HomeMy WebLinkAboutContracts & Agreements_169-2011_CCv0001.pdf AGREEMENT FOR GEOTECHNICAL SERVICES FOR REDLANDS'
ED HALES PARK IMPROVEMENTS PROJECT
This agreement for geotechnical services for the City of Redlands' Ed Hales Park
Improvement Project("Agreement") is made and entered into this 12th
day of October,
2011 ("Effective Date"),by and between the City of Redlands, a municipal corporation
("City") and Hilltop Geotechnical, Inc. ("Consultant"). City and Consultant are
sometimes individually referred to herein as a"Party" and,together, as the"Parties." In
consideration of the mutual promises contained herein, City and Consultant agree as
follows:
ARTICLE I - ENGAGEMENT OF CONSULTANT
1.1 City hereby engages Consultant to provide geotechnical services for City's Ed Hales Park
Improvement Project(the "Services").
1.2 The Services shall be performed by Consultant in a professional manner, and Consultant
represents that it has the skill and the professional expertise necessary to provide the
Services to City at a level of competency presently maintained by other practicing
professional consultants in the industry providing like and similar types of Services.
ARTICLE 2 - SERVICES OF CONSULTANT
2.1 The Services that Consultant shall perform are more particularly described in Exhibit
"A," entitled"Scope of Services," which is attached hereto and incorporated herein by
reference.
2.2 Consultant shall comply with applicable Federal, State and local laws and regulations in
the performance of this Agreement including, but not limited to, the Americans with
Disabilities Act, the Fair Employment and Housing Act and prevailing wage laws.
ARTICLE 3 - RESPONSIBILITIES OF CITY
3.1 City shall make available to Consultant information in its possession that may assist
Consultant in performing the Services.
3.2 City designates Fred Mousavipour, City's Interim Municipal Utilities and Engineering
Director,or the Director's designee, as the City's representative with respect to
performance of the Sen)-ices, and such person shall have the authority to transmit
instructions, receive information, interpret and define City's policies and decisions with
respect to performance of the Services.
ARTICLE 4 - PERFORMANCE OF SERVICES
4.1 Consultant shall perform the Services in a prompt and diligent manner and in accordance
with the schedule set forth in Exhibit "B," entitled "Project Schedule."
1:'ca\djiiiAgteements',,Hilltop Geotechnical 201 Ldoc I
4.2 During the term of this Agreement, City may request that Consultant perform Extra
Services. As used herein, "Extra Services"means any work that is determined necessary
by City for the proper completion of the project or work for which the Services are being
performed,but which the Parties did not reasonably anticipate would be necessary at the
time of execution of this Agreement. Provided the Extra Services do not exceed twenty
percent(20%)of the compensation to be paid by City to Consultant for the Services, such
Extra Services may be agreed to by the Parties by written amendment to this Agreement,
executed by the City Manager, or duly authorized city official. Consultant shall not
perform,nor be compensated for, Extra Services without such written authorization from
City.
ARTICLE 5 - PAYMENTS TO CONSULTANT
5.1 The total compensation for Consultant's performance of the Services shall not exceed the
amount of Ten Thousand Five Hundred Dollars ($10,500). City shall pay Consultant on
a time and materials basis up to the not to exceed amount, in accordance with Exhibit"C"
entitled"Project Costs," and based upon the hourly rates shown in Exhibit"D," entitled
"Rate Schedule." Both Exhibits "C" and"D" are attached hereto and incorporated herein
by this reference.
5.2 Consultant shall submit monthly invoices to City describing the work performed during
the preceding month. Consultant's invoices shall include a brief description of the
Services performed, the dates the Services were performed, the number of hours spent
and by whom, and a description of reimbursable expenses related to the project. City
shall pay Consultant no later than thirty (30) days after receipt and approval by City of
Consultant's invoice, provided(1)the Services reflected in the invoice were performed to
the reasonable satisfaction of City in accordance with the terms of this Agreement, and
(2)that related expenses, rates and other information set forth in the invoice are
consistent with the terms and conditions of the Agreement.
5.3 Project communications and notices shall be given in writing by personal delivery or by
mail.Notices sent by mail should be addressed as follows:
Citv Consultant
Mr. Bassam Alzanimar, Construction Manager Mr. Mark Hulett
Municipal Utilities and Engineering Dept. President
City of Redlands. Hilltop Geotechnical, Inc.
35 Cajon Street, Suite 15A 786 S. Gifford Avenue
Redlands,CA 92373 San Bernardino, CA 92408
When so addressed, such notices shall be deemed given upon deposit in the United States Mail.
Changes may be made in the names and addresses of the person to who notices and payments are
to be given by giving notice pursuant to this section 5.3.
L\ca1djm1,Agreemen&-J4i11top Geotechnical 201 Ldoc
ARTICLE 6 - INSURANCE AND INDEMNIFICATION
6.1 Insurance. Insurance required by this Agreement shall be maintained by Consultant for
the duration of its performance of the Services. Consultant shall not perform any Services
unless and until required insurance listed below is obtained by Consultant. Consultant
shall provide City with certificates of insurance and endorsements evidencing such
insurance prior to commencement of the Services. Insurance policies shall include a
provision prohibiting cancellation or modification of the policy's coverage limits except
upon thirty(30)days prior written notice to City.
6.2 Workers' Compensation and Employer's Liability. Consultant shall secure and maintain
Worker's Compensation and Employer's Liability insurance throughout the duration of
its performance of the Services in accordance with the laws of the State of California.
6.3 Hold Harmless and Indemnification. Consultant shall defend, indemnify and hold
harmless City and its elected officials, employees and agents from and against claims,
losses or liability, including attorneys' fees, arising from injury or death to persons or
damage to property occasioned by Consultant's and its officers', employees' and agents'
sole negligent acts or omissions in performing the Services.
6.4 Assignment. Consultant is expressly prohibited from assigning any of the Services
without the express prior written consent of City. In the event of agreement by the Parties
to assign a portion of the Services, Consultant shall add the assignee as an additional
insured and provide City with the insurance endorsements required by this Agreement
prior to the performance of any Services by the assignee. Assignment does not include
printing or other customary reimbursable expenses that may be provided for in this
Agreement.
6.5 Comprehensive General Liability Insurance. Consultant shall secure and maintain in
force throughout the term of this Agreement comprehensive general liability insurance
with carriers acceptable to City. Minimum coverage of One Million Dollars($1,000,000)
per occurrence and Two Million Dollars ($2,000,000) aggregate for public liability,
property damage and personal injury is required. City shall be named as an additional
insured. Such insurance shall be primary and non-contributing to any insurance or self-
z:1
insurance maintained by City.
6.6 Professional Liability Insurance. Consultant shall secure and maintain professional
liability insurance throughout the term of this Agreement in the amount of One Million
Dollars($1,000,000)per claim made.
6.7 Business Auto Liability Insurance. Consultant shall have business auto liability coverage,
with minimum limits of One Million Dollars ($1,000,000)per occurrence,combined
single limit for bodily injury liability and property damage liability. This coverage shall
include all Consultant owned vehicles used in connection with Consultant's provision of
the Services,hired and non-owned vehicles, and employee non-ownership vehicles. City
1 ;Ca,(ijm',,agreements,,,Iiiiltop Geotechnical 201 Ldoc 3
shall be named as an additional insured. Such insurance shall be primary and non-
contributing to any insurance or self insurance maintained by City.
ARTICLE 7 - CONFLICTS OF INTEREST
7.1 Consultant covenants and represents that it does not have any investment or interest in
any real property associated with the subject matter of this Agreement or any other source
of income, interest in real property or investment that would be affected in any manner or
degree by the performance of Consultant's Services. Consultant further covenants and
represents that in the performance of its duties hereunder, no person having any such
Z:1
interest shall perform any Services under this Agreement.
7.2 Consultant agrees it is not a designated employee within the meaning of the Political
Reform Act because Consultant:
A. Does not make or participate in:
(i)the making or any City governmental decisions regarding approval of a rate,
rule or regulation, or the adoption or enforcement of laws;
(ii)the issuance, denial, suspension or revocation of City permits, licenses,
applications,certifications, approvals, orders or similar authorizations or entitlements;
(iii)authorizing City to enter into, modify or renew a contract;
(iv)granting City approval to a contract that requires City approval and to which
City is a party, or to the specifications for such a contract;
(v)granting City approval to a plan, design, report, study or similar item;
(-vi) adopting, or granting City approval of, policies, standards or guidelines for
City or for any subdivision thereof.
B. Does not serve in a staff capacity with City and in that capacity,participate in
making a governmental decision or otherwise perform the same or substantially the same
duties for City that would otherwise be performed by an individual holding a position
specified in City's Conflict of Interest Code under Government Code section 87302.
7.3 In the event City determines that Consultant must disclose its financial interests by
completing and filing a Fair Political Practices Commission Form 700, Statement of
Economic Interest Consultant shall file the subject Form 700 with the City Clerk's office
pursuant to the written instructions provided by the City Clerk.
1:`ca'dji-n.A.-reements'Jiilltop Geotechnical 1-01 Ldoc 4
ARTICLE 8 -GENERAL CONSIDERATIONS
8.1 Attorneys' Fees. In the event any action is commenced to enforce or interpret any of the
terms or conditions of this Agreement the prevailing Party shall, in addition to any costs
and other relief,be entitled to the recovery of its reasonable attorneys' fees,including fees
for the use of in-house counsel by a Party.
8.2 Prohibition Against Assigrlent. Consultant shall not assign any of the Services, except
with the prior written approval of City and in strict compliance with the terms, and
conditions of this Agreement.
8.3 Documents and Records. Project related documents,records, drawings,designs,cost
estimates,electronic data files, databases and other documents developed by Consultant
in connection with its performance of the Services, and copyright interest in such
documents, shall become the property of City and shall be delivered to City upon
completion of the Services, or upon the request of City. Any reuse of such documents,
and any use of incomplete documents, shall be at City's sole risk.
8.4 Inde pendent Contractor Status. Consultant is for all purposes under this Agreement an
independent contractor and shall perform the Services as an independent contractor.
Neither City nor of its agents shall have control over the conduct of Consultant or
Consultant's employees, except as herein set forth. Consultant shall supply necessary
tools and instrumentalities required to perform the Services. Assigned personnel
employed by Consultant are for its account only, and in no event shall Consultant or
personnel retained by it be deemed to have been employed by City or engaged by City for
the account of, or on behalf of City. Consultant shall have no authority, express or
implied,to act on behalf of City in any capacity whatsoever as an agent,nor shall
Consultant have any authority, express or implied, to bind City to any obligation.
8.5 Termination.
A. Unless earlier terminated as provided for below, this Agreement shall terminate upon
completion and acceptance of the Services by City.
B. This Agreement may be terminated by City, in its sole discretion,by providing seven
(7)days prior written notice to Consultant(delivered by certified mail,return receipt
requested)of City's intent to terminate.
C. If this Agreement is terminated by City, an adjustment to Consultant's compensation
shall be made, but(1)no amount shall be allowed for anticipated profit or unperformed
Services,and(2) any payment due Consultant at the time of termination may be adjusted
to the extent of any additional costs to City occasioned by any default by Consultant.
D. Upon receipt of a termination notice, Consultant shall immediately discontinue its
provision of the Services and,within five(5)days of the date of the termination notice,
deliver or otherwise make available to City, copies (in both hard copy and electronic
1-.",.ca,djin\Agreemcnts%Hilltop Geotechnical 201 1,doc 5
form,where applicable) of project related data, design calculations, drawings,
specifications,reports, estimates, summaries and such other information and materials as
may have been accumulated by Consultant in performing the Services. Consultant shall
be compensated on a pro-rata basis for Services completed up to the date of termination.
8.6 Books,and Records. Consultant shall maintain books, ledgers, invoices, accounts and
other records and documents evidencing costs and expenses related to the Services for a
period of three(3) years, or for any longer period required by law, from the date of final
payment to Consultant pursuant to this Agreement. Such books shall be available at
reasonable times for examination by City at the office of Consultant.
8.7 Entire Agreement/Amendment. This Agreement, including the Exhibits incorporated
herein by reference, represents the entire agreement and understanding between the
Parties as to the matters contained herein, and any prior negotiations,written proposals or
verbal agreements relating to such matters are superseded by this Agreement. Except as
otherwise provided for herein, an amendment to this Agreement shall be in writing,
approved by City and signed by City and Consultant.
4n
8.8 Governing Law. This Agreement shall be governed by and construed in accordance with
the laws of the State of California.
1:,Icai(litn�Agrecinen&,Hilltop Geotechnical 201 Ldoc 6
IN WITNESS WHEREOF. duly authorized representatives of the City and Consultant have
signed in confirmation of this Agreement.
CITY OF REDLANDS HILLTOP GEOTECHNICAL, INC.
By: _ By
Tina Kundig, Mark Hulett, President
Finance Director/City Treasurer
Attest:
Sam Irwin, Ci le k
1:icaldjjn\Agreements�Hilltop Geotechnical 201 Ldoc 7
EXHIBIT A
SCOPE OF SERVICES
Our scope of work will include the following:
• Conduct in-place density tests of compacted sub-grade and aggregate base
sections, and placement observations
* 10 Verification Compression Tests on pavers
• 3 Maximum Density Test
[:',ca',.djtn,Agreements.Hilltop Geotechnical 201 Ldoc A-1
EXHIBIT B
PROJECT SCHEDULE
The schedule for density testing of compacted testing will follow the construction
schedule.
The duration for project completion is 15 working days.
1:'ca"cfim',Ngreenimtsr,Hilltop Geotechnical 201 Ldoc B-1
EXHIBIT C
PROJECT COSTS
X. FIELD OBSERVATION AND TESTING
Field Technician
15 triDs@ 8 hours/trip
JB $84.00/hoDr $%O,M80.QO
LABORATORY TESTING
lo Verification Compression Tests 0np8nerS (No Charge)
3 Maximum Density Tests 6@ $I40.O0/eQ.
______________________________________________________________________________
CosK1yo%a .......................................,.......................................$1KX,500.00
_________________________________________________________________________
Minimum Charges:
Engineering Technician.....................................................................................8hours
Work past I%AM0oOver 4Hours......................................................................8hours
Show Up and No Testing or Inspection.............................................................3 hours
Cancellation of Work After 3:30pznQD previous day.......................................2 hours
Overtime:
EXHIBIT D
RATE SCHEDULE
'���l� GEOTECHNICAL,
� � INC.��0�0� m ��m ��m��� � ���������������� m����
lkD� ��&U|��Z |��l0U� X»|�K�Ul���7[
��"^ "�^�"°���' PARK PROJECT
��� � �����|���UTD|� ���� ����|��
^~~"^ ^'~~��°�"^~'���� ��" FEES
DISCOUNTED FOR TIIE CITY OF REDLANDS
PERSONNEL CHARGES
Drafting,per hour..................................... ........................................................................... .............$65.O0
Labor, per hour..--.----------------------- ...................................................$65.O0
<8 per hour.................................................................................................................$651m
Wordper hour........................................... ........................................................$60.00
Engineer Registered,per hour--------------------------------_—..$l5O1N
Engineer Non-Registered,per hour.......................... .......................................................................$l08.0O
Geologist Registered,per hour..........................................................................................................$l501X)
Geologist Non-Registered,per hour ................. ..............................................................................
$lO0.0O
ProjectManagerper hour.................................................................................................................$lO3.00
per hour -----------------------------------.—.--$l03.0U
ICC Special loapector,per hour................................................................... ......................................$76.00
Teohziciao- Geologic,per hour.........................................................................................................$76.0O
Tcnbuiciau-Grading,per hour...........................................................................................................$7610
Tecbuicbun- Senior Grading,per hour................................................................................................$80.00
Tuobniciuo- Manometer,per hour......................................................................................................$76.00
Teuluiokan- Material,per hour...........................................................................................................$7680
Technician' Post Grading,per hour...................................................................................................$76.00
Iechniciom-Office,per hour..............................................................................................................$80.0O
Tccbniciao- Sc Office,per hour........................................................................................................$8010
Prevailing Wage-Inspector ICC, per
PrevailingWagc-Senior bxg, per hour.............................................................$84.00
PrevailingWage-Technician-Post Grading, per hour.................................................................
PrevailingWage omro$r,per hour......-------~~~-.-...-.......,..-......--_-~.-�84�M�
Outside Drilling Service.......................... ......................... ......................................................Cost Plus /5%
permile................................................................................ ................____........................$050
LABORATORY TESTING FEES
SOIL TESTING
ChlorideTest, .................................-- ............. ...... ............. ....... ............ ---.......................$80.0U
Chunk Density JbMoisture........ ........... ... ................-- .................. .................. ......................$25l0
ConsolidationTest....................... —............. ........................ ..... .............. .................... ...........................
u)Consolidation- full.............. ....................... ................... ................— .... ...................$l5j1X)
b)Couoobdudmo- Remold ........ ....—......... .... —.... ....... .......... .................. —.................$40.00
u)Consolidation- Single Point .............. ...... --.......... ...... .................. — .....................$80.00
Cuomuk`o Analysis Test(Ph Redox, ...... ........................... — ................—''............$145.00
DirectShear Test................................ ..................... ....................... —....... ......... — ................................
a)Direct 8boar'In-Situ ...—.......... -- ............... — ..............— ... ....... ...... — ..............Sl65{)0
b) Direct Shear-Remold ..... ... ............— ..... .......................... ....... .... —....................$2O5.80
ExpansionIndex Test ................ ...........--................. — ............... --....................... ..............$llf.00
2011 SCHEDULE OF FEES-ED HALES PARK PROJECT
LABORATORY TESTING FEES, (continued)
MaximumDensity Test ....................................................... .................. .......-...............................$150.00
MoistureContent Test ........................ ....... ..................... ................ ........ .................................$15.00
PermeabilityTest ................................................................................................................................Quote
AtterbergLimits Test ................................. ..................................................... ...............................$120.00
Resistance Value Test(R-value) ........... ....................................................... .................................$260.00
Resistivity................................................................... ................................ ................................$105.00
RingMoisture&Density Test .......................................................................................... ................$20.00
SandEquivalent Test .................................................................................................... ..................$100.00
Sieve Analysis Test-(Hydrometer) ................................................................................ ..............$200.00
SieveAnalysis Test-(Full) ..............................................................................................................$100.00
SieveAnalysis Test-(-200)............................................................................................. ..................$85.00
SulfateTest .................................................................................. ............................... ................$65.00
TurbidityTest .....................................................................................................................................$25.00
CONCRETE/MASONRY/PAVER TESTING
CylinderCompression Test ................................................................................................................$28.00
CylinderCore,Charge........................................................................................................................$33.00
CylinderTrim, Charge........................................................................................................................$10.00
GroutCompression Test ....................................................................................................................$34.00
MortarCompression Test....................................................................................................................$34.00
ASPHALT TESTING
Asphalt Content-Ignition Oven,
Premixed AC Sample(CT382),ea.......................................................................................$125.00
Asphalt Content/Gradation- Ignition Oven,
Premixed AC Sample(CT202,CT382),ea..........................................................................$200.00
Hveem Specific Gravity/Stability Value,
Premixed AC Sample(CT308,CT366),ea..........................................................................$190.00
Hveem Stability Value-Premixed AC Sample(CT366),ea............................................................$120.00
Hveem Specific Gravity/Stability Value(Rubberized Asphalt),
Premixed AC Sample(CT308,CT366),ea................................... ......................................$210.00
Hveem Stability Value(Rubberized Asphalt)-
Premixed AC Sample(CT366),ea .......................................................................................$150.00
Specific Gravity of Hveem or Core Sample-Uncoated(CT308),ea..................................................$45.00
Specific Gravity of Hveem or Core Sample-Coated(CT308),ea......................................................$65.00
AGGREGATE TESTING
Specific Gravity and Absorption -Coarse
Aggregate(ASTM C127) -......... ....................... ............... .............___...........$110.00
Specific Gravity and Absorption- Fine
Aggregate(ASTM C128)................. ........................ ............................... ......... ...........$150.00
Sodium or Magnesium Sulfate Soundness
Fine or Coarse Aggregate(ASTM C88),per sieve size tested...............................................$65.00
Los Angeles Abrasion- Small Size Coarse
Aggregate(ASTM C 13 1).............................__........ .............. ..............S220.00
Los Angeles Abrasion-Large Size Coarse
Aggregate(ASTM C535)............................ ............. ............................$240.00
Durability Index Fine or Coarse Aggregate
(Calif 229)..............................__..................... .......... ......_..............$160.00
1:',ca'�dji-n\.Agrt--eiiient,'lf4ilitop Geotechnical 201 Ldoc A-2
2011 SCHEDULE OF FEES-ED HALES PARK PROJECT
LABORATORY TESTING FEES, (continued)
Potential Reactivity of Aggregate-Chemical
Method(ASTM C289).................................... ............... ...............__........_.......................$375.00
Petrographic Examination Fine to Coarse
Method(ASTM 0295)each(Plus Thin-Sections)................... ..................................$1,400.00
Gradation of Aggregates(ASTM C 136)(Calif 202)
FineAggregate Dry Sieve.......................................................................................................$85.00
Fine Aggregate Washed Sieve .............................................................................................$115.00
Coarse Aggregate Dry sieve .........................................................................__ ...........$90.00
Coarse Aggregate Washed Sieve ............................................ ..........._..............................$120.00
Combined Aggregate Dry Sieve ..................................................... .........................$150.00
Combined Aggregate Washed sieve ....................................... ............... ......................$200.00
Material Finer than 9200 Sieve
(ASTM C117).........................................................................................................................$75.00
Sand Equivalent Test(ASTM D2419) (Calif 217)....................................... ...................................$105.00
Flat and Elongated Particles(ASTM D4791)...................................................................................$200.00
Clay Lumps and Friable Particles(ASTM C142).............................................................................$100.00
Lightweight Particles(ASTM 0123)
Coat/Lignite(sp gr=2.00)..............................................................................................................$100.00
Chert(sp gr=-2.4)............................................................................................................................$100.00
Organic Impurities in Fine Aggregate(ASTM C40)..........................................................................$65.00
Cleanness Value(Calif 227).............................................................................................................$160.00
Unit Weight/Calculated Voids(Fine/Coarse
/Mixed Aggregates)(ASTM C29)......................................................................................$140.00
Resistance Value Test(R-Value) (Calif 301)
AggregateBase Material.......................................................................................................$260.00
Potential Alkali Reactivity of Cement-Aggregate
Combinations(Mortar-Bar Method) (ASTM C227)................................................................Quote
Potential Volume Charge of Cement-Aggregate
Combination(ASTM C342).......................................................... .........................................Quote
Potential Reactivity Rock Cylinder Method
(ASTM C586)..................................................................... ....................................................Quote
Length Change Due to Alkali-Carbonate
Reactivity(ASTM C1105)............... .........__._........................... ...................... .................Quote
Potential Reactivity Mortar Bar
(ASTM C1260)................. ................._......... ..................................................................Quote
Potential Expansion of Aggregates from
Hydration(ASTM D4792)...................................... ............. ....... ....................Quote
Aggregate Sampling, Staff Geologist/Engineer
(Portal to Portal),per hour .....................................................................$108.00
Sample preparation,packaging,and
delivery for shipping for outside services,per hour........ .......... ........................ ...................$60.00
Registered Geologist/Engineer for Test Result Evaluation,
Report Preparation,Consultation,etc., per hour........ ........ .....................$150.00
Shipping..........................................__............. ............_.............. ........................ ......Cost Plus 15%
Outside Testing Services........................ ........ .................. ................... ....Cost Plus 15%
Mileage,per mile.............................. .........__.................. ............. ............_............................$0.50
1:�ca"djm,Agreeinent-,1Iiilltop Geotechnical 201 Ldoc A-3