Loading...
HomeMy WebLinkAboutContracts & Agreements_223-2018 FIRST AMENDMENT TO AGREEMENT TO PUBLIC WORKS CONSTRUCTION CONTRACT This first amendment ("First Amendment") to the Public Works Construction Contract dated June 5, 2018 ("Contract"), by and between the City of Redlands, a municipal corporation ("City"), and Matich Corporation ("Contractor"), is made and entered into this 4th day of December,2018 RECITALS WHEREAS, it is the desire of the City and Contractor to amend their existing Contract, specifically to increase the scope of work for the Contract to include certain street repair work for Nevada Street, NOW, THEREFORE, City and Contractor agree as follows AGREEMENT Section 1 The scope of work to be performed by Contractor pursuant to the Contract is hereby amended to include the work that is identified in Exhibit"A,"which is attached hereto and incorporated herein by this reference Section 2 The Contract Sum, as set forth in Section 2 of the Contract, is hereby increased by the amount of seventy six thousand five hundred twenty three dollars and fifty-one cents ($76,523 51) Section 3 All other provisions of the Contract shall remain unchanged by this First Amendment, and in effect IN WITNESS WHEREOF,the parties have executed this First Amendment,to be effective as of the 4th day of December, 2018 CITY OF REDLANDS MATICH CORPORATION By Paul W Foster, Mayor Mark T Hickman, Vice President ATTEST. J e Donaldson, City Clerk L\ca\djm\Agreements\Matich Corp First Amendment.docx 1 t EXHIBIT "A" Sari Item Prices f or : 18026 Redlands Nevada A - Copy Matich Corporation Jake Reade 11/9/2018 Itent Dacriptiou Quantity U/M Unit Price Total Price 1 I Mobilization IOOLS $21,792160 $21,79216 1 2 Traffic Control 1 OOLS $12 869 470 $12,869.47 1 3 Survey I OOLS $2,783 480 $2,783 48 1 4 FDR25 9" 2,778 OOSY $2 550 $7,083 90 i 1 5 AC PAVE 450 OOTONS $56 000 $25,200 00 1 6 ROADWAY EX 250 OOCY $18.000 $4,500 00 1 7 AC BERM 50 OOLF $5 000 $250 00 I 1 8 6"W ILTE THERMO 279 GOLF $0 550 $153 45 1 9 DOUBLE YELLOW 318 OOLF $1 100 $349 80 3 i 1 10 12"W111TE/YELLOW 364 GOLF $2 750 $1,001 00 i I 11 12"WHITE STOP BAR 71 OOLF $2 750 $195 25 I 12 STOP LEGEND 3 00EA $115 000 $345 00 Phase 1 Schedule I Subtotal $76,523,51 i $76,523 51 BID TOTALS Page 1 of 1 i Details Report For : 18026 Redlands Nevada A - Copy Matich Corporation Jake Reade 11/9/2018 a Pit Rein Description 1 1 Mobilization Quantity UTAf Uu:t Cost 7bia1 Cast Margin°o Unil Pricer Tatal Price r 1 00 LS $19,811 05 $19 811 05 10 00 21,792 16 $21,792 16 Activity POTHOLE UTILITIES Crew POTHOLE UTILITIES Activity Qty 1 00 LS i f Rate. Days. TotalcoSt 4,755.01 Day. 0 50 LS Laboi 2.00 How, 010 LS Egmpment 200 UtIltcoSt 4,755 010 Actunl. 200 i Labor Qnantity Boors Bays Unit Cost L4 LBR,GRP 4 200 800 HR 2.00 $63 60 $2,035 07 L2 LBR,GRP 2 200 800 HR 200 $61 25 $1,959 94 Total $3,995 01 Equipment Quantity Hours Days Unit Cost TPU 112 TON PICK UP TRUC 200 800 HR 200 $5 00 $160 00 COMPI INGERSOL RAND 185 C 2.00 8.00 HR 2.00 $15.00 $480.00 Total $640 00 Material Quantity Unit Cost ACCOL COLD MIX 200 $60 00 $120 00 Total $120 00 Act Note Page 1 of 5 i Details Report For : 18026 Redlands Nevada A - Copy Matich Corporation .lake Reade 11/9/2018 Plr Itena Description 1 1 Mobilization Quantity U/M Unit Cost Total Cost Morgue% UndPrecet TotalPnee 1 00 LS $19,811 05 $19,811 05 10.00 21 79216 $21 792 16 Activity SUPERVISION Crew SUPERVISION Activity Qty 100 LS Rate Days- Day 0 10 LS Labor a 00 TotfllCoSt: 10,707 fib Hour 000 LS Equipment 8 00 UnitCost• 10,707 660 Aetual 800 Labor Quantity Hours Days Unit Cost OF12 OPER,FOREMAN GRO 100 900 HR 800 $83.66 $6 023 52 SUPER SUPERINTENDENT 1 00 8.00 HR 300 $75 00 $1,800 10 ENG OFFICE ENGINEER 1 00 800 HR 300 $48,00 $1,152.00 The total contains overtime cost of $227 04 Total $9,202.66 Equipment Quantity Houis Days Unit Cost TPUFM FOREMAN PICK UP TR 100 8.00 HR 8.00 $7 50 $480 00 TPUSP SUPERINTENDENT PIC 1 00 800 HR 300 $7 50 $180.00 TPU 112 TON PICK UP TRUC 100 800 HR 300 $5.00 $120.00 Total $780 00 Material Quantity Unit Cost TOILET SANITARY TOfLETS 1 00 $225 00 $225.00 SANDB SWPPP 100 $500 00 $500 00 Total $725.00 Act Note. Activity QUALITY CONTROL Crew QUALITY CONTROL Activity Qty 100 LS Rate. Days. Totalcost: 1,760.00 Day. 0 50 LS Labor 200 Hour: 010 LS Equipment 200 Und cost. 1,760 000 Actual: 200 Labor Quantity [-lours Bays Unit Cost 08 OPER,GENERAL 8 1 00 800 HR 200 $100 00 $1 60000 Total $1,600.00 Equipment Quantity ]-tours (Jays Unit Cost TPU 112 TON PICK UP TRUC 1 00 800 HR 200 $10 00 $160 00 Total $160 00 Act Note- Page 2 of 5 i Details Report Form. 18026 Redlands.Nevada A - Copy � € Matich Corporation Jake Reade 11/9/2018 i Pit went Description 1 1 Mobilization Quantity U/M 0111 Cost Total Cost Margin% Unit Pricet Total Price 1 00 LS $19 811 05 $19 811 05 10 00 21,792 16 $21,792 16 I Activity EQUIPMENT MOVES Crety EQUIPMENT MOVES Activity Qfy 1 00 LS a Rate- Days �'otlllCoSf 2 348.97 I Dny 100 LS tabor 100 Hour- 013 LS � tu 8 i potent 1 00 Ultitcost 2,348 970 Actual 1 00 Labor Quantity Hours Days Unit Cost T3 TMST,3 LOWBED 1 00 800 HR 100 $66 12 $528 97 Total $528 97 Equipment Quantity Hours Days Unit Cost LB3AT LOWBED 3 AXLE TILTB 1 00 8 00 HR 1 00 $40 00 $320 00 Total $320 00 Subcontract Quantity Unit Cost MISC CTI MORE 1 00$1,500 00 $1 50000 Total $1 50000 Act Nate. Item Note, Page 3 of 5 1 E E Details Report For : .18026 Redlands Nevada A - Copy Maticls Corporation Jake Reade 11/9/2018 j Pk Item Description 1 2 Traffic Control Quanfity U/M Uaait Cost Total Cost Afargin% Unit Privet Total Price i 100 LS $11 699,52 $11 699 52 10.00 12 869 47 $12,869.47 I r Activity TRAFFIC CONTROL CREW Crew TRAFFIC CONTROL CREW Activity Qty 1 00 LS Rate- Days Day: 4 10 L5 Labor 800 Tolalcost 11,558 01 11our: 000 LS l~quipraw 800 Undcost 11,558 010 I j Aotpni• 800 i Labor Quantity Hours Days Unit Cost L4 LBR,GRP 4 1 00 8.00 HR 800 $63,60 $4,070 14 L2 LBR,GRP 2 1 00 800 HR 800 $61 25 $3,919 87 Total $7 990 01 Equipment Quantity Mours Days Unit Cost TCTRK TRAFFIC CONTROL TR 1 00 800 HR 800 $15.00 $960.00 TCCON TRAFFIC CONES 5000 8.00 HR 800 $0.05 $160.00 TCSIGN TRAFFIC SIGNS 1000 800 HR Soo $0.50 $320 00 TCARB ARROWBOARD 100 800 HR 800 $6.25 $400 00 TCB1 TYPE I BARRICADE 10,00 800 HR 800 $0.50 $320.00 TCB3 TYPE III BARRICADE 400 800 EA 8.00 $0,50 $128.00 TOMSM CMS MONTHLY 1 00 800 HR Soo $20.00 $1,280 00 Total $3 568 00 Act Note. Itettt Note• Pie Item Description 1 3 Survey Quantity U/r11 Unit Cost Total Cost Margin% Unit Privet Total price 1 00 LS $2,530 44 $2,530 44 10 00 2,783.48 $2,783.48 Activity SURVEY MONUMENTS Crew MISC ACTIVITY Activity Qty 1 00 LS Rate, Days. TotalCost 2,500.00 Day' 100 LS Laboi 100 Hagar• 013 LS Equipment 100 UttrtCost 2,500 000 Actnnl 100 Subcontract: Quantity Unit Cost MISC CENTERLINE SURVEY 100$2,500 00 $2 500,00 Total $2,500.00 Act Note Item Note. Page 4 of 5 Details Report For . 18026.Redlands Nevada A - Copy r Matich Corporation Jake Reade 71/9/2018 r Cost %MU price Labor $23,317 1000 $25 648 i �grrrp $5 468 10.00 $6 015 � t Equip.Rent $0 1000 $0 i Material $645 1000 $930 Tiatrsportrrttosr $0 1000 $0 Sub/Service $4 000 1000 $4 400 Other $0 1000 $0 Bond $411 1000 $452 Total Bill $34,041 2480 $76,524 ToWlMargin $42,483 j I 'I i Page 5 of 5