HomeMy WebLinkAboutContracts & Agreements_38-1988_CCv0001.pdf v- Geotechnical Engineers 251 Tennessee Street (714) 793-2691
Redlands.California 92373
Schaefer DixonAssociates Sc"a_`er J Dixon Johrt i P,tel i.
His i .onesosech F h�`v ae,ta
Robert Lvnn „vhn H Fe to
J.N. M8R0209C Paas Da,s Bernard J 1 aR,ue
September 15 1988 Janes Vve er We c Emerson
p r William,i J Monahan !N its
E. J Pa r sh- R c`rafo B ra r
<.
CITY OF REDI,ANDS Y`. V,xn
P.O. Box 280 >
Redlands, CA 92373
c1
Attn: Mr. Richard Corneille t_
Subj : Proposal for Subsurface Evaluation of
Salt Brine Contamination :
Brine Evaporation Pond, Redlands Wastewater Plant
Redlands, California
Gentlemen:
It has been requested by Mr. Corneille to submit a response to
a request from the California Regional Water Control Board,
Santa Ana region, to evaluate salt brine contamination at the
referenced facility. To develop an appropriate work program a
meeting was held with the above individual to determined the
approach the city wished to take regarding the investigation.
The directive received was to establish the vertical and
relative lateral extent of salt brine contamination above the
specified action levels and develop options for its mitigation
as required by the referenced agency.
BACKGROUND INFORMATION
During September of 1986, Pioneer Consultants was authorized to
perform a preliminary assessment of the integrity of the salt
brine impoundment at the referenced facility. The intent was
to establish if leakage had occurred and whether terminating
the use of the pond through abandonment would be the most
logical step to pursue. Additionally, the information
contained within this report was to develop a preliminary
assessment as to whether the impoundment would meet the
guidelines imposed by the California administrative code, Title
23 Waters, sub-chapter 15 of chapter 3 . That report was
submitted on September 30, 1986,
The finds of the referenced report indicated the salt brine had
leaked from the impoundment generating soil salt concentrations
above current basin objectives imposed by the referenced agency
J.N. MBR0209C
CITY OF REDLANDS
September 15, 1988
Page Four (4)
Should it be necessary to install a monitoring well , as
described above, the well, upon completion, will be developed
in accordance with specified EPA procedures. Upon establishing
an appropriate level of production, water samples will be
collected for chemical analysis in conjunction with field
measurements of electrical conductance.
Prior to advancing all exploratory borings for collection of
surface samples drilling and sampling equipment will be
decontaminated with the use of a pressurized hot water cleaner.
Between each individual sample drive within a particular bore
hole, the sampling equipment will be decontaminated with the
use of a TSP solution scrub and double rinsing with distilled
water. All wastewater collected from this operation will be
contained on site for our client's disposal.
In addition to the drilling activities conducted by this firm,
monitoring well have been previously established on site by
Harding Lawson Associates in January, 1988, for use in the
solid waste assessment report for the adjacent landfill. Water
samples will be collected and analyzed from these wells through
that firms work to comply with quarterly monitoring. The
information obtained by that firm will be utilized to evaluate
the impact subsurface brine contamination has had on the
overall water quality of the first encountered groundwater
aquifer.
LABORATORY ANALYSIS
Within the laboratory, selected and composite samples will be
analyzed to determine the electrical conductance of a soil and
distilled water extract at a ratio of one to two, respectively.
Additionally, peak concentrations of salt brine identified by
this procedure, in the near surface soils, will be analyzed to
determine the presence and concentration of CAM metals. This
information will be utilized to classify the materials
contained the impoundment for appropriate designation for
disposal. All analysis will be conducted by a state certified
laboratory, assumed at this time to be Centrum. Analytical
Laboratory in Redlands, California.
iAssociates
Schaefer Dxon
J.N. M8R0209C
CITY OF REDLANDS
September 15, 1988
Page Three (3)
We propose at this time to place four to five exploratory bore
holes within the impoundment bottom through the liner. The
holes will be advanced in the vertical fashion, located at any
visible rips or tears in the liner or at a random selected
location. Tentative placement is provided on Exhibit 1 ,
attached.
During the advancement of each rotary flight auger boring,
samples will be collected at five foot intervals with a
California modified split spoon sampler or alternate sampling
device, as dictated by subsurface conditions. The samples will
be evaluated at the time of collection in the field by
performing quick extractions of the salt contained within the
soil at a dilution ratio, that will need to be established by
the Water Quality Control Board. Previous ratios of 1 part
soil to 2 parts water and 1 part soil to 5 parts water have
been used. These water samples will be tested using a YSI
model no. 32 conductance meter to establish preliminary salt
concentrations at the time of drilling. This information will
be utilized to designate acceptable exploratory boring depths.
It is anticipated at this time that the borings will be
advanced to at least fifteen to twenty feet beyond achieving
concentrations of 2000 micromohs per centimeter or until
groundwater is contacted, whichever is less. Each of the
samples retained by this method will be packaged in accordance
with current regulatory procedures. The samples will be placed
into an appropriate storage containers and retained for
analysis by our representative.
At the completion of each boring to it's designated depth, the
resulting bore hole will be backfilled with a bentonite plug,
specifically Beroid Hole Plug, from the base of the boring to
the existing ground surface. The near surface hole plug will
be hydrated to develop an appropriate seal. All drilling
cuttings will be left on site for ultimate disposal at some
future date by our client. However, if groundwater is
contacted within the exploratory borings and it is determined
that electrical conductance through field analysis is above
designated concentrations, a single monitoring well will be
established in the most down gradient location in accordance
with the design specifications presented on Exhibit 2 at 1 to 2
locations.
Associates
Schaefer Dixon
J.N. M8R0209C
CITY OF REDLANDS
September 15, 1988
Page Two (2)
of 2000 micromohs per centimeter. The exact extend of the salt
brine contamination was not completely evaluated. However, two
wells installed, (one up-gradient, one down-gradient) , did not
contain groundwater which had a conductance above the basin
objective or out of line with regional anticipated salt
concentrations. However, the exact impact of the overlying
salt brine contamination on the water table was not completely
assessed.
Subsequent to submittal of the referenced report the City of
Redlands determined that abandonment of the impoundment was in
the best interest of the city. Appropriate notification was
given to the users of the pond, and termination occurred, as we
understand, during April of 1987. The pond has not been used
since that date and we are informed at present that it is dry.
A directive was received from the California Regional Water
Quality Control Board authored by Ms. Dixie Lass, which
indicated that an additional investigation would be required at
the impoundment. The work was to establish the extent of the
salt brine contamination and to develop recommendations for
it's mitigation where concentration exceeded the basin
objective of 2000 micromohs per centimeter, based upon
electrical conductance. In response to this request, an
appropriate work program has been developed and presented
below.
PROPOSED FIELD INVESTIGATIVE PROGRAM
The brine pond in question measures approximately 180 feet in
width and 210 feet in length. The pond it contains within it's
area a synthetic liner which was used for retention of the
fluids contained therein. The previous subsurface investigation
performed by Pioneer Consultants was designed so as not to
penetrate the implaced liner generating leakage. This was
conducted by performing four angle borings around the periphery
of the pond, and two groundwater wells, one up-gradient, and
one down-gradient. This information indicated peak
concentrations of salt brine contamination were identified
along the western and southern portions of the impoundment.
This area will be focused on during future subsurface work.
Associates
Schaefer Dixon
J.N. M8RO209C
CITY OF REDLANDS
September 15, 1988
Page Five (5)
REPORT
A report shall be prepared based upon the field and laboratory
data collected. This information will be utilized to establish
the vertical and potential lateral extent of salt brine
contamination above the 2000 micromohs per centimeter criteria
used by the regulatory agencies involved. Concentration
profiling with depth will be performed utilizing all available
information. An assessment of the impact of the underlying
groundwater table by migrating salt solutions will also be
performed.
The end resultant of the project will be development of a
closure plan that will establish viable options for the
mitigation of salt brine contamination above regulated
concentrations. These formalized recommendations will need to
be discussed with the California Regional Water Quality Control
board and the County of San Bernardino, to assess the practical
options available. The particular options which will be
pursued will be for the excavation of high concentration of
salt brine contamination and disposal at some designated
location with minimal hall distance and disposal cost.
Particularly use as a road base, building foundation material,
or landfill final cover base. In conjunction with these
removal options, the viability of in-situ encapsulation or
negotiated concentrations for residual contamination will also
be discussed with the regulatory agencies, to pursue all
available options.
TIMING
With regard to timing, we will be able to initiate this work
within three to five days of notification to proceed. The
timing required to complete all of the activities listed above
and to submit a final report for your report, would be three
weeks from the date the work is initiated.
FEES AND CONDITIONS
our services will be performed under the conditions indicated
with the attached Exhibit A - Conditions.
Associates
Schaefer Dixon
J.N. M8R0209C
CITY OF REDLANDS
September 15, 1988
Page Six (6)
The fees for our services will be based upon the rates
indicated on the attached Exhibit B - Schedule of Fees. The
fees for the scope of work described hereon are estimated at
$16,925, without the additional charges provided below and on
attachment C - Cost Estimate. It should be noted herein, that
the variabilities involved with this project, specifically, the
need for monitoring well installations, the depth of
exploratory borings, bore hole grout backfill and the amount of
regulatory contact required for development of appropriate
options for mitigation will lead to variability in the cost
estimate. As the project progresses, we will keep the client
apprised of the charges for budgeting and contractual purposes.
The costs provided herein do not include cost for containment
or disposal of contaminated materials generated from the
drilling and well production operation. It is assumed that
these materials will be left on site for our client's disposal
with drums provided by our client for the containment of
wastewater generated from well development and decontamination.
If it is your desire for our firm to provide these containment
vessels, a charge of $45. 00 per drum will be added to the
project.
It is assumed that after submittal of the report for your
review, meetings will be desired to discuss the available
options and to present the report to the water quality control
board for their final approval and acceptance. Due to the
unknown number of meetings required and the duration of time,
one meeting has been budgeted for. It is assumed that a
addtional meeting will be charged at the fee schedule rates
provided herein.
CLOSURE
Thank you for the opportunity to be of service. Should you
have any questions regarding the scope, schedule, or costs of
the services described herein, please do not hesitate to
contact our office at your convenience.
Please indicate that you have read this proposal, including
Exhibits 1 and 2, that you fully accept the scope of services,
Associates
Schaefer Dixon
J.N. M8R0209C
CITY OF REDLANDS
September 15, 1988
Page Seven (7)
authorization to proceed and complete the scope of services by
signing the authorization title block in the space provided on
the signature page and initialing Exhibits 1 and 2, and
returning one signed copy to Schaefer Dixon Associates.
Upon receipt of your acceptance and authorization of this
proposal, we shall commence with the scheduling of our work.
Respectfully submitted,
SCHAEFER DIXON ASSOCIATES
Kyle D. Emerson, C.E.G. 1271
As iate
Dean M. P.E.
Redlands Branch Manager
KDE/DMW:dmv
Attachments
Addressee (2)
AUTHORIZATION AND ACCEPTANCE OF CONDITIONS
City of Redlands
(Signature) (Firm)
Mayor October 5 , 1988
(Title) (Date)
P. O. Box 2090 , Redlands, CA 92373 714-798-7500
-ATTI7,91 : (Address/Telephone)
City Clerk
Ass4c(6ies
Schae er Dixon
The Client agrees to review the data, interpretations and recommendations of SDA and notify SDA in writing of such of
any failure of SDA to achieve the above standard of care prior to utilizing said data. Within the written project description,
objectives of SDA services, and scope of work under this Agreement, SDA shall at SDA's expense, perform remedial pro-
fessional services as required to achieve the above standard of care,
Client recognizes that subsurface conditions may vary from those encountered at the location where borings, surveys,
or explorations are made by SDA and that the data, interpretations and recommendations of SDA are based solely on the
information available to SDA. SDA shall not be responsible for the interpretation by others of the information developed.
All data obtained during the investigation phase are subject to confirmation of conditions encountered during construction.
Client recognizes that the scope of work:under this Agreement is limited by Client's budget for services, and that a more
detailed and extensive scope of work at greater cost to the Client may yield more accurate and reliable information regard-
ing conditions at or near the site. Nevertheless, Client recognizes and assumes the inherent risk of the scope of work
performed under this Agreement.
Client warrants that all information,studies, pians, specifications, description of underground utilities,or other materials
supplied by Client to SDA for SDA's use in completing its services under this Agreement are accurate and sufficient for
use by SDA in that SDA can reasonably rely on their sufficiency and accuracy.
Hazardous Materials
The services provided by SDA may require subsurface exploration in areas where the presence of hazardous materials
may be discovered. By entering into this Agreement, Client acknowledges and warrants that Client has no knowledge or
reason to suspect that hazardous materials are present at the subject site. In the event that hazardous materials are pre-
sent, whether known or unknown as such by SDA, Client agrees to indemnify, defend and hold harmless SDA, its officers,
employees and agents from all claims whether alleged to be as the result, in whole or in part, the fault of SDA in providing
their services that involves in whole or in part the presence of hazardous materials. Client also agrees to compensate SDA
for time and expenses incurred by SDA,in defense of any claim; for storage, transportation and disposal of contaminated
samples; disposal of contaminated consumables and decontamination of equipment. All such compensation shall be
based upon SDA's prevailing Schedule of Fees.
SDA reserves the right to unilaterally suspend or terminate all services under this Agreement at its sole discretion in the
event hazardous materials are discovered. If SDA services are terminated or suspended, SDA agrees to negotiate in good
faith a new agreement to continue to meet Client's needs.
Limitation of Liability
SDA'S aggregate liability for damages arising out of the professional services rendered hereunder whether arising out of
tort or contract. is Iimited to an amount not to exceed $50,000 or the total gross billings of SDA to Client hereunder,
whichever is less. Client shall release defend and indemnify SDA from and against all further liability beyond the above
amount, whether arising in contract or otherw se.
Insurance
SDA represents and warrants that it shall maintain in force during the period that services under this Agreement are pro-
vided, workers compensation insurance as required by law and Comprehensive General Liability Insurance with aggregate
iirr„is of$1,000,000. Costs of special insurance, if available, requested by the Client including, but not limited to, an in-
crease in policy limits and naming addifiona4_nsured parties on policies of SDA will be charged at cost plus 15%. Evidence
of the existence of the above-described insurance, on forms acceptable to the insurer,will be provided to client upon re-
quest in writing-
Ownership of Documents
All reports, prinna,'lees, field data and notes, `aboratory test data, calculations, estimates aria other documents prepared by
SDA, as instruments of service, shall remain the property of SDA. Client agrees that all reports and other work furnished to
the client or its agents, which are not pad for, will be returned upon demand and will, not be used by the Client for any pur-
pose whatsoever.
Disputes
In the event that a dispute arises relating to the performance of the services to be provided under this Agreement, and
should that dispute result in litigation, it is agreed that the prevailing party shall be entitled to recover all reasonable costs
incurred in connection with such dispute, including SDA's staff time at SDA's Schedule of Fees in effect at the time of
such dispute, court costs, attorney,'s fees and all other claim-related expenses,
Neither the client nor SDA may delegate, assign, sublet or transfer his or its duties or interest in this Agreement without
the prior express written consent of the other part,
Testing Charges
Charges for laboratory testing include labor and an additional overhead fee to account for laboratory equipment, maintenance
and supplies.Charges for rental of specialized laboratory equipment and tests contracted to others are charged at cost plus 15%.
For routine tests on common soils, unit testing charges may be estimated as follows:
Concrete
Compression Test (includes mold, cap, test and report)
Normal weight. 6 x 12 cylinder. . . . . . . . . . . 13.00
Lightweight, 6 x 12 cylinder, includes density . . . . . . . 35.00
Core sample, delivered to lab . . . . . . . 35.00
Masonry
Compression Test: Grout & Mortar 15.00
Brick . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 40,00
Block (8"x 8"x 16") 45.00
Asphalt
Asphaltic Stability Test, Premixed. . . . . . . . . . . . . . . . . . . . . 75,00
Marshall Stability Test, Premixed . . . . . . . . . . . . . . . . . .$100.00
Extraction Percent Asphalt
without gradation. . . . 70,00
with gradation . . .$110,00
Aggregates
Sieve analysis
Fine . . . . . . . . . —$ 4000
Coarse. . — . . — - . . . . . . . . . $ 4000
Oversized. . . . . . . . . . 80.00
Specific Gravity&Absorption 40.00
Steel
Reinforcing Steel
Tension, Bend&Physical Measurement 50.00
Structural Steel
Tension&Bend(coupon prep, not included) . . . . . . . . .$ 40.00
Soil
Moisture Content . . . . . . . . . . . . . . . . . . . .$ 15,00
Particle Size Analysis. . . . . . . . . . . . . . . . . . . . . . . $ 40,00
Including Hydrometer . . . . . . . . . . . . . .$100.00
Plasticity index . . . . . . . . . — , , . . , , , , .$ 40.00
Maximum Density—Optimum Moisture
Fiji!Curve . . . . . . .$1 00.00
Checkpoint . . . . . . . . . . . $ 15,00
Specific Gravity . . . . . . . - - - - $ 40,00
Expansion index . . . . . . . . . . . . . . . . .$ 70D0
Consolidation—One Dimensional $120.00
Direct Shear—Three Leads(Specimens). $1010.00
Triaxial Shear . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Will Quote
Permeability . . . Will Quote
R-Value . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$150,00
Sand Equivalent . . . . - - . . . . . . . . . . . . . . . .$ 4500
if samples are untestable as received from the field, an additional hourly sample preparation fee will be charged at the
technicians regular hourly rate.
Thisschedule includes the tests most often requested A detaileo schedule listing all laboratory tests performed is available
on request.
City of Redlands
Brine Pond
(Attachment C)
Drilling: 5 holes to 80 feet or refusal
Soil Borings 25 hours drilling @ $130/hour = 3250
25 hours service truck @ $25/hour 625
Steam Cleaner @ $100/day 300
Well Installation
1 well x (assumed 100 feet) x 40. 00/ft = 4000
Soil boring backfill 5 borings to 80 feet @ 8. 00/ft = 3200
Field Time•
Geologist = 1950
Vehicle = 150
Supplies = 100
Conductivity Testing (field) = 200
2400
Laboratory:
Conductivity test: Eight per boring @ $10/each = 400
CAM metals 1 per boring @ $240/each = 1200
TDS 1 per boring @ $50 = 250
1850
Report Preparation with Recommendations = 1300
with one final meeting
TOTAL $16,925
NOTE: Charges do not include costs for containment or
disposal of contaminated drilling cuttings or
waste water. Charges are not included for
meetings beyond one final meeting with the client
or water quality board.
Charges may be adjusted to a lower total dependent
upon the volume of needed bentonite backfill and the
single well installation.
Associates
Schaefer Dixon
' LOCKING TRAFFIC k_-IED CONCRETE 'ttECKs
WALL tiOVBR SLOPED TO DRAIN
a '
GROUND SURFACE
THREADED PLUG
OR 'SLIP CAP ' .,.. VARIABLE THICKNESS OF
• 2% BENTONITE CONCRETE
' ) SLURRY
2'-BENTONITE SEAL
` SOLID FLUSH JOINT
SCH. 40 PVC CASING
VARIABLE ;��, IIIIIIIII
,LENGTH IIIIIIIII :S::
0. 3 MONTEREY SAND PACK
GROUNDWATER a IIII
ELEVATION VIII SLOTTED FLUSH JOINT
VARIABLE '•: IIIIIIIII :�l. SCH.40 PVC - VARIABLE
. LENGTH LENGTHS ABOVE AND BELOW
: : IIIIIIIII;;: WATER TABLE TO MEET SITE
III��IIII CONDITIONS
:i' IIIIIIII! '�c:
l ...: Illllllll . " N
THREADED PLUG
fr T•..
2M�
$a;
TYPICAL'•MQNITORING WELL DESIGN
Goolachnlcal Engineers DAT E J 0 B NO.
4 ` S& SQ.U2clq C.
Associates SCALE NONE EXHIBIT •�
Schaefer Dixon L•+ , - -
o. 2 O
W
Oz C o .i
s a W
W z o`--` C W
W pe C
Q W o
W a a rr
L
i b c ® °
I(o m
r r
d
l m m O
w
Aempeoa OV
m�
FO,
a
_. O ,U'v
-C 14r. l
� c
a I I z
z
a
CL
m
m =
O m 13
W I Z
a Z ®I 0 W
m ~
a
r
O O�°'� .• l= I
t�,m� a
�q4 ,W I v
avow lura
luew)iuegwa UOIIOGIOJd (8uue43 JeAIJI bub► glue$