Loading...
HomeMy WebLinkAboutContracts & Agreements_20-1960 AGREEMENT THIS AGREEMINT, made and entered into this Lt. day of January, 1961 by Matich Corporation and the City of Redlands, a municipal corporation for the purpose of supplying plant-mi- a paving materials, screenings, asphaltic emulsion for seal coat, and equipment rental for the period from January 1, 1961 to January 1, 1962 apon the following terms and conditions Item 1. ,'or furnishing 5,000 tons more or less of dense graded plantkrod asphaltic paving material, which shall meet the specifications of Section 39 of the Standard Speci- fications of the .)-tat e of California dated January 1, 1960. (a) 7.C.B. Matich Redlands plant to the City of Badlands trucks * commove • yo • * • * '4'; 3.92 per ton (b) F.O.B. jobs within the corporate limits of the city of ?Jsdlands, California . h.82 per ton Item 26 4,000 tons, more or less, of open graded plant-nixed asphaltic paving material, which snail meet the specifi- cations of section 394.06 of the aforesaid standard Specifications. (a) ,c0.13. Ystich oTedlalds plant to the Clty of ftedlands tricks 00 . 60160 6 11,492 (b) r.O.B. jobs within the corporpte limits of the City of , edlandal California * * * ante . * 5.82 Item 3. 500 tons, more or less, or rock screenings, which will moot the specifications for fine-type seal cost of Section 37 of aforesaid Standard Specifications. (a) F.O.B. jobs within the corporate mits of the of Redlands, California . . Item L . 10,000 gallons, more or less, or asphaltic emalsion: which shall meet the specifications or high viscosity emulsion of Section 94 of the aforesaid Standard 21-Jecifications. (a) F.O.B. jobs within the cnrrerate limits of the City of Redlands, Cal:dorms. . . i,;; 0.20 per gallon Item 5. For furnishing the fallowing equitment, fully oprated and maintained, including transportation to and from the job. (a) Barber-Greene finishing machine . . • 27.00 per hour (b) Asphaltic Emulsion Distributor Muipment„ minimum 400 gallon capacity . 0 4 14.00 per hour (c) Tandem Roller, five to eight ton . $ 14.00 par hour (d) Pnelamatio-,Tired holler . • • . . . . . 6 14,00 par hour The price per ton quoted wader Item 4 above includes all costs in ordering material, and also includes the cost of the distributor truck and any overtime in excess or the two hours spreading time le .ch is normal for this operation. For the application of penetration type emulsion for ease as a tack coat for pant-mixed surfacing, we have submitted an hourly rental rate for the distribution truck, A charge of 0.12 per gallon mill be made for the penetration type emulsion used as tack coat for plant- siiwea suufaal ag. \-2 For e'a do _ Corporation { i'..:y o' Rellanil .� ro - •1 c ` : MATICH CORPORATION * general Contractors 'tea f��;I G�4, MATICH BROTHERS YARD AND OFFICE �i MATICH BROTHERS PAVING COMPANY 350 West Valley Boulevard j MATICH CONSTRUCTORS RIALTO CALIFORNIA MATICH EQUIPMENT INC. MAILING ADDRESS: P 0 Box 390 December 15, 1960 COLTON,CALIFORNIA Telephone Colton TRlnity 7 2100 The Honorable Council City of Redlands Redlands, California RE* Bid for furnishing plant mixed paving materials, screenings, asphaltic emulsion for seal coat, and equipment rental for the period from January 1, 1961 to January 1 , 1962. Gentlemen: In accord with your invitation for bids, dated the sixth day of December, 1960, we are pleasedto submit for your consideration the following bid: ITEM NO. 1 For furnishing 5,000 tons more or less of dense graded plant-mixed asphaltic paving material, which shall meet the specifications of Section 39 of the Standard Speci- fications of the State of California, dated January 1960. (a) F.O.B. our Redlands plant to the City of Redlands trucks $ 3,9z per ton (b) F.O.B. jobs within the corporate limits of the City of Redlands, California $ 4-, rz.per ton ITEM NO. 2 4,000 tons, more or less, of open graded plant-mixed asphaltic paving material, which shall meet the specifi- cations of Section 39-2.06 of the aforesaid Standard Specifications. (a) F.O.B. our Redlands plant to the City of Redlands trucks $ n/.f2 per ton (b) F.O.B. jobs within the corporate limits of the City of Redlands, California. $ .,8 z per ton ITEM NO. 3 500 tons, more or less, of rock screenings, which will meet the specifications for fine-type seal coat of Section 37 of the aforesaid Standard Specifications. (a) F.O.B. jobs within the corporate limits of the City of Redlands, California $ 4-,Eo per ton The Honorable Council City of Redlands Page Two December 15, 1960 ITBM NO. 4 10,000 gallons, more or less, of asphaltic emulsion, which shall meet the specifications for high viscosity emulsion of Section 94 of the aforesaid Standard Specifications. (a) F.O.H. jobs within the corporate limits of the City of Redlands, California $0 l per gallon ITEM N0. 5 For furnishing the following equipment, fully operated and maintained, including transportation to and from the job. (a) Barber-Greene finishing machine yp q`'" per hour (b) Asphaltic Emulsion Distributor Equip- ment, minimum 400 gallon capacity $ i "4 per hour (c) Tandem Roller, five to eight ton "'1, g � 1 y- _ per hour (d) Pneumatic-Tired Roller 1V-` per hour The price per ton quoted under Item 4 above includes all costs in ordering material, and also includes the cost of the distributor truck and any overtime in excess of the two hours spreading time which is normal for this operation. For the application of penetration type emulsion for use as a tank coat for plant- mixed surfacing, we have submitted an hourly rental rate for the distributor truck. A charge of $0.12 per gallon will be made for the penetration type emulsion used as tack coat for plant-mixed surfacing. Very truly yours, MATICH CORPORATION Martin A. Matich President MAM:caj