Loading...
HomeMy WebLinkAboutContracts & Agreements_2-1984_CCv0001.pdf X65--029. 003 565-029. 009 565-029. 010 A G R E E M E N T THIS AGREEMENT, made and entered into the 7th day of February f 1984, by and between the CITY OF REDLANDS, A MUNICIPAL CORPORATION, hereinafter referred to as the "City" and NESTE, BRUDIN & STONE INCORPORATED, duly licensed Civil Engineers-Planners of San Bernardino, California, hereinafter called the "Engineer" . WITNESSETH: WHEREAS, said City proposes to study the possible expansion of its existing sanitary landfill; and WHEREAS, said City desires to engage the• Engineer to perform certain engineering and planning services pertinent to the above project; NOW THEREFORE, in consideration of the premises and mutual benefits which will accrue to the parties hereto in carrying out the terms of this Agreement, it is mutually understood and agreed as follows: SCOPE OF WORK The Engineer agrees to furnish professional services to perform the study and master planning of the City' s landfill according to the following tasks. TASK 1 LAND ACQUISITION FEASIBILITY STUDY 1. 1 Effect on Gas Migration 1. 1. 1 Review Documentation The State Solid Waste Management Board (SSWMB) report of existing gas migration and all other available reports and data regarding migration and generation of landfill gas at the site will be reviewed. 1. 1. 2 Analysis of Gas Migration Using existing data, an assessment of the existing gas migration problem will be made as well as evaluation of the various available methods' to mitigate the current problem, including the acquisition of adjacent land. 1. 2. Permits for Landfill Expansion 1. 2. 1 Responsible Regulatory Agency Review Responsible regulatory agencies (such as Regional Water Quality Control Board, State Solid Waste Management Board, County Health Department, California Division of Forestry, and City and 2 County Planning Departments) will be contacted to review the proposed landfill expansion and to identify constraints from a regulatory point of view. Requirements Insofar as possible , tentative requirements will be obtained from the regulatory agencies and included in the Technical Feasibility Report (see below) . Such requirements will play a key role in the feasibility analysis of the expansion. 1. 3 Environmental Feasibility Review A review of the most likely environmental questions which could affect the project will be conducted. 1. 4 Technical Feasibility Report Upon completion of Tasks 1. 1 thru 1. 3, a Technical Feasibility Report will be prepared and submitted to the City for review. The report will contain the information generated in the previous tasks; an analysis of the gas migration situation; an analysis of tentative regulatory requirements; and a review and brief analysis of environmental questions which could affect acquisition of the property and expansion of the landfill. Five (5) copies, each of a draft and final report will be submitted. 3 TASK 2 ECONOMIC ANALYSIS 2. 1 Review of Competing Disposal Sites Using primarily City refuse collection records and other data that may be available, potential competing disposal sites at San Timoteo Canyon and Cooley Ranch in Colton, including potential refuse-to-energy projects in the wasteshed will be identified and projections made of disposal fees at such sites. Haul times to the competing sites will be estimated to determine the total cost of the City for using such sites and/or processes. 2. 2 Predict Refuse Quantities Using primarily City refuse collection records and other data that may be available, projections will be made for annual quantities (tons/year) of refuse received at the site for two basic modes of operation, i.e. (1) City - collected refuse only, and (2) having the landfill open to the general public. The San Bernardino County Solid Waste Management Plan will be consulted to aid in projecting waste quantities and future disposal sites. Projections will be made for the expected life of the project and will consider the likelihood of refuse-to-energy projects being implemented within the wasteshed, including at the landfill site itself. 2. 3 Projection of Disposal Costs A projection will be made of disposal costs over the life of the expanded landfill. The projection will include: 4 0 Capital (land acquisition) 0 Site Development o ' Site Operation and Maintenance 0 Haul to the Site 0 Sinking Fund for Landfill Closure Costs will be converted to annual costs and divided by the projected refuse tonage received at the site. Unit costs will be calculated for City collected refuse only and for refuse from all sources (open-to-the-public option) . 2. 4 Projection of Annual Unit Costs From the information generated on projected refuse quantities and disposal costs, annual unit costs will be predicted. The cost for each year during the life of the expanded landfill will then be compared with the projected costs at competing sites and relative hauling costs to demonstrate the feasibility of expanding the landfill. 2. 5 Economic Feasibility Report At the conclusion of Tasks 2. 1 thru 2. 4, an Economic Feasibility Report will be prepared to document the findings of the economic analysis. This report, when considered with the Technical Feasibility Report, will form the basis for the City to decide whether to go forward with the project. The report will present, on a year to year basis, the costs of operating the landfill versus the costs of alternative, competing sites and the potential for revenue generation by being open to the public. Five (5) copies, each of a draft and final report will be submitted. - 5 Task 3 - Master Plan A master plan for construction and operation of the landfill will be prepared. The master plan will consider, in addition to efficient operating practices for the expanded landfill, protection of the environment, avoidance of nuisances for existing and future neighbors and ultimate use of the site. The plan will include sections on the following subjects: 0 Site Geology 0 Filling Plan and Sequencing 0 Access Roads and Drainage 0 Landfill Gas Control System 0 Leachate Control 0 Site Facilities 0 Nuisance Control 0 Plan for Ultimate Use 0 Use of Wastewater Treatment Plant By-Products (sludge and reclaimed water) Five (5) copies, each of a draft and final Master Plan will be submitted. TIME OF PERFORMANCE Phase I - Engineer will complete the task assignments listed in the Scope of Work within the time allowances listed below: Task 1 Land Acquisition Feasibility 3 Months from Authorization* Task 2 Economic Analysis 1-1/2 Months from Authorization for Task 2 6 Task 3 Master Plan 2 Months from Authorization for Task 3 Pending timely response from regulatory agencies. RESPONSIBILITY OF CITY The City shall furnish available and applicable information in the City' s possession needed by the Engineer for his work, including but not limited to, gas analysis and surveys, topographic maps of the existing and proposed landfills, plans for modification of the existing landfill, refuse generation quantities, etc. City shall promptly review and provide comments on Engineer' s submittals. IN CONSIDERATION of the above agreements, it is mutually agreed that the following payments shall be made in the following manner: ENGINEER' S FEE The fee due the Engineer for the work described herein shall be estimated as herein set forth in this section. The work will be performed on an hourly basis and charged according to the Engineer' s Schedule of Hourly Billing Rates, Exhibit "A" , attached. The cost for performing the tasks described in the Scope of Work shall not exceed $51,000- 00. METHOD OF PAYMENT The City shall pay the Engineer the fee as set forth above in the following manner: - 7 1 . Payments shall be made monthly for the services performed and billed. 2. The City will pay the Engineer for additional services, when authorized in writing by the City, as performed by personnel assigned to the regularly established office of the Engineer at the prevailing hourly billing rates per Exhibit "A" attached hereto, plus the actual cost of reimbursable expenses. CANCELLATION OR SUSPENSION OF CONTRACT The City shall have the right to cancel or suspend the Contract by giving the Engineer fifteen (15) days written notice to that effect. If such cancellation or suspension shall take effect during the performance of an uncompleted phase, the Engineer shall be paid the reasonable value of the work accomplished. IN WITNESS WHEREOF, THE City and Engineer have executed this Agreement as of this date first above written. CITY OF REDLANDS By 6'Mayor NESTE, BRUIN & STONE INCORPORATED By Galen N. Peterson' VicePresident Approved as to form this - day of 1984 CITY ATTORNEY By 8 EXHIBIT "A" NESTE, BRUDIN & STONE Engineers - Planners INCORPORATED SCHEDULE OF HOURLY BILLING RATES Effective August 1, 1933 OFFICE: ENGINEERING Principal Consultant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $78-00 Project Director . . . . . . . . . . . . . . . . . . . . . . . . . . . 6100 Principal Engineer . . . . . . . . . . . . . . . . . . . . . . . . 59,00 Assistant Principal Engineer . . . . . . . . . . . . . . . . . . 56.00 Senior Engineer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54,00 Engineer . . . . . . . . . . . . . . . . . . . . . . . . . . . 4T00 Geologist. . . . . . . . . . . . . . . . . - -- - - - _ 47,00 Associate Engineer. . . . . . . . . . . . . . . . . . . . . . . . . _ _ _ 43,50 Assistant Engineer . . . . . . . . . . . . . . . . . . 37.00 PLANNING Principal Planner . . . . . . . . . . . . . . . . . . . . . . . . . . . 59.00 Assistant Principal Planner . . . . . . . . . . . _ - - - - - - - - - - 56.00 Senior Planner. . . . . . . . . . . . . . . . . . . . _ _ 54.00 Planner 47.00 Associate Planner. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45,00 Assistant Planner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37.00 DESIGN AND DRAFTING Senior Designer . . . . . . . . . . . . 45.00 Designer . . . . . . . . . . . . . . . . . _ 4150 Senior Drafter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39,00 Drafter. . . . . . . . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ _ . . . . . . . . . . . . . 37.00 Delineator . . . . . . . . . . . . . . . . _ _ _ . . . . . . . . . . 31.00 Engineering Aide . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . 22.00 FIELD: CONSTRUCTION MANAGEMENT Principal Engineer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ . . . 59,00 Senior Resident Engineer . . . . . . . . .. . . . . . . . . 54.00 Senior Project Representative. . . . . . . . . . . . _ _ . . . . . . . . . . . . 54.00 Resident Engineer . . . . .. . . .. . . . . . . 4T00 Project Representative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47.00 Associate Project Representative. . . . . _ _ . . . . . . . . . . . . . . . . . . . . . . . . . . 45.00 Senior Inspector. . . . . . . . . . . . . . . . . . . . . . 2.75 x Direct Salary Inspector . . . . . . . . . . . . . . . . . . . . . 2.75 x Direct Salary SURVEYING Principal Surveyor . . . . . . . . . . 59.00 Assistant Principal Surveyor . . . . . . . . . . . . . . . . . . . . . . . _ 56.00 Supervising Surveyor. _ . . . . . . . . . . . . . . . . . . . . . . 54.00 3-man Survey Crew. - _ . . . . . . . . . . . . . . . . . . . _ 150.00 2-man Survey Crew. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105.00 1-man Survey Crew. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52.00 Travel Time — (when in excess of eight hours work time per day) 3-man Survey Crew. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ _ . _ 70,00 2-man Survey Crew, . . . . . . . . . . . . . . . . 48.00 SERVICES AND EXPENSES: Computer. Central Processing Unit(CPU) . . . . . . . . . . . . . . . . . 15(t/Second Connect Time,per Hour . . - . . . . .. . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . TOO Printing. . . . . . . . . . . . . . . . . . . . . . _ _ . . . 1.50/100-lines Minimum. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25.00 Programmer . . . . . . . . . . _. . . . . . . . . . 45,00 Technician . . . . . . . . . . . . . . . . . . . . 3T00 Researcher/Processor . . . . . . . . . . . . . . . . 31,00 Executive and Administrative Secretary . . . . . . . . . . . . _ . . . _ _ . . . . . . . . . . . 31.00 Data Entry . . . . . . . . . . . . . . . . . . . . . . _ _ . . . . . . . . . . . . . . . . . 22,00 Secretary/Clerk. . . . . . . . . . . . . . . 22.00 In-house Reproduction, . . . . . . . . . . . . . . - - - - - - - - - - . Cost Mileage . . . . . . . . . . . . . . . _ _ . . . . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2ft/Mile Subsistence . . . . . _ . . . . _ . . . . . . . _ _ _ _ _ . . . . . . . . . . . _ _ . . . . . . . . . . . . . . cost Other Expenses — including Special Consultants and Purchased Services through Subcontracts . . . . . . . . . . . . . . . . . . . . . . . . Cost + 10% Bdhrci rotes ioclde tavebecd,ea.zprneaf,spacerent.'_etc These b,Ung rates are suloecf to increase August I of each;ear due to union agreements Ord salary increases. A tcn,p.vurem FINANCE CHARGE vrill be opphed'O­V­r­db.1w­_contrue—mg th�,ty(30)d.Vs after at, oft. ed by,to. 8182