Loading...
HomeMy WebLinkAboutContracts & Agreements_02-1988_CCv0001.pdf AMENDMENT NO. 1 TO AGREEMENT BETWEEN OWNER AND ENGINEER R PROFESSIONAL VICES R ALIGNMENT S Y AND DESIGN CITY OF REDLANDS WATER TRANSMISSION IN BETWEEN DEARBORN RESERVOIR AND TEXAS RESERVC)IR DATED NOVEMBER 18, 1987 Reason forgea Finalize scope, fee and schedule for Tasks 2 through 7. Description: Article 5 - Payments to Engineer shall be amnded as follows: 1. Delete last sentence of Article 5.4 and add the following: Compensation for Tasks 2 through 7 of the Scrape of Mork in attach- ment A with the exception of Task 3.1 (9) shall not exceed $129,392 without theOwner's written approval. A breakdown of estimated manhours, labor fees, subcontractor fees and expenses is contained in Attachment C. Compensation for Task 3.1 (9) shall be based on actual time re- quired for pothole locations using the method of compensation as previously provided. For budgeting purposes an allowance of $2809 is estimated. Attachment A, the Scope of Work shall be amended as fellows: I. Under Article 2.1 delete Item (5) . 2. Delete Articles 2.2 and 2.3, and substitute as follows: 2.2 Hydraulic Analysis The ENGINEER will perform a calibration run and a maximum of two hydraulic system analyses of the 1570 zone within the study area utilizing the distribution system model inputs and demands from the City's 1981 Mater Master Plan and updated data provided by City staff for two alternatives for both Summer and tinter flow patterns. The two hydraulic system analysis are to be selected by the OWNER from consultation with the ENGINEER. This analyses will include: 1 1. Calibration run conforming to the 1981 water system analysis production run and data wase. Then updating the 1570 zone 1981 data base from information provided by the OWNER by incorporating piping changes made since 1981. The shall, also provide pump head curves and system head curves for the Vwps at Texas Reservoir. 2. Convert the updated data to the University of Kentucky data base. Perform couter analysis of the existing water trans- mission main and distribution system considering all pipes inches in diameter and larger. 3. using the university of Kentucky model, analyze a maxiTwim of two alternative transmission main alignments. Pipe sizes and locations where the existing cross-pipes should be connected to the new transmission main will be determined. 24 hour and fire flow model simulations will be performed for each alternative alignment as required. 4. Provide recd endations and pipe sizing for maintaining service along the existing water transmission maim along Brockton Street. 2.3 The ENGINEER will provide the OWNER with two copies of a Preliminary Design. letter report. 3. Corder Article 3.1 (1. ), delete final sentence "Based on final to the City". 4. Under Article 5.5, revise Item (1) to read as follows: "l. Two sets of 90 complete 40 scale construction plans and specifica- tions". Attachment B, the Project Schedule shall be amended as follows: 1. Delete third paragraph and substitute the following: The Preliminary Design letter report will be submitted within 30 calendar clays and the 90% design submittal within 120 calendar days from receipt of Notice to Proceed. Final documents will be submitted within: two weeks after receipt of all City comments on the 90 submittal. Attachment C, the Fee Estimate shall be amended as follows: 1e Delete the second sentence and after the words "alignment study" add the words "and preliminary and final design". 2. Acid the attached tables. Additional Ti ate fired; Cost Summary Original Contract Amount $ 16, 00.00 Net Charges by Previous Amendment 0.00 Contract Amount Prier to this Amendment 16, 00.00 t Contract Amount will.. be Increased by 131,392.0 New Contract Amount $147,592.00 All other original contract previsions remain unchanged by this contract amendment, except as outlined herein, Submitted By. /dotg, c f Date: . 2 1 f Dree I c. Approved ByiDate: February , 188 City�oRe s ATTEST 3A:30 C-411-ty- lurk 3 CITY OF REDLANDS WATER TRANSMISSION MAIN BETWEEN DEARBORN AND TEXAS RESERVOIR ---------------------------------------------------------------------------------------- DIRECT LABOR HOURS TASK/SUBTASK OIC PM HE PE DFT CL 2 . PRELIMINARY DESIGN 2 .1 Meetings 0 16 0 16 0 4 2 . 2 Constructability 2 8 0 16 0 0 2 . 4 Hydraulic Analysis 2 a 24 go 4 a 2 . 5 Appurtenances 1 4 0 a 0 0 2 .6 Cross Sections 1 16 0 20 0 0 2 .7 Cost Estimate 0 4 0 a 0 4 2 . 8 Lotter Report 2 10 0 12 6 12 2 .9 Technical Review/QA 8 0 0 0 0 0 TOTAL HOURS 16 66 24 160 10 28 TASK 2 FEE ESTIMATE TOTAL DIRECT LABOR FEES $6598 x 3 .05 - $20 , 123 OTHER DIRECT COSTS $1500 x 1 .10 - 1 , 650 TOTAL FEE TASK 2: $21 ,773 3 . FINAL DESIGN 3 . 1 Coor. Gootoch. 0 4 0 6 0 4 3 . 2 Coor. Survey 0 4 0 8 0 4 3 . 3 Utilities 0 4 0 24 0 3 . 4 Permits 0 8 0 8 0 4 3 .5 Cover Sheet 0 1 0 2 6 0 3 .6 Gen. Info. Sheet 0 4 0 a 6 4 3 . 7 19 Plan & Profile 2 153 0 341 341 4 3 . 8 3 Detail Shasta 0 8 0 30 48 a 3 . 9 Cost ESt/Quantities 2 6 0 24 0 4 3 . 10 Specifications 2 10 0 20 2 36 3 . 11 Technical Review/QA is 0 0 0 0 0 TOTAL HOURS 24 202 0 471 405 76 CITY OF REDLANDS WATER TRANSMISSION MAIN BETWEEN DEARBORN AND TEXAS RESERVOIR ---------------------------------------------------------------------------------------- TASK 3 FEE ESTIMATE TOTAL DIRECT LABOR $21749 x 3 .05 - $66 ,334 OTHER DIRECT COSTS $ 3200 x 1 . 10 - 3 , 520 GEOTECHNICAL SUBCONTRACTOR $ 9150 x 1 .10 - 10,0165 SURVEY SUBCONTRACTOR 27,000& x 1 .10 - 29 ,700 TOTAL FEE TASKS 3 , 4 , & 5 $105 ,619 InCludos $2,000 allowance for locating potholts @ 2 days SUMMARY FEE ESTIMATE 1 . ALIGNMENT STUDY $16 , 200 2 . PRELIMINARY DESIGN REPORT 21 , 773 3 . FINAL DESIGN 109 , 619 TOTAL DESIGN FEE $147, 592 3A-. 31