HomeMy WebLinkAboutContracts & Agreements_21-1991_CCv0001.pdf AGREEMENT TO FURNISH CONSULTING SERVICES
FOR
ESTABLISHMENT OF A FIRE SUPPRESSION
ASSESSMENT DISTRICT
This AGREEMENT is made and entered into this 4
=`74 day of
jun ,e- , 1991.
by and between City of Redlands, hereinafter
referred to as "OWNER. "
and NBSJLowry, Engineers and
Planners, hereinafter
referred to as "ENGINEER. "
In consideration of the mutual promises, covenants and
conditions hereinafter set forth, the parties do hereby agree as
follows:
ARTICLE 1 - ENGAGEMENT OF THE ENGINEER
1. 1 The OWNER hereby engages the ENGINEER and the ENGINEER
hereby accepts the engagement to perform engineering
services in connection with the establishment of a City-
wide Fire Suppression District in the City of Redlands,
hereinafter referred to as "PROJECT. "
1.2 All work under this AGREEMENT shall be done in a
professional manner, and ENGINEER represents that he is
skilled in the professional expertise necessary to provide
high quality services under this AGREEMENT.
1.3 The ENGINEER shall be responsible, to the level of
competency presently maintained by other practicing
professional engineers performing the same type of work for
the professional and technical soundness, accuracy and
adequacy of all studies, designs, drawings, specifications,
and other work and materials furnished under this
AGREEMENT.
ARTICLE 2 - SERVICES OF THE ENGINEER
2.1 The ENGINEER will perform the services in connection with
the PROJECT as defined in Attachment A, Scope of Work.
-1-
ARTICLE 3 - RESPONSIBILITIES OF THE OWNER
3 . 1 The OWNER will place at the disposal of the ENGINEER all
available information pertinent to the PROJECT,
including previous reports and any other relative data.
3 .2 The OWNER will provide access to and make all provisions
for the ENGINEER to enter upon public and private lands
as required for the ENGINEER to perform his work under
this AGREEMENT.
3 .3 The OWNER will provide all environmental assessments or
impact reports required for this project.
3 .4 The OWNER will designate in writing a person to act as
the OWNER's representative with respect to the work to
be performed under this AGREEMENT, such person to have
complete authority to transmit instructions, receive
information, interpret and define the OWNER'S policies
and decisions with respect to materials, equipment,
elements and systems pertinent to the work covered by
this AGREEMENT.
ARTICLE 4 - PERIOD OF SERVICE
4. 1 The ENGINEER shall proceed with the engineering services
set forth in Article 2 in accordance with the schedule
defined in Attachment A.
4.2 The ENGINEER shall proceed with the services under this
AGREEMENT promptly and will prosecute them diligently.
ARTICLE 5 - PAYMENTS TO THE ENGINEER
5. 1 For the services performed under Article 2, OWNER will
pay the ENGINEER on a time and materials basis at the
hourly rates shown in Attachment B, Rate Schedule. The
manhour estimates and total budgets are shown on
Attachment A.
5.2 Payment for additional services requested by the OWNER
will be in accordance with a separately negotiated fee
or in accordance with the hourly fees shown in
Attachment B, Rate Schedule.
5. 3 ENGINEER agrees that at the point 75-percent of budgeted
costs have been expended for each scope of the PROJECT,
the ENGINEER will notify the OWNER in writing, including
a brief report on job status, percent complete, analysis
of budget, and envisioned expenses to complete the
contractual effort. Budgets shall not be exceeded
except if previously approved by OWNER.
-2-
5. 4 The ENGINEER shall bill the OWNER within ten days fol-
lowing the close of each month by submitting an invoice
indicating the work performed, who performed the work,
and the detailed cost of all work including backup
material, if requested.
Payments by OWNER to ENGINEER shall be made within . 30
days after receipt and approval of ENGINEER'S invoice,
by warrant payable to N. B.S. Lowry, Engineers and
Planners. .
All notices, bills and payments shall be made in writing
and may be given by personal delivery or by mail.
Notices, bills and payments sent by mail should be
addressed as follows:
TO OWNER: CITY OF REDLANDS
Engineering services Dept.
P. O. Box 3005
30 Cajon Street
Redlands CA 92373
TO ENGINEER: N. B.S. Lowry, Engineers and
Planners
P. O. Box 8124
164 Hospitality Lane, Suite 1
San Bernardino CA 92412
When so addressed, such notices shall be deemed given
upon deposit in the United States Mail. In all other
instances, notices, bills and payments shall be deemed
given at the time of actual delivery. Changes may be
made in the names and addresses of the person to whom
notices, bills and payments are to be given, by giving
notice pursuant to this paragraph.
ARTICLE 6 - INSURANCE AND INDEMNIFICATION
6. 1 ENGINEER shall maintain worker's compensation insurance
and, in addition shall maintain insurance to protect
OWNER from claims for damage due to bodily injury,
personal injury, or death and claims for injury to or
destruction of tangible property while performing the
services covered by this AGREEMENT. Said public
liability and property damage insurance shall be in a
minimum combined single limit of $1, 000, 000 per occur-
rence. The OWNER shall be named a primary additional
insured on insurance coverage for public liability and
property damage. The ENGINEER shall provide OWNER with
a certificate evidencing such insurance coverage.
-3-
6.2 ENGINEER agrees to maintain professional liability
insurance pursuant to this paragraph to protect OWNER from
negligent acts, errors or omissions of a professional
nature. The total aggregate of ENGINEER'S professional
liability insurance coverage shall be a minimum of
$1,000,000.
6.3 ENGINEER agrees to indemnify and hold harmless OWNER and
any and all of their officers, agents and employees from
and against all claims, loss, damage, charge or expense, to
which they or any of them may be put or subjected to
arising out of or resulting from any willful or negligent
act or actions, omission or failure to act on the part of
the ENGINEER, his contractors, his suppliers, anyone
directly or indirectly employed by any of them or anyone
for whose acts or omissions any of them may be liable in
the performance of the services described in this
AGREEMENT.
ARTICLE 7 - GENERAL CONSIDERATIONS
7. 1 In the event of any legal action brought by either party
against the other to enforce any of the obligations
hereunder or arising out of any dispute concerning the
terms and conditions hereby created, the losing party shall
pay the prevailing party such reasonable amounts for fees,
costs, expenses, including attorney's fees, as may be set
by the court.
7.2 The ENGINEER shall not sublet or assign any of the work
covered by this AGREEMENT, except with the prior written
approval of the OWNER and in strict compliance with the
terms, provisions, and conditions of the CONTRACT.
7.3 The key ENGINEER'S personnel proposed for this project are
as follows:
Richard A. Bueermann, Vice President
Ed Houston, Senior Project Coordinator
ENGINEER agrees that these key people will be made
available and assigned to the OWNER'S project, and that
they will not be replaced without concurrence from the
OWNER.
7.4 It is understood and agreed by and between the parties that
all documents, records, drawings, designs and
specifications, cost estimates, and other project documents
developed by the ENGINEER pursuant to this AGREEMENT shall
become the property of OWNER and shall be delivered to
OWNER if and when requested upon completion of services.
Any reuse of such documents for other projects and any use
of incomplete documents will be at the OWNER'S sole risk.
-4-
7 . 5 ENGINEER is for all purposes an independent contractor.
All qualified personnel provided by ENGINEER pursuant to
the provisions of this AGREEMENT are to be employed by
ENGINEER for his account only, and in no event shall
ENGINEER or any personnel retained by him be deemed to
have been employed by the OWNER or engaged by the OWNER
for the account of or on behalf of the OWNER®
7 . 6 Unless earlier terminated as stipulated below, this
agreement shall terminate upon completion and acceptance
by the OWNER of all work approved for performance under
Article 2 of this AGREEMENT.
7.7 This AGREEMENT may be terminated in writing by either
party in the event of failure by the other party to
fulfill its obligations under this AGREEMENT through no
fault of the terminating party: PROVIDING, that no such
termination may be effected unless the other party is
given (1) not less than thirty (30) calendar days
written notice (delivered by certified mail, return
receipt requested) of intent to terminate, and (2) an
opportunity for consultation with the terminating party
prior to termination.
7.8 If this AGREEMENT is terminated by the OWNER for reasons
of default by the ENGINEER, an adjustment to ENGINEER'S
compensation shall be made, but (1) no amount shall be
allowed for anticipated profit or unperformed services,
and (2) any payment due to the ENGINEER at the time of
termination may be adjusted to the extent of any
additional costs to the OWNER occasioned by the
ENGINEER'S default. If terminations for default is
effected by the ENGINEER, the adjustment in compensation
shall provide for payment to the ENGINEER to include a
reasonable profit for services rendered and
reimbursement for expenses incurred prior to the termi-
nation, in addition to termination settlement costs
reasonably incurred by the ENGINEER relating to
commitments which had become firm and approved by OWNER
prior to the termination.
7.9 Upon receipt of a termination notice, the ENGINEER shall
(1) promptly discontinue all services affected (unless
the notice directs otherwise) , and (2) deliver or other-
wise make available to the OWNER, copies of data, design
calculations, drawings, specifications, reports, esti-
mates, summaries, and such other information and mater-
ials as may have been accumulated by the ENGINEER in
performing this AGREEMENT.
7. 10 ENGINEER shall maintain books and accounts of all project
related payroll costs and all expenses and incidental
expense. Books shall be available at all reasonable times
for examination by the OWNER at the office of the ENGINEER.
7. 11 This AGREEMENT, including attachments incorporated herein
by reference, represents the entire AGREEMENT and
understanding between the parties and any negotiations,
proposals or oral agreements are intended to be integrated
herein and to be superseded by this written AGREEMENT. Any
supplement of amendment to this AGREEMENT to be effective
shall be in writing and signed by the OWNER and ENGINEER.
7. 12 This AGREEMENT is to be governed by and construed in
accordance with the laws of the STATE OF CALIFORNIA.
IN WITNESS WHEREOF, duly authorized representatives of the
parties have signed in confirmation of this AGREEMENT.
CITY OF REDLANDS NBS/LOWRY, ENGINEERS &
PLANNERS
By
Vice President
Date Cl I Date 7-7/
ATTEST;
Citi Clerk
1 14)
-6-
E X H I B I T 'A'
Proposal for
The Establishment of a
Fire Suppression Assessment
for the
CITY OF REDLANDS
May 1991
Prepared for:
City of Redlands
Redlands, California
CITY OF REDLANDS
FIRE SUPPRESSION ASSESSMENT
TASK LIST
• Discuss services to be furnished by the Fire Suppression Assessment
a. Fire Protection d. Salaries & Benefits
b. Training e. Capital Equipment
C. Equipment f. Building Facilities
• Attend a working meeting to discuss the proposed boundary and area of
benefit with City staff.
• Review work assignments and data required.
• Establish points of contact.
Principal Consultant 8 hrs $ 920
Principal Engineer Assoc. 8 hrs,
Engineer 760
8 hrs
_520
$2,200
DAI-�Gath�erin
• Obtain computer listing of property ownership, owner address, parcel number,
acreage, improved parcel areas by square foot and assessed value from the ,
County of San Bernardino.
• Review Redlands Specific Plans for land use
• Meet with City staff to review Fire Suppression requirements and estimated
costs
a. Salaries d. Building Facilities
b. Benefits e. Training
C. Equipment f. Capital Equipment
• Review similar Fire Suppression Assessment formations.
•
Review Government Code §50078: Fire Suppression Assessment requirements.
Principal Consultant 5 hrs $ 575
Principal Engineer Associate 20 hrs 950
Engineer 10 hrs 600
Clerical 10 hrs --ao—o
$2,425
.Preliminary Report
• Prepare a preliminary boundary map
• Prepare a preliminary listing of property owners including:
- parcel number
- requested owner
- acreage
- improvements
- assessed values
- improved property square footage
- number of parcels
- number of owners
• Land use review
• Net developable acreage by land use
• Cost estimate of capital improvements
• Cost estimate of personnel salaries and benefits
• Recommended method of assessments
- existing single family residence
- Multiple family residence
- commercial
- industrial
- office
- unimproved
Principal Consultant 20 hrs $ 2,300
Principal Engineer Assoc. 80 hrs 7,600
Engineer 80 hrs 5,200
Clerical 80 hrs 2,800
Computer 50 hrs 1.500
$19,400
Report
Prepare a report in accordance with Government Code §50079.4
* Property-owner listing with proposed assessment
* Proposed amount of assessment
* Method of assessment
* Schedule of assessment
* Duration of assessment
* Bans of assessment
* Maximum amount of assessment for each lot or parcel
Principal Consultant 10 hrs $1,150
Principal Engineer Assoc. 40 hrs
Engineer 3,800
40 hrs
Clerical 2,600
Computer 40 hrs 1,400
20 hrs 600
$9,550
MgMof Notice
* Prepare a draft letter of explanation for each property owner for City signature.
• Assist in the preparation of a draft letter of endorsement from the Redlands
Professional Fire Fighters.
* Provide address labels for each parcel owner in the City.
* Provide a notice of property assessment for each parcel.
* Mailing postage, envelopes and letter of explanation will be provided and paid
by the City. Mailing will be at least 2 weeps before date set for public hearing.
Principal Consultant 10 hrs $1,150
Principal Engineer Assoc. 10 hrs 950
$2,100
Postino of Notice
•
Post Notice of Hearing in three public places.
• City will advertise hearing in accordance with Governmental Code §606b.
Engineer 10 hrs - 650
650
Public Hearing
• Assist City in determining percentage of written protest, if any.
• Assist in providing responses to comments at the public hearing, if any.
Principal Consultant 10 hrs $1,150
Principal Engineer Assoc. 10 hrs
Engineer 950
20 hrs 1.300
$3,400
Final Assessment
• Provide final assessment roll to the City reflecting any revisions approved bthe
City Council for filing with the County Auditor and Tax Collector. y
Principal 10 hrs $1,150
Principal Engineer Assoc. 20 hrs
Engineer 20 hrs 1,900
Clerical 20 hrs 1,300
Computer 700
10 hrs
--3-0-Q
$5,350
SUMMARY
Preliminary Meeting $ 2,200
Data Gathering 2,425
Preliminary Report 19,400
Report
9,550
Mailing
2,100
Posting 650
Public Nearing 3,400
Final Assessment Roll
Travel $ 45,075
Reproduction 200
1.000
$46,275
E X H I B I T IB-11
NBS
ENGINEERS & PLANNERS
' LOWRY
SCHEDULE OF HOURLY BILLING RATES
Effective July 1, 1990
OFFICE
ENGINEERINGIPLANNING DESIGN AND DRAFTING
Senior Principal . . . . . . . . . . . . . _ _ . . . $135.00 Senior Designer . . . . . . . . . . . . . . . . . . . . $ 65.00
Principal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 115D0 Designer . . . . . . . . . . . . . . . . . . . . . . . . . . 60.00
Principal Engineer/Planner . . . . . . . . . . . . . . . . 95.00 Senior Drafter . . . . . . . . . . . . . . . . . . _ 55.()0
Senior Engineer/Planner . . . . . . . . . . . . . . . . . . . . KOO Drafter . . . . . . . . . . . . . . . . . . . . . . . . . . 45.00
Engineer/Planner . . . .. . . . : . . . . . . . . . . . 65D0 Engineering Technician . . . . . . . . . . . . . . . . . . . . . 35.00
Assistant Engineer/Planner . . . . . . . . . . . . . . . . . 50,00
FIELD
CONSTRUCTION MANAGEMENT SURVEYING
Principal Engineer/Construction Mgr 2.8 x Direct Salary Principal Surveyor . . . . . . . . . . . . . . . . . . . . . . . $ 90.00
Senior Engineer/Construction Mgr . . . . . 2.8 x Direct Salary Senior Surveyor . . . . . . . . . . . . . . . . . . . . 80.00
Resident Engineer/Construction Mgr , . . 2.8 x Direct Salary Supervising Surveyor . . . . . . . . . . . . . . . . . . . 70.00
Assistant Construction Engineer . . . . . . 2.8 x Direct Salary Survey Technician . . . . . . . . . . . . . . . . . . . . . . . 45.00
Inspector . . . . . . . . . . . . . . . . . . . . 2.8 x Direct Salary Survey Crew (3 Person) . . . . . . . . . . . . . . . . . . . 160.00
Survey Crew (2 Person) . . . . . . . . . . . . . . . 130.00
Travel Time . . . . . . . . . . . . . . . . . . . . . 50% x Crew Rate
Mileage (Survey Truck) . . . . . . . . . . . . . . . . . .45/Mile
SERVICES AND EXPENSES
Systems Analyst/Sr. Financial Analyst . . . . . . . . . $ 85.00 Computer:
Programmer/Financial Analyst . . . . . . . . 65.00 Mainframe Connect Time . . . . . . . . . . . $ 30.00/Hour
Senior Technician . . . . . . . . . . . . . 55.00 PC Connect Time . . . . . . . 10.00/Hour
Technician . - - . . . . . . . . . . . . 45D0 Disk Storage (Per 100K) . . . . . . . . . . . . . 45.00/Month
Executive Secretary/Admin. Assistant . . . . . . . 40,00 Reports: ($25.00 Minimum)
Secretary . . . . . . . . . . . . . . . . . 35.00 Lines Printed . . . . . . . . .02/Line
Word Processor/Clerk/Office Aide 30,00 CPU Time . . . . . . . . . . . . . . . . .30/Second
In-House Reproduction _ . . . . . . . . . . .10/Copy
Mileage . , � . . . . . . . . . . . . . . . . . . _ .30/Mile
Subsistence . . . . . . . . . . . . . . . . . . At Cost
Other Expenses . . . . . . , . Cost + 15%
Billing rates include overhead and are subject to increases each war due to onlon botgoininq agreenwrits and cost of living increases.
A late payment FINANCE CHARGE will be applied to onio unrooid N)'ance, cornruencingthirtv(30)days after the date of the original invoice, at the
maximurn interest rate allotuted by lam
6/90
NIB E X H I B I T B-2
SCHEDULE OF HOURLY BILLING RITES
Effective July 1, 1991
Engineering/Planning Design and Drafting
Senior Principal 5135.00 Senior Designer
Principal, 570.00
115.00 Designer
Principal Engineer/Plonner 95.00 Senior Drafter 65.00
Senior Engineer/Plonner55.00
85.00 Drafter
Engineer/Plonner 70.00 Engineering Technician 45.00
Assistant Engineer/Plonner55,00 40.00
Construction Management Surveying
Principal Engineer/Construction Mgr 2.8 x Direct Salary Principal Surveyor $95.00
Senior Engineer/Construction Mgr 2.8 x Direct Salary Senior Surveyor 85.00
Resident Engineer/Construction Eng 2.8 x Direct Salary Supervising Surveyor 70.00
y Survey Tech
Assistant Construction Engineer 2.8 x Direct Salarnic ion
45.00
Inspector
2.8 x Direct Salary Survey Crew(3 Person) 175.00
Survey Crew(2 Person) 140.00
Travel Time 50%x Crew Rote
Mileage(Survey Truck) 2/Mlle
IM Tj R Tn7j)
Systems Analyst/Sr Financial Analyst $85.00 Computers:
Programmer/Financiol Analyst 65.00
Mainframe Connect Time
e S30.00/Hour
Senior Technician 55.00 PC Connect Time 10.00/Hour
Technician 45.00 Disk Storage(Per Mb) 515.30/Month
Executive Secretory/Admin Assistant 45.00 Reports:(525.00 Minimum)
Secretary 40.00 Lines Printed .02/Line
Word Processor/Clerk/Office Aide 35.00 CPU Time .50/Second
Photocopies .]a/Copy
Mileage .32/Mile
Subsistence At Cost
tither Expenses Cost +15%
Billing rates Include overhead and ore subject to sub' increases each year due to union bargaining agreements and
cost of living increases. I
A late payment FINANCE CHARGE will be applied to any unpaid bolonce,commencing thirty(30)days after the dote of the original
invoice,at the maximum interest rate allowed by low,
6/91