control signs upon the state highway which is
a freeway, or any portion thereof, which, if used, signs shall be designed to permit
display of different speeds at various times of the day or night
• Such signs need not conform to the standards & specifications per CVC 21400, but if
used, shall be of sufficient size and clarity to give adequate notice of the applicable
speed limit
Minimum Speed Limits on State HiLyhways- See CVC 22400
Option
The following speed limits may apply
• Whenever the Department of Transportation determines based upon an engineering and
traffic survey that slow speeds on any part of a state highway consistently impede the
normal and reasonable movement of traffic,the Department may determine and declare
a minimum speed limit Appropriate signs giving notice shall then be installed on that
segment
3
• A motorist can be cited for stopping or impeding the normal and reasonable movement
of traffic unless the stop is necessary for safe operation and in compliance with the law
EnLymeermLy and Traffic Survev
Support
CVC Section 627 defines the term "Engineering and traffic survey" and lists its
requirements
Standard-
An engineering and traffic survey shall include, among other requirements deemed
necessary by the department, consideration of all of the following
(1) Prevailing speeds as determined by traffic engineering measurements
(2) Accident records
(3) Highway,traffic, and roadside conditions not readily apparent to the driver
Guidance
The Engineering and Traffic Survey should contain sufficient information to document
that the required three items of CVC Section 627 are provided and that other conditions not
readily apparent to a motorist are properly identified
Prevailing speeds are determined by a speed zone survey A speed zone survey should
include
• The intent of the speed measurements is to determine the actual speed of unimpeded
traffic The speed of traffic should not be altered by concentrated law enforcement, or
other means,dust prior to,or while taking the speed measurements
• Only one person is required for the field work Speeds should be read directly from a
radar or other electronic speed measuring devices, or,
• Devices, other than radar, capable of accurately distinguishing and measuring the
unimpeded speed of free flowing vehicles may be used
• A location should be selected where prevailing speeds are representative of the entire
speed zone section If speeds vary on a given route, more than one speed zone section
may be required, with separate measurements for each section Locations for
measurements should be chosen so as to minimize the effects of traffic signals or stop
signs
• Speed measurements should be taken during off-peak hours between peak traffic
periods on weekdays If there is difficulty in obtaining the desired quantity, speed
measurements may be taken during any period with free flowing traffic
• The weather should be fair(dry pavement)with no unusual conditions prevailing
• The surveyor and equipment should not affect the traffic speeds For this reason, an
unmarked car is recommended, and the radar speed meter located as inconspicuously as
possible
• In order for the sample to be representative of the actual traffic flow, the minimum
sample should be 100 vehicles in each survey In no case should the sample contain
less than 50 vehicles
• Short speed zones of less than 0 8 km (0 5 mi) should be avoided, except in transition
areas
• Speed zone changes should be coordinated with changes in roadway conditions or
roadside development
• The speed limit should be established at the nearest 10 kin;h (5 mph) increment to the
85th percentile speed However, in matching existing conditions with the traffic safety
needs of the community, engineering judgement may indicate the need for a further
reduction of 10 km/h(5 mph)
Speed zoning should be in 20 knvh(10 mph)increments except in urban areas where 10
km/h(5 mph) increments are preferable
• Speed zoning should be coordinated with adjacent jurisdictions
4
Support
Physical conditions such as width, curvature, grade and surface conditions, or any other
condition readily apparent to the driver, in the absence of other factors, would not require special
downward speed zoning Refer to CVC 22358 5
Option
When qualifying an appropriate speed limit, State and local authorities may also consider
the following findings
1 Residential density, if any of the following conditions exist on the particular portion of
highway and the property contiguous thereto, other than a business district
a Upon one side of the highway, within 0 4 km (0 25 mi), the contiguous property
fronting thereon is occupied by 13 or more separate dwelling houses or business
structures
b Upon both sides of the highway, collectively, within a distance of 0 4 km (0 25 mi)
the contiguous property fronting thereon is occupied by 16 or more separate dwelling
houses or business structures
c The portion of highway is larger than 0 4 km (0 25 mi) but has the ratio of separate
dwelling houses or business structures to the length of the highway described in
either subparagraph a or b
2 Pedestrian and bicyclist safety
Option
The following two methods of conducting engineering and traffic surveys may be used to
establish speed limits
1 State Highways -The engineering and traffic survey for State highways is made under
the direction of the Department of Transportation's District Traffic Engineer The data
includes
a One copy of the Standard Speed Zone Survey Sheet(See Figure 2B-103) showing
• A north arrow
• Engineer's station or post mileage
• Limits of the proposed zones
• Appropriate notations showing type of roadside development, such as "scattered
business," "solid residential," etc Schools adjacent to the highway are shown, but
other buildings need not be plotted unless they are a factor in the speed
recommendation or the point of termmation of a speed zone
• Collision rates for the zones involved
•Average daily traffic volume
•Location of traffic signals, signs and markings
• If the highway is divided,the limits of zones for each direction of travel
• Plotted 85a,percentile and pace speeds at location taken showing speed profile
b A report to the District Director that includes
• The reason for the initiation of speed zone survey
• Recommendations and supporting reasons
The enforcement jurisdictions involved and the recommendations and opinions of
those officials
• The stationing or reference post in kilometers (mileage) at the beginning and ending
of each proposed zone and any intermediate equations Location ties must be given
to readily identifiable physical features
2 City and County Through Highways,Artenals, Collector Roads and Local Streets
a The short method of speed zoning is based on the premise that a reasonable speed
limit is one that conforms to the actual behavior of the majority of motorists, and that
by measuring motorists' speeds, one will be able to select a speed limit that is both
reasonable and effective Other factors that need to be considered include but are not
5
limited to the most recent two-year collision record, roadway design speed, safe
stopping sight distance, superelevation, shoulder conditions, profile conditions,
intersection spacing and offsets, commercial driveway characteristics, and pedestrian
traffic in the roadway without sidewalks
b Determination of Existing Speed Limits - Figures 2B-105 & 2B-106 show samples
of data sheets which may be used to record speed observations Specific types of
vehicles may be tallied by use of letter symbols in appropriate squares
In most situations, the short form for local streets and roads will be adequate, however,
the procedure used on State highways may be used at the option of the local agency
Guidance
The factors justifying a reduction below the 85th percentile speed for the posted speed
limit are the same factors mentioned above Whenever such factors are considered to establish the
speed limit, they should be documented on the speed zone survey or the accompanying
engineering report
The establishment of a speed limit of more than 10 km/h (5 mph) below the 85ti,
percentile speed should be done with great care as studies have shown that establishing a speed
limit at less than the 85th percentile generally results in an increase in accident rates, in addition,
this may make violators of a disproportionate number of the reasonable majority of drivers
Support
Generally, the most decisive evidence of conditions not apparent to the motorist surface
in accident histories
Speed limits are established at or near the 85a,percentile speed, which is defined as that
speed at or below which 85fl,percent of the traffic is moving The 85th percentile speed is often
referred to as the critical speed Pace speed is defined as the 16 km/h (10 mph) increment of
speed containing the largest number of vehicles (See Figure 213-104) The lower limit of the pace
is plotted on the Speed Zone Survey Sheets as an aid in determining the proper zone limits Speed
limits higher than the 85th percentile are not generally considered reasonable and prudent Speed
limits below the 85ti,percentile do not ordinarily facilitate the orderly movement of traffic and
require constant enforcement to maintain compliance Speed limits
established on the basis of the 85ti, percentile conform to the consensus of those who drive
highways as to what speed is reasonable and prudent, and are not dependent on the judgement of
one or a few individuals
The majority of drivers comply with the basic speed law Speed limits set at or near the
85a,percentile speed provide law enforcement officers with a limit to cite drivers who will not
conform to what the majority considers reasonable and prudent Further studies show that
establishing a speed limit at less than the 85�percentile (Critical Speed) generally results in an
increase in accident rates
Option
When roadside development results in traffic conflicts and unusual conditions which are
not readily apparent to drivers, as indicated in collision records, speed hunts somewhat below the
85fl,percentile may be justified Concurrence and support of enforcement officials are necessary
for the successful operation of a restricted speed zone
Guidance
Speed zones of less than 0 8 km(0 5 mi) and short transition zones should be avoided
Speed Traps
Support
Refer to CVC 40802 for Speed Traps
Standard.
A speed trap shall not apply to a local street, road, or school zone
A section of highway shall be defined as a speed trap if the prima facie speed limit is
not,justified by an engineering and traffic survey within five years, and the enforcement of
6
the speed limit involves the use of radar or any other electronic device that measures the
speed of moving objects
This time provision shall be extended to seven gears when using radar and all of the
following criteria are met
• The arresting officer has successfully completed a minimum of 24 hours of
certified radar operator course training
• The radar used to measure the speed meets or exceeds the minimal operational
standards of the National Traffic Highway Safety Administration, and has been
calibrated within three years of the alleged violation
This time provision shall be extended to seven years when using laser or other
electronic device(other than radar) and all of the following criteria are met
• The arresting officer has successfullv completed a minimum of 24 hours of
certified radar operator course training
• The arresting officer has successfully completed a minimum of 2 hours of
additional approved certified training
• The radar used to measure the speed meets or exceeds the minimal operational
standards of the National Traffic Highway Safety Administration, and has been
calibrated within three years of the alleged violation
Option
This time provision for an engineering and traffic survey may be extended to ten years
when all of the above conditions are met and no significant changes in roadway or traffic
conditions have occurred, including changes in adjoining property or land use,roadway width, or
traffic volume as determined by a registered engineer
Truck Sgeed Zone on Descendme Grades
Guidance
Highway descending grades, if used for posting TRUCK SPEED LIMIT signs for trucks
traveling downhill, should have recorded incident history of runaway commercial vehicles
Descending grades shorter than 16 km (1 mi) should be avoided for posting signs because
deceleration of vehicles due to braking action can generally provide sufficient control on
descending grades of less than 16 km(1 mi)
Support
To establish a downhill truck speed limit, a physical profile showing length and gradient
and a downhill speed profile for three or more axle commercial vehicles with a gross rating of
4,536 kg(10,000 lbs) or more will be provided
Standard
Speed profiles for truck speed limits shall be prepared on the same form as other
speed surveys.An analysis of collisions involving trucks shall be prepared.
Guidance
Posted speeds should be on the low side of the scale, generally within the pace of loaded
commercial vehicles
Standard
If warranted, the Department of Transportation's District Director shall issue a
standard speed zone order
Support
Posting of the regulation will be by placement of a standard 900 x 1150 mm (36 x 45 in)
Speed Limit(R2-1) sign with a TRUCK(M4-4)plate above
Standard
A standard End Speed Limit(CA Code R3) sign with TRUCK (M4-4) plate shall be
posted at the end of the truck zone when appropriate
7
Definitions of Terms
Average Dailv Traffic Volume of traffic during a 24-hour period
ECL Easterly City Limit, (also W C L , N C L , and S C L for
Westerly,Northerly, and Southerly City Limits, respectively
85th Percentile Speed The "speed" which 85% of the observed vehicles are not
(Critical Speed exceeding This speed is usually within 2 mph of the upper
limit of the pace
Mean Speed The average speed
MPH or mph Miles Per Hour
MVM or mvm Million Vehicle Miles Accident rates are generally
expressed as the number of accidents occurring per million
vehicle miles traveled during a given time period
Pace The 10 mph range of observed vehicle speeds containing the
largest number of vehicles A normal distribution will
contain approximately 70% of the sample within the pace,
with 15% above and 15%below
8
Regulations Governing Speed Limits
(Excerpts from California Vehicle Code)
REGULATIONS GOVERNING SPEED LIMITS
INTRODUCTION
In order to enforce speed limits by radar or other electronic devices, a study must be
conducted every five years Section 40802 of the California Vehicle Code defines a
speed limit enforced by radar and " which speed limit is not justified by an engineering
and traffic survey conducted within five years prior to the date of the alleged violation "
constitutes a speed trap, unless the following criteria are met
If officers have completed specialized training courses that are approved by the
Commission on Peace Officer Standards Training, the time span between studies
can be extended to seven years
If after seven years, " a registered engineer evaluates the section of the highway
and determines that no significant changes in roadway or traffic conditions have
occurred, including, but not limited to, changes in adjoining property or land use,
roadway width, or traffic volume " the time span between studies can be
extended to ten years
Since speed traps are illegal, the lack of an adequate study effectively precludes the
police from using radar enforcement Through adoption of an adequate study, the police
department will be able to enforce posted speed limits with radar equipment
Under California law, the maximum speed limit for any passenger vehicle is 65 miles per
hour(mph) All other speed limits are called prima facie limits which "on the face of it",
are safe and prudent under normal conditions Certain prima facie limits are established
by law and include the 25 miles per hour limit in business and residential districts, the 15
miles per hour limit in alleys, at blind intersections and blind railroad grade crossings,
and a part time 25 miles per hour in school zones when children are going to and from
school
Intermediate speed limits between 25 and 65 miles per hour may be established by local
authorities based on traffic engineering surveys Such surveys include the analysis of
roadway conditions, accident records, and the prevailing speed of prudent drivers using
the highway under study If speed limits are established below what the majority of
drivers consider reasonable, they are often not obeyed and consequently, are difficult to
enforce Those drivers who do not comply with posted reasonable speed limits are,
conversely, subject to equitable enforcement action
The Vehicle Code provides that the use of radar to enforce speed limits, which have not
been based on a traffic and engineering study within the preceding five years, constitutes
a "speed trap" Since speed traps are also prohibited by the code, lack of the required
study effectively prohibits local agencies from using radar enforcement
1
APPLICABLE VEHICLE CODE SECTIONS
Business District
235 A "business district is that portion of a highway and the property contiguous thereto
(a) upon one side of which highway, for a distance of 600 feet, 50 percent of more of the
contiguous property fronting thereon is occupied by buildings in use for business, or (b)
upon both sided of which highway, collectively, for a distance of 300 feet, 50 percent or
more of the contiguous property fronting thereon is so occupied A business district may
be longer than the distance specified in this section if the above ratio of buildings in use
for business to the length of the highway exists
Business and Residence District Determination
240 In determining whether a highway is within a business or residence district, the
following limitations shall apply and shall qualify the definitions Section 235 and
515
a) No building shall be counted unless its entrance faces the highway and the front
of the building is within 75 feet of the roadway
b) Where a highway is physically divided into two or more roadways, only those
buildings facing each roadway separately shall be counted for the purpose of
determining whether the roadway is within a district
c) All churches, apartments, hotels, multiple dwelling houses, clubs and public
buildings, other than schools, shall be deemed to be business structures
d) A highway or portion of a highway shall not be deemed to be within a district
regardless of the number of buildings upon the contiguous property if there is
no right of access to the highway by vehicles from the contiguous property
Residence District
515 A "residence district" is that portion of a highway and the property contiguous
thereto, other than a business district, (a) upon one side of which highway, within a
distance of a quarter of a mile, the contiguous property fronting thereon is occupied
by 13 or more separate dwelling houses or business structures, or (b) upon both
sided of which highway, collectively, within a distance of a quarter of a mile, the
contiguous property fronting thereon is occupied by 16 or more separate dwelling
housed or business structures A residence district may be longer than one quarter
of a mile if the above ratio of separate dwelling houses or business structures to the
length of the highway exists
2
EnomeermLy and Traffic Survev
627 (a) "Engineering and traffic survey" as used in this Code, means a survey of
highway and traffic conditions in accordance with methods determined by the
Department of Transportation for use by the state and local authorities
(b) An engineering and traffic survey shall include, among other requirements
deemed necessary by the department, consideration of all the following
1) Prevailing speeds as determined by traffic engineering measurements
2) Accident records
3) Highway, traffic, and roadside conditions not readily apparent to the driver
Maximum Speed Limit
22349 Except as provided in Section 22356, no person shall drive a vehicle upon a
highway at a speed greater than 65 miles per hour
Basic Speed Law
22350 No person shall drive a vehicle upon a highway at a speed greater than is
reasonable or prudent having due regard for weather, visibility, the traffic on, and surface
and width of, the highway, and in no event at a speed which endangers the safety of
persons or property
Speed Law Violations
22351 (a) The speed of any vehicle upon a highway not in excess of the limits specified
in Section 22352 or established as authorized in this code is lawful unless
clearly proved to be in violation of the basic speed law
(b) The speed of any vehicle upon a highway in excess of the prima facie speed
limits in Section 22352 or established as authorized in this code is prima facie
unlawful unless the defendant establishes by competent evidence that the
speed in excess of said limits did not constitute a violation of the basic speed
law at the time, place and under the conditions then existing
Prima Facie Speed Limits
22352 The prima facie limits are as follows and the same shall be applicable unless
changed as authorized in this code and, if so changed, only when signs have been erected
giving notice thereof
(a) Fifteen miles per hour
3
1) When traversing a railway grade crossing, if during the last 100 feet of the
approach to the crossing the driver does not have a clear and unobstructed
view of the crossing and of any traffic on the railway for a distance of 400
feet in both directions along such railway This subdivision does not
apply in the case of any railway grade crossing where a human flagman is
on duty or a clearly visible electrical mechanical railway crossing signal
device is installed but does not then indicate the immediate approach of a
railway train or car
2) When traversing any intersection of highways if during the last 100 feet of
his approach to the intersection the driver does not have a clear and
unobstructed view of the intersection and of any traffic upon all of the
highways entering the intersection for a distance of 100 feet along all such
highways, except at an intersection protected by stop signs or yield right-
of-way signs or controlled by official traffic control signals
3) On any alley
(b) Twenty-five miles per hour
1) On any highway other than a state highway, in any business or residence
district unless a different speed is determined by local authority under
procedures set forth in this code
2) When passing a school building or the grounds thereof, contiguous to a
highway and posted with a standard "SCHOOL" warning sign, while
children are going to or leaving the school either during school hours or
during the noon recess period Such prima facie limit shall also apply
when passing any school grounds which are not separated from the
highway by a fence, gate or other physical barrier while the grounds are in
use by children and the highway is posted with a standard "SCHOOL"
warning sign
3) When passing a senior center or facility primarily used by senior citizens,
contiguous to a street other than a state highway and posted with a
standard "SENIOR"warning sign
Increase of Local Limits
22357 Whenever a local authority determines upon the basis of an engineering and
traffic survey that a speed greater than 25 miles per hour would facilitate the orderly
movement of vehicular traffic and would be reasonable and safe upon any street other
than a state highway otherwise subject to a prima facie limit of 25 miles per hour, the
local authority may be by ordinance determine and declare a prima facie limit of 25 miles
per hours, the local authority may by ordinance determine and declare a prima facie
speed limit of 30, 35, 40, 45, 50, 55, 60 miles per hour or a maximum speed limit of 65
miles per hour, whichever is found most appropriate to facilitate the orderly movement of
4
traffic and is reasonable and safe The declared prima facie or maximum speed limit
shall be effective when appropriate signs giving notice thereof are erected upon the street
and shall not thereafter be revised except upon the basis of an engineering and traffic
survey The provisions of this section shall not apply in respect to any 25-mile-per-hour
prima facie limit, which is applicable when passing a school building or the grounds
thereof
Decrease of Local Limits
22358 Whenever a local authority determines upon the basis of an engineering and
traffic survey that the limit of 65 miles per hour is more than is reasonable or safe upon
any portion of any street other than a state highway where the limit of 65 miles per hour
is applicable, the local authority may by ordinance determine and declare a prima facie
speed limit of 60, 55, 50, 45,40,35,30, or 25 miles per hours, whichever is found most
appropriate to facilitate the orderly movement of traffic and is reasonable and safe, which
declared prima facie limit shall be effective when appropriate signs giving notice thereof
are erected upon the street
Downward Speed Zonm2
22358 5 It is the intent of the Legislature that physical conditions such as width,
curvature, grade and surface conditions or any other condition readily apparent to a
driver, in the absence of other factors, would not require special downward speed zoning,
as the basic rule of Section 22350 is sufficient regulation as to such conditions
Boundary Line Streets
22359 With respect to boundary line streets and highways where portions thereof are
within different jurisdictions, no ordinance adopted under Sections 22357 and 22358
shall be effective as to any such portion until all authorities having jurisdiction of the
portions of the street concerned have approved the same This section shall not apply in
the case of boundary line streets consisting of separate roadways within different
jurisdictions
Multiple-Lane Hiahways
22361 On multiple-lane highways with two or more separate roadways, different prima
facie speed limits may be established for different roadways under any of the procedures
specified in Sections 22354 to 22359, inclusive
Speed Trap Prohibition
40801 No peace officer or other person shall use a speed trap in arresting, or
participating or assisting in the arrest of, any person for any alleged violation of this code
nor shall any speed trap be used in securing evidence as to the speed of any vehicle for
the purpose of an arrest or prosecution under this code
5
Speed Trap
40802 A "speed trap"is either of the following
a) A particular section of a highway measured as to distance and with boundaries
marked, designated, or otherwise determined in order that the speed of a
vehicle may be calculated by securing the time it takes the vehicle to travel
the known distance
b) A particular section of a highway with a prima facie speed limit provided by
this code or by local ordinance pursuant to paragraph (1) of subdivision (b) of
Section 22352, or established pursuant to Section 22354, 22357, 22358, or
22358 3, which speed limit is not justified by an engineering and traffic
survey conducted within five years prior to the date of the alleged violation,
and where enforcement involves the use of radar or other electronic devices
which measures the speed of moving objects This subdivision does not apply
to local streets and roads
For purposes of this section, local streets and roads shall be defined by the latest
functional usage and federal-aid system maps as submitted to the Federal Highway
Administration When these maps have not been submitted, the following definition
shall be used A local street or road primarily provides access to abutting residential
property and shall meet the following three conditions
1 Roadway width of not more than 40 feet
2 Not more than one-half mile of uninterrupted length Interruptions shall include
official traffic control devices as defined in Section 445
3 Not more than one traffic lane in each direction
Speed Trap Evidence
40803 (a) No evidence as to the speed of a vehicle upon a highway shall be admitted in
any court upon the trial of any person in any prosecution under this code upon
a charge involving the speed of a vehicle when the evidence is based upon or
obtained from or by the maintenance or use of a speed trap
(b) In any prosecution under this code of a charge involving the speed of a
vehicle, where enforcement involves the use of radar or other electronic
devices which measure the speed of moving objects, the prosecution shall
establish, as part of its prima facie case, that the evidence or testimony
presented is not based upon a speed trap as defined in subdivision (b) of
Section 40802
(c) When a traffic and engineering survey is required pursuant to subdivision (b)
of Section 40802, evidence that a traffic and engineering survey has been
6
conducted within five years of the date of the alleged violation or evidence
that the offense was committed on a local street or road as defined in
subdivision (b) of Section 40802 shall constitute a prima facie case that the
evidence or testimony is not based upon a speed trap as defined in subdivision
(b) 40802
7
City of Redlands
Engineering and Traffic Survey
Summary
Street OLIVE AVE Field Observer KRIS PASILLAS
Limits SAN MATEO ST Checked By MARK MILLER
TERRACINA BLVD Date 3/6/2009
Factors Direction East/West
A Prevailmp Speed Data
Location of Survey Roberts Rd
85th Percentile 41
10 mph Pace 28-37
Percent in Pace 634%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 { 3 )
Total Collisions 2
Collision Rate(Acc/MVM) 0 708
Expected Collision Rate 198
C Traffic Factors
Average Daily Traffic 3238
Length of Segment 4201
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Arterial
D.Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 35
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc 454
City of Redlands
Traffic Engineering Department
Street Name OLIVE AVE
Limits SAN MATEO ST to TERRACINA BLVD
Radar Survey Sheet -
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum %
601 1 1 I I
1 I j 1 10% 100%
551 I C I I I I
(� 1 10% 99 0%1
0
5 �
l 1 10% 98 0%1
1 2 970%1
I 1 1 i 2 120%
20% 95 0%1
45 I ! 1 1 10% 93 1%1
I I 1
I 5 50% 921%1
1 j I l I I ( I 1 2 20% 871%
1 10% 85 1%
3 30% 842%1
40 4 140% 81 2%1
1 10% 77 2%1
_ 10 1 9 9°076 2°I°
i ( 9 18 9% 66 3°f°
7 169%
35
5 5 0% 50 5%
C I 7 69% 45 5°1°
/ 1 1 I 7 69% 38 6%1
1 1 ( 3 30% 31 7%1
30 6 59% 287%1-
4
87% -
4 40-16 228%1
3 30% 12 9%1
j I 1 1 3 30% 99% 1
3 30% 69% 1
25 1 I 1 10-1 40% 1
I 1 2 20% 30% 1 -
1
20 ( I 1 1 ( 1 10% 10%
I i ' � I � �
151 ! f 1 I I ! ! I !
Total Samples 101E
Date of Survey 3/6/2009 Start Time 11.27
85th Percentile Speed 41 -
50th Percentile Speed 34 Weather Sunn End Time 1212
15th Percentile Speed 28 Road Condition Fair Posted Speed 35
10 MPH Pace 28-37 Street Class Arterial Observer KRIS PASILL
Number in Pace 64 Conditions not
Percent in Pace 634% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street ORANGE ST Field Observer KRIS PASILLAS
Limits LUGONIA AVE Checked By MARK MILLER
PIONEER AVE Date 3/6/2009
Factors Direction North/South
A Prevailing Speed Data
Location of Survey Dreka Ave
85th Percentile 42
10 mph Pace 33-42
Percent in Pace 771%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 12
Collision Rate(Acc/MVM) 1 362
Expected Colliston Rate 1 98
C Traffic Factors
Average Daily Traffic 10719
Length of Segment 3957
Lane Configuration Single Lane Each Direction with Left-Turn Pockets, Undivided
Street Classifaction Arterial
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential/Vacant
Posted Speed Limit 35
Speed Limit Change9 Yes
Revised Speed Limit 40
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc k 55
City of Redlands
Traffic Engineering Department
Street Name ORANGE ST
Limits LUGONIA AVE to PIONEER AVE
Radar Survey Sheet -
X=North /=South -
5 10 15 20 25 30 35 40 # %ea cum %
50 i
I ( 1 09%j 100%(
I i 1 09% 991%1
1 09% 98 2%
45 // j i ( I 3 28% 95 4%1
I 4 37% 927%1
1 5 46% 89 0%1
1 4 37% 84 4%1
1
40 ( 4_ 37% 80 7%1
7 641° 771%]
1 10 l 92% 706%1I /IA1 Al I I 1 14 12 8%161 5%j
1 _ 13 Ill 9%148 6%
35 , / I 13 11 9%136 7%
I +llT T 1 8 7 3%1 24 8%I
1 I 6 55% 174%1-
--
I I I I !-
4 37% 119%1
30 XXjX _ -- 5 14 6% 83%
_ 1 109% 37%
1 1 1 I 1 109% 28%
II 1 IIII I I
2 1 1 8°f°I 18% 1 -
25
III ( 11 � I 1 1 1 1 it I I
20l l I I ( l III illi ill �_
� I I it 11 III
151
101 I 1 I I
1 I
5 )
Total SamDles 1109
Date of Survey 3/6/2009 Start Time 12.45
85th Percentile Speed 42
50th Percentile Speed 37 Weather Sunnv End Time 1345
15th Percentile Speed 33 Road Condition Good Posted Speed 35
10 MPH Pace 33-42 Street Class Arterial Observer KRIS PASILL
Number in Pace 84 Conditions not
Percent in Pace 771% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street ORANGE ST Field Observer KRIS PASILLAS
Limits PIONEER AVE Checked By MARK MILLER
HUBBARD CT Date 3/5/2009
Factors Direction North/South
A Prevaiiina Speed Data
Location of Survey North end of bridge
85th Percentile 60
10 mph Pace 51 -60
Percent in Pace 705%
Posted Speed Limit 50
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 5
Collision Rate(Acc/MVM) 1 148
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 7940
Length of Segment 2640
Lane Configuration Single Lane Each Direction, Undivided
Street Ciassifaction Arterial
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adjacent Land Use Vacant
Posted Speed Limit 50
Speed Limit Change? Yes
Revised Speed Limit 55
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #56
City of Redlands
Traffic Engineering Department
Street Name. ORANGE ST
Limits PIONEER AVE to HUBBARD CT
Radar Survey Sheet
X-North /=South
5 10 15 20 25 30 35 40 # %ea cum
60 � � �� ( 1 i 23 16.5°r'o 1
7 50% 835%1
j 8 58% 78 4%1
1 I 6 43% 727%1-
551( 1 I I ! 4 29% 68 3%1_
I ( ( 5 36% 65 5%1
65% 619%1
1
14 101%°l0 55.4°l0�
10 72% 453%1
1 1 1 ( 12 86% 381%1
50 I 1 6 4.3% 29 5%1
6 43% 25 2%1
11 79% 20 9%1
I ( I 12 1 4% 9 4% 1 -
45 ' �/I I 1 6 4 3% 7 9% 1
II III IIII I
I I I ( I 2 14i° 36% 1 -
1 I I 3 22% 2.2% 1_
4011 I � I
III I 1
351 I I 1 I I I I I I
_ 1
I
301 ( ( ' ( I I " I I � 1 i I l ;
( -
251 I I
1 I I 4
201
I f
15' � � I ( � i ? I � I
Total Sarnoles 1139
Date of Survey 3/5/2009 Start Time 14.00
85th Percentile Speed 60
50th Percentile Speed 53 Weather Sunn End Time 15.00
15th Percentile Speed 48 - Road Condition Good Posted Speed 50
10 MPH Pace 51-60 Street Class Arterial Observer KRIS PASILL
Number in Pace 98 - Conditions not
Percent in Pace. 705% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street ORANGE TREE LN Field Observer ANTONIO ELMORE
Limits CALIFORNIA ST Checked By MARK MILLER
ALABAMA ST Date 1/9/2009
Factors Direction East/West
A. Prevailino Speed Data
Location of Survey 2075 Orange Tree
85th Percentile 25
10 mph Pace 17-26
Percent in Pace 950%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 4
Collision Rate(Acc/MVM) 0 693
Expected Collision Rate 355
C Traffic Factors
Average Daily Traffic 5000
Length of Segment 5558
Lane Configuration 4 Lanes, Undivided
Street Classifaction Local
D Conditions Not Readily Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Industrial/Commercial
Posted Speed Limit 30
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #57
City of Redlands
Traffic Engineering Department
Street Name ORANGE TREE LN
Limits. CALIFORNIA ST to ALABAMA ST
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum %
451 ( ( t 1
40 1 C I
35 ( 1 110% 100%j
30 I 1 1 i I
1 1 1 110% 99 0%1
5 50% 960%1
1
25 1 1 10
11 1011 0 0°l° 9 11 0%0%1
1 ( % 8 1
14 14 0°l.1700%1
1 12 1200 l°J 56 0 01
11 110 44 0%1
20 / 1 - ( 1 7 7 0 0 33000/,j
13 13 0°% 26 0
�1 I 1 8 8
4 4
1
15X I 1 ( ( I ��� 1 10% 10%
1 3
�__—�—�� _
101 1 1
5 i I
r
0 1 1 1 G I i I i I
Total Samules 100 _
Date of Survey 1/9/2009 Start Time. 830
85th Percentile Speed 25
50th Percentile Speed 22 Weather Sunnv End Time 9.15
15th Percentile Speed 19 Road Condition New Posted Speed 30 -
10 MPH Pace 17-26 _ Street Class - Local Observer* ANTONIO EL
Number in Pace 95 Conditions not
Percent in Pace 212% - Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street PALO ALTO DR Field Observer KRIS PASILLAS
Limits COUNTRY CLUB DR Checked By MARK MILLER
MIRASOL DR Date 2/5/2009
Factors Direction East/West
A PrevarlEnq Speed Data
Location of Survey 650 Palo Alto Dr
85th Percentile 38
10 mph Pace 26-35
Percent in Pace 716%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 1266
Length of Segment 1448
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readily Apparent
Conditions Curves, driveways
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 30
Speed Limit Change? Yes
Revised Speed Limit 35
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #60
City of Redlands -
Traffic Engineering Department
Street Name PALO ALTO DR
Limits COUNTRY CLUB DR to MIRASOL DR
■
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum %
451 ) 1
( ( 1 09% 98.2%1
4 37% 97 2%
40 ! I I ! ! 3 28% 936%1
( ( ( 3 28% 908%1
7 64°�° 881°0
( 6 55% 817%
1 3 28% 76 1%1
355 ( 1 9 83% 73 4%1
91
_ 7 64% 651%1
I 7 64%
587%1
( 8 73% 52 3%1
( I 8 73% 450%j
30 8 73% 37 6%1_
8 73% 303%°1
A 8 73% 22 9%1
8 73% 156%1-
7 64% 83%
25X III 1los°f° 18% j
II I i I I
09% 09% 1
I ( I I
20 ( I ( I I ( I
( ( I
I I
1511 I . 1 1
I I
I I
10�
5I j
0
Total Samples 11091
Date of Survey 2/5/2009 Start Time. 11 47
85th Percentile Speed 38 -
50th Percentile Speed 32 - Weather Sunny End Time 12.40
15th Percentile Speed 27 Road Condition Fair Posted Speed 30
10 MPH Pace 26-35 Street Class. Collector Observer KRIS PASILL
Number in Pace 78 Conditions not Curves driveways
Percent in Pace 71.6% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street PALO ALTO DR Field Observer KRIS PASILLAS
Limits MIRASOL DR Checked By MARK MILLER
SUNSET DR S Date 2/5/2009
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey 30620 Palo Alto Dr
85th Percentile 38
10 mph Pace 28-37
Percent in Pace 720%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 1 058
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 1266
Length of Segment 3592
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readily Apparent
Conditions Curves
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 30
Speed Limit Change) Yes
Revised Speed Limit 35
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #61
City of Redlands
Traffic Engineering Department
Street Name PALO ALTO DR
Limits MIRASOL DR to SUNSET DR S
Radar Survey Sheet -
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum %
45 1 110% 100%1
i I I 1 1 1 0% 990%1-
2
90%1-
2 120% 98 0%1
1 2 120% 960%1-
2
60%1-2 20% 940%
3 30% 920%
40 ( ! I I 3 3 0% 89 0°101
6 60% 86 0%1
6 60% 800%j
1 8 8 0%j 74 0%1
35 V / / I j 9 90% 66 0%1
�� 6 60% 57 0%1
f I 7 70% 510%,-
8
10%I-8 80% 440%1-
30 lV � 7 70%136.0%1
7 70% 29 0%1
— I 7 70% 22 0%1
7 70%% 150°l01
I I I I ( ! 1 10% 80% 1
1 10% 70% (
25 ( I I IIIA I I II � I I 1
/I I I I I I I I I 1 10% 60% !
A I ( I ! 1 10% 50% 1
! ( j 1 10% 40% 1
I
1 0% 2 0%
1 I 1 1 ( 1 1 0% 10%
15 ! � Hl I I I I I I I �
f II I
101 1
1 I I I
! I
5 � I I
0
Total Samples 100;
Date of Survey 2/5/2009 Start Time 1312
85th Percentile Speed 38
50th Percentile Speed 33 Weather Sunny End Time 1405
15th Percentile Speed 28 Road Condition Fair Posted Speed 30 -
10 MPH Pace 28-37 - Street Class Coliector Observer KRIS PASILL
Number in Pace 72 - Conditions not Curves
Percent in Pace 720% - Apparent -
City of Redlands
Engineering and Traffic Survey
Summary
Street PIONEER AVE Field Observer ANTONIO ELMORE
Limits TEXAS ST Checked By MARK MILLER
ORANGE ST Date 1/16/2009
Factors Direction East/West
A Prevailing Speed Data
Location of Survey 503 Pioneer
85th Percentile 38
10 mph Pace 31 -40
Percent in Pace 865%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 2
Collision Rate(Acc/MVM) 1 813
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 2007
Length of Segment 2646
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readily Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 30
Speed Limit Change? Yes
Revised Speed Limit 35
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #63
City of Redlands
Traffic Engineering Department -
Street Name PIONEER AVE
Limits TEXAS ST to ORANGE ST
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 %ea cum%
501 I I III
I E �
1 110% 100%I
45 ( '
I1 I ► I � ' I � ISI
I ( 1 1 0% 99 0%
I I I I I I I ( ( 2 19% 98 1%)
40 I ( 5 4.8%1962%1
6 58%1913%1
9 8 7%185 6%1
10 96%1769%1 -
11 106% 67 3%1
35 ' 12 1150 47 1% °1
10
1 16 58% 250%1
1 10 96% 192%1
30 �' ---1-1 3 2 9% 96%
I 5 14.8% 67% 1
[
�
I [ � I I I I ( 1 1 1 0% 19%
1
� III
1 I10% 10%
25 I
I
20'
1511 11 I I I
II III � I I
I
101 i
5
1
Total Samoles 11041
Date of Survey 1/16/2009 Start Time. 15.43 _
85th Percentile Speed 38
50th Percentile Speed 35 Weather Sunny End Time 16.10
15th Percentile Speed 31 - Road Condition. Fair Posted Speed 30
10 MPH Pace 31 40 Street Class Collector Observer ANTONIO EL
Number in Pace 90 Conditions not
Percent in Pace 865% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street PIONEER AVE Field Observer.ANTONIO ELMORE
Limits- ORANGE ST Checked By MARK MILLER
OCCIDENTAL DR Date 1/16/2009
Factors Direction East/West
A Prevadinp Speed Data
Location of Survey 523 Pioneer
85th Percentile 35
10 mph Pace 25-34
Percent in Pace 769%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 1 122
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 1081
Length of Segment 3967
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D. Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 30
Speed Limit Change? Yes
Revised Speed Limit 35
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #64
City of Redlands -
Traffic Engineering Department
Street Name PIONEER AVE
Limits ORANGE ST to OCCIDENTAL DR
"Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum %
451 11 �� � I
401 1 I 2 19% 100%1
I ( I 4 38% 981%1
I I I I I ! 2 19% 94 2%1
1 I 6 5.8% 92 3%1
35 / I I I I 4 38% 86 5%1
I I I I 1 ! 11 1060 721%1-
I I I 8 177% 61 5%15 148%
301�� 1// I I I I I 11 6%
0 490%1-
13 29% 385%
I-
1 9 87% 35 6%1
! 1 ( I I ( 8 77% 26 9%1
1 8 77% 19 2%1
25 A ( I ! (_ 6 5 8% 11 5%1
1 3 l 29%1 58% 1 I l I l 1 10%j 1 0% 1
2011 I
i
151 � lll = ( I 111111 il " ! I ! I I I I I
101
I I I I I
5 1 1 I I
I � I
Oi � , ��
I Total Samples 104: -
Date of Survey 1/16/2009 Start Time 16.12
85th Percentile Speed 35
50th Percentile Speed 31 Weather Sunny End Time 1652
15th Percentile Speed 26 - Road Condition Fair Posted Speed 30
10 MPH Pace 25-34 Street Class Collector Observer ANTONIO EL
Number in Pace 80
- Conditions not
Percent in Pace. 76.90% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street PIONEER AVE Field Observer ANTONIO ELMORE
Limits OCCIDENTAL DR Checked By MARK MILLER
DEARBORN ST Date 2/27/2009
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey River Bend Dr
85th Percentile 37
10 mph Pace 28-37
Percent in Pace 840%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 4
Collision Rate(Acc/MVM) 1 482
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 2000
Length of Segment 6494
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readily Apparent
Conditions
Roadway Geometrics
Comments
E Adcacent Land Use Residential/Vacant
Posted Speed Limit 30
Speed Limit Changes Yes
Revised Speed Limit 35
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #62
City of Redlands
Traffic Engineering Department
Street Name PIONEER AVE
Limits OCCIDENTAL DR to DEARBORN ST
r
Radar Survey Sheet _
X=West 1-East -
5 10 15 20 25 30 35 40 # %ea cum%
45 ! I I I I I I 1 09% 100%1
1 09%1991-
1 09% 98 1%lo
3 28% 972°l0;-
2 19% 94.3%1
40 / 4 38% 925%1 -
1
25%11 09% 88 7%1
1 7 66% 87 7%1
1 11 104% 811%1
35 /VI/ i II 1 I I 11 10 4% 70 8%1
x 1 11 10 4°/ 60 4%1
i 11 104% 50 0%1
/ 1 10 94% 396%1-
30 A�� ( I ( � � ( ( ' 9 85% 302%1
1 8 75%1217%1
I/1 ( I 1 1 7 66% 14.2%1
I ( I I 4 38% 75% 1
251 III
1 09% 38% 1
1 1 1 I I ( I I 1 0 9% 28% 1
20 ( I I I I 12 19% 19% 1-
I ( I I I I
I III I I II � I I I I I
I I ( (
15iI
101 I I 1 t
1 I �
5 1
C i 11 I I i-
it I II Cil PI lig
I Total Samoies 106 =
Date of Survey 2/27/2009 Start Time 12.13
85th Percentile Speed 37 -
50th Percentile Speed 33 - Weather Over Cast End Time 12.56
15th Percentile Speed 30 Road Condition Fair Posted Speed 30
10 MPH Pace 28-37 Street Class Collector Observer ANTONIO EL
Number in Pace 89 Conditions not
Percent in Pace. 840% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street RESERVOIR RD Field Observer ANTONIO ELMORE
Limits FORD ST Checked By MARK MILLER
WABASH AVE Date 31612009
Factors Direction East/West '
A Prevailinq Speed Data
Location of Survey 1528 Reservoir Rd
85th Percentile 48
10 mph Pace 38-47
Percent in Pace 798%
Posted Speed Limit 45
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 0 818
Expected Collision Rate 1.98
C Traffic Factors
Average Daily Traffic 1000
Length of Segment 5881
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Local
D Conditions Not Readily Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential/Freeway
Posted Speed Limit 45
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #63
J
City of Redlands
Traffic Engineering Department
Street Name RESERVOIR RD
Limits FORD ST to WABASH AVE
Radar Survey Sheet -
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum %
601
{ I 1 0 9°o j 100°jo 1
'I 1 0 9% 99 1%1-
! ! i
55
I I 1 09%1982%1
50 IT I I I ( ! I ( ! 2 111% 972%1
! ( 1 6 155%( 954%1 -
7
5%( 954%1 -
7 6 4%° 89 1
i 10 92%1835%1
5 46% 74 3%1
45 �— I 12 11 0% 69 7% -
10 9 2% 58 7%
7 634 49 5%1
I ( 181 10 1°%I 35 8%1
40 / -- I I I I 1 ( 7- 15 46%( 165%1
_ I 1 1 9 183%1119%
35 /I/ I ! i I ! I I I 1 I ( 1 1 2 18%1 18°x° i-
Ti I I ( I
30! I ! ! I ( I ( I I
I I I I I I I I I
251
1 I I I ( !
201
I =
15I
i Total Samples 1091
Date of Survey 3/6/2009 Start Time 1215
85th Percentile Speed 48 =
50th Percentile Speed. 44 Weather. Sunny End Time 1305
15th Percentile Speed 39 Road Condition Fair Posted Speed 45
10 MPH Pace- 38-47 Street Class Local Observer ANTONIO EL
Number in Pace 87 Conditions not
Percent in Pace 798% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street SAN BERNARDINO AVE Field Observer ANTONIO ELMORE
Limits. MOUNTAIN VIEW AVE Checked By MARK MILLER
CALIFORNIA ST Date 2/20/2009
u I
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey 25982 San Bernandino Ave
85th Percentile 47
10 mph Pace 38-47
Percent in Pace 842%
Posted Speed Limit 45
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 3
Collision Rate(Acc/MVM) 0 391
Expected Collision Rate 2 3
C Traffic Factors
Average Daily Traffic 6963
Length of Segment 5301
Lane Configuration 4-6 Lanes Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Industrial/Vacant
Posted Speed Limit 45
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #64
City of Redlands
Traffic Engineering Department -
Street Name SAN BERNARDINO AVE
Limits MOUNTAIN VIEW AVE to CALIFORNIA ST
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum -
551 1
2 10% 10001-
1 05-. 99 0%1
//X 1 i ! 3 15% 985%1=
I
50 I I 5 25% 97 0%1-
} ( 3 15% 946%1 -
8
46%1 -8 40% 931%1
— �—; 17 84% 891%
45 � � - — 26 1 9 9% 807%1
20 s s°�° 678%1
— —__ ---�I --
20 19 s% 579%1
V � 0� 22 109% 480%1 0%I
1 1 14 69% 371%1
I I 11 54% 30 2%1
40 � 1 13 64% 24.8%1
1 17 84%
18.3°f3%o 1
10150% 99% 1_-
2 1 0% 50% 1
141 1 2 10%
I° 40%
35 i i I 4 2 0 3 0
! l l 1 0.5% 10%
I ( I I I I ( ( I I I I ( ( 1 05% 05%
( ( I 1 I (
30 I � I -
I I I I I I
251 I � III I I I II I III ILII
f I I I I
I
20) E I I I I
151 I i
I
II �
1 0 1 1 ! I I
I Total Samples 2021
Date of Survey 2/20/2009 Start Time 9.45
85th Percentile Speed 47
50th Percentile Speed 44 Weather Sunnv End Time 10.15
15th Percentile Speed 39 Road Condition Good Posted Speed 45
10 MPH Pace 38-47 Street Class Arterial Observer ANTONIO EL
Number in Pace 170 Conditions not
Percent in Pace 84.2% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street SAN TIMOTEO CANYON RD Field Observer ANTONIO ELMORE
Limits BARTON RD Checked By MARK MILLER
FERN AVE Date 3/6/2009
Factors Direction North/South
A Prevailinq Speed Data
Location of Survey 11528 San Timoteo Canyon Rd
85th Percentile 45
10 mph Pace 37-46
Percent in Pace 788%
Posted Speed Limit 40
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 8
Collision Rate(Acc/MVM) 0 968
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 5639
Length of Segment 7057
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Vacant
Posted Speed Limit 40
Speed Limit Change' Yes
Revised Speed Limit 45
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc k 65
City of Redlands
Traffic Engineering Department
Street Name SAN TIMOTEO CANYON RD
Limits BARTON RD to FERN AVE -
Radar Survey Sheet
X=North /=South
5 10 15 20 25 30 35 40 # %ea cum
50 I 1 ( 1 11 1 ( ! 110% 100
1 1 ( 1 1 110% 990%
I 2 1 1 9% 981%1 -
2 119% 96 2%1=
7 67% 94,2%1
45 .X0 I I 9 87% 87 5%1
9 87%1788%1
I ( 9 87% 70 2%1
11 106% 615%1
8 77% 51 010
40 ( 7 67% 43.3%
10196% 365%
I 1 5 148% 26 9%1�
7 67% 221%1--
1 ( 1 5 48% 15.4% -
35 /I ( I I 4 38% 106% _
I 3 29% 67%
2-119% 3 8% 1=
I I I I I I I 1 1 1 10% 1 9% 1
30N I I I I ( I I ( I 1 1 0%1 10% 1
I I
251 I
I I I ( � I
I I I I I I 1 I I I I
II I Ill I I I
201 ( I ( I
I I I I I I I
-
151 I I
I I-
I
I 1 I
101 I ! 1 I ( E
51 I � I � I it Ill � l l I
I Total Sarnoles 104
Date of Survey 3/6/2009 Start Time 900
85th Percentile Speed 45
Weather. Sunny End Time 9.45
50th Percentile Speed 41
15th Percentile Speed 36 Road Condition Good Posted Speed 40
10 MPH Pace 37-46 Street Class Arterial Observer ANTONIO EL
Number in Pace 82 Conditions not
Percent in Pace 788% Apparent -
J
City of Redlands
Engineering and Traffic Survey
Summary
Street SUNSET DR Field Observer KRIS PASiLLAS
Limits VINTON WY Checked By MARK MILLER
ALTA VISTA DR Date 1/29/2009
Factors Direction North/South
A Prevailing Speed Data
Location of Survey 30908 Sunset Dr
85th Percentile 38
10 mph Pace 28-37
Percent in Pace 762%
Posted Speed Limit 30
B Collision Histont
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 2642
Length of Segment 2587
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readilv Apparent
Conditions Curvilinear, no sidewalks
Roadway Geometrics
Comments
E Adiacent Land Use Residential/Vacant
Posted Speed Limit 30
Speed Limit Changes No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #68
City of Redlands
Traffic Engineering Department
Street Name SUNSET DR
Limits VINTON WY to ALTA VISTA DR
Radar Survey Sheet -
X=North /=South
5 10 15 20 25 30 35 40 # %ea cum %
551 � � i � II � 11 I 1
F 1 1 1 12°r° 100%
50� I I 1
��( 1 1 12% 98 8%1
1 1 I 3 36% 97 6%1
451 1 12% 94 0%1
J
1 ( I 11 12% 929%1-
40
29%1-
40 J� I I 1 1 1 2 24% 91 7%1
3 36% 893/° -
I I ( I E 4 4.8% 85 7%1
1 I I 1 I 1 7 183% 81 0%1
1 1 I 1 2 24% 72 6%1
35 / / 1 I 1 1 I ff I7 8 3% 70 2%1
1 ( 7 C 83% 61 9%1
1 I 1 7 183% 53 6%1
I 1 ( 7 83% 452%1
1
1 7 83%1369%1 -
3 U0
3% 369%130 // ( I I 1 1 7 8.3% 28 6%1
/ 1 7 83- 20 2%1
6 71% 119%1
1 12% 48% 1
1 , 12% 36%
1
25
1 12% 24%
20 ( I ( 1 1 1 12% 12% 1
151 1 I
101 1 1 1 I II I i C1i (. i
Total Sarnolea 134
Date of Survey 1/29/2009 Start Time 13.28
85th Percentile Speed 38 -
50th Percentile Speed 33 Weather Sunny End Time 1420
15th Percentile Speed- 29 Road Condition- Fair Posted Speed 30
10 MPH Pace 28-37 Street Class.. Collector Observer KRIS PASILL
Number in Pace 64 Conditions not Curvilinear,no sidewalks
Percent in Pace. 762% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street SUNSET DR Field Observer KRIS PASILLAS
Limits ALTA VISTA DR Checked By MARK MILLER
PANORAMA POINT Date 1/29/2009
Factors Direction- North/South
A Prevadinp Speed Data
Location of Survey 31080 Sunset Dr
85th Percentile 32
10 mph Pace 24-33
Percent in Pace 840%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 2
Collision Rate(Acc/MVM) 2 279
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 708
Length of Segment 5966
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D. Conditions Not Readilv Apparent
Conditions Curvilinear, no sidewalks
Roadway Geometrics
Comments
E Adjacent Land Use Residential
Posted Speed Limit 30
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #69
City of Redlands
Traffic Engineering Department
Street Name SUNSET DR
Limits ALTA VISTA DR to PANORAMA POINT
Radar Survey Sheet -
X=North /=South
5 10 15 20 25 30 35 40 # %ea cum%
45 1 110%1 100%j
I
I
401 ; i-
i 1 ! I 1 10% 99 0%1
! 1 1 10% 98 0%1
I / ( I 11 1 1 10% 97 0%1
35
f I 1 11 10% 93 0%1
i1 5 5 0°0 92 0%1
1 1 9 90% 87 0%1
10 100% 780%,
30 ( ( I 111 110% 680%1
11 110% 57 0%1-
11 110%1460%1
10 100% 350%,
99 % 25
25 I I / I I I I 1 ( l 6 6 0%i 16 0%1
I I I i l 2 2 0% 8 011
! 1 3 130% 60% 1
I 1 1 0% 3 0% 1
20 I I 1 ( 1 10% 20%
! I I 1 I ( 1 ( ( 1 1 10% 10%
15 I11I I
�
101
I I i i
5 !
o ' iii ilii Illi l I ; i 1-
Total Samoles 1100E
85th Percentile Speed 32 Date of Survey 1/29/2009 Start Time 14.25
50th Percentile Speed 29 = Weather Surm End Time 1520 -
15th Percentile Speed 25 Road Condition Fair Posted Speed- 30
10 MPH Pace 24-33 - Street Class Collector Observer KRIS PASILL -
Number in Pace 84 Conditions not Curvilinear no side=walks =
Percent in Pace 84.0% Apparent -
City of Redlands
Engineering and Traffic Survey
Summary
Street TERRACINA BLVD Field Observer ANTONIO ELMORE
Limits BARTON RD Checked By MARK MILLER
OLIVE AVE Date 3/6/2009
Factors Direction North/South
A Prevarlinq Speed Data
Location of Survey Morning Dove Ln
85th Percentile 47
10 mph Pace 39-48
Percent in Pace 827%
Posted Speed Limit 45
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 6
Collision Rate(Acc/MVM) 0 417
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 17103
Length of Segment 4052
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Minor Arterial
D Conditions Not Readily Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential/Orchards
Posted Speed Limit 45
Speed Limit Change) No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department.
Date Loc #68
City of Redlands
Traffic Engineering Department
Street Name TERRACINA BLVD
Limits BARTON RD to OLIVE AVE
Radar Survey Sheet r
X=North /=South
5 10 15 20 25 30 35 40 # %ea cum%
551 I 1 !
I
1 10% 100%1
50 / ! I 1 -
3 29% 99 0%1
✓�� I 1 1 ! 8 77% 96.2%1
I 9 87% 88 5%1
/A 1 1 ( 9 87% 798°x°1
451 I ( I I ( 6 58% 71 2%1
V / /I� i 13 12.5%165 4%1
10 96% 529%1
( 9 87% 433%1_
j
40 � 1 9 87l° 346/°
° ° 1 -
( ! 5 48% 260%i-
��C 8 77%1212%1
I I ! 5 48% 135%1 -
1
35%1-I ! 5 48% 87% I_
( 2 19% 38%
1
35 ( I ! I 1 10% 19% !
( 1 10% 10% i-
I
I III ( II I
I
I I I II I I III
251
I I i I i I
201 ( ! I !
I i
I I I
151
I � r
101 I I l f
! 4 ( 3
Total Samoles {1041
Date of Survey 3/6/2009 Start Time 955 _
85th Percentile Speed 47
Weather Sunny End Time 10.26
50th Percentile Speed 43 -
15th Percentile Speed 39 - Road Condition- Good Posted Speed 45
10 MPH Pace 39-48 Street Class Minor Arterial Observer ANTONIO EL
Number in Pace 86 - Conditions not -
Percent in Pace 82.7% - Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street TERRACINA BLVD Field Observer ANTONIO ELMORE
Limits OLIVE AVE Checked By MARK MILLER
CYPRESS AVE Date 3/6/2009
Factors Direction- North/South
A Prevailinq Speed Data
Location of Survey Luarel Ave
85th Percentile 36
10 mph Pace 28-37
Percent in Pace 856%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 3
Collision Rate(Acc/MVM) 0 574
Expected Collision Rate 355
C Traffic Factors
Average Daily Traffic 17103
Length of Segment 2512
Lane Configuration 4 Lanes Each Direction, Undivided
Street Classifaction Minor Arterial
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adjacent Land Use Residential/Hospital
Posted Speed Limit 35
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #69
City of Redlands
Traffic Engineering Department
Street Name. TERRACINA BLVD
Limits OLIVE AVE to CYPRESS AVE
Radar Survey Sheet
X=North /=South -
5 10 15 20 25 30 35 40 # %ea cum %
55 I1 j ( I I ' II I I � I ! i C
I ( 1 10% 100%1-
I
50 ( 1 -
I I I f
451 I I 1 l I I
401IX 1 1 1 I 1 1 0% 99 0% -
4 38%1981%1
1 2 1 19% 942%1--
5
42%1--
5 14.8% 92 3%1
1 // �� ( 1 1 I ( 8 7 7% 87 5°01-
35 — I 7 67% 79
10 96% 731%1
10 96% 63 5%1
1 1 1 15 114 4% 538%1
11 10 6°I0 39 4°I0
30 1 1 1 8 177% 288% -
1 ( 7 67% 21 2%1
1/ ( 8 177%1144%1
I 2 1 9%1 67%
( 1 I 3 29%1 48% 1
251 I ( 1 1 0°'01 1 9% 1-
I � I
( 1 10% 10% 1
201 ( I 1 I ( 1
151
I I I C 1=
10
Total Samoles 104
Date of Survey 3/6/2009 Start Time 10.30
85th Percentile Speed 36 -
50th Percentile Speed 32 Weather Sunny End Time 11.10 =
15th Percentile Speed 29 Road Condition Good Posted Speed 35
10 MPH Pace 28-37 Street Class Minor Arterial Observer ANTONIO EL
Number in Pace 89 Conditions not
Percent in Pace 856% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street TEXAS ST Field Observer ANTONIO ELMORE
Limits REDLANDS BLVD Checked By MARK MILLER
LUGONIA AVE Date 1/16/2009
Factors Direction North/South
A Prevailino Speed Data
Location of Survey Western Ave
85th Percentile 45
10 mph Pace 36-45
Percent in Pace 762%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 3
Collision Rate(Acc/MVM) 0 341
Expected Collision Rate 355
C Traffic Factors
Average Daily Traffic 10019
Length of Segment 4225
Lane Configuration 4 Lanes, Undivided
Street Classifaction Arterial
D. Conditions Not Readily Apparent
Conditions Railroad crossing.
Roadway Geometrics
Comments
E Adiacent Land Use Industrial/Commercial/Residential
Posted Speed Limit 35
Speed Limit Changer Yes
Revised Speed Limit 40
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #72
City of Redlands -
Traffic Engineering Department
Street Name TEXAS ST
Limits. REDLANDS BLVD to LUGONIA AVE
Radar Survey Sheet
X=North /=South -
5 10 15 20 25 30 35 40 ° ea cum
50 I I I III I I II
2 19% 100%1 -
3
00°x°1 -3 29% 98 1%
-
1 10% 95.2%
45 /r I 1 11 105% 943%1
6 57%1838%1
1 ( I 6 157%1781%1
6 57%1724%1
10 95% 667%1
40
10 9 5%157 10%1
1 10 95% 476%1-
/ — — I 9 86%I381%1
4 38% 295%1
I I ( 1 I 8 76%1257%1
35 I I I I15 48% 133%1
3 29% 86% 1 -
1
6% 1 -
2 19% 48% 1
30 I I I I 111 o°r°1 29% 1
2 19%j 19%
251 I � 1 I I I C
201
I � I I � If
151 ( 1 I
CI ( I
101 1 1 1
! I I 4
5i
I Total Sarnoles ,1051 =
Date of Survey 1/16/2009 Start Time 14.57 _
85th Percentile Speed- 45
50th Percentile Speed 40 Weather Sunnv End Time 1530
15th Percentile Speed 35 - Road Condition Fair Posted Speed 35 -
10 MPH Pace 36-45 Street Class Arterial Observer ANTONIO EL
Number in Pace 80 Conditions not Railroad crossing -
Percent in Pace 762% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street TEXAS ST Field Observer ANTONIO ELMORE
Limits- LUGONIA AVE Checked By MARK MILLER
SAN BERNARDINO AVE Date 1/15/2009
Factors Direction North/South
A Prevailmo Speed Data
Location of Survey Pennsylvania
85th Percentile 38
10 mph Pace 30-39
Percent in Pace 853%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc[MVM) 0 182
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 10019
Length of Segment 2534
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential/Vacant
Posted Speed Limit 35
Speed Limit Change? Yes
Revised Speed Limit 40
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Lac #73
City of Redlands
Traffic Engineering Department
Street Name TEXAS ST
Limits LUGONIA AVE to SAN BERNARDINO AVE
Radar Survey Sheet
X=North /=South
5 10 15 20 25 30 35 40 # %ea cum %
451 ) C I I I ; I I I I I ! I
1 1 a°r°� 100°o
I I I 4 139% 99 0%1
40 / 4 39% 951%,
10 98% 853%1--
I I 11 108% 75 5%1
1 1 110% 64 7%1
35 1 A I � I I 12 11 8°0l 63 7%1
I � I °f 0
12 118% 44 1%I_
12 118% 32.4%1
7 69% 20 6%1
S0 ��� I I I I I I ( 8 78% 13 7%1
1 { 1 I 1 1 ( 4 39%1 59% 1
I I I I I 1 10%1 2 0% (_
25 —+I 1+1 ( 1 1 1 o°i° 1 a°i°
201 1 1 1 II I I I III I ) I I
I � ( I
I I
151 I II I I I I ( II I
i-
101
I ( I I II ► ►
� I I
5
E i J r
OE IE II II I li II ` I ! ! I I I
Total Samales 1102;
85th Percentile Speed 38 Date of Survey 1/16/2009 Start Time 14.21 _
50th Percentile Speed 3333 Weather Sunnv End Time 1453
15th Percentile Speed 31 - Road Condition Good Posted Speed- 35 -
10 MPH Pace 30-39 Street Class Arterial Observer. ANTONIO EL
Number in Pace 87 Conditions not
Percent in Pace 853% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street TEXAS ST Field Observer ANTONIO ELMORE
Limits SAN BERNARDINO AVE Checked By MARK MILLER
DOMESTIC AVE Date 2/27/2009
Factors Direction North/South
A Prevailinq Speed Data
Location of Survey Baldwin Ave
85th Percentile 33
10 mph Pace 25-34
Percent in Pace 963%
Posted Speed Limit
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 1351
Length of Segment 2667
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Vacant
Posted Speed Limit
Speed Limit Change? Yes
Revised Speed Limit 30
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #72
City of Redlands
Traffic Engineering Department
Street Name TEXAS ST
Limits SAN BERNARDINO AVE to DOMESTIC AVE
Radar Survey Sheet
X-North /=South
5 10 15 20 25 30 35 40 # %ea cum %
451
i
401 � I 1 I � 1
1 C I
I
I II C C I I I
35� I (//////J I ( I I ` ( 5 63% 988%1-
1 ( 8 100%1925%
1 10 125%10 12 70 0%1
801 ,1 f I 1 10 125% 57 5%1
1 1 I I I I I P ( 1 10 12.5% 45 0%1
1 1 9 113% 32 5%1
€ 1 1 1 1 ( 7 87% 21 3%1
25 I 2 25°l°1 56zI/
1 1 I ( ( 11 ( I 2 25% 25% 1
201 I I I I 1 1 1 1
I I I I I I I I
II II
151 I I I I I
II 11 I I I
10' I ( I
it 111111 � �
5 ' I I f
I-
II I 1
0 !
1 Total Samples so
Date of Survey 2/27/2009 Start Time 1305
85th Percentile Speed 33
50th Percentile Speed 30 - Weather Over Cast End Time 1350
15th Percentile Speed 27 - Road Condition Fair Posted Speed
10 MPH Pace. 25-34 Street Class Collector Observer ANTONIO EL
Number in Pace 77 Conditions not
Percent in Pace 96.3% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street UNIVERSITY ST Field Observer ANTONIO ELMORE
Limits CYPRESS AVE Checked By MARK MILLER
COLTON AVE Date 2/20/2009
Factors Direction North/South
A Prevailinq Speed Data
Location of Survey 515 University Ave
85th Percentile 35
10 mph Pace 27-36
Percent in Pace 905%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 10
Collision Rate(Acc/MVM) 8 723
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 1518
Length of Segment 3635
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments High accident rate
E Adjacent Land Use Residential/Vacant
Posted Speed Limit 30
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #73
City of Redlands
Traffic Engineering Department
Street Name UNIVERSITY ST
Limits CYPRESS AVE to COLTON AVE
Radar Survey Sheet
X-North /=South
5 10 15 20 25 30 35 40 # °f°ea cum °
451 1 ! I i I I '
I� t �
401 ( i 1 1 10% 100%1
j I I I I I 1 110% 981%1
I 1 I 1 0% 97 1%1
351 I 1 1/ I/ I 1 I I ( 12 115 4% 90 5%1
I I I 10 95% 79 0%1
1 ( 1 1 9 86% 610%1
6 57% 524%j
30 �� ) I I I I ( I 12 114% 467%1-202%
116 1520 35 2°I°
7 6 7%120 0%1
8 76%1133%1
25 I I 1 10%° 3 8% 1
1 10% 10% 1
I I I I I I
201 I I I
I I II 111ki I +
I III I I I I I I I
I
I 11
151 i I I I _
I li I i ii I I
101 I I I ( I I
I E
5
0
I Total Samples 1105
Date of Survey 2/20/2009 Start Time 11.43
85th Percentile Speed 35
50th Percentile Speed 31 - Weather Sunnv End Time 1228
15th Percentile Speed 28 Road Conditior Good Posted Speed 30
10 MPH Pace 27-36 Street Class Observer ANTONIO EL
Number in Pace 95 Conditions not
Percent in Pace 90.5% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street UNIVERSITY ST Field Observer ANTONIO ELMORE
Limits COLTON AVE Checked By MARK MILLER
LUGONIA AVE Date 2/20/2009
Factors Direction North/South
A Prevailing Speed Data
Location of Survey Syvaln Park
85th Percentile 36
10 mph Pace 28-37
Percent in Pace 806%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 3
Collision Rate(Acc/MVM) 3 61
Expected Collision Rate 198
C Traffic Factors
Average Daily Traffic 1518
Length of Segment 2635
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not ReaddV Apparent
Conditions
Roadway Geometrics
Comments High accident rate
E Adiacent Land Use Residential/Vacant
Posted Speed Limit 30
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #74
City of Redlands -
Traffic Engineering Department
Street Name- UNIVERSITY ST
Limits COLTON AVE to LUGONIA AVE
Radar Survey Sheet
X=North /=South
5 10 15 20 25 30 35 40 # %ea cum %
45,N
I i I I I I ! 1 1 1 1 1 09%1 100°x°1
1 1 09% 991%1
C I , 2 19% 981%1
! I 1 09% 96 3%
40�� I I 2 19%1954%1
2 19% 93 5%1
! I I 1 09% 91 7%1
I //� I I I I ( I 1 110 1 9 3% 80 6%!
//V 35 / / I ( ( 1 9 83% 713%1-
%/I ( ! ! ! 1 9 8.3% 630%j
1 9 83% 54.6%1
�� 10 93%1463%1
30• �� I ! 8 74%1370%1
��� I 1 ! 9 83% 296%1
-- !— 12 (111% 213% -
! 1 ( 09% 10.2%
` I ! !T1 1 1 ( ! 5 46% 93% 1
25 ( I I 1 I I 219%
19% 4.6% 1
1 ( I I I ! I 1 1 1 2 1 9% 28% 1
20
1 I
II I III 111 I . I !
15 hili ! � IIl � i 1 , ! I II � I i = ill I Ig
101
! ! III II ! ! I 1 !
5 I I ! I ! If 1
z ,
Total Samoles 108
Date of Survey 2/20/2009 Start Time 11.08
85th Percentile Speed 36
50th Percentile Speed. 32 Weather Sunn End Time 11.40
15th Percentile Speed 28 Road Condition Good Posted Speed 30 -
10 MPH Pace 28-37 - Street Class Collector Observer ANTONIO EL
Number in Pace 87 - Conditions not
Percent in Pace 806% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street UNIVERSITY ST Field Observer ANTONIO ELMORE
Limits LUGONIA AVE Checked By MARK MILLER
SAN BERNARDINO AVE Date 2/20/2009
Factors Direction North/South
A Prevailing Speed Data
Location of Survey 1530 N University St
85th Percentile 37
10 mph Pace 28-37
Percent in Pace 887%
Posted Speed Limit 25
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 1207
Length of Segment 2652
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readilv Apparent
Conditions
Roadway Geometncs
Comments
E.Adiacent Land Use Residential
Posted Speed Limit 25
Speed Limit Change? Yes
Revised Speed Limit 30
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #75
City of Redlands
Traffic Engineering Department
Street Name- UNIVERSITY ST
Limits LUGONIA AVE to SAN BERNARDINO AVE
Radar Survey Sheet
X=North /=South
5 10 15 20 25 30 35 40 # %ea cum % -
1
I
45
1 0 99,. 100%
1 09% 991%
1 , i
401 I
5 47% 981%1
I I 1 2 1 9% 93 4%
I
7 66% 915%1
1 I I 1 6 57% 84 9%1
35 VV V ( ( I I ( I ( 11 10.4 79 2%1
11 10.4%I 689%1
12 113 585%1-
11
85%11 10 4% 47 2%1
VVV ( I 113 12.3% 36 8%1
301 � I I I I 12 111 3%�24 5%1
Il
V 1 1 I 1 ( 1 7 66%113.2°rol
I I l 1 4 38% 66% I-
I 1 i I 1 I I I i 1 ( 09la1 19!1,1
251 1 1 1 1 1 1 11 I I I I I 11 09% 09% 1
I I 1 III I I I I � I
I I I I I I I I
I Iilll I � I I I
201 1 i t I I 11 I I I I I I f
III I I I I I I I f I I I
IIII `` I � I I I II II I I I
151 1 1 l i I I I 1 1 1 1 1 I 1 O
I I I II I I I I
101 I I I
5 ! I I
01I � -
Total Samples 1061
Date of Survey 2/20/2009 Start Time 1025
85th Percentile Speed 37
50th Percentile Speed 33 Weather Sunny End Time 11 05
15th Percentile Speed 30 Road Condition Fair Posted Speed 25
10 MPH Pace- 28-37 Street Class Collector Observer ANTONIO EL
Number in Pace 94 Conditions not
Percent in Pace 887% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street WABASH AVE Field Observer ANTONIO ELMORE
Limits STH AVE Checked By MARK MILLER
CITRUS AVE(N) Date 1/30/2009
Factors Direction North/South
A. Prevailing Speed Data
Location of Survey 144 S Wabash Ave
85th Percentile 48
10 mph Pace 36-45
Percent in Pace 660%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 198
C Traffic Factors
Average Daily Traffic 4800
Length of Segment 2613
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not Readily Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential/Vacant
Posted Speed Limit 35
Speed Limit Change? Yes
Revised Speed Limit 45
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #78
City of Redlands
Traffic Engineering Department
Street Name WABASH AVE
Limits 5TH AVE to CITRUS AVE(N)
Radar Survey Sheet
X-North /=South
5 10 15 20 25 30 35 40 # %ea cum,°
601 i1 ! 111
I ! �
1 10% 100%1
55 � ( I I I ` 3 29% 99 0%1
1' ` I 1 1 I 1 10% 961%1
3 29% 951%1
50 1 I I 2 19% 92 2%1
1 I 1 1 I I 5 49% 90.3%1-
4 I ( 4 3 9% 85 4%1
�1 1 10% 81 6%1
_1 5 49% 80 6%1
45 1 8 78% 757%
7 6.8% 680%
_ _ _�_ 8 78% 612%
//
__ 10 97% 534%1
I ( ( ( 1 7 6.8% 43 7%
40 ( 5 149% 31611%
I ( _ 5 149% 262%1
�� 11 ( ( 1 I � I 6 5$°l° 214%1
1 1 6 158% 15 5%1
355 4 39% 97%
( I I ( I I I ( ( I I
1 10% 29%
301J1/1 1 11 ' 1 I I I ' I
1 1 1 1 1 1 1 1 ( 1 (
10% 1 9% 1
1 1 1 1 1 I I I
1 1 1 I1 I � I I
I
1 110% 10% 1
251 ( ( I I I II 1
I I I I I I 1 I
11 i � 1 I I
201 f' 1 I i
151
I Total Samoles 1031 -
Date of Survey 1/30/2009 Start Time* 1410
85th Percentile Speed 48 -
50th Percentile Speed 42 Weather Sunn End Time 1505
15th Percentile Speed 36 - Road Condition Good Posted Speed 35
10 MPH Pace 36-45 Street Class Arterial Observer ANTONIO EL
Number in Pace. 68 Conditions not
Percent in Pace 66.0% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street WABASH AVE Field Observer ANTONIO ELMORE
Limits CITRUS AVE(N) Checked By MARK MILLER
COLTON AVE(E) Date 1/30/2009
Factors Direction North/South
A Prevailing Speed Data
Location of Survey Crafton School
85th Percentile 43
10 mph Pace 31 40
Percent in Pace 651%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 2
Collision Rate(Acc/MVM) 0 667
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 5365
Length of Segment 2692
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not Readdv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential/Vacant
Posted Speed Limit 30
Speed Limit Change? Yes
Revised Speed Limit 40
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #79
City of Redlands
Traffic Engineering Department
Street Name WABASH AVE
Limits- CITRUS AVE(N)to COLTON AVE(E)
Radar Survey Sheet
X=North /=South
5 10 15 20 25 30 35 40 # %ea cum %
551 I I ill I I i t j ! ( I I
1 09% 100%j
50 2 19% 991%1
( 1 ( ( ( 1 09% 97 2%1
( ! 1 2 19% 96 2%1
1 4 38% 94 3%1
45 3 28% 906%1
1 7 66% 877%1-
2 19% 811%1
5 47% 79.2%1
40 ���f ( ! ( 1 8 75% 74 5%1
( ( 1 5 47% 67 0%1
( 8 75% 62 3%1
! 1 ( 1 I 1 7 66% 547%1 -
7
47%1 -
7 66% 481°!x1
35 — /// I 10 94% 415%1
7 66% 321%1
4 38% 25 5%1
( 1 I 7 66% 21 7%1
6 57% 151%
30 7 66% 94%
1 ( 1 09% 28% 1
1 09% 19%
x 11 ( ( I ( 1 09% 09%
25 1 1 I I I ( I
I 1 i i I
201
151 I s ,
101
Total Samples 1061
Date of Survey. 1/30/2009 Start Time- 1330
85th Percentile Speed 43
50th Percentile Speed 37 = Weather SunnEnd Time 14 04
y
15th Percentile Speed 31 - Road Condition Good Posted Speed 30
10 MPH Pace 31-40 Street Class- Arterial Observer ANTONIO EL
Number in Pace 69 _ Conditions not -
Percent in Pace 651% Apparent -
City of Redlands
Engineering and Traffic Survey
Summary
Street WABASH AVE Field Observer ANTONIO ELMORE
Limits COLTON AVE(E) Checked By MARK MILLER
SESSUMS DR Date 1/30/2009
W
Factors Direction North/South
A Prevailing Speed Data
Location of Survey 1838 Wabash Ave
85th Percentile 37
10 mph Pace 28-37
Percent in Pace 788%
Posted Speed Limit 35
B Collision Histonr
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 906
Length of Segment 7476
Lane Configuration 1-2 Lane Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not Readily Apparent
Conditions
Roadway Geometrics
Comments
E Adjacent Land Use Residential/Vacant
Posted Speed Limit 35
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #80
City of Redlands
Traffic Engineering Department
Street Name WABASH AVE
Limits COLTON AVE(E)to SESSUMS DR
Radar Survey Sheet
x=North /=South -
5 10 15 20 25 30 35 40 # %ea cum %
451
f
1 I I 1 12% 100%1
40 ( I 5 15 9% 98.8401
5 15.9% 92 9401
182% 71%1
17 8.2%17888%1
351 1 8 94% 70 6%1
1 8 94% 612%1-
1 1 7 82% 51 8%1
7 8.2% 43.5%1
1 I 6 71% 353%1
6 71% 28.2/a
30 ( 6 71% 21 2%1
� 5 59% 141%1
1 12% 82% 1
25 �1 I I ( ( I 1 I 3 3.5% 71%
l I I l l ( 1 1 ( 1 1 2% 35% 1
12% 24% 1
� ( ( 1 � ( � 1 12%1 12%
1
20 1 1 I 1
� II
I1 1 1 i
I ! I I
10
51i
•
i Total Samples .85 1 -
Date of Survey 1/30/2009 Start Time 12.32
85th Percentile Speed 37 =
50th Percentile Speed 33 Weather Sunny End Time 13.26
15th Percentile Speed 29 Road Condition- Fair Posted Speed 35
10 MPH Pace 28-37 Street Class Arterial Observer ANTONIO EL
Number in Pace- 67 = Conditions not
Percent in Pace 78.8% Apparent
City of Redlands -
Traffic Engineering Department
Street Name CYPRESS AVE -
Limits CENTER ST to REDLANDS BLVD
Radar Survey Sheet
X=North /=South -
5 10 15 20 25 30 35 40 # 'lea cum%
6011 1 1 1 1 1
� � I
I 1 09% 100%j
55!/ f l 2 1 9 99 1% 1
2 19%1972%1
1
I I I I 1
50 1 I 1 09%1953%1
3 2 8%' 1 94 3%j
I i I
1 2 19% 896%1
45 8 75% 858%1
3 28% 783%1 --
1 A I� 1 f 6 57%1755%1
10 9 4% 69 8%1
40 1 I 1 9 85% 604%1
-- — _I 7 66%147 2%1
7 66%1406%1
7 66% 340%1
35 ( _ 4 138%1274%1
6 i 157% 23 6%1
/ ( 9 ( 85% 179%1
4 38% 94% 1
1 1 3 28% 57% 1
30t ' 1 I ' � � � , '
�� 2 19% 28% 1-8°b -
1 1 1 09%
09%
1
251 I ( I
201 ( I
I-
151s11 �
I Total Samoles 1061 -
Date of Survey 5/8/2009 Start Time 1055
85th Percentile Speed 44
50th Percentile Speed 39 Weather Sunny End Time 1130
15th Percentile Speed 33 Road Condition Fair Posted Speed 40
10 MPH Pace 33-42 Street Class Arterial Observer KRIS PASILL
Number in Pace 70 Conditions not Parking
Percent in Pace 660% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street CYPRESS AVE Field Observer KRIS PASILLAS
Limits REDLANDS BLVD Checked By MARK MILLER
CITRUS AVE Date 5/8/2009
J
Factors Direction North/South
A Prevailinq Speed Data
Location of Survey 727 Cypress Ave
85th Percentile 44
10 mph Pace 33-42
Percent in Pace 705%
Posted Speed Limit 40
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 4
Collision Rate(Acc/MVM) 0 716
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 7671
Length of Segment 3504
Lane Configuration 1 Lane SB,2 Lanes NB, Undivided
Street Classifaction Arterial
D Conditions Not Readilv Apparent
Conditions Parking, driveways
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 40
Speed Limit Change? Yes
Revised Speed Limit 45
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Da,e Loc #21
City of Redlands
Traffic Engineering Department
Street Name CYPRESS AVE
Limits- REDLANDS BLVD to CITRUS AVE
Radar Survey Sheet
X=North /=South
5 10 15 20 25 30 35 40 # %ea cum%
551 I
1 I I 1 1 I 1 10% 100%j-
50K I I
1 I ( I 1 3 29% 990%1-
1
90%1-
1 2 19% 96 2%1
2 19% 94.3%1
I ( 2 19% 92 4%1
45 J I ( I I I 3 29% 90 5%1
1 I I I ( 5 48% 87 6%1
i
I ( I 4 38% 829%1-
V
29%1-
V I 1 I 5 48% 790%1-
6
90%16 57% 74.3%1
40 ���� I I I 15 114 3%168 6%1-
11
%1-
11 1105% 54 3%1
�I ( 1 1 13 (12.4% 43.8%1 -
1 4 38% 31 4%1
I I 2 19% 27 6%1
35 I I I ( I I I I I 2 19% 257%1-
I 1/�/V/V — I 1 J 11 105%1238%1
5 10%
0!° 186%
/°
30 I ( 3 29% 76%
2 19% 48%
I II II I I I II ��_ 1 I 1
1 2 1 9%1 29%
FF I 1 1 1 0% 10%
51
2
I II fl I I II
i I 1 II
201 f I C I
I I � I II I I I I
15
h
I
I C t i l I
I E I S I � 1I1 � I I I I
101 1 1 I'I I I
i Total Samoles (1051
Date of Survey 5/8/2009 Start Time 950
85th Percentile Speed 44 -
- Weather Sunny End Time 1045
50th Percentile Speed 39
15th Percentile Speed 34 = Road Condition Fair Posted Speed 40
10 MPH Pace 33-42 Street Class , Arterial Observer KRIS PASILL
Number in Pace- 74 Conditions not Parking driveways
Percent in Pace 70.5% Apparent -
City of Redlands
Engineering and Traffic Survey
Summary
Street DEARBORN ST Field Observer ANTONIO ELMORE
Limits- COLTON AVE Checked By MARK MILLER
LUGONIA AVE Date 1/30/2009
Factors Direction East/West
A Prevadmq Speed Data
Location of Survey 1114 Dearborn St
85th Percentile 32
10 mph Pace 23-32
Percent in Pace 847%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 0 553
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 3128
Length of Segment 2780
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Arterial
D. Conditions Not Readilv Apparent
Conditions Driveways
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 30
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #24
City of Redlands
Traffic Engineering Department
Street Name DEARBORN ST
Limits COLTON AVE to LUGONIA AVE
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum
451 1 1 1 ( I
-
401 1 I �-
I
1 � !
2 24% 100%1
351
I 2 2 4%197 6.1.11
1 1 5 15 9% 95 3016 1
5 159% 894%1=
j 6 71%1835%1
30 / 8 94% 76 5%1
8 94% 671%1 -
1 I 8 94% 576%1-
9 106% 48.2%
8 9 4% 37 65/7.
25 1 8 94% 28.2%1
1 1 1 7 8.2% 18 8%1
5 59% 10 6%1
3 35%1 47% 1
I 1 1 1 12% 12% 1
201 ( 1 1 1 1
I ( I I
151 I 1 1 1 ' -
1 I I I I
CII I I I
10� I C
II 1
I-
i
5
Total Samples 85
Date of Survey 1/30/2009 Start Time 11.32
85th Percentile Speed 32 - -
End Time 12 25
50th Percentile Speed 28 - Weather Sunnv
15th Percentile Speed* 24 = Road Condition Good Posted Speed 30
10 MPH Pace 23-32 - Street Class Arterial Observer ANTONIO EL
Number in Pace 72 Conditions not Driveways _
Percent in Pace. 847% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street DEARBORN ST Field Observer ANTONIO ELMORE
Limits LUGONIA AVE Checked By MARK MILLER
SAN BERNARDINO AVE Date 2/27/2009
Factors Direction North/South
A Prevailinq Speed Data
Location of Survey Close to Foothill Way
85th Percentile 36
10 mph Pace 28-37
Percent in Pace 880%
Posted Speed Limit
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 3128
Length of Segment 4752
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Local
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adjacent Land Use Residential/Vacant
Posted Speed Limit
Speed Limit Change) Yes
Revised Speed Limit 25
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #25
City of Redlands
Traffic Engineering Department
Street Name DEARBORN ST
Limits LUGONIA AVE to SAN BERNARDINO AVE
Radar Survey Sheet
X=North /=South
5 10 15 20 25 30 35 40 # %ea cum%
4511 1 I 1 ISI ! � � � � � 1 1-
1 20% 100%1-
1
00%j1 20% 98 0%1
40 ( 1 1 20% 960%1-
3
60%3 60% 94 0%1
3 11 20% 84 0%1
5 1 20% 820%
4 80% 800%
8 160% 720%
_ 8 160% 560% -
7 14.0%140 0% -
30I I -- f I I I 7 140%1260%1-
1 j V 1 ( 1 6 120% 120%1-
251 I I i 1 ( I I
201 ( 1 1
I I ( I II f i t
I I � I III � I I
151 11 1 1 1 11 I 1�
101
5 I I
0 I
Total Samoles 50 -
Date of Survey 2/27/2009 Start Time 1035
85th Percentile Speed 36
50th Percentile Speed 31 Weather- Over Cast End Time 11.20
15th Percentile Speed 29 Road Condition, New Posted Speed. -
10 MPH Pace 28-37 Street Class Local Observer ANTONIO EL
Number in Pace 44 Conditions not
Percent in Pace 88.0% Apparent -
City of Redlands
Engineering and Traffic Survey
Summary
Street DEARBORN ST Field Observer ANTONIO ELMORE
Limits- SAN BERNARDINO AVE Checked By MARK MILLER
SESSUMS DR Date 2/27/2009
Factors Direction North/South
A Prevaihnq Speed Data
Location of Survey N/A
85th Percentile 31
10 mph Pace 23-32
Percent in Pace 1000%
Posted Speed Limit
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 3128
Length of Segment 1901
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Unclassified
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Vacant
Posted Speed Limit
Speed Limit Change? Yes
Revised Speed Limit 30
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #26
City of Redlands
Traffic Engineering Department
Street Name DEARBORN ST
Limits SAN BERNARDINO AVE to SESSUMS DR
Radar Survey Sheet
X=North I=South
5 10 15 20 25 30 35 40 0 %ea cum %
4511 I1 1
I I
401
i I I I
jl ff � I I
35 I ( { I I I
ill I I
7 14 0% 100%1
7 1140- 86 0%1
30 /I ( I I 8 16 0 I 72 0%1
8 16 040' 56 0%1 =
7 14 0% 400%1-
6
00%1-6 120% 260%1 -
! ( 1 5 10 0°0 14 0%1
25 11 I ( I 11 1 I 1 1 1 2 0% 40% 1
1 20% 20% 1
201
1 V I I I I I ( I ( I
I I III I i I I ( I I
111 I II { I III !
I Ill l i l ( I I I
15
1 I
i-
10 I I
5 I
I
I �
0 1
Total Samples 150 -
Date of Survey 2/27/2009 Start Time 11 25
85th Percentile Speed 31
50th Percentile Speed- 29 Weather Over Cast End Time 1210 ;
15th Percentile Speed 27 Road Condition Good Posted Speed
10 MPH Pace 23-32 - Street Class Unclassified Observer ANTONIO EL
Number in Pace 50 _ Conditions not -
Percent in Pace 00.0% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street ELIZABETH ST Field Observer KRIS PASILLAS
Limits GARDEN ST Checked By MARK MILLER
CRESCENT AVE Date 2/6/2009
y
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey Near Fountain Ave
85th Percentile 44
10 mph Pace 33 42
Percent in Pace 680%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 2
Collision Rate(Acc/MVM) 0 987
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 1912
Length of Segment 5100
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Arterial
D.Conditions Not Readilv Apparent
Conditions Curves, parking, minimal sidewalks
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 30
Speed Limit Change9 Yes
Revised Speed Limit 35
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #27
City of Redlands
Traffic Engineering Department
Street Name ELIZABETH ST
Limits GARDEN ST to CRESCENT AVE
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum -
55(A 11 ( 11 1 I I I I I I I ! 1 1 0% 100%1
1 1 0°10�99 0%1-
50� I € ! ! 2 20% 980%j
i ' 1
C
I ( I 1 1 10% 960%1
( I3 30% 95 0%1
45 /X 6 6 0%192 09/61
3 ' 30%1860%1-
1
0% 860%1-( 4 40%
830%1
' 4 40% 790%1
4 ( 4 0%175 0%1
40 12 112 0%171 0%1
( 6 6 09/6159 0%1
7 70%1530%1
_ ! I 7 70%. 4150%1 -
7
60% -
7 70% 390%1
35 I I_ 7 70% 320%
( 7 70%1250%
7 70% 180
( 2 2 0%1 11 0%
�i I ( ` 3 3.0% 90% 1
3U ( { 1 1 0% 6 0%
( ( I ( 2 120% 5 0%
I (
� ( I I III I ( ( 2 20%1 30% 1
1II � � ( � I li I
251 I I ( 1 I I 1
( ( ( 1 10 10%
I I
20 1
I
15i j
I I i
I t
10!
I Total 5amoles 1100
Date of Survey 2/6/2009 Start Time 1212 ■
85th Percentile Speed 44
50th Percentile Speed. 38 Weather End Time 13.05
S nny
15th Percentile Speed 33 Road Condition Fair Posted Speed 30
10 MPH Pace 33-42 Street Class Arterial Observer KRIS PASILL
Number in Pace68 Conditions not Curves,parking,minimal sidewalks
Percent in Pace 680% = Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street FERN AVE Field Observer ANTONIO ELMORE
Limits REDLANDS BLVD Checked By MARK MILLER
CAJON ST Date 1/16/2009
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey 126 E Fern Ave
85th Percentile 39
10 mph Pace 30-39
Percent in Pace 842%
Posted Speed Limit 40
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 2
Collision Rate(Acc/MVM) 0 773
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 6811
Length of Segment 1829
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 40
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #24
City of Redlands
Traffic Engineering Department
Street Name FERN AVE
Limits REDLANDS BLVD to CAJON ST
Radar Survey Sheet -
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum -
451 J ' I I I I I 1 1 I I I I
I I ( 3 130% 100%1
IJ
I_
2 20% 97 0%1-
1 I 4 40% 950%1 -
40
50%1 -40 ; ( 5 50% 911%1-
7
11%1_7 69%1861%1
/' J 7 69%1792%1
15 14 9%172.3%1
11 109% 574%1
11 10 9%146 5°'0
35 1 ( 6 59%1356%1
% -
1 6 59% 297%
208101
0 ( ( 8 79% 149% -
3 �1 (
5 50% 69%
1 1 0%1 20% 1
1 10% 10% 1
25 1
I I
201 I �-
I I I
I _
151 I
10 ( i
' I
SC ,
! i Ali li I
0
Total Satnnles 1011
Date of Survey 1/16/2009 Start Time 11 48
85th Percentile Speed 39 -
50th Percentile Speed 36 _ Weather Sunny End Time 12.30
15th Percentile Speed 32 - Road Condition Good Posted Speed 40 -
10 MPH Pace. 30-39 Street Class Coliector Observer ANTONIO EL
Number in Pace 85 _ Conditions not -
Percent in Pace 842% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street- FERN AVE Field Observer ANTONIO ELMORE
Limits CAJON ST Checked By MARK MILLER
CENTER ST Date 1/16/2009
Factors Direction East/West
A Prevailmq Speed Data
Location of Survey 615 Fern Ave
85th Percentile 36
10 mph Pace 28-37
Percent in Pace 951%
Posted Speed Limit 40
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 0 268
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 6811
Length of Segment 2637
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 40
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #29
City of Redlands -
Traffic Engineering Department
Street Name FERN AVE
Limits CAJON ST to CENTER ST
JP
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum %
451 1 ' I I I X11 I � C I
I I I I I I
Ix 1 10% 100°10)_
401
(� I 1 10% 990%j
I 2 19% 98 1%1
I/�/ �� 1 9 87% 96 1%1
V� 4 39% 87 4%1
35 11 107% 835%1
11 107% 72 8.0(-
(f ( ( ( 14 136% 621%I
(� ( 12 11 7% 48 9%1
12 117% 369%1
30 I I . I 12 11 7°o 252%1-
1
52% -
1 10 97% 136%1
1 3 29% 39% 1
( I ( 1 10% 10%
25 I1 1 I I I I
II I 11
1-
201 I I I
I II ( I I I
I I I I
151 I I I ( I
II II I
i � II I l
10 I I I ( I
I -
II
5E
I I I
pi
Total Samoles 103
Date of Survey 1/16/2009 Start Time 11.10
85th Percentile Speed 36
50th Percentile Speed 33 Weather Sunny End Time 11.45 _
15th Percentile Speed 30 Road Condition Fair Posted Speed 40
10 MPH Pace 28-37 Street Class Collector Observer ANTONIO EL
Number in Pace 98 = Conditions net
Percent in Pace 95.1% ,apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street- FERN AVE Field Observer ANTONIO ELMORE
Limits CENTER ST Checked By MARK MILLER
SAN MATEO ST Date 1/16/2009
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey 1032 Fern Ave
85th Percentile 42
10 mph Pace 32-41
Percent in Pace 777%
Posted Speed Limit 40
B.Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 1 98
C.Traffic Factors
Average Daily Traffic 6811
Length of Segment 2639
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 40
Speed Limit Change) No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department.
Date Loc #30
City of Redlands
Traffic Engineering Department
Street Name FERN AVE
Limits CENTER ST to SAN MATEO ST
Radar Survey Sheet
X=West /=East -
5 10 15 20 25 30 35 40 # %ea cum pro =
50 DC j I I i ( i I I I I 1 1 10% 100%1-
45
00%1-
455��f Q I ( 3 29%1990%;
6 58% 96 1°lo I -
1 6 58% 903',.l
10 97% 845%1
40 9 87%174.8%1
1 5 4 9% 66 0%1
1 8 78%1612%1-
Ix
8% 612%1-
IX I 1 10 97% 534%1
35 // I I ( I I 3 29 350%1-
1 8 78% 320%1-
77
20%1-77 10 97% 24 3%1
I 1 8 78% 146%1
30 ( 2 1 9% 29%
1 I ( 1 1 10% 10% 1
25 ! ( ( I I
201 I ( i ' I ( 1-
1
151 ( i
10
f �
I
� II
SiliI-
Total Samples 103
Date of Survey 1/16/2009 Start Time. 1018 •
85th Percentile Speed 42
50th Percentile Speed 37 - Weather Sunnv End Time 11.03
15th Percentile Speed 33 - Road Condition Good Posted Speed 40
10 MPH Pace 32-41 Street Class Collector Observer- ANTONIO EL
Number in Pace 80 - Conditions not
Percent in Pace 777% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street FERN AVE Field Observer ANTONIO ELMORE
Limits SAN MATEO ST Checked By MARK MILLER
TERRACINA BLVD Date 1/16/2009
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey 1320 Fern Ave
85th Percentile 34
10 mph Pace 26-35
Percent in Pace 892%
Posted Speed Limit 35
B. Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 0 188
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 6811
Length of Segment 3766
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 35
Speed Limit Change9 No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #31
City of Redlands
Traffic Engineering Department
Street Name FERN AVE
Limits SAN MATEO ST to TERRACINA BLVD
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum "o
451 1 I ( I I { I I I I
1 -
E
40 1 i ( 1 10% 100%1-
1
00%1_1 10% 990%1 -
1
90%1 -1 10% 980%]
6 59% 971%1
35 5 49% 91 2%1
6 59% 86 3%1
j I ( 10 98% 804%]
1 ( 16 157% 70 6%1
1 17 167% 54 9%1
30 ,� ! 11 108% 38.2%1
7 69% 275%1
8 78% 206%1-3 29% 127%1
8 78% 99 8%% I
25 2 20% 20% 1
j I I i I
20 1 I I I
I I I I I I ( I I
1 I I I I
15 1 I I I I 1
101
i i f
5 1_
I ,
0 1 1 1 I C -
Total Sarnoles 102
Date of Survey 1/16/2009 Start Time 9.30 ■
85th Percentile Speed 34
Weather Sunny End Time 10.14
50th Percentile Speed 31
15th Percentile Speed. 28 Road Condition Good Posted Speed 35 -
10 MPH Pace 26-35 Street Class Collector Observer ANTONIO EL
Number in Pace 91 Conditions not
Percent in Pace 89.2% Apparent
A
City of Redlands
Engineering and Traffic Survey
Summary
Street- 5TH AVE Field Observer KRIS PASILLAS
Limits FORD ST Checked By MARK MILLER
DEARBORN ST Date 3/5/2009
Factors Direction East/West
A Prevaidtnq Speed Data
Location of Surrey Marion Rd
85th Percentile 45
10 mph Pace 36-45
Percent in Pace 752%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 3
Collision Rate(Acc/MVM) 0 779
Expected Collision Rate 355
C Traffic Factors
Average Daily Traffic 6720
Length of Segment 2760
Lane Configuration 4 Lanes, Undivided
Street Classifaction Arterial
D Conditions Not Readdv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential/School/Vacant
Posted Speed Limit 35
Speed Limit Change? Yes
Revised Speed Limit 45
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #32
City of Redlands
Traffic Engineering Department
Street Name 5TH AVE
Limits FORD ST to DEARBORN ST
Radar Survey Sheet
X=West /=East -
5 10 15 20 25 30 35 40 # %ea cum %
601
jl II I I I
1 [ C I 1 1 0% 1001/101
1 f I ( I 1 1 0% 990%1-
551
90%1_55
I I
I 2 20% 980%1 J I I 1 10% 960%1
0 K/I/X I ( 4 40%1950%11
I
1 10i° 891%1
45 I I ' 12 11 9°r I 881°r
I6 5 9% 76.2%°
I 7 69% 7036[� I
-
�Q Q _ 1 13 129% 58 4%1
40 / 4 4.0% 45 5%1
I I I 1 1 1 8 179% 41 6%1
I7 69% 33 7%1
0 ( 1 1 1 4 140% 267%1-
10 99% 228%1
351 1 4 1 4.0% 12 946;
1 ( 1 ( 1 3 30
8 9%
1 1 I ( I ( 1 1 1 1 1 0% 59%
_ _ 3 130% 50%zzr
30 ( I I I IT-1-I I 1 110% 2 0% 1
x 1 I ( 1 10%j 1 0%
251 1 I 1 1 ' 1 I
I II I ( I 1
� -
I
1 I �
20j
1i i1 I -
I '
151 1 l l 1 I 1 II
Total Sarnoles 101
Date of Surrey 3/5/2009 Start Time 11.21
85th Percentile Speed 45
50th Percentile Speed 41 - Weather Sunny End Time 11 46
15th Percentile Speed. 36 - Road Condition Fair Posted Speed 35
10 MPH Pace 36-45 Street Class Arterial Observer KRIS PASILL
Number in Pace- 76 Conditions not _-
Percent in Pace 75.2% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street 5TH AVE Field Observer KRIS PASILLAS
Limits DEARBORN ST Checked By MARK MILLER
WABASH AVE Date 3/5/2009
Factors Direction East/West
A Prevailing Speed Data
Location of Survey La Salle St
85th Percentile 48
10 mph Pace 39-48
Percent in Pace 754%
Posted Speed Limit 45
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 198
C Traffic Factors
Average Daily Traffic 6720
Length of Segment 2656
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adjacent Land Use Residential/Vacant
Posted Speed Limit 45
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #33
City of Redlands
Traffic Engineering Department
Street Name 5TH AVE
Limits DEARBORN ST to WABASH AVE
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum %
551 { 1 i I
� � I
1 1 1 08% 100%1
�I 1 3 25% 99 2°0
{ I I 1 [ 3 25% 96 6%'
50 1 1 1 1 3 , 25% 94 1%1
1 7 59% 91 5%1
A
I ( I I 5 { 42% 85 6%1
9 76% 81 4%1
IN, 12 102% 73 7%1
45 I 9 76% 63 6%
VI/ I 12 102% 500%1
I 10 85% 39 8% _
1 5 42% 31 4%1
40 9 76% 271%1 -
6 1 1
11 93% 195%
i t I 2 17% 10 2%1
1 I I I 6 51% 85% 1
f/J i 1 ( ( 1 ( I 1 ' 08% 34%
35(^ )' I I ( I 1 ( 08% 25% 1
1 ( I 1 1 108% 17% 1
30 I I 1 108% 0 8% 1
I I I I I I
25 I ( ( ( I { I
20
I
1 I I
151 € I
' ' ll
(-
1
10
Total Samples 11181 _
w
Date of Survey 3/5/2009 Start Time 11.53
85th Percentile Speed 48
50th Percentile Speed 43 = Weather Sunny End Time 1217 =
15th Percentile Speed 39 Road Condition Fair Posted Speed 45
10 MPH Pace 39-48 Street Class Arterial Observer KRIS PASILL
Number in Pace 89 Conditions not -
Percent in Pace 754% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street FORD ST Field Observer.KRIS PASILLAS
Limits CITRUS AVE Checked By MARK MILLER
5TH AVE Date 1/29/2009
Factors Direction North/South
A Prevailinq Speed Data
Location of Survey Balfour Ct
85th Percentile 46
10 mph Pace 38-47
Percent in Pace 730%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 2
Collision Rate(Acc/MVM) 0 528
Expected Collision Rate 355
C Traffic Factors
Average Daily Traffic 8235
Length of Segment 2212
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not Readilv Apparent
Conditions Driveways, parking
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 35
Speed Limit Change? Yes
Revised Speed Limit 40
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #34
City of Redlands
Traffic Engineering Department
Street Name- FORD ST
Limits CITRUS AVE to 5TH AVE
a
Radar Survey Sheet
X=North /=South
5 10 15 20 25 30 35 40 # %ea cum
-
551 E � -
E
1 10% 100%1
I11 0% 99 0%1
50 1 1 I 1 ( 1 10% 98 0%1
JX
2 120% 970%1
2 20% 950%1
4 4.0% 930%5 50% 890%1
45 — 10 10 0°° 840%1
7 70% 74 0%1
� 4 40% 670%,
3 30% 63 0%1_
/ 11 110% 600%1-
40
00%40 / i I �1 16 160% 490%1-
2
90% -2 20% 33 0%1_
11 �11 0% 31 0%1 -
1 2 20% 20 0%1
1 I I 1 3 30% 18 0%1
35 ( ( ( 1 ( 4 40% 15 0%1
1 5 50% 11 0%
2 20% 60%
1 1 2 20% 40%
30 2 20% 20%
1
1 1 I
251
2O1 1 1 1 !
15
101
Total Samoles 1001
Date of Survey 1/29/2009 Start Time 916
85th Percentile Speed 46 -
50th Percentile Speed 41 - Weather Sunn End Time 9.50 ,
15th Percentile Speed 35 - Road Condition Good Posted Speed 35 -
10 MPH Pace 38-47 Street Class Arterial Observer KRIS PASILL
Number in Pace 73 Conditions not Driveways parking
Percent in Pace 73.0% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street- FORD ST Field Observer KRIS PASILLAS
Limits 5TH AVE Checked By MARK MILLER
RESERVOIR RD Date 1/29/2009
y Factors Direction North/South
A Prevailinq Speed Data
Location of Survey Crestview Rd
85th Percentile 40
10 mph Pace 30-39
Percent in Pace 786%
Posted Speed Limit 35
B. Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 1 98
C.Traffic Factors
Average Daily Traffic 8235
Length of Segment 2885
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 35
Speed Limit Change9 Yes
Revised Speed Limit 40
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #31
City of Redlands
Traffic Engineering Department
Street Name FORD ST =
Limits 5TH AVE to RESERVOIR RD -
Radar Survey Sheet
X=North /=South =
5 10 15 20 25 30 35 40 # ',.ea cum %
501 I ( I I
�
1 10% 100°==01
451 1 I
2 1 9% 990%j
( ( 3 29% 971%1
( 2 19% 94 2%1
( 3 29% 92 2%1
40 5 49% 89 3%1
( I 5 49% 845%1 -
8
45%1 -8 78% 796-1/01
( 1 7 6.8% 71 8%1
13 126% 65 0%1
I 12 11 7% 52 4%
35 ( 12 1117% 40 8°0
I ( i 6 511% 29 1%
8 78%123.3%1
5 4 9% 15 5%(
30 I 5 49°l0 107/{
1 4 39% 58%
1 10% 19%
1 I I I !
25
1 1 0% 1 o°i°
l
201 ( ( ! I ( I I !
I I I III ! I ! I
I I
I ! I
15 I I
I i
! ! I I
� I
101 f i
4 C
5
Total Samoles 1031
Date of Survey 1/29/2009 Start Time 9.54
85th Percentile Speed 40 -
Weather Sunny End Time 10,15
50th Percentile Speed 35
15th Percentile Speed 31 Road Condition Good Posted Speed 35
10 MPH Pace 30-39 - Street Class Arterial Observer KRIS PASILL
Number in Pace 81 Conditions not
Percent in Pace 786% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street FORD ST Field Observer.KRIS PASILLAS
Limits RESERVOIR RD Checked By MARK MILLER
SUNSET DR N Date 1/29/2009
Factors Direction North/South
A Prevailinq Speed Data
Location of Survey Patricia Dr
85th Percentile 42
10 mph Pace 32-41
Percent in Pace 663%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc1MVM) 0 517
Expected Collision Rate 2 3
C Traffic Factors
Average Daily Traffic 3822
Length of Segment 2437
Lane Configuration 4 Lane with Raised Median, Divided
Street Classifaction Arterial
D Conditions Not Readily Apparent
Conditions
Roadway Geometncs
Comments
E Adiacent Land Use Residential
Posted Speed Limit 35
Speed Limit Changer Yes
Revised Speed Limit 40
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #36
City of Redlands
Traffic Engineering Department
Street Name FORD ST
Limits RESERVOIR RD to SUNSET DR N
Radar Survey Sheet
X=North /=South
5 10 15 20 25 30 35 40 # %ea cum %
I ( ( I ( ( k t
501 ! 1 0% 100%1-
j I 1 10% 99 0%1
2 2 0% 98 0%1
45
/ 4 4 0% 96 0%1
i
I
{ ( 2 20%1921%1
/`V l I 6 59% 90 1%1
I I 6 59% 84.2%1-
40 / l 5 ' 50% 78 2%1
J 9 89% 73 3%1
9 ( 89% 644%1
I I 6 59% 55.4%1
/A I ( I 8 79% 495%1
35 I 1 5 50% 41 6%1
6 59% 366%j
6 59%1307%1
l 7 169% 24.8°I°1_
/ I { ( 1 2 2 0% 17 8%1
2 20% 158°I°!-
30 4 40%1139%1
! I I ( I I I 1 1 00/0
3 3 0°I°
1 I I 2 20% 59%
25 ( ( ( l ( 1 100% 4 0°l° 1
3 3 0% 3 0% !
I ! I I I (
2011 !
f
I I 1-
151 ! 1
I-
1
101 I
1 � -
5I !
Total Samoles 101
Date of Survey 1/29/2009 Start Time 10.22
85th Percentile Speed 42
Weather Sunnv End Time 10.45
50th Percentile Speed 37 -
15th Percentile Speed 30 Road Condition Good Posted Speed- 35
10 MPH Pace 32-41 Street Class Arterial Observer KRIS PASILL
Number in Pace. 67 Conditions not
Percent in Pace 66.3% Apparent -
City of Redlands
Engineering and Traffic Survey
Summary
Street- FORD ST Field Observer KRIS PASILLAS
Limits SUNSET DR N Checked By MARK MILLER
GARDEN HILL DR Date 1/29/2009
Factors Direction North/South
A Prevailino Speed Data
Location of Survey Ford Dr
85th Percentile 40
10 mph Pace 28-37
Percent in Pace 580%
Posted Speed Limit 30
B. Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 2
Collision Rate(Acc/MVM) 04
Expected Collision Rate 1 98
C.Traffic Factors
Average Daily Traffic 8235
Length of Segment 2919
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not Readily Apparent
Conditions Parking,driveways
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 30
Speed Limit Change9 Yes
Revised Speed Limit 35
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #37
City of Redlands
Traffic Engineering Department
Street Name FORD ST
Limits SUNSET DR N to GARDEN HILL DR
A
Radar Survey Sheet
X=North /=South -
5 10 15 20 25 30 35 40 # %ea cum °o
501
I I i
1 10% 100%1
I I 1 10% 99 0%1
45 ( r 1 1 10% 980%1-
1
80%1-1 3 130% 97 0%1
1 ( 1 10% 94 0%1
1 10% 93 0%1
4 4.0% 92 0%1
401 1 ` 4 40% 88 0%1
1 4 40% 84 0%1
1 6 6.0% 80 0%1
1 3 130% 74 0%1
1 1 1 7 170%1710%1_
35 I 8 80%1 64001°1'
8 8010 560%
4 4 0%1-48-O
( �� 8 80% 440%1
5 50% 36 0%1
30 1_ 1_ 4 40% 31 0%
5 50% 270%
j 6 6 0% 22 0%1
2 20% 16 0%1
4 40% 14 0%1
2 20% 10 0%1
25 1 1 ( ( 1 1 I j 4 40% 80% 1
I I I I I I I I I I 1
2 120% 40% 1
r` 1 10% 20% 1
20 / I I 1 1 1 10% 10%
I
1 ( I
II I I I 111 I
15i '
10
5
Total Samples 100
Date of Survey 1/29/2009 Start Time 1050
85th Percentile Speed 40
Weather Sunnv End Time 11 47
50th Percentile Speed 34 -
15th Percentile Speed 27 Road Condition Good Posted Speed 30
10 MPH Pace 28-37 Street Class Arterial Observer KRIS PASILL
Number in Pace. 58 Conditions not Parking driveways -
Percent in Pace 58.0% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street GROVE ST Field Observer ANTONIO ELMORE
Limits HIGHLAND AVE Checked By MARK MILLER
CITRUS AVE Date- 3/6/2009
Factors Direction. North/South
A Prevailmq Speed Data
Location of Survey Napa St
85th Percentile 37
10 mph Pace 26-35
Percent in Pace 759%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 1 581
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 1184
Length of Segment 2571
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readilv Apparent
Conditions Multiple driveways, Parking, Curve
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 30
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #38
City of Redlands
Traffic Engineering Department
Street Name GROVE ST
Limits HIGHLAND AVE to CITRUS AVE
Radar Survey Sheet
X=North /=South
5 10 15 20 25 30 35 40 # %ea cum %
501 I I I I I I I
1 I i I i 1 13% 100%i
f I
f!
45 P
I I I I 1 13% 98 7%1
1 1 � 13%� 975%1 -
1 13% 962%1 -
2
62%1 -2 25% 94 9%1
40
1 I 1 I 1 13% 92 4%1
I i 2 25% 911%1
2 25% 88 6%1
1 I 1 1 1 13% 861%1
13 38% 84.8%1
35I I I I 1 3 38% 81 0%1=
4 51% 772%1
I I 6 76% 72 2%1
1 1 1 6 76% 646%1-
1 3 38% 57 0%1
30fti>0V/)V/ 1 15 19 0% 532%1
5 6 3% 34.2°'°
6 76%1278%1
7 89% 203%1
1 1 14 1 ' S 63% 114%1
25 �) 1 13% 38% 1
I
1 2 25% 25%
201 1 I
I II I
151 I 1 C I I 1 I
1 I
101
5
Total Samples 79
Date of Survey 3/6/2009 Start Time 11 20
85th Percentile Speed 37 -
50th Percentile Speed 30 = Weather Sunny End Time. 12 05
15th Percentile Speed 27 Road Condition Good Posted Speed 30
10 MPH Pace 26-35 Street Class Collector Observer ANTONIO EL
Number in Pace- 60 Conditions not Multiple driveways Parking Curve
Percent in pace 75.9% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street GROVE ST Field Observer.KRIS PASILLAS
Limits CITRUS AVE Checked By MARK MILLER
BROCKTON AVE Date 3/5/2009
Factors Direction North/South
A Prevailinq Speed Data
Location of Survey 639 Grove St
85th Percentile 37
10 mph Pace 28 37
Percent in Pace 77.9%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 1 032
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 1184
Length of Segment 3938
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readilv Apparent
Conditions Narrow roadway, No sidewalks, Multiple driveways
Roadway Geometrics
Comments
E Adiacent Land Use Residential/Vacant
Posted Speed Limit 30
Speed Limit Change9 No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #39
City of Redlands
Traffic Engineering Department
Street Name GROVE ST
Limits CITRUS AVE to BROCKTON AVE
Radar Survey Sheet
X=North /=South
5 10 15 20 25 30 35 40 # ',,.ea cum %
501
I I I
I I ; 1 08%1 100%11_
I-
45, 1 08% 992%1-
1
92%1-
1 0 8% 98 5%1
I
1
3 23% 97 74f°
1 08% 954%
40 �/� ( ( 6 4.6% 947%1
2 15%1901%1
1 4 31%1885%1
J11/1 10 17 6%185 5%1
/ ( 12 9 2% 77 9%1
35 i 12 92% 68-j I'.
1 59 5 Yo
9 16 9%f° 48 1%1-
/ 7 V �� 13 99% 41 2%1
I � 12 92% 313%I
30 I 9 69%/ 221%1-
6 4 6% 15 3%1
4 31% 107%
1 2 15% 76% 1
2 15% 61% 1
25
1 08% 46% 1
1 1 ( 1 1 3 23% 38% 1
I 1 1
08% 15% 1
1 08% 08% 1
201
I I I
I I I I
151 ( I I 1 1 I I
I ! G
i
I I
' I I
101 1
I I
�-
5
i Total Samples 131
Date of Survey 3/5/2009 Start Time 13.53 _
85th Percentile Speed 37
_ Weather Sunntr End Time 14.42
50th Percentile Speed 34
15th Percentile Speed- 29 Road Condition Fair Posted Speed 30
10 MPH Pace 28-37 - Street Class Collector Observer KRIS PASILL -
Number in Pace 102 _ Conditions not Narrow roadway, No sidewalks, Multiple driveways
Percent in Pace 779% Apparent.
City of Redlands
Engineering and Traffic Survey
Summary
Street JUDSON ST Field Observer ANTONIO ELMORE
Limits CITRUS AVE Checked By MARK MILLER
COLTON AVE Date 1/16/2009
Factors Direction North/South
A Prevailing Speed Data
Location of Survey Central Ave.
85th Percentile 41
10 mph Pace 33-42
Percent in Pace 892%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 0 361
Expected Collision Rate 355
C Traffic Factors
Average Daily Traffic 5080
Length of Segment 2622
Lane Configuration 4 Lanes, Undivided
Street Classifaction Arterial
D Conditions Not Readily Apparent
Conditions
Roadway Geometrics
Comments
E Adeacent Land Use Residential/Commercial
Posted Speed Limit 35
Speed Limit Change? Yes
Revised Speed Limit 40
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #40
City of Redlands
Traffic Engineering Department
Street Name JUDSON ST
Limits CITRUS AVE to COLTON AVE
Radar Survey Sheet
X=North /=South
5 10 15 20 25 30 35 40 4 %ea cum %
501
I i '
I 1 10% 100°01
451 � �
4 39% 990%1
6 59% 95 1%1
8 78% 8929/ 1
40 (i1 9 8 8% 81 4
7 69%1725%j
1514 7% 65 7%I
10 9 8% 51 0°I°1
I j 4 39°% 412%1
35 / 13 127% 37 3%1
_1 10 98% 245%j
1 9 88% 14 7%1
1 12 20% 59% 1
1 / ( ( ( 1 2 20% 39% j
301 I I 1 ( I I 1 10% 20% j
1 10% 10%
II I I I I
25) I I ( I
1 I I 1
I I I � 111 f
I
20111 1 I III I { I
( I III I I
I I ( I I
I I
151 1
101 1 I
5
Total Sarnoles 102
Date of Survey 1/16/2009 Start Time 1242
85th Percentile Speed 41
Weather Sunn End Time. 1304
50th Percentile Speed 37
15th Percentile Speed 34 - Road Condition Fair Posted Speed 35
10 MPH Pace 33-42 Street Class Arterial Observer ANTONIO EL
Number in Pace 91 _ Conditions not -_
Percent in Pace 89.2% - Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street JUDSON ST Field Observer ANTONIO ELMORE
Limits COLTON AVE Checked By MARK MILLER
LUGONIA AVE Date 1/16/2009
Factors Direction North/South
A Prevadinq Speed Data
Location of Survey 928 Judson St
85th Percentile 40
10 mph Pace 29-38
Percent in Pace 728%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 2
Collision Rate(Acc/MVM) 0 717
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 5080
Length of Segment 2643
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Arterial
D.Conditions Not Readily Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 35
Speed Limit Change? Yes
Revised Speed Limit 40
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #41
City of Redlands
Traffic Engineering Department -
Street Name JUDSON ST
Limits. COLTON AVE to LUGONIA AVE
Radar Survey Sheet
X=North /=South
5 10 15 20 25 30 35 40 4 %ea cum %
501 I I � � 1 I ii Ili I I
, I 1
j I 1 110% 100°0 l
45 1
3 29% 99 0°I°
r 2 19%1961%I
t 2 1 19% 9429/61
V ( 5 49% 92 2%1
40 _ ( 6 5.8% 87 4%I
5 49% 81 6%1
11 1107% 76 7%1
3 29% 66 0%(
J� , 10 97% 631%I
35 ! 1 8 78% 53.4%1-
7 68% 456%1 -
13
56%113 126% 388%1
2 19% 26 2%1
9 87% 243%
30 ` _ 5 49% 15.5°!°
(� I---I 768% 7%
1
1 10% 39%
9°I°
1 10% 29%
I 1 10% 19%
251), 1 I I I I
J/ 1 10% 10%
I I I I 1
201 1
15�
1 I I
101 1 1 ( i
5ji l i liI I I I c !
Total 5amoles 1031
Date of Survey 1/16/2009 Start Time 13.10 •
85th Percentile Speed 40
Weather Sunn End Time 13,33
50th Percentile Speed- 35
15th Percentile Speed 30 Road Condition Fair Posted Speed 35
10 MPH Pace 29-38 Street Class - Arterial Observer ANTONIO EL
Number in Pace. 75 - Conditions not -
Percent in Pace 72.8% Apparent
A
City of Redlands
Engineering and Traffic Survey
Summary
Street JUDSON ST Field Observer ANTONIO ELMORE
Limits LUGONIA AVE Checked By MARK MILLER
PIONEER AVE Date 1/16/2009
Factors Direction North/South
A Prevailinq Speed Data
Location of Survey 1544 Judson St
85th Percentile 36
10 mph Pace 28-37
Percent in Pace 771%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 5080
Length of Segment 3960
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not ReadilV Apparent
Conditions Narrow roadway
Roadway Geometrics
Comments
E Adjacent Land Use Residential/Vacant
Posted Speed Limit 35
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #42
City of Redlands
Traffic Engineering Department
Street Name JUDSON ST
Limits LUGONIA AVE to PIONEER AVE
Radar Survey Sheet
X=North /=South
5 10 15 20 25 30 35 40 # -,.ea cum
451I-
! !-
40
6 72% 100%
( 1 7 8 4010 928%1
356 72% 843%1
l ( j 8 96% 771%1
7 84% 675%1-
I ( 6 72% 590%1
( ( I ( 1 7 8.4% 51 8%
6 72% 43.4°io
30 I ( 4 48% 361%1
7 84% 31 3%1 _
( 4 48% 229%1-
I/I ( 1 5 60% 18 1%
25 ! I I ( ( 4 4 8% 12 0%
2 24% 72% 1
2 24% 48% 1
2 24% 24% 1
201 1 l ( I I 1
!-
151 ! I I (
II I III I f I-
i
101 1
5 I 1 ( ( I
i I 1
3 I
t
i ( f
0
I III I-
Total Sainoles 83
Date of Survey 1/16/2009 Start Time- 1340
85th Percentile Speed 36
- Weather' Sunn End Time 1415
50th Percentile Speed 31 _
15th Percentile Speed 25 Road Condition Fair Posted Speed 35
10 MPH Pace 28-37 Street Class Arterial Observer ANTONIO EL -
Number in Pace 54 Conditions not Narrow roadway
Percent in Pace 771% Apparent
a
City of Redlands
Engineering and Traffic Survey
Summary
Street LUGONIA AVE Field Observer ANTONIO ELMORE
Limits 1500'W/O RESEARCH AVE Checked By MARK MILLER
CALIFORNIA ST Date 1/9/2009
Factors Direction East/West
A Prevailing Speed Data
Location of Survey Bryn Mawr
85th Percentile 48
10 mph Pace 40-49
Percent in Pace 840%
Posted Speed Limit 45
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 4
Collision Rate(Acc/MVM) 0 859
Expected Collision Rate 1.98
C Traffic Factors
Average Daily Traffic 4109
Length of Segment 5453
Lane Configuration 2 Lanes WB, 1 Lane EB, Undivided
Street Classifaction Arterial
D. Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Industrial/Vacant
Posted Speed Limit 45
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #43
City of Redlands -
Traffic Engineering Department
Street Name LUGONIA AVE
Limits 1500'W/O RESEARCH AVE to CALIFORNIA ST
Radar Survey Sheet f
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum%
60 I I ( I I 1 1 0% 100°x°1_
I C I 1-
1 110% 990%
55 I I-
1 1 10% 980%
2 20% 97 0%
1 10% 95 0%1
I 2 20% 94.0% -
50 ( 2 20% 920%j
5 5 0% 90 0%
,' 7 7 0% 850%
/ I I_I�, 9 90% 780%
_ —1 11 11 0% 69 0 f
11 110% 580% _
45 ��� ( ( 12 12 0°°I 47 0%
11 110% 350%1-
r/4 7 7 0% 240%7 70°° 170I°4 4.0% 100%40 / ( ( I 3 30% 60% 1
/J ( 1 I 2 20% 30% 1
l
4
35I i I I 1 110% 1 0% 1
I � II I I I l
301
1-
251 I I I I I
II � I Ii I I
201 I I s y I I
4 f i
I t i i i
151
! Total 5amoles 100 I
Date of Survey 1/9/2009 Start Time 11.00
85th Percentile Speed 48 - -
50th Percentile Speed 45 = Weather Sunny End Time 11 45
15th Percentile Speed 41 Road Condition Good Posted Speed 45 -
10 MPH Pace 40-49 Street Class Arterial Observer ANTONIO EL
Number in Pace 84 - Conditions not
Percent in Pace 840% Apparent. -
City of Redlands
Engineering and Traffic Survey
Summary
Street LUGONIA AVE Field Observer ANTONIO ELMORE
Limits CALIFORNIA ST Checked By MARK MILLER
ALABAMA ST Date 1/9/2009
Factors Direction East/West
A Prevaithna Speed Data
Location of Survey 1711 W Lugonia Ave
85th Percentile 44
10 mph Pace 35-44
Percent in Pace 748%
Posted Speed Limit 45
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 13
Collision Rate(Acc/MVM) 1 954
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 6082
Length of Segment 5264
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Vacant/Industrial
Posted Speed Limit 45
Speed Limit Change' No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #44
City of Redlands
Traffic Engineering Department
Street Name LUGONIA AVE
Limits CALIFORNIA ST to ALABAMA ST
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum %
551
I
f 1 1 10% 100°'01
501 I i 1 I 2 19% 99 0%1
1/I 1 10% 97 1%1
1 I ( ( 1 2 19% 961%1
5 49% 94 2%1
45 r 1 1 4 39% 89 3%1
� 8 78%1854%
9 8 7% 77 70/0
1 1 10 97% 689%1-
6
89%16 58% 592%1-
40
92%1-
40 I I I 12 117% 53 4%1
_ ( I
8 78% 41 7%
i
6 5 8 34.00% -
x I I ( ( _ 1 8 7 8%128.2%1-
I ( 5 49% 20 4%1
35 I ( 5 49% 155%
I 1 ( ( 5 49% 107%
1 3 29% 58%
1 10% 29%
1 ( 1 1 ( ( 1
301/ 1 1 ( ( 1 10% 19%
1 10% 10%
( 1 ( I I (
251 1 I I f I r I I I-
I I I I I
' I
I i i
201
I i l
I i
15 I 1
1 I I -
I
101
Total Sarnoles 103
Date of Survey 1/9/2009 Start Time 1033 _
85th Percentile Speed 44
Weather. Sunny End Time 10.56
50th Percentile Speed 40
15th Percentile Speed- 35 Road Condition Good Posted Speed 45
10 MPH Pace 35-44 Street Class Arterial Observer ANTONIO EL
Number in Pace 77 Conditions not
Percent in Pace 748% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street LUGONIA AVE Field Observer ANTONIO ELMORE
Limits ALABAMA ST Checked By MARK MILLER
TENNESSEE ST Date 1/9/2009
J
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey 1410 W Lugonia Ave.
85th Percentile 36
10 mph Pace 28-37
Percent in Pace 868%
Posted Speed Limit 45
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 2
Collision Rate(Acc/MVM) 0 272
Expected Collision Rate 3.55
C Traffic Factors
Average Daily Traffic 12070
Length of Segment 2931
Lane Configuration 4 Lanes with Left Turn Channelization, Undivided
Street Classifaction Arterial
D Conditions Not Readdv Apparent
Conditions Multiple signals
Roadway Geometrics
Comments
E Adiacent Land Use Industrial/Retail
Posted Speed Limit 45
Speed Limit Change? Yes
Revised Speed Limit 40
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #45
City of Redlands
Traffic Engineering Department
Street Name LUGONIA AVE -
Limits ALABAMA ST to TENNESSEE ST -
Radar Survey Sheet ■
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum % _
45
I �
I ( ( I i j09% 100%]-
401 I I 1
3 26% 991%1-
I 7 161% 96.5°x"°1
I � 1 7 61% 904°!°1
351//1/ _ I I 9 79% 84 2%1
11 96% 76 3%1
j 9 79% 667%1 -
2
67%12 ill 4%I58 48.2%1
3 ill 4°l0 48.2°l0 l
I
30 j ( ( I ( I 10 88% 368%1-
f -
110 88°I° 281°%1-
1 ( X ( ( 11 96% 19 3%1
5 44% 96% 1 -
( I I I 2 18% 5.3% 1
25 / 1 1 I ( I ( I I I 4 135% 3 5% 1
201 I II I II I I
I I I I I I I I I
III II I III I i I i
151 1
1
I II ' ( II II i I
i II it I � I I I
101 1
I I-
I I 1
5
I 1
o
Total Samples 1141 -
Date of Survey 1/9/2009 Start Time. 1007
85th Percentile Speed 36 -
- Weather Sunny End Time 10.30
50th Percentile Speed 32
15th Percentile Speed. 28 - Road Condition Good Posted Speed 45
10 MPH Pace 28-37 Street Class Arterial Observer- ANTONIO EL
Number in Pace. 99 s Conditions not Multiple signals
Percent in Pace 86.8% - Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street. LUGONIA AVE Field Observer ANTONIO ELMORE
Limits TENNESSEE ST Checked By MARK MILLER
TEXAS ST Date 2/27/2009
E
Factors Direction East/West
A Prevailing Speed Data
Location of Survey 846 Lugonia Ave
85th Percentile 44
10 mph Pace 33-42
Percent in Pace 752%
Posted Speed Limit 45
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 0 166
Expected Collision Rate 355
C Traffic Factors
Average Daily Traffic 12070
Length of Segment 2401
Lane Configuration 4 Lanes Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not Readdv Apaarent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential/Vacant
Posted Speed Limit 45
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department.
Date Lor #46
City of Redlands
Traffic Engineering Department
Street Name LUGONIA AVE
Limits TENNESSEE ST to TEXAS ST
Radar Survey Sheet -
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum % -
50 1I I I I i 1 10% 100%j
3 29% 990% -
( ( I ( 2 19% 962%j
I ( 2 19% 943%j
451/ 1 �
4 38% 924%1-
I 5 4.8% 88 6%1
( I 3 29% 838%1-
7
38%1-
7 67% 810%j
8 76%174.3%1
40 ( ( ( ( 5 4 8-/.166 7%1
( ( I I 1 13 124%1619%1
10 95%1495%1
6 157% 400%I
I I ( 9 86% 34 3%1
8 76% 25 7%1
35 V I I ( I I ( I I 6 57% 181%1
7 67% 124%
1 ( I I ( 5 48% 57%
1 10% 10%
30 1 1 I II II i I I i
I I
25Ili ( 1 II II II I I I-
i I I I I I I I I I
201 — �-
I I I
151 I I I
1 I I 1
101
I �
I i II
v j I
51
! Total 3amoles 1051
Date of Survey 2/27/2009 Start Time 9.10
85th Percentile Speed- 44
Weather Over Cast End Time 947
50th Percentile Speed 33
15th Percentile Speed 34 - Road Condition Fair Posted Speed. 45 -
10 MPH Pace. 33-42 Street Class Arterial Observer ANTONIO EL
Number in Pace 79 Conditions not
Percent in Pace 752% _ Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street LUGONIA AVE Field Observer ANTONIO ELMORE
Limits TEXAS ST Checked By MARK MILLER
ORANGE ST Date 2/27/2009
y
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey 511 Lugonia Ave
85th Percentile 42
10 mph Pace 35-44
Percent in Pace 841%
Posted Speed Limit 40
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 0 151
Expected Collision Rate 3 55
C Traffic Factors
Average Daily Traffic 12070
Length of Segment 2636
Lane Configuration 4 Lanes Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not Readily Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential/Vacant
Posted Speed Limit 40
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlards Traffic Engineering Department
Date Loc #47
City of Redlands
Traffic Engineering Department
Street Name LUGONIA AVE
Limits TEXAS ST to ORANGE ST
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum %
60
-
I
j ( ( 1 09% 100%1 -
55
00%1-
55 ! I P I
501 I
I ! ! I I I 1
I I I i 1
I/ 1 109% 991%1
45 / 1 3 28% 981%1
1 1 1 4 37% 953%1_
1 5 47% 916%1-
I ( ( ( 7 65 869°l°1
8 175% 80.411a
40 / I 9 184% 72 9%1
121112% 64.5%
10 9 3%% 53 3%
10 19 3% 43 9%1
15 140% 34.6%
35 i i 10 9 3% 20 6% -
1 1 3 28% 11 2%1
I I I ( ( 1 1 09% 84% 1
5 47% 75% 1
1 109%
9% 2 8°!° 1
30 I 1 1 1 09% 19%
1 109%
09%
I ( ( ( I I I 1 1 1
25 1
! � I
201
k �
4
I � E
151
Total Samles 11071
Date of Survey. 2/27/2009 Start Time 9.53
85th Percentile Speed 42Weather-
eather Over Cast End Time 10.26
50th Percentile Speed 38 =
15th Percentile Speed 35 - Road Condition Fair Posted Speed- 40
10 MPH Pace 35-44 _ Street Class * Arterial Observer ANTONIO EL
Number in Pace 90 _ Conditions not -
Percent in Pace 84.1% Apparent -
City of Redlands
Engineering and Traffic Survey
Summary
Street MARIPOSA DR Field Observer KRIS PASILLAS
Limits WABASH AVE(E) Checked By MARK MILLER
COUNTRY CLUB DR(El Date 2/5/2009
Factors Direction East/West
A. Prevailinq Speed Data
Location of Survey 648 Mariposa Dr
85th Percentile 27
10 mph Pace 19-28
Percent in Pace 925%
Posted Speed Limit 25
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 1.98
C Traffic Factors
Average Daily Traffic 1224
Length of Segment 2023
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readily Apparent
Conditions Curve
Roadway Geometrics
Comments
E Adjacent Land Use Residential
Posted Speed Limit 25
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #48
City of Redlands
Traffic Engineering Department
Street Name MARIPOSA DR
Limits WABASH AVE(E)to COUNTRY CLUB DR(E)
Radar Survey Sheet
X-West /=East
5 10 15 20 25 30 35 40 # %ea cum %
451 I' 1ill j I i E 1 i s ( I I
40 i t
i
I � I
I
35
2 25%1 100%
30 1 ( 1 3°l° 97 5%1
1111AX I 1 3 1 3 89/6 l 96 3%1-
�� I l ( ( 8 10 0%) 92 50/.1
8 10 0°0 82 5%1
25 —
9 113� 7250/-[� 9 11 3°I°j 61 3%
9 113% 50 0%1
9 113% 388%1
I I 1 8 10 09/. 27 50/.
20�� I 1 I I1 7 87%1175%1
50%
( 1 j 4 5 0°t° 87% j
1 113% 3 8% 1
15 I I � i i � ( i i I , 2 25°l° 25%
II I I I I i I
1 I ( I lil I
101
I
I
1 ! 1 1 I I
�-
Ii
0 I
Total Samoles 80
Date of Survey 2/5/2009 Start Time 14.14
85th Percentile Speed. 27
Weather Cloudy End Time 15,07
50th Percentile Speed 23
15th Percentile Speed 20 Road Condition Fair Posted Speed 25
10 MPH Pace 19-28 Street Class Collector Observer KRIS PASILL
Number in Pace 74 Conditions not Curve
Percent in Pace 925% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street MARIPOSA DR Field Observer KRIS PASILLAS
Limits COUNTRY CLUB DR(E) Checked By MARK MILLER
GARDEN ST Date 2/6/2009
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey 535 Mariposa Dr
85th Percentile 40
10 mph Pace 31 -40
Percent in Pace 780%
Posted Speed Limit 30
B.Collision History,
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 1 248
Expected Collision Rate 1 98
C.Traffic Factors
Average Daily Traffic 1224
Length of Segment 3150
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readily,Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential/Golf Course
Posted Speed Limit 30
Speed Limit Change? Yes
Revised Speed Limit 35
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #49
J
City of Redlands -
Traffic Engineering Department
Street Name MARIPOSA DR
Limits- COUNTRY CLUB DR(E)to GARDEN ST
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum
50 1
1 10% 1000/,0
II 1 10% 990%j
451 ( ! I i I i 2 20% 98 0%1
2 20% 96 0%1
3 30% 94.0%1
_ 5 50% 910%1
( � 1 10%
860%j
40 8 80% 850%
7 70% 770°l01_
1 12 120%1700%1
I 1 9 90%1580%1
7 7 0%149 0%1
35
j 9 90%1420%1-
11
0% 420%1-11 111 0°/. 330%
1 I 4 40% 220%
1 I _ 8 80% 180
3 30% 100%
1 2 20% 70%
30 �1 I_ I -- 0% 1
x I 1 I 1 2 20% 20% I
251 I I I I I -
j
I I I I I
I I f I 1 I I I$
201 I I I I I
15
! i
i 1 I
511
I Total Samoles 110 , -
Date of Survey 2/6/2009 Start Time 9.50
85th Percentile Speed 40
Weather Cloud v End Time 1038
50th Percentile Speed 37 -
15th Percentile Speed 32 Road Condition Fair Posted Speed 30
10 MPH Pace 31-40 - Street Class Collector Observer KRIS PASILL
Number in Pace 78 - Conditions not
Percent in Pace 78.0% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street MARIPOSA DR Field Observer.KRIS PASILLAS
Limits HALSEY ST Checked By MARK MILLER
DWIGHT ST(N) Date, 3/6/2009
Factors Direction EastlWest '
A Prevailing Speed Data
Location of Survey 304 Mariposa Dr
85th Percentile 22
10 mph Pace 15-24
Percent in Pace 900%
Posted Speed Limit 20
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 1224
Length of Segment 1933
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Local
D Conditions Not Readily Apparent
Conditions Many curves
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 20
Speed Limit Changes No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #50
J
City of Redlands
Traffic Engineering Department
Street Name MARIPOSA DR
Limits HALSEY ST to DWIGHT ST(N)
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # 01aea cum % -
451 i I Ii !
I
4
40 I
351 II I �
25% 100%1
301 { ( 1 125% 97 -
( ( ( ( ( ( !! 1 125% 95 0%1
I
I
it I I I
{ ( I 1 125% 92 5%1
251
II I Ili I I i
(� ( 1 1 125% 90 0%1
( ( 1
41ao% x75°r°]
1125%1775 _
�j 5 12 5%1 77 5%
201 f_ �I I 5 12 5 52 0%
�`— 5 1125% 52 5%
( ( ( ( ( I ( I 5 125% 400%1
5 112 5% 27 50/,
4 �100% 15 0°l0
15 V i ( ( I I ( I 2 5 0% 5 0%
101 1 1
( ( f
5 I �-
I
E I !
I
0
Total Samoles +40
Date of Survey 3/6/2009 Start Time 1045
85th Percentile Speed 22
- Weather Cloud End Time 11 45
50th Percentile Speed 19
15th Percentile Speed 16 - Road Condition Fair Posted Speed 20
10 MPH Pace 15-24 Street Class.. Local Observer KRIS PASILL
Number in Pace 36 Conditions not Many curves -
Percent in Pace 90.0% - Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street MOUNTAIN VIEW AVE Field Observer KRIS PASILLAS
Limits LUGONIA AVE Checked By MARK MILLER
SAN BERNARDINO AVE Date 3/5/2009
Factors Direction North/South
A Prevailina Speed Data
Location of Survey 1450 Mountain View Ave
85th Percentile 43
10 mph Pace 34-43
Percent in Pace 700%
Posted Speed Limit 45
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 11740
Length of Segment 2224
Lane Configuration 2 NB, 1 SB with Left Turn Channel, Divided
Street Classifaction Arterial
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Industrial/Residential/Vacant
Posted Speed Limit 45
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #51
City of Redlands
Traffic Engineering Department -
Street Name MOUNTAIN VIEW AVE
Limits LUGONIA AVE to SAN BERNARDINO AVE
Radar Survey Sheet
X=North /=South
5 10 15 20 25 30 35 40 # %ea cum % -
551 11 I I 1 I
t
1 1 1 0°0 100%j
I 1 1 1 0% 990%1-
50 ( I
r
( � I 2 120%1980%1
1 1 1 1 0% 96 0%1
45 4 40% 95 0%1
I 2 120% 91 0% -
�� 1 6 60% 890%1
! 1 1 5 50% 830%1-
�
40 / ( 1 1 i 1 7 70%1690%1
9 -
1 ( 5 50% 62 0%1
7 70% 570%1
8 80% 50 0%1
1 I I ( 5 50% 420°1°1
1 1 5 50%1370%1
35 1 1 { I ( 13 130%1320%1
{ ( 3 30% 190%1
2 20%116.0%
6 60% 14 0%
30 / — I 2 20% 80%
2 20%
6 0% 1
3 30% 40% 1
25
1 110% 1 0% 1 -
� I 1 1 I 1 I I I 1
I I
201 ( I I ( 1 1
1 I I
1 ( ! 1
15! ! 3-
101
Total Samaies 10
Date of Survey 3/5/2009 Start Time 1030
85th Percentile Speed 43 -
Weather Sunn End Time 11 03
50th Percentile Speed 37
15th Percentile Speed 32 Road Condition- Good Posted Speed 45 -
10 MPH Pace. 34-43 - Street Class Arteriai Observer KRIS PASILL
Number in Pace 70 Conditions not
Percent in Pace 700% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street NEW YORK ST Field Observer KRIS PASILLAS
Limits COLTON AVE Checked By MARK MILLER
LUGONIA AVE Date 3/6/2009
Factors Direction North/South
A Prevailinq Speed Data
Location of Survey Brockton Ave
85th Percentile 39
10 mph Pace 29-38
Percent in Pace 670%
Posted Speed Limit
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 1000
Length of Segment 2798
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Commercial/Vacant
Posted Speed Limit
Speed Limit Change? Yes
Revised Speed Limit 35
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #52
City of Redlands
Traffic Engineering Department
Street Name- NEW YORK ST
Limits COLTON AVE to LUGONIA AVE
Radar Survey Sheet
X=North /=South =
5 10 15 20 25 30 35 40 # %ea cum %
50 2 18% 100%1
1 ( 2 18% 982%1
45 1 I 1 09% 96 3%1
1 09% 954%1-
i
I 1 I 3 28% 94.54ro
4 37% 91 7%1
I 1 1 09% 881%1
401 1 1 1 1 1 4 37% 87 2%1
1 11 101% 835%1
8
73% 73A%j_
� 10 92% 661%1
35 /(A i i t l 1 ( 8 173% 56 9%1
1 1 1 4 37%1495%1
Il I I 1 1 1 8 7 3% 45 9%1
8 7 3% 38 5%1
A
%1A ( ( 1 1 6 55%1312%1
30 1 ( ( 4 37% 25 7%1
1_ 6 55% 22 0%1
4 37% 16 5%1
VVI 1 I I 1 2 181/o 12 8%1 _
1 V ( 4 37% 110%]
25 IV,)
1 ( 1 1 09% 73% 1
I , /A I ( 4 37% 64% 1
1 ( I 1 ( 1 1 1 1 1 09%I 28% 1
1 ( ( I 1 I 2 18% 18% 1
201
15I
1
10 I I
5
Total Samaies 103
Date of Survey 3/6/2009 Start Time 9.32
85th Percentile Speed 39
Weather Sunny End Time 10.25
50th Percentile Speed 35
15th Percentile Speed 28 Road Condition Good Posted Speed
10 MPH Pace 29-38 Street Class Collector Observer KRIS PASILL
Number in Pace 73 Conditions not -
Percent in Pace 67 0°% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street OLIVE AVE Field Observer KRIS PASILLAS
Limits CITRUS AVE Checked By MARK MILLER
SAN MATEO ST Date 3/6/2009
Factors Direction EasUWest
A Prevailinq Speed Data
Location of Survey Sonora St
85th Percentile 35
10 mph Pace 27-36
Percent in Pace 690%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 3
Collision Rate(Acc/MVM) 0 668
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 3238
Length of Segment 6672
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 30
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #53
City of Redlands
Traffic Engineering Department
Street Name OLIVE AVE
Limits CITRUS AVE to SAN MATEO ST
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum%
451 f I "
1 10%j 100% _
40 1 10%1990%
I
A j J ( 220% 980%
X ! I 1 10% 960%1
/)// j 6 60%
950%1
35 ( ! 6 60% 89 0%1
! X 1 6 60% 830%1
4 40% 77 0%1-
6 60% 73 0%1
7 70% 670%1
30 I ! 1 ( ( ! l i 6 60%1600%1
10 1000/. 540%1
12 120% 440%1-
6
40% -6 60% 32 0%1
1 1 4 40% 260%1
2511 ( 1 4 40% 220%1
W, ( ( 1 6 60% 180%j
2 20% 12 0%1
j I 1 1 5 50% 100%1
1 ( 3 30% 50% 1
20 I I I ( 1 10% 20% 1
1 110% 1 0% 1
15
1-
101
1
5 (
i
pi
Total Samoles 1100'
Date of Survey 3/6/2009 Start Time 10.44
85th Percentile Speed 35 -
50th Percentile Speed. 2g Weather S nnp� End Time 11 14
15th Percentile Speed 24 Road Condition Fair Posted Speed 30
10 MPH Pace 27-36 Street Class Collector Observer KRIS PASILL
Number in Pace 69 Conditions not
Percent in Pace- 69.0% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street ALABAMA ST Field Observer ANTONIO ELMORE
Limits BARTON RD Checked By MARK MILLER
PARK AVE Date 1/9/2009
Factors Direction North/South
A Prevailing Speed Data
Location of Survey 310 Alambama St
85th Percentile 47
10 mph Pace 36-45
Percent in Pace 69.4%
Posted Speed Limit 45
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 4
Collision Rate(Acc/MVM) 0 286
Expected Collision Rate 355
C Traffic Factors
Average Daily Traffic 15491
Length of Segment 4340
Lane Configuration 4 Lanes with Left Turn Channethzation, Undivided
Street Classifaction Arterial
D.Conditions Not Readdv Apparent
Conditions
Roadway Geometrics
Comments
E Adjacent Land Use Residential/Vacant
Posted Speed Limit 45
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #1
City of Redlands
Traffic Engineering Department
Street Name ALABAMA ST
Limits. BARTON RD to PARK AVE
Radar Survey Sheet -
X=North /=South
5 10 15 20 25 30 35 40 # j%ea cum%
55llilll
� I ( 1 � 09% 100°l01
C I ` 2 19% 991%1
50 j I i ( 410
I 109% 95.4%1-1 1
I `
93% 90 7%1
7I 1 1 7 65% 815%1
45 — / _ _ I_ 10 93% 75 0%1
9 8 3% -
/ 8 174% 57 40°l°
6 566/o 50 °I°
9 83% 44.4%
40 5 4.6°l° 361%
6 56% 31 5%
_ A I I I I I 1 5 46% 259%
/ h I 9 83% 21 3%1
_ --- ---� 4 3 7% 5 46/
35 I I I I I I I 1 09% 19% 1
1 09% 09% 1
I ( I
3011 I I I 11 1 I I I
I I I I I I III I I I I C I
251 ( ( I II II Ilj ( Iilll I
III ( I I I i -
20 I ( I
151 I
101 I I II s li IiI I lil C I
I Total Sary ales 108
Date of Survey 1/9/2009 Start Time 9.40
85th Percentile Speed 47
50th Percentile Speed 42 = Weather Sunny End Time 1000
15th Percentile Speed- 37 - Road Condition Good Posted Speed 45
10 MPH Pace 36-45 - Street Class Arterial Observer ANTONIO EL
Number in Pace 75 Conditions not
Percent in Pace 694% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street- ALABAMA ST Field Observer ANTONIO ELMORE
Limits PARK AVE Checked By MARK MILLER
LUGONIA AVE Date 1/9/2009
Factors Direction North/South
A Prevailinq Speed Data
Location of Survey 620 Alabama St
85th Percentile 41
10 mph Pace 32-41
Percent in Pace 698%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 13
Collision Rate(Acc/MVM) 0.848
Expected Collision Rate 3.55
C.Traffic Factors
Average Daily Traffic 18309
Length of Segment 4031
Lane Configuration 4 Lanes with Left Turn Channelization, Undivided
Street Classifaction Arterial
D Conditions Not Readdv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Commercial/Retail
Posted Speed Limit 35
Speed Limit Change? Yes
Revised Speed Limit 40
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #2
City of Redlands
Traffic Engineering Department
Street Name ALABAMA ST
Limits PARK AVE to LUGONIA AVE
Radar Survey Sheet
X-North /=South
5 10 15 20 25 30 35 40 # %ea cum %
55 jlj j I j I 1 ; a s°t° 100%1
I I I
I � I -
II-
501
I 1 1 �-
i I
Ix-A 1 2 19% 991%1
45i I ( I 1
1 09% 97 2%
I I I L I 3 28% 96,2%I
C 2 19% 93 4%1
7 6.6% 91 5%1
/ J 1 10 94% 849%1 -
40 V ` 1 I 1 8 75% 75 5%1
1/I I ( I 9 ' 85% 67 9%1
1 1 I ( 6 57% 59 4%1
11 104% 53,8%1 -
35 ..
3.8%1-
35 . 1 1 7 66% 43 4%1
l a A l ( ( I i 5 47% 36 8%1
6 57%1321%1
6
5 47%1217%1
30 ��� 3 2 8%117 0%1 -
3 2 8% 14 2%1
T I 1 ( ( I 2 19% 11 3%1
� 1 1 1 1 ( I 2 1 9% 9 4%
1
1 0 9% 7 5%
25'/' ( ( I 2 19% 6 6°°
I 3 28% 47%
2 19% 19%
20! i 1
151
I -
j
�-
10
i-
Total Sarnoies 1061 -
Date of Survey 1/9/2009 Start Time 920
85th Percentile Speed 41
50th Percentile Speed 36 - Weather Sunn End Time 9.36
15th Percentile Speed 30 Road Condition Fair Posted Speed 35 -
10 MPH Pace 32-41 Street Class Arterial Observer ANTONIO EL -
Number in Pace L - Conditions not
Percent in Pace 698% Apparent =
City of Redlands
Engineering and Traffic Survey
Summary
Street ALTA VISTA DR Field Observer KRIS PASILLAS
Limits FLORIDA ST Checked By MARK MILLER
SUNSET DR Date 2/5/2009
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey 31720 Alta Vista Dr
85th Percentile 47
10 mph Pace 35-44
Percent in Pace 570%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 1 379
Expected Collision Rate 1 99
C Traffic Factors
Average Daily Traffic 1000
Length of Segment 3491
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics Curves, no sidewalks
Comments
E Adtacent Land Use Residential/Open
Posted Speed Limit 35
Speed Limit Change) Yes
Revised Speed Limit 40
Approved and Authorized for release by City of Redlands Traffic Engineering Department.
Date Loc #3
City of Redlands
Traffic Engineering Department
Street Name ALTA VISTA DR
Limits- FLORIDA ST to SUNSET DR
u 1 1 1 1 1
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum °o
601I-
j
1 10% 100%
5511 II I I I
1-
[ 1 10% 990%1
1
1 1 0% 98 0%
50 — --�—� —— ————I— � 7 7 0% —9-7-F/.]_
1 33.0% 90 0%1
I 1 13 30% 87 0%1
5 50% 84.0%1
451 I 1 i 1 1 6 60% 79 0%1
s 8 0 %s 00%
w, 1 ( IT I I 6 60°1°1530%1
40I ( � � 1 — 4 4.0°t° 470%1
1 110% 430%1
5 150% 420%1
7 170% 37 0%1
1 ) 1 7 70% 30 0%1
35 V I I I 7 70% 230%1
1 ( ( ( 1 ( 1 ( 1 1 1 I 5 50% 160%1
1 II � I
1 10%j 11 0%1
I� 1 1 0%1—10-0%
30 1 ( i 5 5 0%1 9 0-,101-
I i 1 1 2 20% 40% I
1 1 1 0%i 20% 1
I 1 I I 1 1 1 10% 10% 1
251 1 1 II II 1 I
1 I Illi
20
I I 1
i-
I � �-
f
15 ,
I Total Samoles 100
85th Percentile Speed 47
Date of Survey 2/5/2009 Start Time 1049
-
50th Percentile Speed 41 Weather Sunny End Time- 1140 i
15th Percentile Speed 34 Road Condition Fair Posted Speed 35
10 MPH Pace 35-44 - Street Class Collector Observer KRIS PASILL
Number in Pace 57 Conditions not
Percent in Pace 570% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street BARTON RD Field Observer ANTONIO ELMORE
Limits WEST CITY LIMIT Checked By MARK MILLER
TERRACINA BLVD Date 1/9/2009
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey 1810 Barton Rd
85th Percentile 47
10 mph Pace 40-49
Percent in Pace 796%
Posted Speed Limit 55
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 0 068
Expected Collision Rate 23
C Traffic Factors
Average Daily Traffic 19782
Length of Segment 3600
Lane Configuration 4 Lanes with Left Turn Channelization, Divided
Street Classifaction Arterial
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Retail/Vacant
Posted Speed Limit 55
Speed Limit Change? Yes
Revised Speed Limit 45
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #4
City of Redlands
Traffic Engineering Department
Street Name BARTON RD
Limits WEST CITY LIMIT to TERRACINA BLVD
r
Radar Survey Sheet
X_West /=East -
5 10 15 20 25 30 35 40 # %ea cum t°
55i
I 1 r I 1 1 09% 100%
I I 2 1 9% 991%(
50
1 I I I I ( 2 19% 935%1
7 65% 91 7%1
11 I 8 74% 85 2%1
I I 11 i 1 I 12 111% 778%1
45 5 46% 667%1
(' 12 11 1%1620%1
I>C I I I 9 8.3%1509%1
%) I 9 83% 42 6%1
I 1 11 10 2%134.3%1
40 f/ I I I I 1 I 11 110 2% 24 1%1-
11K
K 5 46%1139%1
I I I I ; 4 37%, 9 3% 1
I ( I I I 1
35 / { I ( ( 5 4 6%I 56% 1
I I I I 11
x I ( I 1 09% 09% 1
1 it I � I III { 1
301 ( I ( 1
1111 I I I 1
III I III 1 I
II I I . I I I I I I I
l i I I I I I I I I I f
251 1I 1 ( 1
II I I ! I I
III I I � I
11H
I I I � � I
III1 , I
ICI
201 ' I 1
► I ► I c � I
i-
15i
101 I ' i Iii i l l I I i f i I
Total Samoles 1108
Date of Survey- 1/9/2009 Start Time 1200
85th Percentile Speed 47
50th Percentile Speed 43 - Weather Sunnv End Time 1217
15th Percentile Speed 39 - Road Condition Good Posted Speed 55
10 MPH Pace 40-49 Street Class Arterial Observer ANTONIO EL
Number in Pace 86 Conditions not
Percent in Pace 796% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street BARTON RD Feld Observer ANTONIO ELMORE
Limits TERRACINA BLVD Checked By MARK MILLER
ALABAMA ST Date 1/9/2009
Factors Direction EastlWest
A Prevailing Speed Data
Location of Survey Oasis Medical Plaza
85th Percentile 46
10 mph Pace 38-47
Percent in Pace 785%
Posted Speed Limit 45
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 2
Collision Rate(Acc/MVM) 0 274
Expected Collision Rate 23
C Traffic Factors
Average Daily Traffic 19782
Length of Segment 1777
Lane Configuration 4 Lane with Rased Median, Divided
Street Classifaction Arterial
D Conditions Not Readily Apparent
Conditions Curve
Roadway Geometr€cs
Comments
E Adiacent Land Use Retail/Residential
Posted Speed Limit 45
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #5
City of Redlands
Traffic Engineering Department
Street Name BARTON RD
Limits. TERRACINA BLVD to ALABAMA ST
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # °%ea cum %
551 i
� II iiI I ill � I
1 0 5% 100% -
I I 2 10% 99 5°f°
I 1 I
50 8
3 15% 976%1°1
8 39% 961%,
1 11 54% 92 2%1
J 13 63% 86 8%1
45
18 88% 80 5%1
1 ( 1 21 102% 71 7%1
'Al21 102% 615%1
�� � 26 12 7% 51 2%
AzV —{— 1 20 98% 38 5%1
40 / 17 83% 288%1-
1
88%(-
1 5 2.4% 20.5%1-
1
9 44% 18 0%1
1 5 24% 13 7%1
7 34% 112
35
6
1 ( 3 15% 49% 1
11 ( ( ( 3 1 15% 34% 1
1 I I ( 4 20% 20% 1
301 I I 1 ► ► 1-
I I I IIID I I I � I
� I
251I I I -
II
201 I
I � t
151 I I I f
1 i �
I I I
10'
I Ictal Sarnales 12051
Date of Survey 1/9/2009 Start Time 12.20
85th Percentile Speed 46
50th Percentile Speed 42 = Weather Sunny End Time 1256 _
15th Percentile Speed 38 - Road Condition Good Posted Speed- 45
10 MPH Pace 38-47 Street Class Arterial Observer ANTONIO EL
Number in Pace- 161 Conditions not Curve -
Percent in Pace 78.5% = Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street BARTON RD Field Observer ANTONIO ELMORE
Limits ALABAMA ST Checked By MARK MILLER
LAKESIDE AVE Date 1/9/2009
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey 1451 Barton Rd
85th Percentile 45
10 mph Pace 36 45
Percent in Pace 769%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 4
Collision Rate(Acc/MVM) 0 497
Expected Collision Rate 2 3
C Traffic Factors
Average Daily Traffic 17508
Length of Segment 2214
Lane Configuration 4 Lane with Raised Median, Divided
Street Classifaction Arterial
D Conditions Not Readdv Apparent
Conditions
Roadway Geometrics
Comments
E.Adiacent Land Use Residential
Posted Speed Limit 35
Speed Limit Change? Yes
Revised Speed Limit 40
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #6
City of Redlands
Traffic Engineering Department -
Street Name BARTON RD
Limits ALABAMA ST to LAKESIDE AVE _
A
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum % -
60! jell 1 I ! 1 i I � i I
1-
I
1 ' ! 1 05-/. 100°1.
551
Il it I 1 I I II I
1 2 1 0% 99 5%1
I 1
50 ( C 1 05%1986%1
j 2 10% 981%1-
3
1 ( ( 7 34%1 957%1 -
x
57%1 _I 9 4.3% 923%1
45 _ i i 17 -
�-
1 I 20 96% 72 1%1
15 72% 625%1
8.20 55 3%I
40 19 91% 471%1
---�-
16 77 31
\0914 67%
3003%3%1
( 16 7 7% 23 6%1
_ 10 4 8%1159%
35 — --I 9 4.3% 111%1
—I I— 1 0 5% 6 7%
_ 9 4.3°I° 6 30
I
l l 4 19% 19%
301���1
251 1 ( I
ICI ( I f-
201
I
151 ! i II i �208 I
Total Samoles 8
Date of Survey 1/9/2009 Start Time 1300
85th Percentile Speed 45
50th Percentile Speed 41 Weather Sunny End Time 1332 _
15th Percentile Speed 36 - Road Condition Good Posted Speed 35
10 MPH Pace 36-45 Street Class Arterial Observer ANTONIO EL
Number in Pace. 160 Conditions not _
Percent in Pace 76.9% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street BROCKTON AVE Field Observer ANTONIO ELMORE
Limits NEW YORK ST Checked By MARK MILLER
TEXAS ST Date 1/30/2009
W
Factors Direction East/West
A Prevailing Speed Data
Location of Survey 1439 Brockton Ave
85th Percentile 39
10 mph Pace 30 39
Percent in Pace 812%
Posted Speed Limit 25
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 2.153
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 1708
Length of Segment 1309
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readilv Apparent
Conditions Parking, driveways
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 25
Speed Limit Change? Yes
Revised Speed Limit 30
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc a 7
City of Redlands
Traffic Engineering Department
Street Name- BROCKTON AVE
Limits NEW YORK ST to TEXAS ST
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum %
501 � �J I I
1 10% 100%
I
451/ 1 2 20% 99 0%
I
I ( 1 10% 97 0%1
I ( 1 10% 96 0%1
4 40% 950%1-
40
50%j-40 I I 1 10% 91 1%1
9 89% 901%1
8 79% 812%1-
1 f I I y 6 59% 73 3%1
- J
j ( —� J 1 6 159% 6
35 � _ 9 189% 611 4%4%1_
1 9 89% 525%1
/-- I —�---I 1
43 9 89% 347%1-
9 89% 257%1
30 � I 8 179%
168%I
5 50%1 89% 1
3 3 0% 40% 1
25
I
1 10% 10%
I I I I I C i I I I
20
I I I I
II I
151
I
! I
101 1 I
I
5 1 1 I I I ! I I
Total SamDles 101
Date of Survey 1/30/2009 Start Time 10.40
85th Percentile Speed 39 =
Weather Sunny End Time 11 29
50th Percentile Speed 34
15th Percentile Speed 30 Road Condition Good Posted Speed 25
10 MPH Pace 30-39 Street Class Collector Observer ANTONIO EL
Number in Pace 82 _ Conditions not Parking driveways
Percent in Pace 81.2% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street BROCKTON AVE Field Observer ANTONIO ELMORE
Limits TEXAS ST Checked By MARK MILLER
CHURCH ST Date- 1/30/2009
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey 6th St
85th Percentile 36
10 mph Pace 29-38
Percent in Pace 893%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 3
Collision Rate(Acc/MVM) 1 205
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 2267
Length of Segment 5286
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D. Conditions Not Readilv Apparent
Conditions Multiple driveways, parked cars
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 30
Speed Limit Change' Yes
Revised Speed Limit 35
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #8
City of Redlands
Traffic Engineering Department
Street Name BROCKTON AVE
Limits TEXAS ST to CHURCH ST
Radar Survey Sheet
X=West /=East -
5 10 15 20 25 30 35 40 # %ea cum Bio
451111 1i II ) Ali 1 1
xI 1 10% 100%
40 1 1 0 i 99 0 1
1 10% 98 1%1
I/ 1 6 58% 97 1%1 -
5
%1 -
5 49%1913%1
1 1 10 97°% 864%1
35 / I 10�
97%1767%1
1 1 1 12 11 7% 67 0%1
�j 10 97%1553%1
1 14 136%1456%1
(/ 18 ( 78% 320%1
1 I ( 1 8 178% 243%1-
30 / / I ( I ( 9 8 7% 16 5%01
5 49% 78% 1
1 0%1 29% 1
25 i I ( l l I I i 1 1 10%( 10%
1 1 I i I I
I ( I I 1
201 ' I I
III I I I I l 1
I I I I I I I I I 1 I
151111 1 1 L1 1 I I I III 1 I�
I � 2I I I ill I I
I 1 I i i
101 I
I ! I
5
4 1
of I I I . i III II i 11 i i
Total Satnoles 1143 y
Date of Survey 1/30/2009 Start Time 9.00
85th Percentile Speed 36 -
50th Percentile Speed- 33 = Weather Sunn End Time 937
15th Percentile Speed 29 Road Condition Fair Posted Speed 30
10 MPH Pace 29-38 Street Class Collector Observer ANTONIO EL
Number in Pace 92 - Conditions not Multiple driveways; parked cars _
Percent in Pace 89.3% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street BROCKTON AVE Field Observer.ANTONIO ELMORE
Limits- CHURCH ST Checked By MARK MILLER
JUDSON ST Date 1/30/2009
Factors Direction East/West
A Prevaidmq Speed Data
Location of Survey 1138 E Brockton Ave
85th Percentile 38
10 mph Pace 30-39
Percent in Pace 84.0%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 6
Collision Rate(Acc/MVM) 2 411
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 2267
Length of Segment 5284
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readilv Apparent
Conditions Driveways,bicycles,crosswalk
Roadway Geometrics
Comments High accident rate
E Adiacent Land Use Residential/University
Posted Speed Limit 30
Speed Limit Change? Yes
Revised Speed Limit 35
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #9
City of Redlands
Traffic Engineering Department
Street Name BROCKTON AVE
Limits CHURCH ST to JUDSON ST
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum %
45 ( ( I I j ! 1 10%1 100%1
XXX I 4 4.0 990%I
1 2 20% 9500,
40 I I ( 4 40% 930%1
4 40% 89 0%1
/ 6 60%. 850%1
11 11 0°0 790%1
I � 1 5 50% 680%1 1
35 / I I 10 100% 63 0%1
10 100% 530%1 -
10
30%1 -10 100% 430%1
1
1 10 100%1330%1
1 10 100% 23 0%1
30 ( i 8 80% 130%j
1 10% 50%
2 20% 40% 1-
1 ( ( I I 1 10% 20%
I I I I ( I
25
Ix 1 1 10% 10% 1
201 I ( I
I I III II I (
{ I ( I I II ( ( ( I
151 I I I I
I II I i II � I
10 I I I I I
i I ! II
5 I � {
01 j { I
Total Samoles 11001
Date of Survey 1/30/2009 Start Time 9 43
85th Percentile Speed 38
Weather Sunny End Time 1036
50th Percentile Speed 34
15th Percentile Speed. 31 Road Condition Fair Posted Speed 30
10 MPH Pace 30-39 Street Class Collector Observer ANTONIO EL
Number in Pace 84 = Conditions not Driveways bicycles crosswalk -
Percent in Pace 84.0% Apparent
a
City of Redlands
Engineering and Traffic Survey
Summary
Street BROCKTON AVE Field Observer KRIS PASILLAS
Limits JUDSON ST Checked By MARK MILLER
WABASH AVE Date 2/12/2009
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey Near Aaron Dr
85th Percentile 37
10 mph Pace 27-36
Percent in Pace 776%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 0 401
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 2267
Length of Segment 5293
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D.Conditions Not Readilv Apparent
Conditions Driveways
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 30
Speed Limit Change? Yes
Revised Speed Limit 35
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #10
City of Redlands
Traffic Engineering Department
Street Name BROCKTON AVE
Limits JUDSON ST to WABASH AVE -
Radar Survey Sheet -
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum%
501 I I E 1 ( ( I I
t I
1 1 2% 100%1
1 1 1 12% 98 8%1
45 ( I I 1 12% 97 6%1
1 1 12% 965%1
1 f 1 1 2% 95 3%1
1 12% 941%1
40 I I I ( 1 12% 92 9%1
1 12% 91 8%1
3 3.5% 90 6%1
4 47% 871%1
3 35% 82 4%1
35 I I i ( ( ( 5 59% 788%1 -
6
88%16 71%1729%1
8 9 4°%1 65 9%1
I 8 94%1565%1
8 94% 471%1
8 94% 376%
30 �/ ( I 8 94% 282%
8 94% 18 8%1
1 1 4 47% 94% 1
1 ( 1 1210 47101
251 I 1 ( ( ( 2 24% 35% 1
I
20 I I I 1 I 1 1 1 j 1 12% 12% I
151 �
, l I
101 I
I �
( I �
5J �
! Total Samples 85
Date of Survey 2/12/2009 Start Time 9.25
85th Percentile Speed 37
50th Percentile Speed. 32 - Weather Sunny End Time 1025 -
15th Percentile Speed 28 - Road Condition Fair Posted Speed 30
10 MPH Pace 27-36 Street Class Collector Observer KRIS PASILL
Number in Pace 66 - Conditions not Driveways
Percent in Pace 776% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street BROOKSIDE AVE Field Observer ANTONIO ELMORE
Limits LAKESIDE AVE Checked By MARK MILLER
CENTER ST Date- 1/30/2009
a+
Factors Direction East/West
A Prevailing Speed Data
Location of Survey Roma
85th Percentile 41
10 mph Pace 32-41
Percent in Pace 895%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 6
Collision Rate(Acc/MVM) 0 571
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 12654
Length of Segment 3995
Lane Configuration 2 Lane with Raised Median, Divided
Street Classifaction Arterial
D Conditions Not Readdv Apparent
Conditions Limited access
Roadway Geometrics
Comments Continuity of Speed
E Adlacent Land Use Residential
Posted Speed Limit 35
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #11
City of Redlands
Traffic Engineering Department
Street Name BROOKSIDE AVE
Limits LAKESIDE AVE to CENTER ST
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum %
501 I
E
I [ j 1 09% 100%
2 18% 991%1
45 I
I 3 26% 97 4%
1 09% 947%1
3 26% 93 9%1
I 8 70% 912%
40 ( I 11 96% 84.2%1
7 61% 746%1
AA I� � I I 11 9 6%! 68 4%1-
14 12 3°I) 588%1
1 18 158% 46 5%1
35 1II I
8 1 70% 21 1%1
/ I I 9 79% 140%1-
I I 1 5 144% 61% 1
1 109%1 18% 1
30 I I ( 1
1 1 1 09%1 09% 1
I I ( I I
251 ( I I
I I I
1 ( I 1 1 I II 11 I I l l
201
151
� I I
10� 1 I I
it I I E I
k -
5l � I
I Total Samples 114 -
Date of Survey 1/30/2009 Start Time 16.12
85th Percentile Speed 41
50th Percentile Speed 37 - Weather Sunny End Time 1648 -
15th Percentile Speed 34 = Road Condition Good Posted Speed 35
10 MPH Pace 32-41 Street Class Arterial Observer ANTONIO EL
Number in Pace 102 Conditions not Limited access
Percent in Pace. 895% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street BROOKSIDE AVE Field Observer.ANTONIO ELMORE
Limits CENTER ST Checked By MARK MILLER
EUREKA ST Date 1/30/2009
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey 407 Brookside Ave
85th Percentile 42
10 mph Pace 29-38
Percent in Pace 679%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 5
Collision Rate(Acc/MVM) 0 961
Expected Colliston Rate 1 98
C Traffic Factors
Average Daily Traffic 12654
Length of Segment 1978
Lane Configuration 2 Lane with Raised Median, Divided
Street Classifaction Arterial
D Conditions Not Readilv Apparent
Conditions Limited access
Roadway Geometrics Curve, multiple pedestrian crossing
Comments
E Adiacent Land Use Residential
Posted Speed Limit 30
Speed Limit Change? Yes
Revised Speed Limit 35
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #12
City of Redlands
Traffic Engineering Department
Street Name BROOKSIDE AVE
Limits CENTER ST to EUREKA ST
A
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # °f°ea cum %
551I-
I 2 110%j 100%I-
1 105% 990%1 05% 986%
50 I I 1 0 5% 98 1%1-
� I
I I
455 I
1 I I I I 3 10 4%° 971%1
1 , ( 4 19% 95 7
rx/ I3 8
181 5.3%° 900%1
10 48%1847%1
40 _ _ I 5 f 2 4%43 79 -
/
13162% 732%1-
14 6 7% 67 0°t°
— 14 67 603/61
35 15 7 2% 53 6%
j� �— 15 72% 46 V1.
18 86% 3920/1
13 6 2. 30 6%
14 67% 244%1
30 -- — — —1 , 11
—— 5 124% 53% 1
4 119% 2 9%
( I I IT
25 2 1 0%1 10% 1 m
20111
C I
151
I
I
10! II f I i l
Total Samoles 2091
Date of Survey 1/30/2009 Start Time 15.10
85th Percentile Speed 42
50th Percentile Speed 35 Weather Sunny End Time 16.07 _
15th percentile Speed 30 Road Condition Good Posted Speed 30
10 MPH Pace 29-38 Street Class Arterial Observer ANTONIO EL
Number in Pace 142 Conditions not Limited access -
Percent in Pace 67.9% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street CENTER ST Field Observer.ANTONIO ELMORE
Limits- STATE ST Checked By MARK MILLER
BROOKSIDE AVE Date 1/9/2009
Factors Direction East/West
A Prevatlmp Speed Data
Location of Survey 78 N Center St
85th Percentile 39
10 mph Pace 32-41
Percent in Pace 83.8%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 0 563
Expected Collision Rate 198
C Traffic Factors
Average Daily Traffic 4250
Length of Segment 2013
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not Readilv Apparent
Conditions Limited access
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 35
Speed Limit Changes No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Lac li 13
City of Redlands
Traffic Engineering Department
Street Name- CENTER ST -
Limits. STATE ST to BROOKSIDE AVE
Radar Survey Sheet
X-West /=East
5 10 15 20 25 30 35 40 # %ea cum % -
451
2 19%1 100°lo I
7 6 7% 98 1%1
40 I ( I 6 57% 91 4%1
10 95-1. 857%1
7 6 7-/.176 2%1
f KK x 14 133%1695%1
9 86%1562%1
355 _ I 11 105%1476%1
13 124%1371%1
3 29% 24 8%1
6 57%1143%1 -
I I (
I i f i j 4 38% 86% 1
0 ( 3 2 9% 4 8% 1-
1 10% 19% 1-
1
25 ( 1 ( 1 10% 10% 1
I I ( I I
201 �
1 I I I I
I II I I I I
I I I I I
I II I I I I
151
II II I I I
I I I ( I I
'oil 1 I ( I I 1 I
01
I ( ( I
5 j I
I-
t �
O1lI ( -
I Total Sarnoles 1051
Date of Survey 1/9/2009 Start Time 13.40
85th Percentile Speed 39
50th Percentile Speed 36 = Weather Sunny End Time 1415
15th Percentile Speed 32 Road Condition Good Posted Speed 35
10 MPH Pace 32-41 Street Class Arterial Observer ANTONIO EL -
Number in Pace 88 _ Conditions not Limited access
Percent in Pace 838% Apparent.
City of Redlands
Engineering and Traffic Survey
Summary
Street CENTER ST Field Observer ANTONIO ELMORE
Limits BROOKSIDE AVE Checked By MARK MILLER
CYPRESS AVE Date 1/9/2009
Factors Direction East/West
A Prevailmq Speed Data
Location of Survey 448 Center St
85th Percentile 40
10 mph Pace 32-41
Percent in Pace 73.1%
Posted Speed Limit 35
B. Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 5
Collision Rate(Acc/MVM) 1 431
Expected Collision Rate 1 98
C. Traffic Factors
Average Daily Traffic 4250
Length of Segment 3958
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not Readilv Apparent
Conditions Parking
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 35
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #14
City of Redlands
Traffic Engineering Department
Street Name CENTER ST
Limits BROOKSIDE AVE to CYPRESS AVE
Radar Survey Sheet
X_West /=East
5 10 15 20 25 30 35 40 # %ea cum
45 1 09% 100°0'
J I ( t I I 6 156% 99 1%1
3 128% 93 5%1
40 / I I 8 174% 90 7%1
f I/ 10 93% 833%j
1 _ I 1 7 65% 69 4%1
1 1 1 9 18 3% 63 0%1
10 93% 54 6%1
35 � I ( I 1 9 83% 454%1-
8
54%1-8 74% 370%
II 10 193% 29 6%
2 1 19% 20 4% -
301 1 I ( 8 74% 18.5%1
I` I � i-
I I I I 1 6 1 5 6°f° i i 1- I
I 5 46% 56% 1
25 I I
II I ( I 1 09% 09%
I I � II II I
20l
it IIII I I I � I II 1 II I
15111 . III III ' I
( ( I I I ff I I I
101
I I I I I i I
5 1 C I I
i I
#
011 # 11
I Total Samoles 11481 -
Date of Survey 1/9/2009 Start Time 1421
85th Percentile Speed 40 -
Weather Sunnv End Time 14.53
50th Percentile Speed 35
15th Percentile Speed 30 Road Condition- Good Posted Speed 35
10 MPH Pace 32-41 Street Class.. Arterial Observer ANTONIO EL
Number in Pace 79 Conditions not Parking =
Percent in Pace 73.1% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street CENTER ST Field Observer ANTONIO ELMORE
Limits. CYPRESS AVE Checked By MARK MILLER
CRESCENT AVE(W) Date 1/9/2009
j
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey 640 Center St
85th Percentile 39
10 mph Pace 30-39
Percent in Pace 790%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 4250
Length of Segment 3606
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not Readdv Apparent
Conditions Limited access,parking
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 35
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department-
Date Loc #15
City of Redlands
Traffic Engineering Department
Street Name CENTER ST
Limits CYPRESS AVE to CRESCENT AVE(W)
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum %
45 1110% 100%1
11/ I 2 20% 990%1 -
4
90%1 -4 40% 970%1 -
E j 4 40%1930%1
40 ( 1 6 6 0% 89 0%1
7 70% 830%1
f ( 1 9 90% 70 0%1
35 / I 1 1 8 80% 61 0%1
�f
9 90% 530%1 -
8
30%1-8 8 0%j 44.0%
10 10 0001 36 0%
7 70%1260%1_
301 3 130% 10 0%
I I 1 1 I 4 40% 70% 1 -
1
0% -
1 10% 30% 1
1 1 1 ( ( 2 20% 20% I
25 X I I I I I
( I � 1
I
201
1 . 0 1 II � 111 t I I
151 I I I I
101 1 I 1
5 � 1
1 I
Oiiil
Total Samoles 100.
Date of Survey 1/9/2009 Start Time 1458
85th Percentile Speed 39
Weather Sunny End Time 1533
50th Percentile Speed 34
15th Percentile Speed 30 Road Condition Fair Posted Speed 35
10 MPH Pace 30-39 Street Class Arterial Observer ANTONIO EL
Number in Pace 79 Conditions not Limited access parking
Percent in Pace 79.0% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street CENTER ST Field Observer KRIS PASILLAS
Limits CRESCENT AVE(E) Checked By MARK MILLER
RIDGE ST Date 2/12/2009
Factors Direction East/West
A Prevailing Speed Data
Location of Survey 1441 Center St
85th Percentile 37
10 mph Pace 25-34
Percent in Pace 817%
Posted Speed Limit 30
B. Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 1 98
C.Traffic Factors
Average Daily Traffic 15491
Length of Segment 1805
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readilv Apparent
Conditions Driveways
Roadway Geometrics Curves
Comments
E Adiacent Land Use Residential
Posted Speed Limit 30
Speed Limit Change? Yes
Revised Speed Limit 35
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #16
City of Redlands
Traffic Engineering Department
Street Name CENTER ST
Limits- CRESCENT AVE(E)to RIDGE ST
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum %
501
j 1 14% 100%1
1 2 28% 9$$°!01-
rclllI
451 -
I � I k -
I V I I ( I I I I I
2 28% 958%1
1 2 28% 93 0%1
40 I ( ( 1 14% 90 1%1
1 I 2 128% 88 7%1
I I 2 2 8% 859%1-
I I
59%1-
I ( I I I 1 1 14% 831%1
351 1 ( ( I 1 4 156% 81 7%1
I I ( 4 56% 761%1
6 85% 704%1-
7 9 90!° 62 0
30 /� I I I I I 7 99 52 1°!°1
�( ( 7 99% 42 3%1
1 6 85°!°1324°!°
6 85%1 23 9%
6 85% 155%
25V 5 70%1 7 0%
I I
II i I I I I
I � I I � I III III I I I
201 1 1 1 I II ( I III I
' I
I I
15'
I
5
1 I I
I I I
I I I
I I
101
5
Total Samoles 71 i
Date of Survey 2/12/2009 Start Time 1036
85th Percentile Speed 37
Weather Sunny End Time 11 35
50th Percentile Speed- 30
15th Percentile Speed 26 Road Condition- Fair Posted Speed 30 -
10 MPH Pace 25-34 Street Class Collector Observer KRIS PASILL =
Number in Pace 58 Conditions not Driveways
Percent in Pace 81.7% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street CENTRAL ST Field Observer.KRIS PASILLAS
Limits UNIVERSITY ST Checked By MARK MILLER
JUDSON ST Date 2/12/2009
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey 1144 Central St.
85th Percentile 35
10 mph Pace 25-34
Percent in Pace 744%
Posted Speed Limit 30
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 6
Collision Rate(Acc/MVM) 4 556
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 2000
Length of Segment 3169
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Local
D. Conditions Not Readilv Apparent
Conditions Prima Facie 25 mph
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 30
Speed Limit Change) Yes
Revised Speed Limit 25
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc a 17
City of Redlands =
Traffic Engineering Department
Street Name CENTRAL ST
Limits UNIVERSITY ST to JUDSON ST
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum %
551 1 I
1 -
1
1/ 1 G 1 12% 100%1
501 ii 1 I
1 1 12% 98 8%1
451 ( 1 12%1976%11
I" li IIII I I I I
( I I 1
401 1 I ( I 2 124% 951°1°I
1
3 37% 927%1 -
1
27%1 _1 1 2 24% 89 0%1
35'A
I I I ( 1 1 I 1 2 24% 866%1 -
1 ( 6 73°1° 841%)
7 85% 768%1
f 11 8 98% 68 3%1
I 6 73% 58
5%
30 — (_ 8 9 8%1 51 2% -
6 73%(415%
1 6 73%1341%1
-- I 6 73%1268%1
3 37%119 5-/.
2511' I I I 11 5 6 140 159%1 ,
I I 1 ( I ( (
1 I 2 24% 98% 1
_ 1 12% 73% 1
( 1 1 12% 61% 1
20 ( 1 ( 1 1 2 24% 49% 1
I 1 12% 24%
I
1 12% 12%
15 i
I I
II 11
10
Total Samoles 82 '
Date of Survey 2/12/2009 Start Time 1300
85th Percentile Speed 35 -
50th Percentile Speed- 30 Weather Sunny End Time 1356
15th Percentile Speed 25 Road Condition Fair Posted Speed 30
10 MPH Pace 25 34 Street Class . Local Observer KRIS PASILL
Number in Pace 61 Conditions not Prima Facie 25 mph
Percent in Pace 74.4% - Apparent -
City of Redlands
Engineering and Traffic Survey
Summary
Street COLTON AVE Field Observer KRIS PASILLAS
Limits DEARBORN ST Checked By MARK MILLER
WABASH AVE(W) Date 2/12/2009
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey 1641 Colton Ave
85th Percentile 45
10 mph Pace 37-46
Percent in Pace 702%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 2
Collision Rate(Acc/MVM) 0 403
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 9159
Length of Segment 2609
Lane Configuration 1-2 Lane Each Direction, Undivided
Street Classifaction Arterial
D Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 35
Speed Limit Changes Yes
Revised Speed Limit 45
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #18
City of Redlands
Traffic Engineering Department
Street Name COLTON AVE
Limits DEARBORN ST to WABASH AVE(W)
Radar Survey Sheet _
X=West /=East
5 10 15 20 25 30 35 40 # %ea cum
551X 1
! I I ! 1 1 1 1 0% 100%j
�( I 1 110% 990%1-
50 2 19% 981%1
J I I 1110% 96 2%
j ! I 2 19% 95.2%1
1 10% 933%j
5 48% 92 3%1
45 / 1 8 77% 87 5%1
j I 1 5 48% 798%j
5 48% 75 0%
7 67% 702%
! ( 11 106% 63 5%1
40 �✓/ I I 7 6 7°0 529%1
1 5 4.8% 46 2%1
IAA/ 1 — 1 9 87% 41 3%1
11 106% 32 7%1
4 3 8% 221%j
35 — -- 5 48% 18 3%1
5 4.8% 13 5%!
_ __ I I 3 29% 87/.
1 4 3 8% 58%
301 1 I I ( 1 I I I 1 I
I I I I 1 f I ( 1 1 2 1 9%1 1 9% 1
I ( 11 II I1 1 I I
25'
201
151 I
I ' I
101 I
Total Sar pies 1104
Date of Survey 2/12/2009 Start Time 1402
85th Percentile Speed 45 -
50th Percentile Speed 40 Weather Sunnv End Time 14.18
15th Percentile Speed 35 Road Condition Good Posted Speed 35 -
10 MPH Pace. 37-46 Street Class Arterial Observer KRIS PASILL
Number in Pace 73 Conditions not
Percent in Pace 702% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street CRESCENT AVE Field Observer KRIS PASILLAS
Limits SERPENTINE DR Checked By MARK MILLER
RAMONA DR Date 1/12/2009
i
Factors Direction East/West
A Prevadina Speed Data
Location of Survey 1216 Crescent Ave
85th Percentile 41
10 mph Pace 31 -40
Percent in Pace 585%
Posted Speed Limit 35
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 2
Collision Rate(Acc/MVM) 2 468
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 728
Length of Segment 5357
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Collector
D Conditions Not Readily Apparent
Conditions No sidewalks, parking
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 35
Speed Limit Changes No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #19
City of Redlands
Traffic Engineering Department
Street Name- CRESCENT AVE -
Limits SERPENTINE DR to RAMONA DR
Radar Survey Sheet
X=West /=East
5 10 15 20 25 30 35 40 4 °r°ea cum %
501/ -
j 1 1 9% 100%1
� I ( 1
I i
1 19% 981%1
i-
45
j 1 19%1962%1
3 157% 94.3%1
} ( I I ( 2 38% 88 7%1
40 I I ( ( 3 57% 84 9%1
I ( I ( 1 19% 79 2%1
4 75% 77 4%]
1 1 1 1 19% 69 8%1
1 ( 3 57%1679%1_
351 1/ i f I I I 1 1 1 1 9%1623%1 -
4
23%1 -4 175%I604%1
I ( 5 94%J 528%1-
lX I 6 11 3% 43 4%1
1 I I 1 3 57% 32 1%1
30 I ( ( I I ( 1 1 19% 26 4%1
VVI ( ( I I 2 138%1245%1
1� 1I I I i ( 2 138% 20 8%1
1/ 1 2 38% 17 0%1
1 1 ( ( 1 1 19% 132%1-
251� 1 19% 113%
I ( I I I I 1 1 119%1 9 4% 1
20 I I ( I 1 1 1 1 1 119%1 7 5% 1
i
I it I
1 19% 57% 1
I II I I 1
C I I I if I
�
j 1 19% 3.8% 1
15 1 I ( ( 1 19% 19% 1
1 ! I I
101 1
I I
1
5
I l 1
Total Samples 53
Date of Survey 1/12/2009 Start Time 11 39
85th Percentile Speed 41
Weather Sunn End Time 12.35
50th Percentile Speed 33
15th Percentile Speed 26 Road Condition Fair Posted Speed 35 -
10 MPH Pace- 31-40 Street Class - Collector Observer KRIS PASILL
Number in Pace 31 Conditions not No sidewalks,parking -
Percent in Pace 58.5°% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street CRESTVIEW RD Field Observer-KRIS PASILLAS
Limits FORD ST Checked By MARK MILLER
BUCKINGHAM DR Date 2/12/2009
Factors Direction East/West
A Prevailinq Speed Data
Location of Survey 1454 Crestview Rd
85th Percentile 42
10 mph Pace 30-39
Percent in Pace 674%
Posted Speed Limit 25
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 0
Collision Rate(Acc/MVM) 0
Expected Collision Rate 1 98
C Traffic Factors
Average Daily Traffic 1000
Length of Segment 4842
Lane Configuration Single Lane Each Direction, Undivided
Street Classifaction Local
D.Conditions Not Readilv Apparent
Conditions Prima Facie 25 mph
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 25
Speed Limit Change? No
Revised Speed Limit
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Luc #20
J
City of Redlands
Traffic Engineering Department
Street Name CRESTVIEW RD
Limits FORD ST to BUCKINGHAM DR -
r
Radar Survey Sheet
X=West /=East -
5 10 15 20 25 30 35 40 # %ea cum 16
I I I ! 1 I l C
! I I ! I I 1 23% 100%1-
1 1 1 ; I { 1 1 2 3% 977%]
a0
iI 1 23% 95 301°I
( I 1 123% 93 0%1
45K 1 ! ! 1 123% 907%1-
C884%11
1 2.3%
1 1 23% 86 0%1
40 3 70% 83 7%1
1 I I I
4 93% 767o.11
I I ( I 3 70% 67 4%1
Ix>0< j 1 12 3% 510 2%
I
35 I ( 1 23% 488%1-
7
88%17 16.3%146 5%1-
I I I ( 1 ( 3 70% 30 2%1
� 3 170% 23 3%1
A I I I I 1 I ( ( I 1 23% 163%1
30 ( I ( 2 147% 14 0%1
2 47% 93%
�I � I I I i
(/II I I I ( 12 147% 47% 1
25111 I I I I I
IIII
I I I I I I
I I
I I
201 ( I I I I I I I
I I I ! I 1 1
I � II II I IIII I
15
1 I II I
i I
1 i
I j I
101 j I �-
� I
IIII i � I
51 ( Ic I II l I i1
Total Samules 43 -
Date of Survey- 2/12/2009 Start Time 14.35
85th Percentile Speed 42
Weather Sunny End Time 15.30
50th Percentile Speed 36
15th Percentile Speed 31 = Road Condition Good Posted Speed 25
10 MPH Pace 30-39 Street Class Local Observer KRIS PASILL
Number in Pace 29 = Conditions not Prima Facie 25 mph _
Percent in Pace 674% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street CYPRESS AVE Field Observer KRIS PASILLAS
Limits TERRACINA BLVD Checked By MARK MILLER
CENTER ST Date 5/8/2009
Factors Direction North/South
A Prevailina Speed Data
Location of Survey 1031 Cypress Ave
85th Percentile 45
10 mph Pace 33-42
Percent in Pace 598%
Posted Speed Limit 40
B Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 2
Collision Rate(Acc/MVM) 0 188
Expected Collision Rate 3 55
C Traffic Factors
Average Daily Traffic 7671
Length of Segment 6659
Lane Configuration 4 Lanes with Left Turn Channelization,Undivided
Street Classifaction Arterial
D.Conditions Not Readilv Apparent
Conditions
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 40
Speed Limit Change? Yes
Revised Speed Limit 45
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc N 21
City of Redlands
Traffic Engineering Department
Street Name CYPRESS AVE
Limits- TERRACINA BLVD to CENTER ST
Radar Survey Sheet
X=North /=South
5 10 15 20 25 30 35 40 # %ea cum
601
1 10% 100%1
551 I 1 1 I I
1 1 ` 1 10% 990%1-
2
90%1-
2 20% 98 0%1
1I I 1 ( 1 1 10% 96 1%1
501 1 I I I 1
1/110% 95 1%1 -
1
1 ( I ( ( I ( 2 20% 94 1%1
2 120% 92 2%1
45 I�(/ ( I ( ( 7 69% 902%1-
I i I I
4 39% 833%1 -
3
33°'°1 _3 29% 794%1
1 1 1 1 I ( I 4 39% 765%1 -
4
65%1 -
4 39%1725%1
11 10 8% 68 6%1-
40 / 1 I 1 1 I 1 7 69%157 8%1
8 78%1510%1
3 2 431%1
2 20%
0% 40 2%
35 // s 78% 3s.2°r°
4 39% 304%
1 _ 10 9 26. %
3 29%9% 1677%
1 I 1 3 129%1137%1
30 I 7 69%1108-1.
1 2 2 0°f° 3 9°I°
1 1 ( 1 1 10% 20% 1
C I I 1 ( 1 1 1 10% 10% 1
251 ( I ( 1
I I II f.
I-
I
20€ (_
I-
1
15� lil I it I Il 1 1-
Total�amnles 102
Date of Survey 5/8/2009 Start Time 11 40
85th Percentile Speed 45
Weather Sunny End Time 12,25
50th Percentile Speed 38
15th Percentile Speed 32 Road Condition Fair Posted Speed 40
10 MPH Pace 33-42 - Street Class Arterial Observer KRIS PASILL
Number in Pace. 61 - Conditions not
Percent in Pace 59.8% Apparent
City of Redlands
Engineering and Traffic Survey
Summary
Street CYPRESS AVE f=ield Observer KRIS PASILLAS
Limits CENTER ST Checked By MARK MILLER
REDLANDS BLVD Date 5/8/2009
Factors Direction North/South
A Prevailing Speed Data
Location of Survey 325 Cypress Ave
85th Percentile 44
10 mph Pace 33-42
Percent in Pace 660%
Posted Speed Limit 40
B. Collision History
Date Range Covered 1/1/2004 To 1/1/2007 ( 3 )
Total Collisions 1
Collision Rate(Acc/MVM) 0 138
Expected Collision Rate 3 55
C. Traffic Factors
Average Daily Traffic 7671
Length of Segment 4546
Lane Configuration 4 Lanes, Undivided
Street Classifaction Arterial
D Conditions Not Readilv Apparent
Conditions Parking
Roadway Geometrics
Comments
E Adiacent Land Use Residential
Posted Speed Limit 40
Speed Limit Change? Yes
Revised Speed Limit 45
Approved and Authorized for release by City of Redlands Traffic Engineering Department
Date Loc #20