Loading...
HomeMy WebLinkAboutContracts & Agreements_110-2008_CCv0001.pdf AGREEMENT TO PROVIDE LANDFILL GAS ENGINEERING AND REPORTING SERVICES FOR THE CALIFORNIA STREET LANDFILL This agreement for the provision of professional consulting services for Landfill Gas Engineering and Reporting Services for the California Street Landfill ("Agreement") is made and entered into this 15th day of July, 2008 ("Effective Date"), by and between the City of Redlands ("City") and SCS Field Services ("Consultant"). City and Consultant are sometimes individually referred to herein as a "Party" and, together, as the "Parties." In consideration of the mutual promises contained herein, City and Consultant agree as follows: ARTICLE I - ENGAGEMENT OF CONSULTANT 1.1 City hereby engages Consultant to perform professional consulting services in connection with landfill gas engineering and reporting services for the California Street Landfill (the "Services"). 1.2 The Services shall be performed by Consultant in a professional manner, and Consultant represents that it has the skill and the professional expertise necessary to provide the Services to City at a level of competency presently maintained by other practicing professional consultants in the industry providing like and similar types of Services. ARTICLE 2 - SERVICES OF CONSULTANT 2.1 The Services which Consultant shall perform are more particularly described in Exhibit "A," entitled "Scope of Services," which is attached hereto and incorporated herein by this reference. 2.2 Consultant shall comply with all applicable Federal, State and local laws and regulations in the performance of this Agreement including, but not limited to, the Americans with Disabilities Act, the Fair Employment and Housing Act and all applicable Labor Code and prevailing wage laws. ARTICLE 3 - RESPONSIBILITIES OF AGENCY 3.1 City shall make available to Consultant information in its possession that may assist Consultant in performing the Services. 12 City will make reasonable provision for Consultant to enter upon City-owned property, as required by Consultant, to perform the Services. 3.3 City designates Gary van Dorst as City's representative with respect to performance of the Services, and such person shall have the authority to transmit instructions, receive information. interpret and define City's policies and decisions with respect to performance of the Services. ARTICLE 4 -PERFORMANCE OF SERVICES 4.1 Consultant shall perform the Services in a prompt and diligent manner and in accordance with the schedule set forth in Exhibit "B," entitled "Project Schedule," which is attached hereto and incorporated herein by reference. 4.2 At any time during the term of this Agreement, City may request that Consultant perform Extra Services. As used herein, "Extra Services" means any work which is determined necessary by City for the proper completion of the project or work for which the Services are being performed, but which the Parties did not reasonably anticipate would be necessary at the time of execution of this Agreement. Provided the Extra Work does not exceed twenty percent (20%) of the compensation to be paid by City to Consultant for the Services, such Extra Work may be agreed to by the Parties, by written amendment to this Agreement, executed by City Manager. Consultant shall not perform, nor be compensated for, Extra Work without such written authorization from City. ARTICLE 5 - PAYMENTS TO CONSULTANT 5.1 The total compensation for Consultant's performance of the Services shall not exceed the amount of One Hundred, Thirty-six Thousand, Eight Hundred and Twenty Dollars ($136,820). City shall pay Consultant on a time and materials basis up to the "not to exceed" amount in accordance with Exhibit "C," entitled "Project Costs," and based on the hourly rates shown in Exhibit "D," both of which are attached hereto and incorporated herein by this reference. 5.2 Consultant shall submit monthly invoices to City describing the work performed during the preceding month. Consultant's invoices shall include a brief description of the Services performed, the dates the Services were performed, the number of hours spent and by whom, and a description of reimbursable expenses, if any. City shall pay Consultant no later than thirty (30) days after receipt and approval by City of Consultant's invoice, provided the Services reflected in the invoice were performed to the reasonable satisfaction of City in accordance with the terms of this Agreement. H:'! G REFkIENTS`,SCS\AGRF EMENT.DOC A 5-3 All notices shall be given in writing by personal delivery or by mail. Notices sent by mail should be addressed as follows: Agency Consultant Gary van Dorst, Director SCS Field Services Quality of Life Department Carl Cortez, Project Manager City of Redlands 10300 Fourth Street, Suite 200 35 Cajon Street Rancho Cucamonga, CA 91730 P.O. Box 3005 (mailing) Redland, CA 92373 When so addressed, such notices shall be deemed given upon deposit in the United States Mail. Changes may be made in the names and addresses of the person to who notices and payments are to be given by giving notice pursuant to this section 5.3. ARTICLE 6 - INSURANCE AND INDEMNIFICATION 6.1 Certificates and Endorsements. All insurance required by this Agreement shall be maintained by Consultant for the duration of its performance of the Services. Consultant shall not perform any Services unless and until all required insurance listed below is obtained by Consultant. Consultant shall provide Agency with certificates of insurance and endorsements evidencing such insurance prior to commencement of the Services. All insurance policies shall include a provision prohibiting cancellation of the policy except upon thirty (30) days prior written notice to Agency. 6,2 Workers Compensation and Employer's Liability. Consultant shall secure and maintain Workers Compensation and Employer's Liability insurance throughout the duration of this Agreement in accordance with the laws of the State of California, with an insurance carrier acceptable to Agency. 6.3 Hold Harmless and Indemnification. Consultant shall defend, indemnify and hold harmless Agency and its elected officials, employees and agents from and against any and all claims, losses or liability, including attorneys fees, arising from injury or death to persons or damage to property occasioned by Consultant's and its officers', employees' and agents' sole negligent acts or omissions in performing the Services. 6.4 Assignment. Consultant is expressly prohibited from assigning any of the Services without the express prior written consent of Agency. In the event of agreement by the Parties to assign a portion of the Services, Consultant shall add the assignee as an additional insured and provide Agency with the insurance endorsements required by this Agreement prior to the performance of any Services by the assignee. Assignment does not include printing or other customary reimbursable expenses that may be provided for in this Agreement. �4 ,AGRI-'EMENTSkSCS\A(iREE,MT.DOC 6.5 Comprehensive General Liability Insurance. Consultant shall secure and maintain in force throughout the term of this Agreement comprehensive general liability insurance with carriers acceptable to Agency. Minimum coverage of One Million Dollars ($1,000,000) per occurrence and Two Million Dollars ($2,000,000) aggregate for public liability, property damage and personal injury is required. Agency shall be named as an additional insured. Such insurance shall be primary and non-contributing to any insurance or self-insurance maintained by Agency. 6.6 Professional Liability Insurance. Consultant shall secure and maintain professional liability insurance throughout the term of this Agreement in the amount of One Million Dollars ($1,000,000) per claim made. 6.7 Business Auto Liability Insurance. Consultant shall have business auto liability coverage, with minimum limits of One Million Dollars ($1,000,000) per occurrence, combined single limit for bodily injury liability and property damage liability. This coverage shall include all Consultant owned vehicles used in connection with Consultant's provision of the Services, hired and non-owned vehicles, and employee non- ownership vehicles. Agency shall be named as an additional insured. Such insurance shall be primary and non-contributing to any insurance or self insurance maintained by Agency. ARTICLE 7 CONFLICTS OF INTEREST 7.1 Consultant covenants and represents that it does not have any investment or interest in the real property that is the subject of the Services and shall not acquire any interest, direct or indirect, in any other source of income, interest in real property or investment which would be affected in any manner or degree by the performance of Consultant's Services. Consultant further covenants and represents that in the performance of its duties hereunder, no person having any such interest shall perform any Services under this Agreement. 7.2 Consultant agrees it is not a designated employee within the meaning of the Political Reform Act because Consultant; A. Does not make or participate in. (i) the making or any governmental decisions regarding approval of a rate, rule or regulation, or the adoption or enforcement of laws; (ii) the issuance, denial, suspension or revocation of permits, licenses, applications, certifications, approvals, orders or similar authorizations or entitlements; (iii) authorizing City to enter into, modiA,or renew a contract; H ,. c R E EMEN rsk cs AxrrMENT.DOC (iv) granting City approval to a contract that requires City approval and to which City is a party, or to the specifications for such a contract; (v) granting City approval to a plan, design, report, study or similar item; (vi) Adopting, or granting City approval of, policies, standards or guidelines for City or for any subdivision thereof. B. Does not serve in a staff capacity with City and in that capacity participate in making a governmental decision or otherwise perform the same or substantially all the same duties for City that would otherwise be performed by an individual holding a position specified in City's Conflict of Interest Code under Government Code section 87302. 7.3 In the event City officially determines that Consultant must disclose its financial interests by completing and filing a Fair Political Practices Commission Form 700, Statement of Economic Interests, Consultant shall file the subject Form 700 with the City Secretary's office pursuant to the written instructions provided by the City Secretary. ARTICLE 8 - GENERAL CONSIDERATIONS 8.1 Attorneys' Fees. In the event any action is commenced to enforce or interpret any of the terms or conditions of this Agreement the prevailing Party shall, in addition to any costs and other relief, be entitled to the recovery of its reasonable attorneys' fees, including fees for the use of in-house counsel by a Party. 8.2 Prohibition Against Assignment. Consultant shall not assign any of the Services, except with the prior written approval of City and in strict compliance with the terms, and conditions of this Agreement. 8.3 Documents and Records. All documents, records, drawings, designs, cost estimates, electronic data files, databases and other documents developed by Consultant in connection with its performance of the Services, and any copyright interest in such documents, shall become the property of City and shall be delivered to City upon completion of the Services, or upon the request of City. Any reuse of such documents, and any use of incomplete documents, shall be at City's sole risk. 8.4 Independent Contractor Status. Consultant is for all purposes under this Agreement an independent contractor and should perform the Services as an independent contractor. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant's employees, except as herein set forth. Consultant shall supply all tools and instrumentalities required to perform the Services. All personnel employed by Consultant are for its account only, and in no event shall Consultant or any personnel retained by it be deemed to have been employed by City or engaged by City for the DOC account of, or on behalf of City. Consultant shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent, nor shall Consultant have any authority, express or implied, to bind City to any obligation. 8.5 Termination. A. Unless earlier terminated, as provided for below, this Agreement shall terminate upon completion and acceptance of the Services by City. B. This Agreement may be terminated by City, in its sole discretion, by providing five (5) business days prior written notice to Consultant (delivered by certified mail, return receipt requested) of City's intent to terminate. C. If this Agreement is terminated by City, an adjustment to Consultant's compensation shall be made, but (1) no amount shall be allowed for anticipated profit or unperformed services, and (2) any payment due Consultant at the time of termination may be adjusted to the extent of any additional costs to City occasioned by any default by Consultant. D. Upon receipt of a termination notice, Consultant shall immediately discontinue its provision of the Services and, within five (5) days of the date of the termination notice, deliver or otherwise make available to City, copies (in both hard copy and electronic form, where applicable) of any data, design calculations, drawings, specifications, reports, estimates, summaries and such other information and materials as may have been accumulated by Consultant in performing the Services. Consultant shall be compensated on a pro-rata basis for Services completed up to the date of termination. 8.6 Books and Records. Consultant shall maintain any and all books, ledgers, invoices, accounts and all other records and documents evidencing costs and expenses related to the Services for a period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant pursuant to this Agreement. Such books shall be available at all reasonable times for examination by City at the office of Consultant. 8.7 Entire Agreement/Amendment. This Agreement, including the Exhibits incorporated herein by reference, represents the entire agreement and understanding between the Parties as to the matters contained herein, and any prior negotiations, written proposals or verbal agreements relating to such matters are superseded by this Agreement. Any amendment to this Agreement shall be in writing, approved by City and signed by City and Consultant. 8.8 Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of California. H A(!Rf !AIINTS SCS IAGIREEMENT DOC 8.9 Severability. If one or more of the sentences, clauses, paragraphs or sections contained in this Agreement is declared invalid, void or unenforceable by a court of competent jurisdiction, the same shall be deemed severable from the remainder of this Agreement and shall not affect, impair or invalidate any of the remaining sentences, clauses, paragraphs or sections contained herein, unless to do so would deprive a Party of a material benefit of its bargain under this Agreement. IN WITNESS WHEREOF, duly authorized representatives of the City and Consultant have signed in confirmation of this Agreement. THE CITY OF REDLANDS BY: r-lzr'; on Harrison, Mayor Attest: City'Perk SCS FIELD SERVICES By:� Galen R-toyan, Sr. Vice Prt sident H:AGR EEMENTS',SCSkAGREEMENT.DOC EXHIBIT A SCOPE OF SERVICES INTRODUCTION This project will consist of three work tasks as described below to assist the City of Redlands with issues related to the landfill gas (LFG) collection system at the California Street Landfill. The proposed tasks are; Monitoring Support and Horizontal Expansion Support. TASK 1: Monitoring Support This task includes assisting the City of Redlands staff with monitoring of the LFG collection system, including preparation of reports, maintenance of the LFG database and technician assistance. The major items of work are described below: 1. Monitoring Assistance - This item consists of providing assistance to City staff when conducting the required SCAQMD monitoring and adjusting and balancing the landfill gas collection system, balancing as needed to support the LFG recovery facility. 2. Annual Inspection and Maintenance - This item consists of conducting an annual inspection of the LFG collection system and flare station. A report of recommendations will be submitted to the City. This item also includes assisting the City staff in conducting annual maintenance tasks. Two annual events are included in this scope of work. 3. SCAQMD Report Preparation - This item consists of assisting the City with preparation of the SCAQMD Quarterly report. Field data will also be reviewed monthly as part of this item. 4. Miscellaneous Regulatory Support - This item consists of support as needed by the City for assistance with regulatory response and negotiation. 5. Flare Source Test Assistance - This item will consist of providing support to the City during the annual flare source testing. Assistance will include assistance with procurement of the testing company, review of the source test protocol, observation of testing, and review of the test report. Two annual events are included in this scope of work, 6. SCAQMD Lab Analysis - This item provides a budget for the cost of outside lab analysis of probe and surface emissions samples. 7. Materials Purchase - This item provides a budget for small, non-recurring material purchases related to construction or maintenance. Materials will be provided on an as needed basis at the request of the City. H-AG DOC 8. This task consists of items of work related to design of additions to the LFG collection system as part of landfill cell construction. The major items of work for this task are described below: • Landfill Expansion LFG System - This item will consist of providing conceptual design and construction of additions to the LFG collection system as needed in conjunction with the landfill expansion design, particularly the construction of additional pipeline and horizontal LFG wells. DJ%I,,Agree/SCS Field Services 5119/08 11:26 a.m. EXHIBIT B PROJECT SCHEDULE PROJECT SCHEDULE TASK COMPLETION DATE Monitoring Support October 31, 2010 Horizontal Expansion October 31, 2010 DJVM/Agree'SCS Field Ser ices %19'08 11:26 a.m. ATTACHMENT C PROJECT COSTS Please see the succeeding page from SCS Field Services proposal. DW/AgreeiSCS Field Services 5/19x38 08 11:26 a.m. City of Redlonds SCS Engineers Project Fees California Street Landfill Category Task Monthly Annual Rate Annual Hours Hours Subtotal Monitoring Support Monitoring Assistance 24 Hours 288 Hours $68/Hour $19,584 Technical Assistance Upon Upon Standard Fee 0- Request Request Schedule Flare Source Test -- 20 Hours $160/Hour $3,200 Option:Annual Source Test By Qualified Subcontractor (SCEC). Not Cost plus basis **$8,200.50 included in annual estimate Annual inspection and Maintenance -- 32 Hours $68/Hour $2,176 SCAQMD Report Preparation and _ $2,500/Quarter $10,000 Data Review Miscellaneous Regulatory Support Upon Upon Request Standard Fee $5,000 Request Schedule Title 27 Probe Analysis __ __ Standard Fee Budget Estimate: schedule $10,000 Mileage/Trude __ __ Standard Fee Budget Estimate Schedule $5,560 SCAQMD lab Analysis. Taking of Estimated 12 Budget Estimate Samples and Review of lab Analysis -- -- samples annually $3,840 Only. City to pay lab fees. @ $320/sample Miscellaneous Materials Purchase Upon Upon Request Request Cost Plus Basis -0- Subtotal- Monitoring Support $59,360 Horizontal Exponsion Engineering design Request -- See note below $15,000 LFG System Construction Budgetary Horizontal Collectors Estimate 200 LF $3,100**** $15.50/LF * Budget estimate only. Not included in annual cost estimate. **Estimated collector length. No way to determine actual length of horizontal collectors at this time. ** Not included in annual cost estimate. Option only. ATTACHMENT D FEESCHEDULE Please see the succeeding pages representing the Consultant's Standard Fee Schedule: DJ%A'IAgree/SCS Field Services 5/19/08 11:26 a,m, SCS FIELD SERVICES STANDARD FEE SCHEDULE Technical Field Personnel Rateiliour Laborer.................................................................................................................................. ........46 Technician......................................................................................................................................57 FusionTechnician................................................................................................................ .........57 EquipmentOperator.................................... ..................................................................................62 Sr. Technician................................................................ .......... .......... ........... ........................68 Foreman.................................................................. ......................................................................72 PlantOperator............................................................. .................................... .......................74 Superintendent............................................ ........................................................_.......................95 Sr. Superintendent............................................................................... .............................110 Management/Support Personnel Rate/Hour Secretarial ......................................................................................................................................45 ProjectAdministrator.....................................................................................................................65 Designer/Drafter.............................................................................................................................75 ProjectProfessional ........ ............................................................................................................110 Senior Project Professional..........................................................................................................130 ProjectManager................ ....... .............................................................. ................. .................160 Regional Manager/Project Director...................................... ............................ .........................195 GENERAL TERMS: 1. Labor rates are in effect until July 31, 2008. Any work performed after that date is subject to a new Standard Fee Schedule. 2. The above rates include salary, overhead, and profit. Other direct charges, such as subcontractors, construction equipment, materials, air travel, freight, auto rental, permits, fees, taxes, tolls, and other costs incurred for the project will be billed at cost plus 15 percent. The cost of equipment owned by SCS Field Services will not be subject to administrative mark-up. Automobile mileage cost is $0.55 per mile. Trucks will be charged at $12.50/hour, not to exceed 8 hours/day ($100.00). (No administrative mark- up will be applied to charges for company owned vehicles). 3. Invoices will be prepared monthly for work in progress, unless otherwise agreed. Invoices are due and payable upon receipt. Any invoices not paid within 30 days of receipt are subject to a service charge of 1.5 percent per month on the unpaid balance. Standard Fee Schedule July 15, 2008 Page 2 4. Rates for Principals may be negotiated OD a project specific basis. For special situations, sticli as expert testimony or international assignments, hourly rates will be on an individu- ally negotiated basis. 5. On short term or one time assignments, services which require less than eight (8) hours, but more than four(4) hours will be billed at eight (8) hours. A minimum of four (4) hours will be billed for any service requested which is not conducted in conjunction with an on-going, project -outs after normal work hours) and will be charged -(Yo _. J (including call portal-to-portal, from SCS Field Services offices. 6. For operation, construction, and/or repair work performed on weekends and"or nights (if work exceeds 8 hours in a day), the above rates will be marked up 40 percent, For work performed on Company recognized holidays or beyond 12 hours in a day, the above rates w ill b I e marked up 70 percent, 7. These rates are based on non-union, non-prevailing wage scales. 8. For long-term on-site project assignments, rates may be discounted on an individually negotiated basis. Long-term on-site personnel are permitted to return home every four (4) weeks. Travel expense shall be invoiced to Client at cost plus 15 percent. 9. Costs for equipment and analysis will be billed in accordance with the rates contained on SCS Field Services Standard Fee Schedule for Equipment and Analysis. H .agecmenis`,SCS%Fee Schedule 2007-8(2),doc � . SCS FIELD SERVICES STANDARD FEE SCHEDULE FOR EQUIPMENT AND ANALYSIS (Effective August D,2007 through July 3&, 2008) GEM500 Gas Analyzer.....................................................................................................$ ll5/day � GEM 2000 Gas Analyzer^—'^^'''''~'~~—^^^^'~^~''~—.~............—..^....-...—^..~$ 185/day 142SGas Pod........................................................................................................................$ 10/dny SEM500 Emissions Monitor.............................................................................................$ 185/day () Rae Gas Analyzer(\,/lT S/C ._~__~,.,.---_----~..—.—..~ 50/day MicroMax Gas .......................................................... 50/day Gas-Tech Tri1ectOrGas Analyzer 02/14. ..................................................... Magnehelic Pressure Set......................................................................................................$ 20/d4y KurzAir Velocity Meter......................................................................................................$ �5/6ov Digital � Readout —~.—..--.~.~...--..—.—._---.--.—._--.^.--_ 25VOay GosteohDetector .............. ............................................................................$ }5/eaoh MetalBellows Vacuum Pump............................................................................................. 35/day Barpunch............................................................................................................................. {O/dnm FisherM95 Metal Detector.................................................................................................. 30/dxv Dewatering Pump —.------.--.—..---.~-------------- 45/day TVA Flame Ionization Detector -Daily Rate................. ............................................................................................$ll8/dny -Weekly Rate........................................ ...............................................................$500/neek Rate............................................ .....................................................$}400/uzouth MiriRac700APTD -Daily Rate.................................. ...........................................................................$lAA/Jnv Rate........................................................................................................$4Uo/"eck Rate..................................................................................................$l700/cuooLh Air Sampling Station � -7�oUx {�cU�—.~--..--...--.~~—.—.—.-....._.'--'__—_.—.----.--._ 4u/uuy Rate.............................................................. .........................................$175/neek Transit -Daily Rate..................................................................................................... .........$ }5/Jny Rate � 75/vveek Rate...--.....'^^—'~^^^~''~^~^-^'~—~^-~'^'—~~'--'^~^—'—~—'- ���0/DzODt� _...._...._^—'—^''—'''^'^'--^-^'-~^^''^^~—^^^—~^^~—^—'- .Level -Daily Rate................................................. .,^,.._',,~,,,_~.__.........................$ {5/dmn � 65/week Rate.—.--------^^''---''^—^—~'—^'--~---~'---'—'— �l��/��Dt� -����t��� �a��.---_.....^.^^..,^_._^~.^,,^,.,.,,_,,._,.,.._.,.^^,..,.^,__.,~ Pipe [4ser - T�nJnRate,—.---.-..~--...—.—.—..----._—.--..._---.------ w5v _.. 'uuy - Weekly Rute ...... --.---.----.—''__---' ....... ..... — ....... .......$22u/wceu ����Q�� - R1�e'—.---.—~--'^—'—^`—'`—''—''—`'~'----''—~—~—'—'--- ' � 7���� l�UterTra�ez-------.—_—^_—_________________,___________ ___� % PAS 3000 Air Pnn�n_...--.--------~-----.~_—.._-------._ 25/uay Standard Fee Schedule for Equipment and Analysis August 1, 2007 Page 2 TedlarBag(10 Liter) .............................................................................................................$ 40/ea Non-Contaminating Air Sampling Pump.............................................................................$ 25/day Fyrite Carbon Dioxide Indicator..........................................................................................$ 15/day InterfaceProbe.....................................................................................................................$ 50/day SubmersiblePump...............................................................................................................$ 50/day WaterLevel Indicator ..........................................................................................................$ 25/day TeflonWell Bailer...............................................................................................................$ 10/day Minuteman Drill Rig(excluding operator).........................................................................$60/hour Vacuum Box/Carbon Canister& Blower.............................................................................$25/day ToolTruck..........................................................................................................................$100/day No. 28 P.E. Fusion Machine (2"-8")...................................................................................$150/day No. 14 P.E. Fusion Machine (1"-4").............................. ..... ......$ 80/day ............................... ............ 412 P.E. Fusion Machine (4"-12")......................................................................................$275/day 618 P.E. Fusion Machine and Tool Truck..........................................................................$400/day Trackstar500 Fusion Machine............................................................................................$375/day Sidewinder P.E. Fusion Machine............... ........., .........$100/day ...................................... ................ AirCompressor....................................................................................................................$ 60/day ArcWelder...........................................................................................................................$ 75/day Generator (5000 Watt).........................................................................................................$ 60/day Generator (3500 Watt).........................................................................................................$ 45/day IsolationPinch Off Tools.....................................................................................................$ 60/day Leister Extrusion Welding Gun.........................................................................................$ 120/day PlateCompactor...................................................................................................................$ 75/day Safety Equipment -Tyvek Suit - each......................................................................................................$ 15/ea -Polyethylene suit- each............................................................................................$ 20/ea -Nitrile gloves - per pair............................................................................................$ 15/ea -PVC Gloves - per pair ...............................................................$ 15/ea -Rubber booties - per pair.........................................................................................$ 15/ea -Organic Vapor Cartridges - per pair........................................................................$ 20/ea -Organic Vapor/Acid Cartridges - per pair...............................................................$ 25/ea -Cartridges pre-filters - per pair................................................................................$ 15/ea -Full face respirator- each.......................................................................................$ 25/day -Half face respirator- each................ ... ....... ................., .....$ 20/day -Ventilator/manhole blowers ...................................................................................$ 25/day -Parachute harness...................................................................................................$ 10/day -Tripod ................ ...... ...... ........__.......... S 35/day -SCBA......................................................................................................................$ 35/day CADocuments and Settings"pandorst\Local SettingsJernporary Internet Files oLK 119 Fee Schedule 2607_8(2).doc Standard Fee Schedule for Equipment and Analysis August 1, 2007 Page 3 General Terms: I Rates are in effect until July 31, 2008. Any work performed after that date will be subject to a new Schedule of Fees. 2. Equipment usage rates are exclusive of freight charges to and from the project site. Freight is an additional expense chargeable to the client. 3. Rates for mobile blower/flare stations are exclusive of expenses for mobilization and demobilization, electric line installation, electricity, generators, fuel or permits or weekly routine operation and maintenance. These expenses are charged to the client separately. 4. Rates for pressure and flow measurement devices cover all such devices used at the site. For example, if 3 magnehelics and I manometer are all used for pressure measurement one day at one site, the total charge would be $15/day. 5. Shipping, supplies, equipment rental, materials, vehicle mileage, and other non-labor equipment costs or direct costs are billed at cost plus IS percent. 6. Equipment rented will be charged portal-to-portal from SCS Field Services offices. Renter is responsible for return charges. 7. The cost of equipment owned by SCS Field Services will not be subject to administrative mark-up. CADocuments and Scuingstgvandorst\Local Settings�.Temporary Internet FilesDLK I 191,Fee Schedule 2007.9(2)Aoc