Loading...
HomeMy WebLinkAboutContracts & Agreements_53-1989_CCv0001.pdf AGREEMENT TO FURNISH ENGINEERING SERVICES FOR 1350 ZONE RESERVOIR SITE PLAN This AGREEMENT is made and entered into as of this 19th day of September , 1989 , by and between City of Redlands Municipal Utilities Department herein after referred to as "OWNER" and Louis Waldo Flores , Civil Engineer hereinafter referred to as "ENGINEER" In consideration of the mutual promises , covenants and con- ditions hereinafter set forth, the parties do hereby agree as follows: ARTL�LE_J_- 1 .1 The OWNER hereby engages the ENGINEER and the ENGINEER hereby accepts the engagement to perform Engineering services in connection with preparation of a site plan for the proposed 1350 Zone Reservoir and assistance with acquisition of a Conditional Use Permit, hereinafter called the Project . 1 .2 All work under this AGREEMENT shall be done in a pro- fessional manner , and ENGINEER represents that he is skilled in the professional expertise necessary to provide high quality services under this AGREEMENT. 1 .3 The ENGINEER shall be responsible, to the level of competency presently maintained by other practicing professional engineers performing the same type of work for the professional and technical soundness , accuracy and adequacy of all designs , drawings , specifications , and other work and materials furnished under this AGREEMENT. -1- ARZI -ERYL!��ES-OF-THE-ERGUJKKR- C�L& ---5 2 .1 The ENGINEER will perform the services in connection with the Project as defined in Attachment A, Scope of Work . 2 .2 The following additional services may be provided by the ENGINEER when requested and approved by the OWNER: 1 . Miscellaneous Construction surveys 2 . Additional copies of drawings and reports 3 . Miscellaneous services not specified elsewhere in the AGREEMENT. ARTIST,E_3 __lag OWNER 3 .1 The OWNER will place at the disposal of the ENGINEER all available information pertinent to the Project , including previous reports and any other data relative to the Project . 3 .2 The OWNER will provide access to and make all provisions for the ENGINEER to enter upon public and private lands as required for the ENGINEER to perform his work under this AGREEMENT . 3 .3 The OWNER will provide all environmental assessments or impact reports required for this project . 3 .4 The OWNER will designate in writing a person to act as the OWNER' s representative with respect to the work to be performed under this Agreement , such person to have complete authority to transmit instructions , receive information , interpret and define the owner's policies and decisions with respect to materials , equipment , elements and systems pertinent to the work covered by this AGREEMENT . ART I CLE_J-- 4 .1 The ENGINEER shall proceed with the engineering services set forth in Article 2 in accordance with the schedule defined in Attachment B. 4 .2 The ENGINEER shall proceed with the services under this AGREEMENT promptly and will prosecute them diligently. -2- 5 .1 For the services performed under Article 2 , OWNER will pay the ENGINEER on a time and materials basis at the hourly rates shown in Attachment C, Rate Schedule. The manhour estimates and total budgets are shown on Attach ment D, Fee Proposal . 5 .2 Payment for additional services requested by the OWNER per Article 2 .2 will be in accordance with a separately negotiated fee or in accordance with the hourly fees shown in Attachment C, Rate Schedule. 5 .3 ENGINEER agrees that at the point 75-percent of budgeted costs have been expended for each scope project, the ENGINEER will notify the OWNER in writing , including a brief report on job status , percent complete, analysis of budget , and envisioned expenses to complete the contractual effort . Budgets shall not be exceeded except if previously approved by OWNER. 5 .4 The ENGINEER shall bill the OWNER within ten days fol- lowing the close of each month by submitting an invoice indicating the work performed, who performed the work , and the detailed cost of all work including backup material, if requested . Payments by OWNER to ENGINEER shall be made within 30 days after receipt and approval of ENGINEER'S invoice, by warrant payable to Louis Waldo Flores . All notices , bills and payments shall be made in writing and may be given by personal delivery or by mail . Notices , bills and payments sent by mail should be addressed as follows: TO OWNER: CITY OF REDLANDS Municipal Utilities Department P. 0. Box 3005 2 E. Citrus Avenue Redlands CA 92373 TO CONSULTANT: Louis Waldo Flores 826 Brookside Avenue, Suite C P . 0. Box 2011 Redlands , CA 92373 When so addressed, such notices shall be deemed given upon deposit in the United States Mail . In all other instances , notices , bills and payments shall be deemed given at the time of actual delivery. Changes may be made in the names and addresses of the person to whom notices , bills and payments are to be given by giving notice pursuant to this paragraph. -3- 6 .1 ENGINEER shall maintain , whenever required by law, worker's compensation insurance and , in addition, shall maintain insurance to protect OT0ER from claims for damage due to bodily injury, personal injury, or death and claims for injury to or destruction of tangible property while performing the services covered by this AGREEMENT . Said public liability and property damage insurance shall be in a minimum combined single limit of $1 ,000 ,000 per occurrence. The OWNER shall be named a primary additional insured on insurance coverage for public liability and property damage. The ENGINEER shall provide OWNER with a certificate evidencing such insurance coverage . The requirements of this Article apply to all sub-consultants performing work under this contract. 6 .2 ENGINEER agrees to indemnify, hold harmless and defend OWNER and any and all of their officers , agents and employees from and against all claims , loss, damage , charge or expense, to which they or any of them may be put or subjected to arising out of or resulting from any willful or negligent act or actions , omission or failure to act on the part of the ENGINEER, his contractors, his suppliers, anyone directly or indirectly employed by any of them or anyone for whose acts or omissions any of them may be liable in the performance of the services described in this AGREEMENT . 7 .1 In the event of any legal action brought by either party against the other to enforce any of the obligations hereunder or arising out of any dispute concerning the terms and conditions hereby created , the losing party shall pay the prevailing party such reasonable amounts for fees, costs , expenses , including attorney's fees , as may be set by the Court . 7 .2 The ENGINEER shall not sublet or assign any of the work covered by this AGREEMEt7` , except with the prior written approval of the OWNER and in strict compliance with the terms, provisions , and conditions of the CONTRACT. -4- 7 .3 The key ENGINEER' S personnel proposed for this project are as follows: Louis Waldo Flores ENGINEER agrees that these key people will be made available and assigned to the OWNER' S project, and that they will not be replaced without concurrence from the OWNER. 7 .4 It is understood and agreed by and between the parties that all documents , records , drawings , designs and spe- cifications , cost estimates , and other project documents developed by the ENGINEER pursuant to this AGREEMENT shall become the property of OWNER and shall be delivered to OWNER if and when requested upon completion of services . Any reuse of such documents for other projects and any use of incomplete documents will be at the OWNER' s sole risk . 7 .5 ENGINEER is for all purposes an independent contractor . All qualified personnel provided by ENGINEER pursuant to the provisions of this AGREEMENT are to be employed by ENGINEER for his account only, and in no event shall ENGINEER or any personnel retained by him be deemed to have been employed by the OWNER or engaged by the OWNER for the account of or on behalf of the OVER. 7 .6 Unless earlier terminated as stipulated below, this agreemenC shall terminate upon completion and acceptance by the OWNER of all work approved for performance under Article 2 of this AGREEMENT. 7 .7 This AGREEMENT may be terminated in writing by either party in the event of failure by the other party to fulfill its obligations under this AGREEMENT through no fault of the terminating party: PROVIDING, that no such termination may be effected unless the other party is given (1) not less than thirty (30) calendar days written notice (delivered by certified mail, return receipt requested) of intent to terminate, and (2) an opportunity for consultation with the terminating party prior to termination . 7 .8 If this AGREEMENT is terminated by the OWNER for reasons of default by the ENGINEER, an adjustment to ENGINEER'S compensation shall be made, but (1) no amount shall be allowed for anticipated profit or unperformed services , -5- and (2) any payment due to the ENGINEER at the time of termination may be adjusted to the extent of any addi- tional costs to the OWNER occasioned by the ENGINEER'S default. If termination for default is effected by the ENGINEER, the adjustment in compensation shall provide for payment to the ENGINEER to include a reasonable profit for services rendered and reimbursement for expenses incurred prior to the termination, in addition to termination settlement costs reasonably incurred by the ENGINEER relating to commitments which had become firm and approved by 01114ER prior to the termination . 7 .9 Upon receipt of a termination notice, the ENGINEER shall (1) promptly discontinue all services affected (unless the notice directs otherwise) , and (2) deliver or other wise make available to the OWNER, copies of data, design calculations , drawings , specifications , reports , esti- mates, summaries , and such other information and mater- ials as may have been accumulated by the ENGINEER in performing this AGREEMENT . 7 .10 ENGINEER shall maintain books and accounts of all project related payroll costs and all expenses and incidental expense. Books shall be available at all reasonable times for examination by the OWNER at the office of the ENGINEER. 7 .11 This AGREEMENT, including attachments incorporated herein by reference, represents the entire AGREEMENT and understanding between the parties and any negotiations , proposals or oral agreements are intended to be integrated herein and to be superseded by this written AGREEMENT. Any supplement or amendment to this AGREE- ME14T to be effective shall be in writing and signed by the OWNER and ENGINEER. 7 .12 This AGREEMENT is to be governed by and construed in accordance with the laws of the State of California. IN WITNESS WHEREOF, duly authorized representatives of the parties have signed in confirmation of this AGREE- MENT. CITY OF REDLANDS -------------------------- By_- --------------- By__ Mayor Louis Waldo Flores Date_-ae i� 9 9 ATTEST p1girrILIEL er, 4::�Iit�M . -6- ATTACHMENT A LOUIS WALDO FLORES Civil Engineer (714) 798-3858 Z May 25 , 1989 lit. ri Mr . Richard W . Corneille , Utilities Director M City of Redlands P . O . Box 280 Redlands , CA 92373 Subject : Proposal for Professional Services 1350 Zone Reservoir Site Plan Dear Mr . Corneille , INTRODUCTION At your request , we are submitting this proposal to provide professional services to prepare comprehensive topographic and related mapping to said in producing a site plan for approximately 19 acres of property located in the City of Redlands . This proposal is based upon your request for proposal dated May 227 1.959 and upon conversations with your staff . We have visited the site for the purpose of preparing this proposal and to review the present site conditions . SCOPE OF WORK : We propose the following scope of work . a ) Review existing mapping , title and environmental information . Research utility information and existing boundary data . Compile utility information for presentation on base man . b ) Perform boundary survey . Perform control surveys for aerial topographic mapping of approximately 32 acres involving the site and adjacent public streets . Perform field surveys to locate and tie existing public utilities to new horizontal ccntrol . V Contract to obtain aerial topographic manuscript plotted at a scale of ! "=40 ' for all property involved in this proposal and for public right of way fronting said property (32 Ac . ) . 0 Prepare a base map at a scale of ! ' =10 ' refleccing all surface and subsurface u! ilivies . sErucnures , zopcgrap hic features and boand ary QaEa . P a rejucoi3n of base map au a Scale of i ' 1-56 ' . 828 EBrookside Avenue, SLAte C AD P.J. EBox 2011 Redlands, CA 92373 1080 Proposal 938 May 20 , City of Redlands Page Two e ) Prepare a preliminary site plan reflecting the ultimate site development of two 3 . 5 million gallon reservoirs with related support facilities on approximately 6 acres of the subject parcel . Site plan is to show preliminary grading design of developed site and access roadway . Site plan shall show the spatial relationship of developed portion to the undeveloped portion of the site . Site plan is to be acceptable for use as CUP site plan submittal to the Planning Department . f ) Assist Municipal Utilities Division in securing a Conditional Use Permit from the City of Redlands for this project . PROJECT APPROACH We propose to coordinate our efforts to prepare a concise , comprehensive topographic base map at 1 ' =40 ' . Said map is to include the adjacent fronting public streets . Such a map can be utilized for design purposes now or in the future . Possible uses include offsite utility installations adjacent to the site , onsite future site and grading design , and for a portion of the offsite street and storm drain improvements . The use of aerial topographic mapping combined with field surveys compiling all surface & subsurface utilities will provide mapping that can be reduced or enlarged to suit a variety of design needs . This is desired since the site in question will have a variety of different site uses . it is assumed that site development of the total land area will occur over time . The preparation and filing of a Record of Survey will establish record data for monumentation set by a boundary survey . Preliminary grading and site design can be accomplished at the reduced scale of 1 "=50 ' . At this scale , the entire land area along with adjacent fronting streets can be shown on one standard City plan sheet . Thus this mapping can be used in the final design of all of the onsite and offsite facilities . The design of street improvements will require additional fieldwork . Thus the Municipal Utilities Division can reduce the overall cost of the design of future improvements by utilizing the concise mapping and information we can produce at this time . FROjECT SCHEDULE The schedule as proposed by the Municipal Utilities Division for preparation of the topographic mapping and site plan is acceptable . We can produce the mapping necessary for revie,,,� by your staff in nhe time alotZed . Final approval of Record ` ay '19'9 ProDosal 938 T City of Redlands Page hree of Survey or for a Parcel Map will not fit into the schedule proposed . The preparation of these maps can be accomplished in the time proposed , but plan checking by county surveyor or the city engineer will require a minimum of 60 days . The use of boundary information generated by field survey can still be utilized in the preparation of site plans and topographic mapping in aci vance of approval of boundary record mapping . SUBCONTRACT ARRANGEMENTS All research and engineering design will be performed by this firm . Most all surveying and map drafting will be performed by this firm . It is possible subcontract arrangements for some fieldwork and map draftinc, may be necessary to meet the project deadline . Aerial topographic mapping will be a subcontract arrangement . We Will provide survey control . This firm at: times utilizes the skill of a professional land surveyor to assist with fieldwork . All map drafting , both in house and subcontract , is performed in our office . Fees paid to subcontractors in normally on an hourly basis . Personnel and organizational conflicts of interest prohibited by law do not exist with the contract personnel currently workingCivil with this firm . Louis Waldo Flores , ! Engineer does not have any organizational or personnel conflicts of interest prohibited by law for perf'ormance of work on this project . ESTIMATED PROFESSIONAL FEE Our fees are based upon time and materials , in accordance with the accompanying fee schedule . Breakdown each phase of Work is shown below . Boundary survey prepare and file- Recor(4 olf Survev i1i e r i a 1 t o p o g-_ a p'll i c it D P 1 n nrO or, Field survevs : _>e al Cont- ro' & Cal Field, locate and tie utilities are' repare base maps . Preepa-- site plan . Pr.__- _. Par ad, in g and road deu gn T T rocessing . s i S CUP p Proposal , May 198Q Page Four Cit:v of Redlands Our 'Lees are based upon p c- e-formJnprofessional work that is acceptable to ourselves , our client , and the various governing agencies . We retain the services of reputable and responsible personnel experienced in the type of work to be performed . Accordingly , we will not incur expenditures above $ 10 , 900 - 00 without prior approval from the client . Fees for professional services beyond the scope of work as described in this proposal , such as construction staking , design work not presently identified , construction estimates , or meetings with the client ' s designated agents on unrelated work , will be accrued on a time and materials basis . It Will be considered extra work and be billed separately . - The accOmpanvinR fee shedule shall apply unless arrangements otherwise are made . The opportunity of submitting this proposal is . sincerely appreciated . If this proposal meets your requirements , or if other information is needed , please contact the undersigned . 0 Sincerely , T CIVIL E LOUIS WALDO FLORES , ENGINEER Louis Waldo Flores , P . E . t i ATTACHMENT B ----------------------------------------- PROJECT CP�L�UL I' T CQI��FUTLI PS P 1 . City Issues Notice-to-Proceed September 20 , 1989 2 . Submit Preliminary Site Plan and Topographic Map October 23 , 1989 . Submit Final Site Plan and Topographic Map for Review November 17 , 1989 ATTACHMENT C Civil Engineer (71 4) 798-8858 June 1989 CITY OF REDLANDS -- Proposal 938 1350 Zone Reservoir Site Plan FEE SCHEDULE FOR (SOURLY RATE OK Civil Engineer $ 80.00 / nr Craftsmen.& Technicians 45.00 / hr Computer Time/Survey Calcs 80.00 ! hr 2 man survey crew 120.00 % hr j man survey crew 140,00 I hr Travel ( survey crew) 60.00 hr Administrative/Clerical 23.00 / hr Blueprints (24 x 3b) 1.25 % she?t (atter first six pian sets have e been issued) Blueprints (Mise. size) 0.20 1 sq. ft. ($1.00/sheet minimum) 826 Brookside Ave:iu€, Suite C P.O. Box 2011 Redl:an<Js, CA 92373 ATTACHMENT D LOUIS WALDO FLORES Civil Engineer 7#4) 798-3858 Proposal 93€3 CITY OF REDLANDS -- Zone 1350 Reservoir Site Flan ESTIMATED PROFESSIONAL FEE _._ MAN HOUR COST BREAKD01§N 1.. Boundary Survey, prepare & file Record of Servet Research Boundary Information 3.0 hr @ $80 $ 240.00 - Survey Precalculations 3.O hr @ $80 240.00 Boundary Survey ( 2 man crew) 6.0 hr @ $120 720.00 Drafting of Record of Survey 7.0 hr @ $45 315.00 Submit to County Surveyor 3 trips @$150 450.00 County Surveyor Filing Fee $100/ea 100.00 Materials / Clerical / Misc. 3.Ohr@ $23 14VOO OO plus materials 1. Subtotal $ 21210..00 2. Aerial Topographic Mapping Subcontract to Aerial Firm 30 ac. @ $50/ac $ 1 ,500. 00 Coordinate with aerial firm & provide information/handling. q Lump Sum 500.O0 2. Subtotal $ 21000.00 3. Field Surveys: Aerial Control and Calculations Field locate & tie utilities Field Survey - Aerial Control 6.O hr 0 $120 $ 720.00 Reduce Motes - calculations 6.0 hr @ $80 480.O0 Set Iles t&Ta gets & monvments, 2.0 hr @ $120 24C.010 Research City plans & utilities 4.O hr @ $80 .320.00 Field Locate Utilities Q man) 4.0 hr @ $120.00 480.00 Reduce Notes utilities locat_i ons 3,O hr C $ASO 240.00 Materials (Paint, stakes, eta.. Cstimated - 90.00 3. Subtotal2,5C3.p( IJ continued on next page. 826 Brookside Avenue, Suite C 0 P.O. Box 2011 Redlands, CA 92373 LOUIS WALDO FLORES Civil Engineer (714) 798-3858 Proposal 938 -- City of Redlands Man hour cost breakdown,continued - 4. Prepare Base Maps Engineer develop site plan / Design 13.0 P $80 $ 1,040.00 Meetings with MUD 4.0 C $80 320.00 Plan Drafting 20.0'@ $45 900.00 Clerical 6.0 @ $23 138.00 Materials / miscellaneous 82.00 4. Subtotal 29480.0 5. Assist MUD with CUP Processing Engineer - Public meetings: Design Review ERC, Planning Commission. Council Consultation with MUD etc. Eng.neer 15 hrs @ $80 $1,200.00 Drafting - Estimated 6 hrs C $45 270.00 Clerical 6 hrs @ $23 138.00 Miscellaneous 32.00 5. Subtotal $1,640.00 TOTAL ESTIMATED FEE $101900.00 826 Brookside Avenue, Suite C 0 P.O. Box 2011 Redlands, CA 92373