HomeMy WebLinkAboutContracts & Agreements_26-1988_CCv0001.pdf AMENDMENT NO. 1 TO AGREEMENT TO FURNISH ENGINEERING SERVICES FOR CORRIDOR WASTEWATER PUMPING STATION AND FORCEXAIN DATED APRIL 19, 1988 Reason for Change: Finalize scope, fee, fee basis and schedule for Tasks 700, 701, 702, 703, 704, and 800. Description: Article 5 - Payments to the Engineer shall be amended as follows: 1. Delete the last sentence of Section 5. 1 and add the following: "Compensation for Tasks 700, 701, 702 , 703, 704, and 800 in Attachment A, Scope of Work, shall be an amount equal to ENGINEER's Direct Labor Costs times a factor of 3 .0 for all Basic Services rendered by employees engaged directly on the Project. In addition to payments provided for above and in Section 5.2, OWNER shall pay ENGINEER the actual costs times a factor of 1.1 of all Other Direct Expenses incurred in connection with all Basic and Additional Services. Computer charges will be invoiced per the schedule provided on Page D2 attached. If it becomes apparent to the ENGINEER at any time before Basic Services to be rendered under this Agreement are about seventy five (75) per cent completed that the total amount of compensation to be paid to ENGINEER on account of Basic services pursuant to this Article (5. 1) will exceed ENGINEER's estimate of the amount applicable to the services rendered, ENGINEER shall give OWNER written notice thereof per the provisions of Article 5. 3 . A-1 If only one prime contract is prepared for construction, materials and equipment for the Project, ENGINEER's estimate of the amount that will become payable for Basic services pursuant to this Article 5.1, inclusive, is $134,078. 11 Attachment A, Scope of Work, shall be amended as follows: 1. Under Task 700, add the following: "Landscape Design. This would include the design of landscaping and irrigation system for the pump station site. Water for the irrigation system will be supplied by the City to the site. City staff will inform ENGINEER of the location and size of waterline on site to be utilized for irrigation. " 2 . Under Task 800, delete the task description and add the following: "Boyle will provide 50 sets of Bid Documents including prints of the plans reduced to one half size under Basic Services, Other Direct Expenses. All other copies of the plans or specifications required for City reviews and permit processing will be provided and invoiced to the OWNER as Other Direct Expenses per the provisions of Article 5. 1. 11 Attachment B, Project Schedule, shall be amended as follows: 1. Delete the existing Project Schedule and add the revised schedule dated July 26, 1988, attached. Attachment C, Fees for Professional Services, shall be amended as follows: 1. Add Attachment C-2. Attachment D-1, Fee Schedule, shall be amended as follows: 1. Delete the existing Fee Schedule and add the revised schedule dated April, 1988. Attachment D-2, Standard Rates for Computer Services, shall be amended as follows: 1. Delete the existing Standard Rates for Computer Services schedule and add the revised schedule dated May, 1988. A-2 COST SUMMARY: Original Contract Amount: $ 38,280 Net Charges By Previous Amendment: -0- Contract Amount Prior To This Amendment: 38,280 Contract Amount Will Be Increased By: 134 .078 NEW AGREEMENT AMOUNT: $172,358 All other original Agreement provisions remain unchanged by this Agreement Amendment, except as outlined herein. SUBMITTED By: DATE: Managing E "gineer/ BOYLE ENGIEERINC CORPORATION APPROVED By: DATE: 8/2/88 CITY OF REDLANDS - Mayor ATTEST: C:tlty Flork, C f Redlands A-3 ATTACHMENT "B" t !-,-M!777777777- 77-- 77 . .777777771 .r avM m {---7777 . - 77 . . 77 . . ,- . . -; i 7771 r77 ^r t ai d pp # t�r —{--_,— r Iia a r i # ci jig t f j t # # i x # { f {L i i i<9Jw�t 3 1 f { # .r4. ! 7777 .air ra # t M1 i -Mille U-1 ATTACHMENT "C-2" CITY OF REDLANDS CORRIDOR WASTEWATER PUMPING STATION AND FORCEMAIN FEES FOR PROFESSIONAL SERVICES TASK ESTIMATED FEE 700 - FINAL LIFT STATION DESIGN $ 44,974 701 - FINAL FORCEMAIN DESIGN 12,794 702 - PLANS, SPECIFICATIONS, AND BID DOCUMENTS 64,368 703 - PERMIT PROCESSING AND AGENCY COORDINATION 1,412 704 - PROJECT CONSTRUCTION COST ESTIMATE 7,380 800 - PRINTING, REPRODUCTION, AND COMPUTER 3150 TOTAL ESTIMATED FEE OF $ 134,078 Total estimated fee may not be exceeded without OWNER's written approval per Article 5. 1. Certain assumptions have been made in preparing the Scope of Work. To the extent possible they are stated therein, and are reflected in the Task Cost Report. If the actual total effort required is different from the assumptions presented, the City agrees to revise the Scope and Budget accordingly. C2-1 ATTACHMENT "D-1" BOYLE ENGINEERING CORPORATION FEES FOR PROFESSIONAL SERVICES APRIL, 1988 For the services of engineers and any other salaried personnel employed by Engineer, the compensation to the Engineer for such personnel shall be the monthly wage cost which is paid by Engineer to said personnel divided by 173 . 3 hours times the number of hours worked on this project times a multiplier for the applicable personnel classifications. For the services of drafters, inspectors, stenographers, clerks and any other hourly personnel employed by Engineer, the compensation to the Engineer for such personnel shall be the direct wage cost which is paid by Engineer to said personnel times a multiplier for the applicable personnel classifications. The multiplier to be used for each personnel classification, as provided heretofore, shall be as follows: Personnel Classification Multiplier Office Personnel Engineers/Architects 3. 00 Drafters 3.00 Secretaries and Clerks 3.00 Field Personnel Engineers/Architects 3.00 Inspectors 2.75 Other services and Supplies Rate Printing and Blueprinting Actual Cost + 10% Travel - Automobile $0. 30 per mile Travel - Other Than Automobile Actual Cost + 10% Materials Testing and In-Plant Inspection Actual Cost + 10% Aerial Photogrammetry Service and Surveys Actual Cost + 10% Soils Investigations and Field Tests Actual Cost + 10% Computer Services See Schedule on Reverse It is understood and agreed that the aforementioned rates and charges include all normal equipment and materials used in connection with the production of the required engineering services. Boyle Engineering Corporation will furnish monthly billings for all services rendered and supplies furnished in accordance with the above compensation provisions. Payments shall be due and payable to Boyle Engineering Corporation upon presentation. A late payment finance charge will be computed at the periodic rate of 1. 5 percent per month and will be applied to any unpaid balance commencing thirty (30) days after the date of the-'briginal invoice. Rates subject to general revision 10/1/88 - D-1 ATTACHMENT "D-2" BOYLE ENGINEERING CORPORATION STANDARD RATES FOR COMPUTER SERVICES EFFECTIVE MAY 16, 1988 Intergraph Computer-Aided Design and Drafting (CADD) System our Intergraph CADD system utilizes a Digital Equipment Corporation VAX 11/751 computer with 4 megabytes of main memory, 919 megabytes of disk memory, floating point accelerator, cache memory, magnetic tape, and a high- speed pen plotter. Graphics workstations have dual 19-inch high-resolution screens, digitizer table, and menu tablet. Unit charges for equipment are as follows: Graphic Workstation $17.00 per hour Pen Plotter $17-00 per hour Terminal (CRT or Printer) $ 4 .00 per hour Central Processing Unit $ 3.00 per minute Microcomputers and AutoCADD Systems Microcomputers include the IBM PC/XT, IBM PC/AT, AST Premium 286, and ot- r similar equipment. Charges are based on an hourly rate for the computer : ..d standard software plus a resource charge for special applications software, and special equipment such as plotters and high-resolution monitors. Word Processing System With Laser Printer $12.00 per hour Engineering Computer System and Standard Software $16.50 per hour Resource Charge: AutoCAD Computer Aided Design & Drafting $ 3.75 per hour MicroStation II Computer Aided Design & Drafting $ 3 .75 per hour Point Line Computer Aided Design & Drafting $ 3.75 per hour DAPPER - Electrical Design Program $24.90 per hour CAPTOR - Overcurrent Protection Analysis $11.25 per hour Trane TRACE - HVAC System Design $ 5.80 per hour Carrier HVAC System Design $ 4.65 per hour ROUTE IV - Drainage Design $ 4.50 per hour GWFM - Groundwater Modeling System $14.50 per hour STAAD III - Structural Design and Analysis $ 3.75 per hour HP 3000 Computer System The Hewlett Packard HP 3000 computer has 2 megabytes of main memory, 480 megabytes of disk memory, a 600 line-per-minute upper-lowercase printer, magnetic tape and four drum plotters. sixty-four terminals are connected directly or via telephone lines. Unit charges are as follows: Central Processing Unit $3. 30 per minute of computer time Elapsed Time $8.80 per hour of terminal connect time Lines Printed $0. 11 per hundred lines printed Plot Records $2.71 per hundred records plotted Outside Comiouter, Services Charges for outside computer services will be billed at invoice cost plus twenty-five percent. Rev 5-16-88 D-2 ~ ^ TASK COST REPORT - ESTIMATED COST FOR FINAL DESIGN PHASE CITY OFREDLANDS CORRIDOR W/NPUMP STATION AND 30 Cajon Street 0RCEMAlN Redlands C& 92373 Project Mqr; Phil Stone mm time > }15:08:05 tt 07-26-1988 page z ------------------------------------------------------------------------------------------------------------------------------ / I\ CUST I DOLLARS D A T E PERSONNEL-HOURS TOTAL OTHER ACTIVITY / TASK START FINISH A 8 C D E HOURS LABOR DIRECT TOTALS ________________________________________________________________________________________ 1OO PROJECT MANAGEMENT (3) 04/19/88 10/26/88 V 0 V O V O V V V 200 ALTERNATIVES ANALYSTS /3\ 04/19/88 05/18/88 V V O 0 O 0 O 0 O 300 PRELIMINARY DESIGN /3\ 05/25/88 07/29/88 V O 0 0 0 0 V O V 400 SURVEY & AERIAL /3\ 04/25/88 08/10/88 V O V V 0 V V O V 500 GEOTECHNICAL INVESTIGATION /3\ 08/03/88 08/25/88 0 V O O V O V O 0 600 COORDINATE WITH CITY /3\ 04/19/88 111/15/88 0 O 0 V 0 0 O O V 700 FINAL LIFT STATION DESIGN 08/03/80 10/25/88 60 02 380 U iO 752 44974 V 44974 701 FINAL FORCE MAIN DESIGN 08/03/88 \N25/88 20 72 1,20 V i0 222 12794 V t2794 702 PLANS & SPECIFICATIONS 08/22/88 10/25/88 62 152 120 1182 60 1576 63216 0 63216 A. 5011 DOCUMENT REVIEW 09/19/88 09/20/88 4 4 O V V 8 576 O 576 B. 90% DOCUMENT REVIEW l0/25/88 1O/26/88 4 4 V 0 0 8 576 0 576 C. 1 / V0% DOCUMENT SUBMITTAL �l/�5/88 1� 16/98 V 0 0 V V V V 0 0 703 PERMIT PROCESSING 08/29/88 10/25/88 2 16 V 0 4 22 1412 V 1412 04 COST ESTIMATE 10/19/80W 101/24/88 R i8 72 48 12 158 7380 V 7380 SUBTOTAL: 08/0/88 11/16/88 160 568 692 1230 96 2746 130928 O 138928 ( 800 PRINTING & COMPUTER i1/08/88 1111f,115/891111f,115/89 0 O O 0 V O O 31,504\5O ` ' 3150 ----------------------------------------------------------------------------------------------- $ttt TOTALS tttl 160 568 692 1230 96 2746 130928 3150 134078 Resource code Average Rate __________ __________ A = PROJECT MANAGER 72.00 8 = PROJECT, ENGINEER 72.00 C = ASSOCIATE ENGINEER 49.00 D = DRAFTER 34.00 [ = CLERICAL 29,00 NOTES: /l\ The purpose Of this schedule is to indicate estimated time periods required for each task as Well as the overall project. /2\ The budget and Schedule depicted assumes commitment to a specific site early in the final design phase. /3\ Tasks 100 through 600 were included in the Alternative Analysis and Preliminary D8siaD Phase; t�er2fVre, costs for those Cd5kS are not shown OD this report. /�\ Other Direct Expenses are estimated at $I150 for 50 sets Of specifications and � ' reduced plans. The remaining $2000 is allOt8d for computer time, supplies and other reproduction costs. /5\ Anticipated delivery date Of documents for 90% review is October 25, 1988. The 100% submittal VD November 15, 1988 is contingent upon review and comment by the OWNER, addressing of comments by the ENGINEER, and printing Of the bid dOCU0eDtS all oCcUriRg between October 25 and November 15, 1988.