Loading...
HomeMy WebLinkAboutContracts & Agreements_3-1957A'GREP -', E, �132: Thio agreennnL for the construction of sanitary sewers for the Gity of Redlands as described in detail in the plans and spewification3 entitled "Sowth. !venue Sever, Units 1 and M, for cntrws ndd hth daywhhwaen 5 of February, 107, to 11M JOITNSON by the GITY OF REDLANDS, a corporation, made �Lrzu entered into this day A."' , 1957, by the WITY OF REBLATTIDS and L101D ft. jOENSON, upon the terms and conditions hereinafter set forth: The MY OF REDLAM agroes to '-wle c0,Itra(;t of 413,377-00, whidla waount was stated as the total price for the construction of Units 1 and !I of the "South Avenue Sewei�" in the bid submitted by ILOID R. jOHNSON to the Cit LY COD-ncil of t-he, City of Redlands., California, when bids were opened Febimaxy 5. 1957, said bid subsequently being accepted and the contract being awarded to LEM R. LLOYD R. JOHNSOM, in compliance with the plans and pecifications BaT the construction of "South Avenue Sewer, Units 1 and M and the other docupents relating thereto and King familiar with the terms ol' the conLract, th� local oonditions affeMME the performance of the contract and the cost of the work at the place Khere the Kcrk is to be done, and with the plans h,ere-by 1, To perform, within the time stipulated, the contrach including all (�," iltz conjpon;-�,,.nt parts and everything required to be performed, and to provide and furnish any and all of the labor, materials, tools, equipment, and all utilit and transportation services necessary to perform the contract and complete in a workmanlike manner all of the work covered by the contract in connection with the project identified as "SOUTH AVENUE SEWER", at the following prices, to sit: -Taal UNIT -1 - 12-Inch ExtTa %T" 276 linear feet @ seven dollars and fifty cents Per ft, (47,50/10. ft.) TOTAL FEIGE b.) 12-Kch Extra Strength Vitrified Clay Pipe Line encased in Class A concrete ccgp2eta, Fifteen linear feet , fifteen dollars and no cents per !%. ft. (415.00/lin. ft.) 1900110 S-Inch plol, Strength vitrified Clay T lete ,y Llie coi�q,) 2038 linear feet 0 fOur dollars and no cents per lin, *3,152.00 n. (14.00/lin. ft.) d,) Standard Precast Reinforced Concrete SCr klayll'-ole� cce�"T'-lete-. 9 each I two handred dollars and no ceKs cach $1,00no Q200.00 na.� WAL UNIT 1 UNIT 1T aj P.jnch Extra Strength Vitrified Olay Fipe Line comriete 40 linear feet I four dollars and no cents per Kn. ft. (11,00/vin. ft.; b.) Standard Precast Reinforoed Concrete Sewer Manholes MOW% 1 eaeb @ two hundred dollars and no cents each (0200.0n ea.) qwo.w TOTAL UNIT 1: 11,160.00 TOTAL UNITS 1 L 11 613,377-00 2. To cannance the scit un&r the said contract within fourteen CIL) days after, notice ly the CITY OF REDLAADS to the Contractor to Proceed vith the sort, and to complete the work in one hundred (100) calendar jayz from and after W contracting parties herein, to wit, LLOTD R. anal um OF RE11WIS, agree to comply vith all the '7=f -Uh'e and speol- ficaticns entitled "SOUTH AVENUE SELER, Units I and 17", on file in the office of the City Glerk of the City of Redlands, Californj% and agree to incorporate said Plans and Specifications by reference into "Llais a�;reerent, including per- formance of the work, the furnishing of labar and materials in the construction ef the York, the Totice of Contractors, the Proposal, Plans, Specification, special provIsions, and Contract Bonds and also any and all supplemWal agreements - 2 - amending or extending the work or required for completion in a substantial and acceptable mariner except as may be otherwise agreed to by written contract between the parties. APPROVED FOR FORM EdwaFd F. Taylor City Attorney Mic LLOYD R. JOHNSON OFFICE OF CITY ENGINEER - CITY OF REOLAN05 - CALIFORNIA March 19, 19-7 Lloyd R. Johnson 800 hest Foothill Doulevard Rialto, California Subject: Extra work on Manhole I,'o, 0., South Avenue Seger Dean Air. Johnson: Reference is made to Article 4.3 of Section %, City of Redlands plans and specifications for South Avenue Sewer now under construction. You are hereby ordered to proceed with the construction of the extra wort, on Manhole Ho. 0. that of installing a base under said manhole according to the dimensional and specifications of the attached plan "South Avenue Sewer Line Manhole No, 0 Repair Tian". All work shall be done according to the Standard Specifications of the City of Redlands,to the satisf,:ction of the Engineer and at the total cost of One lHundred and 'Twenty-five dollars (�;125.00). PEJ:Ir Very troy ours, PAn E. OHMNSON City Engineer _ � t. �. - awl l�� _mow• I, the undersigned contractor, have given careful consideration to the extra work proposed and hereby agree„ if this proposal is approved, that we will provide all equipment, furnish all materials, and perform all services necessary for the work above specified and will accept as full payment therefore the prices shown above. By reason of this proposed change 0 days extension of time will, be allowed.� /i Accepted, Date Zo lln Contractor