Loading...
HomeMy WebLinkAboutContracts & Agreements_22-1959CONTRACT AGREEMENT THIS AGREEFINT, made and concluded, in duplicate, this 22rd�day of July , 19_.�9, between the City of Redlands, party of the first part, and Matich Co oration s Contractors party of the second part. ARTICLE I. WI7NE5SETH, that for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the said party of the first part, and under the conditions expressed in the two bonds, bearing even date with these presents, and hereunto annexed, the said party of the second part agrees with the said party of the first part, at his own proper cost and expense, to do all the work and furnish all the materials, except such as mentioned in the specifications to be furnished by said party of the first part, necessary to construct and complete in a good, workmanlike and sub- stantial manner, the improvement of San Mateo Street from Fern Avenue to Cypress Avenue, and from Chestnut Avenue to Highland Avenue in accordance with the special provisions therefor, and also in accordance with the specifications entitled "State of California, Department of Public Works, Division of Higliways, Standard Specifications, August 1954," which said special provisions and standard specifications are hereby specially referred to and by such reference made a part hereof. Said work to be done is shown upon plan included in "San Mlateo Street Con- struction Projects No. 101 and iO3," which said plans are hereby made a part of this contract. AR`IICLE II. And the said Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and doing all the work contem- plated and embraced in this agreementf also for all loss or damage arising out of the nature of the work aforesaid, or from the acts of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until, its acceptance by the City of Redlands, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension of discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the plans and specifications, and the requirements of the Engineer under them, to wit; Item Quantities Item With Unit Price Written in Words Unit Price TOTAL 1 1741 Cubic yards of roadway excavation 2 Lump Sum Removal of driveways across the storm water drain and excavation of reinforced concrete above existing storm water drain at station 8 + 27 of San Mateo St. south of Chestnut Avenue 3 807 Linear feet of 30-inch standard strength reinforced concrete pipe installed, including connection of a 15-inch reinforced concrete pipe at station 0 + 40 atXQD dollars and _ _�ij Xty--_I; VP. .cents per din. ft. 1 Storm water drain manhole per City of Redlands Detail Drawing No. 405 installed at Two hundred Sixt Five dollars and no cents each 5 9 Curb outlet and inlet boxes per City of Redlands Detail Drawing No. 301 installed Lump Sum $ L .500.00 Lump Sum $6Q0.0O $ 265.00 $ 26 C?0 Lump Sum $ l,L0O.00 Item Quantities Item With Unit Price Written in Words Unit Price TOTAL 6 106 Linear feet of 12-inch 14 gage of round corrugated metal pipe at Six dollars and no cents per lin. ft. $ 6.00 b36.o0 7 18 Linear feet of 12-inch standard strength of reinforced concrete pipe installed at Seven dollars an Seuent�- cents per lin. ft. $ 7.7n_F _ Fn 8 1 Catch basin per detail on Sheet 3 of plans installed at dollars and • • • a() cen s each $ � 50. no 9 1 Manhole adjusted to grade at dollars an Nn „-•-_- cents each0_nn $ -50_00 IR 11 12 13 14 15 16 17 6138 Square yards of imported base material, 6 inches thick, in place at r.* dollars an F r y-Cnp cents per sq. ya'�_ 2,16.8 1072 Tons of plant -mixed surfacing including asphaltic paint binder in place at Four dollars and - -- •Iline2a ..- cents per ton _ ' -20 202 Cubic yards of Portland Cement Concrete in place at �enty Five dollars and `o -' cen s per cu. yds.$ 25,00 $� 30 Linear feet of reinforced concrete box culvert, per Detail Drawing# in place at i hte n dollars and No cents per in. ft. $---� 8.00 $_,.... bo..po 155 Linear feet of 18-inch by 11-inch 16 gage corrugated metal pipe arch in place at Five dollars an No cents per lin. ft. $ 5.00 $ 11500 155 Linear feet of 29-inch by 18-inch 14 gage corrugated metal pipe arch in place at Nine dollars and No cents per 1" ft. $ 2.00 $ 1 .00 42- Linear feet of 8-inch 16 gage diameter round corrugated metal pipe in place at Five doilzwg anil Thirty cents per lin. ft. 5.2o $ 222 370 Cubic yards of imported borrow in place at Two doll.ara and cents per cu. yd. $ 2.00 $ 749.00 TOTAL $.321826.13 ARTICLE III. The said party of the first part hereby promises and agrees with the said Contractor to employ, and does hereby employ, the said Contractor to provide the materials and to do the work according to the terms and conditions herein contained and referred to, for the prices aforesaid, and hereby contracts to pay the same at the time, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid or proposal of said Contractor then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date first above written. ATTESTS y Clerk, City of RedlAnds APPROVED AS TO FORM: City Attorney, UP of Redlands APFROVED t r" C 't izz7-, y eery City of Re an a CONTRACTOR by �� /I �'•� ,