Loading...
HomeMy WebLinkAboutContracts & Agreements_44-1983_CCv0001.pdf � ^. JOHN P a rifle ra LLO J"".^ c°. 'Q06-mr,. ""^ps ENGINEERS ~~~~ Hom/x,^z - wwLwm�EE^c^ a".��,�~�yr.ps ~ =� "mwmwv^uno^ ' vw^u^ r^ ps rw�o° ^z ^�. a "°^=^~E pE, s ^°"lar° December 2, 1983 F02603B1.2 o ^~e ~E, �,s Mr. John Donnelly o��n-sy^== P� � � ,~~~~ ^""^'e Director of Public Works ` �"'`c ���pc City 0f Redlands �, pe . 30 Cajon ` ~ � �+ ~ u,,s �=,~"" �, v�* Redlands , CA 92373 Subject : Proposal for Engineering Services Wastewater Treatment and Disposal Facilities 1983 Nitrification Basin Upgrade Services During Construction Dear Mr, Donnelly: Thank you for the opportunity to submit this proposal to perform ser- vices during construction of the Nitrification Basin Upgrade project. Our scope of work, estimated budget, and schedule to perform the ser- vices you desire are as follows: SCOPE OF WORK I. Review Submittals and shop drawings for compliance with the Plans and Specifications. 2. Perform periodic, technical observation of construction as requested by the CITY. 3. Review laboratory, shop and mill test reports of material and equipment. 4. Review the CONTRACTOR'S monthly partial payment and final payment requests prior to Submittal to CITY. 5. Review CONTRACTOR'S schedule for completeness and adherence with the contract construction period. O. Assist the CITY in testing and a final inspection of facili - ties constructed for adherence to the requirements of the Plans and Specifications. 7. Prepare construction record drawings from infonnation pro- vided by CONTRACTOR. 8. Prepare an amendment to the O&M Manual for the treatment plant aeration system. 9. Assist with Start-up of new facilities. 10840wAnwsa^,Eoussv/rs100 roowrwwVALLEY,CALIFORNIA 92mo rELspxowE .n+963-y35` EXHIBIT A BUDGET ESTIMATE LABOR HOUR ESTIMATE Estimated Description of Work Labor Hours 1. Review Submittals 5 @ 8 hrs. ea. 40 2. Construction Observation Two weeks at start 80 Periodic visits : 2/week for six weeks = 96 Final Inspection & Start-up 40 216 3. Miscellaneous Tasks 20 Review partial payments, review schedule, review shop tests, etc. 4. Prepare O&M Manual Addendum 80 Subtotal 356 Estimating Contingency 34 Total Labor Hour Estimate 390 BUDGET ESTIMATE 390 hours x $46/hour* = $17,940.00 *(Estimated average hourly rate; the actual rate will depend on the staff who perform the work. ) A Mr. John Donnelly City of Redlands December 2, 1983 Page Two BUDGET AND SCHEDULE Our fee for performing the services described herein would be based on our actual hours worked and our actual salary costs plus 104 percent for overhead and profit, plus direct expenses. The estimated cost for performing the services is a not-to-exceed fee of $17,940.00. This fee is based on the manhour budget presented in Exhibit A and a construc- tion schedule of 90 days. The estimated cost will not be exceeded unless there is a change in scope of work or a change in the construction schedule which increases the construction duration beyond 90 days. Changes are subject to the approval of the CITY. If you wish to accept this proposal , please sign below and return one copy to us. We are pleased to have the opportunity to submit this proposal and look forward to working on the completion and operation of this Phase of your energy conservation program. Very truly yours, JOHN CAROLLO ENGINEERS K-1 jGail P. Lynch GPL:lc Enclosure The City of Redlands hereby accepts this proposal By: 04( TITLE: . Mayor of the City of Redlands DATE: December 14, 1983