HomeMy WebLinkAboutContracts & Agreements_26-1983_CCv0001.pdf SCOPE OF SERVICES
PHASE I - Reservoir Canyon
1. Investigate possibility of funding project with Public
Works Title I money.
2. Investigate hydraulic capacity and perform visual in-
spection of existing culvert through Central Business
District. It is not anticipated that any special
equipment would be used in this inspection.
3. Perform necessary hydrological studies using San
Bernardino County Synthetic Unit Hydrograph Method.
4. Investigate various alignment alternatives for safely
conveying Reservoir Canyon flows through or around the
Central Business District and study effects on down-
stream development and channel. Alternatives to be
investigated include a flood peak shaving detention
basin.
5. Determine design and construction cost estimate for
the various alignments studied under #4 above. Also
investigate non-cost issues such as environmental con-
cerns.
6. Coordinate with Corps of Engineers to analyze inter-
relationship between the Zanja channelization study and
this project.
7. Prepare concept report and recommend alignment concept
to be designed. Attend study session with various City
departments to discuss report and recommendation.
8. Design improvements necessary to convey Reservoir
Canyon flows safely through or around the Central
Business District.
9. Prepare plans , specifications and final cost estimate
for bidding purposes , answer questions during the bid
process, analyze bids and make recommendation of award
to the City.
10. Coordination and ongoing meetings with City Staff for
input and review, and to keep them informed of Project
status.
11. Attend City Council meetings to report on project
status and to make presentation of concept report.
SCOPE OF SERVICES
PHASE II - The Zanja
At the present time, it is anticipated that the Corps of
Engineers will be analyzing the Zanja. If the Corps deter-
mines that it will not do the Zanja, we are prepared to
incorporate the following work in our scope of services.
1. Perform necessary hydrological studies of the Zanja
drainage area using San Bernardino County Synthetic
Unit Hydrograph Method.
2. Investigate various alignment alternatives for safely
conveying the Zanja flows through or around the Central
Business District and study effects on downstream de-
velopment and channel.
3. Determine design and construction cost estimates for
the various alignments studied under item #2 above.
Also consider non-cost issues such as environmental
concerns.
4. Prepare report and recommend alignment concept to be
designed. Attend study session with various City de-
partments to discuss report and recommendation.
5. Design improvements necessary to convey flows from the
Zanja safely through or around the Central Business
District.
6. Prepare plans , specifications and final cost estimate
for bidding purposes , answer questions during bid
process, analyze bids, and make recommendation of award
to city.
7. Coordination and ongoing meetings with City Staff for
input and review, and to keep them informed of project
status.
8. Attend City Council meetings to report on project
status and to make presentation of concept report.
EXHIBIT A
AGREEMENT FOR PROFESSIONAL SERVICES
ASL CONSULTING ENGINEERS/CITY OF REDLANDS
DESCRIPTION OF SERVICES
The services described herein are for the City of Redlands-
Reservoir Canyon Drainage Study. The Consultant shall perform
the following tasks as part of the study:
PHASE I - Reservoir Canyon
1. Investigate possibility of funding project with Public
Works Title I money.
., Investigate hydraulic capacity and perforin visual in-
spection of existing culvert through Cenral Business
District. It is not anticipated that any special
equipment would be used in this inspection.
3. Perform necessary hydrological studies using San
Bernardino County Synthetic Unit Hydograph Method.
4. Investigate various alignment alternatives for safely
conveying Reservoir Canyon flows through or around the
Central Business District and study effects on down-
stream development and channel. Alternatives to be
investigated include a flood peak shaving detention
basin.
5. Determine design and construction cast estimate for
the various alignments studied under #4 above. Also
investigate non-cost issues such as environmental con-
cern .
6. Coordinate with Carps of' Engineers to analyze inter-
relationship between the Zama channeliation study and
this project.
7. Prepare concept report and recd end alignment concept
to be designed. Attend study session with various City
departments to discuss report and recommendation.
. Design improvements necessary to convey Reservoir
Canyon flows safely through or around the Central
Business District.
. Prepare plans, specifications and final: cost estimate
for bidding purposes , answer questions during bid process,
analyze bids and make recommendation of award to City.
14. Coordination and ongoing meetings with City Staff for
input and review, and to keep them informed of project
status.
11 . Attend City Council meetings to report on project
status and to make presentation of concept report.
The following services are associated with Phase II work and
are not included within the scope of this Contract. They are
included for reference only.
PHASE II - The Zanja
1. Perform necessary hydrological studies of the Zanja
drainage area using San Bernardino County Synthetic
Unit Hydrograph Method.
2. Investigate various alignment alternatives for safely
conveying the Zanja flows through or around the Central
Business District and study effects on downstream de-
velopment and channel.
3. Determine design and construction cost estimates for
the various alignments studied under item #2 above.
Also consider non-cost issues such as environmental
concerns.
4. Prepare report and recommend alignment concept to be
designed. Attend study session with various City de-
partments to discuss report and recommendation.
5. Design improvements necessary to convey flows from the
Zanja safely through or around the Central Business
District.
6. Prepare plans , specifications and final cost estmate for
bidding purposes , answer questions during bid process,
analyze bids and make recommendation of award to City.
7. Coordination and ongoing meetings with City Staff for
input and review, and to keep them informed of project
status.
8. Attend City Council meetings to report on project
status and to make presentation of concept report.
RESERVOIR CANYON DRAINAGE STUDY & DESIGN
CITY OF REDLANDS
AGREEMENT FOR PROFESSIONAL SERVICES
THIS AGREEMENT, is made and entered into this 7th
day of June , 1983, by and between the City of
Redlands, a municipal corporation, hereinafter referred to
as "CITY" , and ASL Consulting Engineers , hereinafter referred
to as "CONSULTANT" .
CITY and CONSULTANT, for the consideration stated herein,
agree as follows:
1. STATEMENT OF AGPXEMENT.
CITY hereby engages CONSULTANT, and CONSULTANT hereby
accepts such engagement, to perform the services herein described
for the compensation herein provided. CONSULTANT hereby warrants
that it has the qualifications, experience and facilities to
properly perform said services in a manner consistant with
accepted professional standards, and hereby agrees to undertake
and complete the performance thereof for the compensation herein
provided. This is an agreement for professional engineering
services and it does not render CONSULTANT an employee of the
CITY for any purposes whatsoever and CONSULTANT shall at all
times retain the status of independent contractor.
2. DESCRIPTION OF SERVICES.
The services to be performed by CONSULTANT are described
in Exhibit "A" attached to this Agreement. The work is generally
described in two (2) phases. Phase II work is not included with-
in the scope of this contract and is enclosed for reference only.
3. COMPENSATION.
The total compensation Payable to CONSULTANT by CITY
for the services described in Exhibit A (Phase I, parts 1
through 11) herein shall be based upon invoices for actual ex-
penditures in accordance with unit rates set forth in the
Hourly Charge Rate and Expense Reimbursement Schedule shown in
Exhibit B. Payment to be made on a monthly basis using item-
ized invoices unless otherwise stated.
4. PROGRESS AND COMPLETION.
CONSULTANT shall commence work on the services to be
performed upon written authorization of the notice to proceed.
All services shall be completed within one hundred twenty (120)
calendar days following notice to Proceed. It is recognized
by both parties to this contract that some work may necessar-
ily be delayed due to input required by the U.S. Army Corps of
Engineers which is not a party to this Contract. CONSULTANT
shall notify CITY in writing within seven (7) calendar days of
the beginning of such delay and request an extension of time.
5. OWNERSHIP OF DOCUMENTS.
All drawings , designs , data and other documentation
prepared by CONSULTANT in the performance of the services here-
in shall become the property of CITY upon completion of the
consulting services pursuant to this Agreement and upon payment
in full of all compensation then due CONSULTANT.
6. NO ASSIGNMENT.
This Agreement is for professional services and is
not assignable by CONSULTANT without CITY's prior consent in
writing.
7. RELATIONSHIP OF THE PARTIES
Both parties to this Agreement agree that the
relationship of the parties shall be that CONSULTANT is an
independent contractor to the CITY, and that in no event shall
CONSULTANT be considered an officer, agent, servant or employee
of CITY.
8. ATTORNEY FEES.
In the event an action is filed by either party to
enforce rights under this Agreement, the prevailing party shall
be entitled to recover a reasonable attorney' s fee in addition
to any Other relief granted by the court.
9. TERMINATION BY CITY.
Notwithstanding any other provision of this Agreement,
CITY, by notifying CONSULTANT in writing, may terminate any or
all of the services agreed to be performed under this Agreement.
In the event of such termination, CONSULTANT shall have the
right and obligation to immediately assemble work in progress
for the winding up of the job. All charges outstanding at the
time of termination shall be payable by CITY to CONSULTANT
within. thirty-five (35) days following submission; of final
statement by CONSULTANT.
10. ACCEPTANCE OF FINAL PAYMENT CONSTITUTES RELEASE.
The acceptance by CONSULTANT of the final payment made
according to the terms of this Agreement shall operate as and be
a release to CITY, and every employee and agent thereof, from
all claims and liabilities to CONSULTANT for anything done or
furnished for or relating to the work or services, or for any
act or neglect of CITY and others relating to or arising out of
the work and this Agreement. Provided, however, that no pay-
ment final or otherwise, shall operate to release CONSULTANT
from any continuing obligations or warranties pursuant to this
Agreement.
11. NOTICES.
Any notice required to be given hereunder shall be
deemed to have been given by depositing said notice in the
United States mail, postage prepaid, and addressed as follows:
TO CITY: City of Redlands
30 Cajon Street
Redlands, CA 92373
TO CONSULTANT: ASL Consulting Engineers
3280 E. Foothill Blvd. , #160
Pasadena, CA 91107
IK WITNESS WHEREOF, this Agreement has been executed by
the parties on the date and year first above written.
CITY OF REDLT
DS
7
Al
Mayor
ATTEST:
. . � .
9 »
--Cit
} ClQky z
CONSULT 7
By
Ti'
Firm: ASL Consulting Engineers