HomeMy WebLinkAboutContracts & Agreements_10-1984_CCv0001.pdf AGREEMENT FOR ENGINEERING SERVICES
DESIGN AND PREPARATION OF IMPROVEMENT
PLANS, SPECIFICATIONS AND ESTIMATE
STREET AND DRAINAGE IMPROVEMENTS
THIS AGREEMENT, made this day of
1984, between the City of Redlands, a municipal corporation,
hereinafter referred to as "CITY" and John Egan and Associates,
Inc . Consulting Engineers, with a place of business at 366
Orange Show Lane, San Bernardino, California 92408, herein-
after referred to as "ENGINEER" ;
WITNESSETH THAT:
WHEREAS, CITY desires to construct street and drainage
improvements for Judson, Lincoln and Dearborn Streets where
each cross the Zanja drainage channel, improvements to con-
sist of construction of reinforced concrete culverts and
street widening at Judson and Lincoln Streets, extension of
existing concrete culvert, widening and realignment at Dear-
born Street and appurtenant work; hereinafter referred to as
"PROJECT"; and
WHEREAS CITY has need for professional engineering
services for preparation of surveys, designs, technical
specifications, and cost estimate for construction of PRO-
JECT; and
WHEREAS, it is beneficial to CITY to have under contract
an engineering firm which can immediately perform required
professional engineering services for CITY; and,
WHEREAS, ENGINEER has specialized knowledge, training
and experience necessary for the work to be performed; and
WHEREAS, ENGINEER desires to perform professional en-
gineering services for CITY under contract;
NOW, THEREFORE, be it mutually agreed as follows :
I. ENGINEER shall perform professional engineering
services in conjunction with the aforementioned PROJECT
including the following:
A. Conduct survey of site(s) to procure information neces-
sary for design.
B. Prepare hydrology analysis of each site for design of
culverts .
2
C. Preparation of designs and drafting of plans for con-
struction of drainage structures, street widening and
appurtenant work, utilizing and referencing CITY and
Caltrans standard drawings where applicable. Effort
will include submittal to CITY for review and the making
of necessary revisions for bidding and construction.
D. Prepare technical specifications and bidding schedule.
E. Prepare construction cost estimate .
II . CITY shall provide ENGINEER with assistance in
conduct of professional engineering services by providing
the following:
A. All available reference drawings and information re-
garding bench marks and horizontal controls useful for
the PROJECT.
B. Right-of-way acquisitions and necessary services.
C. Complete all environmental impact report processes
required.
D. Potholing of existing utilities where required.
3
E. CITY drawing stock if desired to be used.
J_
F. CITY standard drawings and details, applicable to the
work.
G. Checking and approval of plans and specifications .
H. Preparation of contract documents and general conditions .
I . Street structural sections to be used.
J. Reproduction for bidding .
III . Reimbursement by CITY to the ENGINEER shall be as
follows:
A. Reimbursement for services performed per Section I will
be on a time and materials basis in accordance with the
fees contained in Exhibit "A" . Maximum amount will be
$18, 300 which will not be exceeded unless prior authori-
zation of the CITY is secured due to extra work.
B. Services beyond the scope described in Section I such
as, but not limited to, revision of design concept or
4
previously approved documents, or delay of ENGINEER'S
performance shall be considered as extra work. Such
work shall be done only after written authorization by
the CITY. - Reimbursement for extra work shall be as
mutually agreed by CITY and ENGINEER or on a time and
materials basis in accordance with the fees contained
in Exhibit "A" .
IV. CITY shall pay ENGINEER monthly in accordance with
ENGINEER'S invoice for work completed. Invoice shall indi-
cate the work performed and completion status for which
payment is requested. Payments not received within 30 days
of CITY'S receipt of invoice shall be subject to alate
charge of 1.0 percent per month.
V. ENGINEER shall begin the work to be performed upon
authorization from the CITY and shall diligently prosecute
same to completion.
VI . This Agreement may be terminated by either party
upon written notice to the other party in the event of breach
by such other party, or if before the professional services
herein described have been rendered CITY deems it necessary
or desirable to abandon the project. in the event of such
termination or any suspension of work at the written direc-
tion of the CITY, CITY shall pay the ENGINEER for work
5
actually performed in proportion to the work completed by
the ENGINEER. Engineer shall, upon termination, submit to
the CITY all calculations, applications, drawings and other
work completed.
VII. ENGINEER shall complete and submit preliminary
drawings and specifications for review within 60 calendar
days of receipt of CITY'S authorization to proceed.
ENGINEER further agrees to complete final drawings,
specifications and estimate ready for bidding within 30
calendar days after return of preliminary documents, with
comments, by CITY.
VII. ENGINEER understands, and does hereby agree, that
in the performance of services pursuant to the Agreement,
ENGINEER shall comply with all applicable laws and govern-
mental regulations pertaining to such services performed for
CITY.
I . This Agreement shall not be modified except by an
agreement in writing signed by both parties.
X. Whenever notices are required to be given pursuant
6
to the provisions of this Agreement, the same shall be
given by depositing the same in the course of transmission
of the United States Postal Service, postage prepaid, ad-
dressed as follows :
a. CITY: John Donnelly
Public Works Director
City of Redlands
P.O. Box 280
Redlands, CA 92373
b. ENGINEER: John G. Egan, President
John Egan and Associates, Inc .
366 Orange Show Lane
San Bernardino, CA 92408
Notices shall be deemed to have been given for the purpose
of this Agreement, on the day that the same are deposited in
the course of transmission of said system.
7
IN WITNESS THEREOF, CITY and ENGINEER have executed this
agreement as of the date first above written.
CI'T'Y OF REDLANDS, CALIFORNIA
BY
JOHN EGAN AND ASSOCIATES, INC.
BY
r
,,' /John G. Egan
President
8
EXHIBIT "A"
JOHN EGAN ANo AssocIATESIIINC.
CONSULTING ENGINEERS
366 ORANGE SHow LANE,SAN BERNARDINO,CAUFORNIA 92408
PHONE: (714) 889-06761{714) 825-1550
SCHEDULE OF FEES
Effective July, 1983
Senior Project Manager $70. 00/hour
Project Manager $58.00/hour
Project Engineer $46 . 50/hour
Design Engineer/Senior Designer $42.00/hour
Designer/Engineer $32 . 50/hour
Drafter $27 . 50/hour
Apprentice Drafter/Engineer Aide $18.00/hour
Secretary $25. 00/hour
Word Processor Typist $23 . 50/hour
Inspection 2. 5 x Salary
Licensed Survey Supervisor $51 . 00/hour
Survey Crew, 3-Man $125. 00/hour
Survey Crew, 2-Man $100. 00/hour
Miscellaneous Services
Mileage $0. 27/Mile
Direct Expenses
In-House Reproduction At Cost
Subcontract Services and Fees Cost + 8 Percent
Note: Fees Subject to Revision July is of Each Year