HomeMy WebLinkAboutContracts & Agreements_15-1989_CCv0001.pdf � ° AGREEMENT TO FURNISH ENGINEERING SERVICES FOR REDLANDS WASTEWATER TREATMENT PLANT EXPANSION TASK ORDER NO. 12 OPERATIONAL ASSISTANCE NITROGEN BENCH/FULL SCALE PILOT WORK This AGREEMENT is made and entered into as of this 21st day of Febru a , 1989* by and between City of Redlands, hereinafter referred to as "OWNER" and John Cdr0110 Engineers, hereinafter referred to as "ENGINEER" In consideration Of the mutual promises, covenants and conditions hereinafter set forth, the parties d0 hereby agree as follows: SECTION 1 (Purpose) The purpose of this Task Order is to authorize and direct the ENGINEER to proceed with Certain "ADDITIONAL FEE SERVICES" as described in SECTION 2(E) Of the January, 1987 AGREEMENT, and as more specifically described below. SECTION 2 (Scope of Work) A. SERVICES PROVIDED BY ENGINEER _ l. Characterize Existinq Operation, Evaluate Data. Additional information w0V|O be 0DtalngU to determine a mass balance and measurement of several process flows not now being monitored. JCE would work with the City's staff to determine these flows. The SRT^s would be calculated for past operation. The data would be then analyzed to qua ntifv the performance of the exist ing denitrification process. The analysis Of the operational parameters would establish the RAS flows, anoxic reactor detention times and ML33 concentrations LO be Used in the parallel bench scale pilot test. 2. Parallel Bench Scale Pilot —Test. The test would be performed JOlOT|y by JCE and Dr~ Di�ve SteDsel Of the University of Washington. The testing goal would be to determine the specific denitrification rate. 3. Prepare Interim Report. The report would present the results of the exlstlng operation and the bench scale tests. The specific 2/I4/88 -1- F02990D.20 denitrification rate would be used to determine the optimum size of an anoxic reactor within the existing nitrification basins. The report would establish the tentative design criteria. 4. Prepare Equipment Specifications and Advise City Staff in It 's Installation. JCE would determine the number, lo_cation and size of mixers needed in the anoxic reactor and would advise the City as to the best way to get electrical power to the mixers. JCE would prepare detailed specifications for City to purchase submersible mixers and flow meters. JCE would provide installation sketches for equipment, as may be required. 5. Monitoring Full Scale Testing. JCE would visit the plant on a weekly basis during the four month full scale testing period to assist the operational staff. During the visits, the operational data would be monitored and reviewed. 6. Evaluate Data, Confirm Critical Design Criteria, Determine Capacity of Existing Facilities. Usingtheoperational data from the full scale winter testing, JCE would establish the design criteria for the anoxic reactor and nitrification basins. The capacity of the existing facilities for present and possible future nitrogen standards would be determined. 7. Prepare/Present Fi nal Report. A summary of all the full scale and pilot testing work would be prepared and submitted as a final report. Presentations would be made to the City and staff as required. B. SERVICES/WORK TO BE PERFORMED BY THE CITY 1. Perform all chemical analysis for the full scale testing. 2. Perform BODS and suspended solids tests for the bench scale tests. 3. Purchase and install the required mixers and flow meters. 4. If necessary, modify piping to create internal recycle flow. 5. Modify the aeration system as needed to provide optimum aeration and scum control . C. SERVICES PROVIDED BY OTHERS Provide for outside services necessary to complete the bench scale testing work. 1. Sanitary Consultant. Provide for services of Dr. Dave Stensel to assist in evaluation of bench scale testing effort. 2/141/89 -2- F02990D.20 � � � ^ � SECTION 3 (Time of Performance) The scope of work presented herein assumes that all work would be complete by ]l March 1990. Should the scope of work material change Or go beyond the above date, a revision to this task order may be required to reflect the appropriate costs. SECTION 4 (Payment) Payment to the ENGINEER for services performed under this Task Order shall be as provided for 1n SECTION 3B Of the January 1987 AGREEMENT. Payment for services under this Task Order shall be based DV the ENGINEER'S Direct Salary times d Multiplier. The Multiplier for this Task Order shall be 2.810. A cost ceiling of Forty Four Thousand Five Hundred Dollars /$44,500\ is hereby established for the envisioned work, and will not be exceeded except as provided for in SECTION 3 of the January 1987 AGREEMENT. Exhibit A and B is attached hereto and reflects the above costs. Direct job expense would be billed at the actual invoice cost. ENGINEER agrees that at the point 75-percent Of budgeted CU5tS have been expended, the ENGINEER will notify the OWNER in writing, including a brief report on 'Ob status, percent complete, analysis of budget, and envisioned expenses to complete the contractual effort. SECTION 5 (Effective Date) This Task Order No. 12 is effective DS of 15 February 89. IM WITNESS WHEREOF, this AGREEMENT is executed by the Mayor and City Clerk of the CITY OF REDLANDS, pursuant to dCt1OD Of its City COUDC1l authorizing same, and the ENGINEER has caused this AGREEMENT to be executed the day and year first written above. CITY OF REDLAND5 JOHN CAROLLO ENGINEERS -^ JL 2 - V1 Mayor 'Gail-'P nch Par�4r A T T E ST ' 2/14/89 -3- F02990D.20 EXHIBITATO TO TASK ORDER NO. 12 PROPOSED BUDGET Direct Labor - 525 hours @ $27.77 per hour $14,579 Direct Labor, Indirect, Profit @ 2.810 40,967 Direct glob Expense 0 Testing/Travel (Dave Stensel ) $2,000 s Computer 20 hrs. @ $15/hr. 300 • CADD 5 hrs. @ $25/hr. 125 • Plotter 2 hrs. @ $35/hr. 70 • Reproduction 2-sets reports 1,000 $3,495 Total Budgeted Expense 44,462 Say $44,500 BICE 2/14/89 F02990D.20 ` � ~ ^ . " EXHIBIT 8 TO TASK ORDER NO. 12 ESTIMATE OF MANHOUR3 Tasks Employee Classification Work Scope PPM E ET WP_ l° Characterize existing 4 40 O 12 O 56 operation, evaluate data 2- Parallel bench scale 2 48 O 5 O 55 pilot test 3. Prepare interim report 4 40 O 24 12 OD 4. Prepare equipment 3 40 48 O 5 yh specifications. Assist the City with installa- tion 5. Monitor full scale 8 72 O 0 O 80 testing O. Evaluate data, confirm 16 50 O 16 U 82 critical design cri- teria, determine capa- city Of existing faci- lities 7. Prepare/present final 4 48 U 8 18 76 report 41 338 48 85 33 525 JCE 2/14/89 F02990D.20