HomeMy WebLinkAboutContracts & Agreements_9-1987_CCv0001.pdf ^ ~ AGREEMENT TO FURNISH ENGINEERING SERVICES FOR REDLANDS WASTEWATER TREATMENT PLANT EXPANSION TASK ORDER NO. 2 (PRELIMINARY AND FINAL DESIGN SERVICES) This AGREEMENT is made and entered into as of this 18th day Of March 1987, by and between City Of Redlands " hereinafter referred to as "OWNER" and John Carollo Engineers , -hereinafter referred to as "ENGINEER" In consideration Of the mutual promises , covenants and conditions hereinafter set forth, the parties do hereby agree as follows : SECTION 1 (Purpose) The purpose Of this Task Order is to authorize and direct the ENGINEER to proceed with certain "PRELIMINARY AND FINAL DESIGN SERVICES" as described in SECTION 2(8) of the January, 1987 AGREEMENT, and as more specifically de- scribed below. SECTION 2 The following items will be included in this preliminary engineering eff0rt ; accordingly: l~ Photogrametry and Aerial Surveys. Provide for topography and contour maps Of the existing and new areas of the plant Site. Existing features of the site including contours , structures , major vegetation , and visible appurtenance will be plotted on Mylar sheets along with the plant's grid system. 2. Surveys . Provide for surveys as necessary to establish vertical and horizont- al control for phOtogrametrY. In addition , provide for surveys to verify locations and elevations of certain critical plant struc- tures , pipes , and equipment , and pick up topographic features not located accurately enough by aerial surveys~ ' 3. Planning for the 17 Acre Parcel . Provide detailed planning for the 17 acre parcel South Of the exist- ing plant~ This planning will have the primary purpose Of e5tab- -l- lisping locations for the sludge beds and operations building and for establishing the future hydraulic profile for the plant and influent sewers . 4. RWQC3 Discharge Requirements. Provide limited services to assist the City in its working with the RWQC3 to establish discharge requirements for expanded capacity. 5. AQMO Permitting. Assist the City in preliminary development of per-lit application to the Air Quality 111anagement District. 6. Rapid Bloc Operation. Provide consulting services during renovation , startup, and opera- tion of the rapid bloc, system and its test program. Assist the City with interpretation of results of the program. -SECTION 3 (Time of Performance) The ENGINEER and OWNER have agreed upon the scope and recognize that time is of the essence. To this extent , the following schedule has been proposed: Days Following Item Authorization to Proceed 1. Notice to Proceed 0 2. Photogrammetry/Survey Complete 45* 3. Site Planning Complete 60 *Depends on weather conditions. The OWNER/ENGINEER agree that each will diligently work toward meeting the above schedule. It is envisioned that all work covered by the Task Order will be completed by July 87. If for unforeseen reasons the work is delayed beyond this date, the ENGINEER may need to revise the scope and payment provisions for work ac- complished at a later date. SECTION 4 (Payment) Payment to the ENGINEER for services performed under this Task Order shall be as provided for in SECTION 38 of the January 1987 AGREEMENT. Payment for services under this Task Order shall be based on the ENGINEER'S Direct Salary times a Multiplier. The Multiplier for this Task Order shall be 2.761. A cost ceiling of Thirty Two Thousand Six Hundred Dollars ($32,600.00) is hereby established for the envisioned work, and will not be exceeded except as pro- vided for in SECTION 3 of the January 1987 AGRMMENT. Exhibit A is attached hereto , and reflects the above costs. SECTION 5 {Effective Date) This Task Order No. 2 is effective as of 17 March 1987. IN WITNESS WHEREOF, this AGRUMENT is executed by the Mayor and City Clerk of the CITY OF REDLANDS , pursuant to action of its City Council authorizing same , and the ENGINEER has caused this AGREEMENT to be executed the day and year first written above. CITY OF REDLANDS JOHN CAROLLO ENGINEERS 1p eB By y Mayor Gail P Lynch Partner L—J U Z— ATTEST -C)ty Clerk- ~ EXHIBIT A TO TASK ORDER NO. 2 w BUDGET HOURS ' Engineering 196 Technical lO Clerical 24 BUDGET TOTAL 235 0 PROJECTED AVERAGE BILLING RATE $24.50 per hour ' 0 TOTAL LABOR EXPENSES $15,964 236 hrs 0 $24.50/hr Times 2.76I Multiplier 0 OTHER JOB EXPENSES Plane - 4 fares @ $I30 $ 520 Car ~ 4 rental days @ $50 200 Job mileage 1,000 mi . @ $.27/mi . 270 Per them 8-days @ $55 ea. 440 $I ,430 $ I°430 ` � REPRODUCTION $ 150 w SUBCONTRACT SERVICES Photogrammetry $IO"OOU 3urvey 5~000 15,000 TOTAL BUDGET $32=544 Say $312,600