STANDARD PROVISIONS CSE AGREEMENT BETWEEN CLIENT AND CONSULTANT
AGREEMENT ENTERED INTO AT Redlands, C
made this. 24th day of April_ 19 816 by and between_
City of Redlands -
Redeve_lopment_Agency
hereinafter called"client," and HICKS &_ HARI'WICK, INC
hereinafter called "consultant."
Client intends to_---COMPLE'T'E PHASE II _DOWNTOWN REDEVELOP!,,,-]-NT
-- ___
-
hereinafter called"project."
The present record owner is:
Flame: NA
Address:
The lender is if none, state below,!:
Marne: - _ NA -Address: ,-, -
Client and consultant for mutual consideration hereinafter scat forth, agree as follows:
A. Consultant agrees to perform they following services:
-
Preparation- of- Plans & Profiles and Specifications for_the___construction
of PHASE IIS _as outlined on attached Exhibit "B"
B_ Client agrees to compensate consultant for such services as follows:
....,> TO EXt-vvn�..� � 6 � , nnnv v v . i..a.c.i.t ye:r t,.t.r it L.. is.i..a.leu on TYiC.`ttitis�- 1.t ex.`71.Z>
C. Client has read and understands all the standard Provisions of Agreement set forth on
the reverse hereof and the Exhibits hereto, and agrees all Standard Provisions and Exhibits are a l
part of this Agreement and are binding on client. rherr's mutat
Dt Client and consultant agree:that the late payment charge provided for inParagraph 33of
the Standard Provisions of Agreement shall be
--- IN 1NtITNESS WHEREOF, the parties hereto have accepted, made and executed this agreement upon the terms,
conditions, and provisions above stated, the day and year first above, w=ritten.
CONSULTANT-T: HICKS HARZ 'IC , INC. CLIENT: CITY OF R ANZ3S
Sig tures By
:signature;
Nla e Harold _R.__ Hartwick frame Carole Beswick
'Prinu sprint:
Title Secretary- Title Chairman, Redevlop ent Agency
Address PC__ ox__10Vii_ Address Post _Off ice-Box 280
Redlands, CA 92373
April 4, 1986 Redlands, - California 92373
(Date)
Client should mail completed contract to the address shown for consultant
ATheconsultant a to furnish and perfornn servicesm
for iter v__ Exhif t "A"
as outlined in Exhibit t "B" follows:
DESCRIPTION
S` FM (FV-of'ce Ilse}
rro. connt=r: ct# :
1) Prepare topographic map of property.
21 Furnish boundary survey of property,
3) Prepare tentative subdivision map of property.
) Present tentative subdivision map to go-m ' g bodies for consideration and action-
51 Prepa-re final subdivision rasp for recordation.
6) Prepare street plans for construction purposes.
) Prepare sanitary sewer plans for construction purposes.
8) Prepare storm sewer plans for construction purposes.
9) Prepare water distribution system plans for construction.
10" Prepare site grading plan.
1) Prepare plans for any type of off-tract improvement work.
12) Prepare grade sheets for inspectors.
131 Install one set of stakes for rough grading of streets.
1 ) Install one set of stakes for sanitary sewer construction..
15) Install one set of stakes for storm sewer construction.
fa) Install one set of stakes for eater line construction.
1 i) Install one set of stakes for curb and gutter construction.
181 Install one set of stakes for lot grading.
19) Install one set of stakes for defining lot lines for building purposes.
20) Install one set of construction stakes for each type of off-tract improv>ernent work required.
21) After construction and lot grading, install one set of stakes defining lot corners.
22) Install control for setting monuments as called for on final map and set final point on monuments.
23) Furnish all transportation required for the performance of services listed above.
24)
B. The client agrees to compensate consultant for the above named services at follows:
Not to exceed 67 , 000. 00
G In the event this agreement is breached, terminated, cancelled or extra work is required,then consultant shall
be paid per following schedule:
6 CI. per hour for services of I't jCon _jtn t -per hour for sery-ices of
C}• _...per hour for services of $–_ ..per hour for services of
3 • per Dour for services of Draftsman Sper hour for services of
25-- Per hour for services of Jr• r f t;+�m n $--—per hour for services of
per hour for services of _ per hour for services of-----
$18
f _9£1. per hour for services,of?1—Man Survey Parti _ per hour for services of Marr Survey=Part-
_1 18.–per hour for services of3 1Mari Sun-e�•PartV -.,_�.w__per hour for services of fan Survey Pasty
Dote (1) Above schedule is for straight time only and in the case of overtime, the rate charged for ill be
11h times the hourly rates shown and Sundays and holidays at 3 dries the hourly rags shown.
Note (2) Schedule above is also to be adjusted in accordance with Paragraph 35 of the standard provisions
of this agreement,
Form M 82-IB 0 1973 and revised 1976, 19"19 and 1982 by California Counei of CivD Engineers&Land Surveyors
HICKS & HARTWICK, INC.
EXHIBIT "B"
The scope of the work will be the preparation of the Plans & Profiles
and Specifications for the construction of PHASE II, as adopted by
the Redevelopment Agency on April 15, 1986. The design work will
cover Orange Street in its entirety from Redlands Boulevard to
Pearl Street and will include the Shoppers Lane design from Orange
Street, west to Third Street. The work will entail the design of
a storm drain from Redlands Boulevard and Third Street, along Third
Street to Shoppers Lane and along Shoppers Lane to Orange Street
and north on Orange Street to a point south of Stuart Avenue. The
existing storm drain north of Stuart Avenue, as constructed by
CALTRANS, will be utilized for that drainage on Orange Street and
also any drainage intercepted from the east.
The hydrology studies will be for the area south of the Santa Fe
Railroad right of way and east of Orange Street for sizing of the
storm drain that will be constructed from Orange Street to the
existing drain in Redlands Boulevard.
Traffic signal design will be included in the project for Shoppers
Lane as well as Stuart Avenue intersections. The landscape plans
will include both sides of Orange Street and Shoppers Lane, as well
as details for street lights, bollards, tree planting, landscape
irrigation and electrical plan for the new street lights. The work
will also include preparation of Specifications for construction
of that portion of PHASE II limited to Orange Street from Redlands
Boulevard to the south side of the Santa Fe Railroad right of way
and Shoppers Lane.
The fee for this work will not exceed $ 67, 000. 00. The Agency
will be billed on a monthly basis for the work performed. The
fee does not include construction supervision during the construction
phase of the project, nor does it include the construction stakina
necessary for the construction of the project.
The fee does not cover the cost for excavation for underground
utility conflicts, said excavation will be billed at our actual
costs. All printing of Plans and Specifications and any photo-
graphic work necessary will be billed at our costs .