HomeMy WebLinkAboutContracts & Agreements_1-1968ORIGINAL _5e,e /i"sa/c
THIS AGREEMENT, made and entered into this day
of , 19 , by and between THE ATCHISON,
TOPEKA AND SANTA FE RAILWAY COMPANY, a Kansas cor-
poration, hereinafter designated "Santa Fe", and the
CITY OF REDLANDS, a municipality, in the State of
California, hereinafter designated "City".
WITNESSETH:
WHEREAS the Public Utilities Commission, State of California, has
ordered that automatic crossing gates be installed at the Orange Street
crossing of Santa Fe track (designated by said Commission as Crossing
No. 2U-8.8 ).
NOW THEREFORE IT IS AGREED by the -parties hereto as follows:
1. Santa Fe shall install aforesaid automatic crossing gates at
the Orange Street crossing, replacing the existing flashing light signals.
2. Such work shall be performed as soon as practicable, consider-
ing availability of materials and manpower, and in consideration thereof
the City will pay to Santa Fe. as its share of the cost thereof, one-half
of the actual dotal cost which total cost is presently estimated by Santa Fe
to be THIRTEEN THOUSAND SEVEN HUNDRED FORTY EIGHT ($1.3,748.00) Dollars.
Santa Fe's contribution toward the total cost of the work shall be applied
first toward any replacement or relocation involved.
3. "That upon completion of the wor]F.specified in Paragraph 1 of
this agreement, Santa Fe will render City a bill for its portion of the
costs and City will promptly reimburse Santa Fe for such costs.
4. That all work covered by this agreement shall conform to
requirements .of the Public Utilities Commission of the State of California.
(2)
5, After installation of railroad crossing protection signals and
appurtenances under terms of this agreement, Santa Fe shall physically
maintain same so long as they remain in place. The maintenance cost of said
signals and appurtenances shall be divided in the same proportion as the
cost of constructing such automatic grade crossing protection as provided
in Section 2 hereof, in accordance with Section 1202.2 of the California
Public Utilities Code,
6. The ownership of all materials used or placed in connection
with.the work specified in Paragraphs 1 and 5 hereof shall be in Santa Fe.
IN WITNESS WHEREOF THE CITY OF REDLANDS has caused these presents
to be executed and attested by its duly qualified and authorized officials
pursuant to authority regularly granted them by its City Council and THE
ATCHISON, TOPEKA AND SANTA FE RAILWAY COMPANY has executed these presents
..both as of the day and year first above written.
THE ATCHISON, TOPEKA AND SANTA' FE RAILWAY COVAh1Y
By
Its
CITY OF REDLANDS �
By
Its Mayor
ATTFT'
C i
erk