Loading...
HomeMy WebLinkAboutContracts & Agreements_201-2003_CCv0001.pdf AGREEMENT TO FURNISH ENGINEERING SERVICES FOR DESIGN OF DIGESTER III XING AND PLANT WATER PUMP STATION This Agreement is made and -entered into this 21st day of October 200') by and between the City of Redlands, a municipal corporation (hereinafter "City") and Carollo Engineers, a Professional Corporation, (hereinafter "Consultant"). In consideration of the mutual promises, covenants, and conditions hereinafter set forth, City and Consultant hereby agree as follows: ARTICLE 1 - ENGAGEMENT OF CONSULTANT 1.1 Citv hereby engages Consultant, and Consultant hereby accepts the engagement, to perform services ("Services") for the design of Digester Mixing Systems and Plant Water PLIMP Station ("Project"), for the City of Redlands, California. 1 .2 The Services shall be performed by Consultant in a professional manner, and Consultant represents that it has the skill and the professional expertise necessary to provide high-quality Services for the Project at the level of competency presently maintained by other practicing professional Consultants in the industry providing similar types of services. ARTICLE 2 - SERVICES OF CONSULTANT 2,1 The specific Services which Consultant shall perform are more particularly described in Attachment "A," entitled "Scope of Services," which is attached hereto and incorporated herein by this reference. 2.2 Consultant hereby agrees to abide by all applicable Federal, State, and local rules, laws, zn I and regulations in the performance of this agreement including but not limited to all 1.� In applicable Labor code and prevailing wage laws. ARTICLE 3 - RESPONSIBILITIES OF CITY 3.1 City shall inake available to Consultant information in its possession that is pertinent to the performance of Consultant's Services. 3.2 City will provide access to and make provisions for Consultant to enter upon City-owned property or rights-of-way as required by Consultant to perform the Services. 3.3 City designates Douglas Headr;ck as Project Manager, to act as its representative with Z:� 0 respect to the services to be performed under this Agreement. I Design of Digester Mixing Systems and Plant Water Pump Stations Services Agreement October 2 1, 2003 Page '? ARTICLE 4 - PERIOD OF SERVICE 4.1 Consultant shall perform the Services in a diligent manner and in accordance with the schedule set forth in Attachment "B", entitled "Project Schedule". ARTICLE 5 - PAYMENTS TO THE CONSULTANT 5.1 The total compensation for Consultant's performance of Services shall not exceed the amount of forty seven thousand, two hundred forty dollars ($47,240). City shall pay Consultant on a time and materials basis up to the not-to-exceed amount, in accordance with Attachment "C", entitled "Project Fee", based on the hourly rates shown in Attachment "D", entitled "Rate Schedule". 5.2 Consultant shall bill City within ten days following the close of each month by submitting an invoice indicating the Services performed, who performed the services, indirect costs, and the detailed cost of all Services, including backup documentation. Payments by City to Consultant shall be made within 30 days after receipt and approval of Consultant's invoice, by warrant payable to Consultant. 5.3 All contractual notices, bills, and payments shall be made in writing and may be given by personal delivery or by mail. Notices, bills, and payments sent by mail shall be addressed as follows: City Consultant Douglas Headrick George Beliew Municipal Utilities Department Carollo Engineers 35 Cajon Street 225 West Hospitality Lane, Suite 2112 P.O. Box 3005 San Bernardino, CA 92408 Redlands, CA 92373 When so addressed, such notices shall be deemed given upon deposit in the United States Mail. In all other instances, notices, bill, and payments shall be deemed given at the time of actual delivery. Changes may be made in the names and addresses of the person to whom notices, bills, and payments are to be given by giving notice pursuant to this paragraph. ARTICLE 6 - INSURANCE AND INDEMNIFICATION 6.1 Consultant's Insurance to be Prim All insurance required by this Agreement is to be maintained by Consultant for the duration of this Project and shall be primary with respect to City and non-contributing to any insurance or self-insurance maintained by the City. Consultant shall not perform Desi-ii of Digester Mixing Systems and Plant Water Pump Stations Services Agreement ZI -- October 21, 200') Page 3 any services pursuant to this Agreement unless and until all required insurance listed below is obtained by Consultant. Consultant shall provide City with Certificates of Insurance and endorsements evidencing such insurance prior to commencement of work. All insurance policies shall include a provision prohibiting cancellation of the policy except upon thirty (30) days prior written notice to Citv. 6.2 Workers' Compensation and Employer's Liability: A. Consultant shall secure and maintain Workers' Compensation and Employer's Liability insurance throughout the duration of this Agreement in an amount which meets the statutory requirement with an insurance carrier acceptable to the City. B. Consultant expressly waives all rights to subrogation against the City, its officers, employees, and volunteers for losses arising from work performed by Consultant for City by expressly waiving Consultant's immunity for injuries to Consultant's employees and agrees that the obligation to indemnify, defend, and hold harmless provided for in this Agreement extends to any claim brought by or on behalf of any employee of Consultant. This waiver is mutually negotiated by the parties. This shall not apply to any damage resulting from the sole negligence of City, its agents and employees. To the extent any of the damages referenced herein were caused by or resulted from the concurrent negligence of City, its agents, or employees, the obligations provided herein to indemnify, defend, and hold harmless is valid and enforceable only to the extent of the negligence of Consultant, its officers, agents, and employees. 6.3 Comprehensive General Liability Insurance: Consultant shall secure and maintain in force throughout the duration of the Agreement comprehensive general liability insurance with carriers acceptable to City. Minimum ID coverage of one million dollars (S 1,000,000) per occurrence and two million dollars ($2,000,000) aggregate for public liability, property damage, and personal injury is required. Consultant shall obtain an endorsement that City shall be named as an additional insured. 6.4 Professional Liability 111SUralice: Consultant shall secure and maintain professional liability insurance throughout the duration of this Agreement in the amount of one million dollars ($1,000,000)per claim made. The Consultant, shall obtain an endorsement extending the reporting period twelve (12) months beyond the current policy expiration date of July 4, 2004. 6.5 Business Auto Liability Insurance: Consultant shall have business auto liability coverage, with minimum limits of one coverage, million ($1,000,000) per occurrence, combined single limit for bodily injury liability and property damage liability. This coverage shall include all consultant owned vehicles used on the project, hired and non-owned vehicles, and employee non- Design of Digester Mixing Systems and Plant Water Pump Stations Services Agreement October 21, 2003 Page 4 Z:1 ownership vehicles. Consultant shall obtain an endorsement that the City shall be named as an additional. 6.6 Ass],2nment and Insurance Requirements. Consultant is expressly prohibited from subletting or assigning any of the services covered by this Agreement without the express written consent of City. In the event of mutual agreement between parties to sublet a portion of the Services, the Consultant will add the subcontractor as an additional insured and provide the City with the insurance endorsements prior to any work being performed by the subcontractor. Assignment does not include printing or other customary reimbursable expenses that may be provided in this Agreement. 6.7 Hold Harmless and Indemnification: Consultant shall defend, indemnify and hold harmless City and its elected officials, employees and agents from and against any actions, claims, demands, lawsuits, losses and liability for damages to persons or property, including costs and attorney fees, that may be asserted or claimed by any person, firm, entity, corporation, political subdivision or other organization arising out of on in connection with Consultant's negligent and/or intentionally wrongful acts or omissions under this Agreement; but excluding such actions, claims, demands, lawsuits and liability for damages to persons or property arising from the sole negligence or intentionally wrongful acts of City, its officers, employees or agents. ARTICLE 7 -GENERAL CONSIDERATIONS 7.1 In the event any action is commenced to enforce or interpret any of the terms or conditions of this Agreement the prevailing party shall, in addition to any costs and other relief. be entitled to the recovery of its reasonable attorneys' fees. 7.2 Consultant shall not assign any of the Services required by this Agreement, except with Z:� the prior written approval of City and in strict compliance with the terms, provisions, and conditions of this Agreement. 7.3 Consultant's key personnel for the Project are: Project Manager: Jim Ewing - Plant Water Pump Station Project Manager: Jim Griffith - Digester Mixing System Consultant agrees that the key personnel shall be made available and assigned to the Project, and that they shall not be replaced without concurrence from City. 7.4 All documents, records, drawings, designs, costs estimates, electronic data files, and databases and other Project documents developed by the Consultant pursuant to this 01 Agreement and any copyright interest Consultant may have in said herein described documents, records, and data shall become the property of City and shall be delivered to Design of Digester Mixing Systems and Plant Water Pump Stations Services Agreement October 21, 2003 Page 5 City upon completion of the Services or upon the request of City. Any reuse of such documents for other projects and any use of incomplete documents will be at City's sole risk. 7.5 Consultant is for all purposes an independent contractor. All personnel employed by Consultant are for its account only, and in no event shall Consultant or any personnel retained by it be deemed to have been employed by City or engaged by City for the account of or on behalf of City. 7.6 Unless earlier terminated, as provided for below, this Agreement shall terminate upon completion and acceptance by City of the Services. 7.7 This Agreement may be terminated by the City, without cause, by providing ten(10) days prior written notice to the Consultant (delivered by certified mail, return receipt requested) of intent to terminate. 7.8 Upon receipt of a termination notice, Consultant shall (1) promptly discontinue all services affected, and (2) deliver or otherwise make available to City, copies (in both hard copy and electronic form, where applicable), of any data, design calculations, drawings, specifications, reports, estimates, summaries, and such other information and materials as may have been accumulated by Consultant in performing the Services required by this Agreement. Consultant shall be compensated on a pro-rata basis for work completed prior to notice of termination. 7.9 This Agreement, including the attachments incorporated herein by reference, represents the entire agreement and understanding between the parties and any prior negotiations, proposals or oral agreements are superseded by this Agreement. Any amendment to this Agreement shall be in writing, approved by the City Council of City and signed by City and Consultant. 7.10 This Agreement shall be governed by and construed in accordance with the laws of the State of California. Design of Digester Mixing Systems and Plant Water Pump Stations Services Agreement October 21, 2003 IN WITNESSS WHEREOF, duly authorized representatives of the City and Consultant have signed in confirmation of this Agreement. City of Redlands Carollo Engineers � ("City„) ("Cons t nt") By: By: '# KARL N. (KASEY) HAWS Mayor Title: Partner ATTEST: BEATRICE SANCHEZ Deputy City Clerk ATTACHMENT A City of Redlands Engineering Services for Design of Digester Mixing Systems and Plant Water Pump Stations SCOPE OF SERVICES INTRODUCTION The purpose of this Agreement is to provide the CITY with engineering services needed to provide (1) pump mixing systems to Primary Digesters 1 and 2, and (2) a Plant Water Pump Station to pump recycle water into the existing plant water piping system at the Wastewater Treatment Plant. As described in the tasks below, the engineering services will include designing and preparing sketches and specifications for the above noted improvements. SCOPE OF SERVICES Performance of engineering services needed to provide designs, sketches, and specifications for Digester Mixing Systems and Plant Water Pump Station. TASK 1 - DESIGN Provide engineering services to design and prepare construction sketches and equipment specifications for adding digester mixing systems and a plant water pump station to the City's Wastewater Reclamation Plant. The work will be in accordance with the descriptions given below in Subtasks A and B. Specifications will be prepared for new equipment only to the extent necessary to supplement the specifications for the 2003 Water Recycling Project. Drawings will be in the form of sketches and notations on existing drawings rather than in the form of new, full-size drawings. The scope does not include preparation of "front-end" specifications or "as-built" drawings. Work will include meeting with the City's staff to discuss the work and to review the design. It is anticipated that there will be no more than two meetings for each of the two subtasks of the project. An allowance of 8 hours for meetings for each subtask of the project is included. Subtask A. Digester Mixing System. Under this subtask, Consultant will design new pump mixing systems for existing Primary Digesters 1 and 2. Each digester will be equipped with one chopper-type pump, suction and discharge piping around the digesters, and electrical power and control systems. Piping configuration for the digesters' internal mixing system will be provided. Control of the pumps will be manual, using on and off switches mounted in local control panels and pump shutdown sensors and circuitry for low suction pressure and high discharge pressure. No SCADA or remote alarms will be included in the design. Subtask B. Plant Water Pump Station. Under this subtask, Consultant will design a new plant water pump station A-1 to be located adjacent to the new Chlorine Contact Basin (CCB). The station will take suction from the pumping wet well at the CCB and discharge into the existing plant water piping system. Under this subtask, design for one can-type, vertical turbine pump will be provided. Design for a second can for a future pump will also be provided. The pump will be driven by a variable speed control and will pump approximately 600 gpm against a head of approximately 80 psig. Electrical equipment will include a variable frequency drive, motor starter, and circuit breaker that will be mounted on an extension of the concrete pad serving the Recycled Water Pump Station. The control system will be designed to automatically control the pump's discharge pressure to the preset plant water system pressure. Controls and sensors to alarm or stop the pump will include high and low discharge pressure and low water level in the CCB. Pump running and pump failure signals, as well as system pressure, will be provided to the plant's SCADA. A-2 ATTACHMENT B City of Redlands Engineering Services for Design of Digester Mixing Systems and Plant Water Pump Stations PROJECT SCHEDULE ENGINEER shall commence work immediately following approval of the Scope of Work and authorization from the CITY. ENGINEER has reviewed the project with CITY and agrees that the following schedule presents a reasonable time frame in which to complete the work. Days Following Notice to Task Item Proceed 1 Recive Notice to Proceed 0 2 Submit 85% Documents to City 28 3 Submit Final Documents to City 40 Because the work will be constructed by the contractor in process of constructing the 2003 Water Recycling Project, ENGINEER will attempt to provide portions of the design at earlier times corresponding to the contractor's work schedule. ENGINEER and CITY mutually agree that they will work earnestly toward meeting the above tentative schedule. Should the Scope of Services change or should problems arise during the work period, which could affect the above schedule, it is understood that both ENGINEER and CITY will develop a revised schedule to address such scope changes and problems. The costing herein assumes that all work will be completed by December 31 , 2003. B-1 ATTACHMENT C-1 City of Redlands Engineering Services for Design of Digester Mixing Systems and Plant Water Pump Stations PROJECT FEE Subtask A- Digester Mixing System Description Amount LABOR COSTS Engineering Labor: 184 hours @ $125.92/hour= $23,170 OTHER DIRECT COSTS Computer Equipment including Word Processing and AutoCAD (PECE)= $1,104 Printing= $186 Mileage= $84 ODC Subtotal $1,374 TOTAL $24,544 Subtask B - Plant Water Pump Station Description Amount LABOR COSTS Engineering Labor: 170 hours @ $125.92/hour= $21,406 OTHER DIRECT COSTS Computer Equipment including Word Processing and AutoCAD (PECE)= $1,020 Printing= $186 Mileage= $84 ODC Subtotal $1,290 TOTAL $22,696 Total Proiect Description Amount LABOR COSTS Subtask A $23,170 Subtask B 21,406 Labor Costs Subtotal $44,576 OTHER DIRECT COSTS Subtask A $1,374 Subtask B -1,290 ODC Subtotal $2,664 TOTAL $47,240 C-1 C-2 ATTACHMENT D City of Redlands Engineering Services for Design of Digester Mixing Systems and Plant Water Pump Stations FEE SCHEDULE As of March 1, 2003 Southern California Hourly Rate Engineers/Scientists Assistant Professional $ 96.00 Professional 125.00 Project Professional 152.00 Lead Project Professional 165-00 Senior Professional 188.00 Technicians Technicians 69.00 Senior Technicians 108.00 Support Staff Word Processing / Clerical 68.00 Project Equipment Communication Expense 6.00 (PECE) Per DL Hour Other Direct Expenses Travel and Subsistence at cost Mileage .36/mile Subconsultant cost + 10% Other Direct Cost cost + 10% Expert Witness Rate x 2.0 D-1 This fee schedule is subject to annual revisions due to labor adjustments. D-I