Loading...
HomeMy WebLinkAboutContracts & Agreements_103-99_CCv0001.pdf AMENDMENT No. 2 TO AGREEMENT BETWEEN CITY OF REDLANDS (OWNER) AND CAMP DRESSER & McKEE (ENGINEER) FOR ENGINEERING SERVICES This AMENDMENT is made and entered this 19"' day of October, 1999. This AMENDMENT makes the following changes to EXHIBIT A to AGREEMENT entered into on the 151h day of April, 1997. PROJECT: Pressure Sustaining Improvements to the Tate Water Treatment Plant Effluent Pipeline. ARTICLE I—ENGAGEMENT OF ENGINEER No changes ARTICLE 2—SERVICES OF ENGINEER The Scope of Work, Attachment A, is modified to reflect additional meetings and coordination efforts with City staff and DHS, additional design changes, and additional project management due to new City and DHS requirements that developed during the meetings. ARTICLE 3—RESPONSIBILITIES OF THE CITY No changes ARTICLE 4—PERIOD OF SERVICE The completion date for the project is extended to November 26, 1999. ARTICLE 5—PAYMENTS TO THE ENGINEER For the additional work defined in Article 2, the total budget is increased by $5,075.00 from $70,425 to $75,500. ARTICLE 6—INSURANCE AND INDEMNIFICATION No changes CDMCamp Dresser&McKee WNTSVRXPr1112068121410X1C0NTRAC\1 PRIMMAmendment 2.doc City of Redlands Contract Amendment No.2 Pressure Sustaining Improvements Page 2 of 2 to the Tate WTP Effluent Pipeline October 19, 1999 ARTICLE 7—GENERAL CONSIDERATIONS No changes IN WITNESS WHEREOF, duly authorized representatives of the parties have signed in confirmation of this AMENDMENT. OWNER: ENGINEER: CITY OF REDLANDS CAMP DRESSER&McKEE INC. By: By: _ y AGaryG elps, P.E. ° '- � rdW. CorneiIIe, P.c a1 Utilities Director V Vice President ATTACHMENTS: Attachment A—Scope of Work CDM Camp Dresser&McKee W:12068W41917CONTRACkIPRIME1Amendment 2.doc Attachment A Scope of Work This amendment is requested due to the following items: (1) Based on our August 27, 1998 letter arnmending the project's scope of work, CDM proceeded with design of a diversion structure to relieve water pressure from the water main from the Tate WTP. A meeting was then scheduled with DHS and City staff to discuss the new design; the meeting was held at the Tate WTP; several telephone conversations were also held subsequent to this meeting. As result of these meetings and telephone conversations, DHS (Kal Baliga's letter dated, December 18, 1998)expressed concern with the possibility of a cross-connection occurring if the flap gate was not able to be opened and the filter backwash water potentially backing into the diversion structure. (2) Further negotiations were held with DHS' (Kal Baliga), Tom Fujiwara, who replaced Lou Perkins as the Project Manager for the City, and Steve Dickey, to come up with a viable solution. (3) As a result of the meetings and telephone calls with DHS and City representatives, CDM had to change the design to install an altitude valve on the water main that would overflow into the Mill Creek, and incorporated other design changes such as the design of a relief valve at the existing 20-inch blowoff pipeline along Julian Road, providing for protection of the clearwell at the Tate WTP (Steve Dickey indicated to CDM that the existing diversion line that is constructed off of Julian Way could be used), and adjusted the telemetry design to conform to the new design alternative. Ninety percent(90%) drawings and specifications were submitted to DHS and to Tom Fujiwara on March 30, 1999. DHS approved the 90% design plans and specifications on April 7, 1999. Comments from the Tom Fujiwara were received in late June 1999. In summary, the additional scope items are: • Additional meetings and negotiations with DHS and City staff were needed during the design phase of the project. • Design changes that included the design to install an altitude valve on the water main that would overflow into the Mill Creek; the design of a relief valve at the existing 20-inch blowoff pipeline along Julian Road, providing for protection of the clearwell at the Tate WTP; and adjustment of telemetry design to conform to the new design alternative. W:\2G68121410klCONTRAC\IPRIME\,Amend2-Attachment A.doc