Loading...
HomeMy WebLinkAboutContracts & Agreements_27-1959CONTRACT AGREEMENT THIS AGREEMENT, made and concluded, in duplicate, this day of Septemoejr 19 �.q , between the City of Redlands, party of the first part, an E. L, YeaEer Company , Contractor,, party of the second part. ARTICLE I. UTITNESSETH, that for and in consideration of the payments and agree- ments hereinafter mentioned, to be made and performed by the said party of the first part, and under the conditions expressed in the two bonds, bearing even date with these presents, and hereunto annexed, the said party of the second part agrees with the said party of the first part, at his own proper cost and expense, to do all the work and furnished by said party of the first part, necessary to construct and complete in a good, workmanlike and substantial manner, the improvement of Fourth Street from Citrus Avenue to Olive Avenue, in accordance with the special provisions therefor, and also in accordance with the specifications entitled "State of California, Department of Public Works, Division of Highways, Standard Specifications, August 1954", which said special provisions and standard specifications are hereby specially referred to and by such reference made a part hereof. Said work to be done is shown upon plan included in "Four-thStreet Construction Project No. 10211, which said plans are hereby made a part of this contract. ARTICLE 11. And the said Contractor agrees to receive and accept the following prices as full compensation for furnishing all n;aterials and doing all the work con- templated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid, or from the acts of the elements, or from any unforeseen difficulties or obstructions -%hick may arise or be encountered in the prosecution of the work until its acceptance by the City of Redlands, and for all risks of every description connected with the workg also for all expenses incurred by or in consequence of the suspension of discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the plans and specifications, and the requirements of the Engineer under them, to wit: Item Quantities Item With Unit Price Written In Words Unit Price TOTAL 1 59O Cubic yards of roadway excavation Lump Sum $ 2300.00 2 245 Cubic yards of Portland Cement Concrete, in place, at Twenty -Seven dollars and no cen s per cu. yds. 27.00 # 6615.00 3 L Curb inlet boxes per City of Redlands Detail Dra7ving No. 301 installed Lump Sum 700.00 4 11.5 Linear feet of reinforced concrete box culvert per Detail Drawing, in place, at Ten dollars l and Fifty cents per in. ft. $ 10. 0 $ 12_ O7.50 5 250 Cubic yards of imported base material, in place, at Two dollars and lnnet 2.90 cents per cu. y . # $ 725.00 ARTICLE III. The said party of the first part hereby promises and agrees with the said Contractor to employ, and does hereby employ, the said Contractor to provide the materials and to do the work according to the terms and conditions herein contained and referred to, for the prices aforesaid, and hereby contracts to pay the game at the time, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid or proposal of said Contractor then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date first above written. ATTESTt )�('w zt_d�'& yClerk,, City of Redlant s APPROVED AS TO FORM: (` - I cj 'c��� City Attorney, My—ofMy—of Redlands APFROVF:D t Citineer City" of Redlands _l CITY OF. I}S Y Navor o 7e Cj CONTRACTOR by l tit, *v heft W1th Unit Prins W.-it{„ en in Words 6 5U Tme cf plant -sized enrfsCu" asphaltic paint binder, in �e'at Five dollars andSevent -Five cents per T 4 Mknholes and catch basing adjusted to g'*As at ___Elf t F ive dollars 1,10 oents each 6 Paxting meter posts Moved at, Your la 0 c:egte each. P 35 Li.nsar feet of f m r (4) inch standard strngth concrete drain pipe@ under Vid wAllcee replaced as required, at e dollars Q -f' v ebats psr Tin. - l0 146 PEAL FriO4 TOTAL k k 2938.25 5 -00 ! 220.00 z .o0� 8 24.0 I1- ; -2� Linear feet of Right - t a) -inch etendard 11trength reinforced amerste pipe, in place i at Four doltsrs Sixt cents per lin. 1. • 60�,,,r 671�60 'AL $ 15448.60