Loading...
HomeMy WebLinkAboutContracts & Agreements_6-1992_CCv0001.pdf AGREEMENT RELATING TO THE CONSTRUCTION OF IMPROVEMENTS TO ALABAMA STREET This Agreement is made and entered into this day of 1992, by and among the City of Redlands, the City of San Bernardino and the City of Highland. WHEREAS, the Cities of Redlands, San Bernardino and Highland recognize the need for the construction of certain improvements to Alabama Street at a location three-tenths (0. 3) of a mile south of Third Street, and desire to cooperate in funding the construction of such improvements (the "Improvements") ; and WHEREAS, the Cities of Redlands, San Bernardino and Highland shall benefit mutually from the Improvements in proportion to the work to be done in each City's jurisdiction as shown in Exhibit "All attached hereto and the map attached hereto as Exhibit "B" ; NOW, THEREFORE, in consideration of the mutual promises contained herein, it is agreed by the Cities of Redlands, San Bernardino and Highland as follows: UCTION I OBLIGATION,9 a THE CITY 2E REDL&NDS A. The City of Redlands shall act as lead agency for purposes of the California Environmental Quality Act and soliciting contracts for the construction of the Improvements. The Improvements shall consist of the following: (1) Grinding one (1) inch of existing pavement. (2) Excavate and install six (6) inches of aggregate base in areas of widening. (3) Overlaying existing pavement with three (3) inches of asphalt concrete. (4) Construction of four (4) inches of asphalt concrete pavement in areas of pavement widening. (5) Traffic painting and the installation of raised markers per the approved striping plan. (6) Installation of traffic signs per the approved plan. B. Construction of the Improvements shall be performed in accordance with the Standard Specifications of the City of Redlands. Plans and specifications shall be prepared and all contract administration shall be done by the City of Redlands. The Improvements may be constructed under one or more contracts in accordance with law. -2- C. Redlands shall require contractors and subcontractors to purchase and maintain the following insurance: I. Commercial general liability insurance or equivalent form with a combined single limit of not less than $1, 000, 000 per occurrence. If such insurance contains a general aggregate limit, it shall apply separately to this Agreement or be no less than two times the occurence limit. Such insurance shall: a. Name the Cities of Redlands, San Bernardino and Highland, their respective officials, officers, and employees as insureds with respect to the construction of the Improvements and contain no special limitations on the scope of its protection to the above listed insureds; b. Be primary with respect to any insurance or self insurance programs covering the Cities and their officials, officers and employees; and C. Contain standard separation of insureds provisions. 2. Business automobile liability insurance or equivalent form with a combined single limit of not less than $500, 000 per occurrence. Such insurance shall include coverage for owned, hired and non-owned automobiles. 3. Workers' compensation insurance with statutory limits and employers' liability insurance with limits of not less than $1,000, 000 per accident. -3- 4 . The City of Redlands shall require the contractor to do all the following: a. Prior to the issuance of a notice to proceed for the Improvements, furnish properly executed certificates of insurance, and certified copies of endorsements, and policies if requested by the City, to the City which shall clearly evidence all insurance required in this Section. Such certificates shall be endorsed to provide that such insurance shall not be canceled, allowed to expire or be materially reduced in coverage except on 30 days' prior written notice to the City. b. Maintain such insurance from the time a notice to proceed is issued until a notice of completion is filed. C. Place insurance with insurers licensed to do business in California. d. Replace certificates, policies and endorsements for any insurance canceled or allowed to expire prior to the filing of the notice of completion for the Improvements. D. Redlands shall be responsible for 59% of the cost of the design and construction of the Improvements as determined in good faith by the City of Redlands. -4- E. Redlands shall provide and install all signing for the project. Partial: reimbursement ent fearsigning shall be provided by the Cities of Highland and Sari Bernardino based upon the schedule attached hereto as Exhibit "CO. F. Redlands shall use due diligence to complete the Improvements by August 31, 1992, Redlands shall allow the Cities of Highland and San Bernardino to conduct a final inspection of the Improvements prior to the recordation of a notice of completion for the Improvements. R. Follow .ng recordation of a notice of completion for the Improvements, Redlands shall provide the Cities of Highland and San Bernardino with an accounting of all casts incurred to construct the Improvements. This accounting shall be used to determine the additional payment or reimbursement required under Sections 2 and 3 of this Agreement. SE9119H 2. oBLIGATM a M CITY 2E EM BIMAEDINO The City of San Bernardino shall pay for 33% of the cost of the design and construction of the Improvements. The parties estimate that this amount shall be $20,930, and the City of San Bernardino shall advance said amount upon the issuance of a notice to proceed for the Improvements. Thirty days following the filing of a notice of completion for the Improvements, one of the following shall occur, as applicable: 1) The city of San Bernardino shall pay for any additional funds necessary to bring the City of San Bernardino's payment up to the above stated percentage of 2) the City of Redlands will return that portion of the advanced funds as necessary to reduce the City of San Bernardino's contribution to the above stated percentage. SECTION 3 OBLIGATIONS OF THE CITY OF HIGHLAND The City of Highland shall pay for 8% of the cost of the design and construction of the Improvements, as determined in good faith by the City of Redlands. The parties estimate that this amount shall be $4,935, and the City of Highland shall advance said amount upon the issuance of a notice to proceed for the Improvements. Thirty days following the filing of a notice of completion for the Improvements, one of the following shall occur, as applicable: 1) The City of Highland shall pay any additional funds necessary to bring the City of Highland's payment up to the above stated percentage of 2) the City of Redlands will return that portion of the advanced funds as necessary to reduce the City of Highland's contribution to the above stated percentage. -6- IN WITNESS THEREOF, the parties hereto have caused this . Agreement to be executed by their respective officials thereunto duly authorized, ATTEST: CITY O D Aut riz" ' n ur Titl City Clerk Dated: February 18, 1992 Title Mayor ATTEST: CITY OF SAN BERNARDINO Authorized Signature Title Dated• Title ATTEST: CITY OF HIGHLAND Authorized Signature Title Dated: Title EXHIBIT 'A' I!rol2ortional Benefit LM Improvements REr2LANDS ZM BERN R12INO HIGHLAN.Q Excavation $ 4,265 _________ $ 295 Aggregate Base 3, 550 _________ 250 Grinding 1,730 $ 2, 130 340 3" A.C. Overlay 14 ,500 18,200 3,000 4" A.C. Widening 11,930 --------- 820 Striping 275 150 130 Signs 450 450 100 TOTALS $ 37, 100 $ 20, 930 $ 4,935 EXHIBIT *B« RU 11 Improvements 16 1 ' 1 • w dF r r o 4 A"A I r w 11i4i1f OF W�A' KNOT CF WAY f CITY OF +Trull ,. 7 till OF Rf-- _..._ r • n 1 �f f f t EXHIBIT "C" R,eimburggMtnt toff gianggg City of Redlands 450.00 City of San Bernardino 450.00 City of Highland 100. 00 $1, 000,00 V IV AGRE-EMENT LOE INETALLATIO QF G2&F-d2R--A--U THIS AGREEMENT, made and entered into this day of , 1991, by and between the City of Redlands, a municipal corporation of the State of California, hereinafter referred to as "REDLANDS, " and the City of San Bernardino, a municipal corporation of the State of California, hereinafter referred to as "SAN BERNARDINO. " WITNESSETH WHEREAS, the parties have determined that the installation of guardrails (the "Improvements") on the existing street section along Alabama/Palm Avenue at City Creek South of Third Street will promote vehicle safety. The exact location of the Improvements is shown in Exhibit "A;" and WHEREAS, San Bernardino and Redlands propose to utilize Federal Hazard Elimination Funds (HES) to finance 90% of the costs of the Improvements, and available local funds for the 10% local agency share; and WHEREAS, the west half of Alabama/Palm Avenue is within the incorporated limits of San Bernardino, with the east half located within the incorporated area of Redlands; and WHEREAS, Redlands and San Bernardino desire to specify herein the terms and conditions under which the Improvements will be constructed, financed and maintained; and SCD57620 WHEREAS, construction of Improvements is proposed for the 19g0-91 fiscal year, at a total preliminary estimated cost of $200,000.00. NOW, 'THEREFORE, in consideration of the covenants and conditions set forth herein, it is mutually agreed as follows: SECTION ONE: San Bernardino shall -- 1. 01 Perform all necessary field surveys, soil tests and material investigations necessary for design of the Improvements. 1.02 Act as Lead Agency in securing Environmental Review approval, preparing all required reports and agreements, and obtaining all permits necessary to construct the Improvements. 1.03 Prepare construction plans, specifications, estimations of quantities and costs, and contract documents for the Improvements. 1.04 Arrange for relocation or removal of all utilities which are in conflict with the Improvements. 1.05 Submit plans, specifications, estimations, and an application for encroachment permit to the County Flood Control District for the Improvements and obtain approval thereof prior to advertising for bids. 1.06 Provide adequate construction inspection of all items of work performed under construction contract referenced 2 SCD57620 hereinabove, and r intain records of inspections and materials test for review by Redlands. 1.07 Perform all required processing with Caltrans as required to secure the Federal HES Funds. 1.08 Maintain a detailed record of any proposed changes to the approved plans and specifications, and secure Redlands' approval prior to authorizing any change estimated to add more than $10, 000 to the total cost of the Improvements. 1.09 Submit a set of "As-Built" plans to Redlands upon completion of the Improvements. 1.10 Advertise, award, administer and fund a construction contract for the Improvements in conformance with HES funding requirements. 1.11 Accept responsibility for 50% of all local agency matching costs of the Improvements, including preliminary engineering, construction engineering, construction contracts, applicable overhead charges, and any other costs directly attributable to project. 1.12 Submit an accounting to Redlands of all costs charged to the project, along with a statement for Redlands' share of the cost. Redlands may require San Bernardino to submit documentation substantiating the costs incurred, and San Bernardino shall maintain and make available to Redlands all such documentation for a period of three years following substantial completion of the Improvements. 3 SCD57620 1 . 13 Upon completion of the Improvements, assume maintenance of the Improvements constructed within the City of San Bernardino. 1. 14 Require its contractors and subcontractors to obtain insurance of the types and in the amounts described below: A. Commercial General Liability Insurance. San Bernardino's contractor and subcontractors shall maintain occurrence version commercial general liability insurance or equivalent form with a combined single limit of not less than $1,000, 000 per occurrence. Such insurance shall: 1. Name Redlands, its officials, officers, employees, agents, and consultants, as insureds with respect to performance of work under this Agreement. Such insured status shall contain no special limitations on the scope of its protection to the above- listed insureds. 2. Be primary with respect to any insurance or self insurance programs covering Redlands, its officials, officers, employees, agents, and consultants. 3 . Contain standard separation of insureds provisions. 4 SCD57620 B. BLIsines9i A11toM012ile Liatility Insurance. San Bernardinots contractor and subcontractors shall maintain business automobile liability insurance or equivalent form with a combined single limit of not less than $1, 000,000 per occurrence. Such insurance shall include coverage for owned, hired and non-owned automobiles. C. Workers ' Compensation Insurance. San Bernardino's contractor and subcontractors shall maintain workers' compensation insurance with statutory limits and employers ' liability insurance with limits of not less than $1,000,000 per accident. D. Certificates/Insurer Rating/Cancellation Notices. San Bernardino shall require its contractor and subcontractors, prior to commencement of work on the Improvements, to furnish Redlands with properly executed certificates of insurance, and certified copies of endorsements which shall clearly evidence all insurance required in this Section. San Bernardino shall require that the contractor and -subcontractors shall not allow such insurance to be canceled or allowed SCD57620 to expire except on 30 days ' prior written notice to Redlands. SECTION TWO: Redlands shall -- 2.01 Permit San Bernardino to construct those portions of the Improvements within the jurisdiction of the City of Redlands in accordance with the approved plans and specifications. 2.02 Accept responsibility for 50% of the local agency matching costs for the Improvements and reimburse San Bernardino within 30 days after receipt of an approved itemized statement of cost. Redlands ' share is estimated to be $10,000.00. In no case shall Redlands' share exceed $15, 000.00. 2.03 upon completion of the Improvements, assume maintenance of the Improvements constructed within the City of Redlands. 2.04 Execute Common Use Agreement and right-of-way dedications (if necessary) for those portions of the roadway located within Redlands' jurisdiction. SECTION THREE: Joint Obligations -- 3.01 Redlands shall defend, indemnify and hold San Bernardino and its officials, officers, employees and agents free and harmless from any and all liability from loss, damage or injury to property or persons, including 6 SCD57620 wrongful death, arising out of any negligent acts, omissions, or willful misconduct of Redlands arising out of or in connection with Redlands ' performance of this Agreement. San Bernardino shall indemnify and hold Redlands, its officials, officers, employees and agents free and harmless from any and all liability from loss, damage, or injury to property or persons, including wrongful death, arising out of or incident to any negligent acts, omissions or willful misconduct of San Bernardino arising out of or in connection with San Bernardino's performance of this Agreement. 3.02 By using HES funding on the project, such funds will reduce the local cost shares of the City and Redlands by the amount of HES funds uses. 3.03 In any action instituted or arising out of this Agreement, the prevailing party in such litigation shall be entitled to all reasonable attorneys' fees and other costs of suit. THIS AGREEMENT shall inure to the benefit of and be binding upon the successors and assigns of the parties involved. SCD57620 i IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their respective officials thereunder duly authorized, CITY OF REDLANDS ATTEST: Clerk of the City of Redlands By: Mayo By: CITY OF SAN BERNARDINO ATTEST: By: W.R. HOLCOMB, Mayor By: City of San Bernardino City Clerk CITY ATTORNEY: Approved as to form and legal content: By: SCD57620 MINUTES OF THE BOARD OF SUPERVISORS Agr 92- 2 OF SAN BERNARDINO COUNTY, CALIFORNIA FCD-Zane 3 Inc cities Redlands July 6, 1992 FROM: KEN A. NIIIER, Director TrarpportaatiaVFlood cont of SUBJECT: OMM USE AJSREEKENT FOR USE OF DISTRICT O6 4ED LAND AT PIDNGE CREEK, BY UM CITi°Y OF REDZANDS FILE: 3-201 : Acting as the governing body of the Flood Control District, approve Cin Use Agreement between the District and the City of Redlands for construction, operation and maintenance of a road widening project on District awned lands on the East side of the Plunge Creek crossing of Alabama Street. BACKGROUND: The Cities of Redlands and San Bernardino are jointly improving Alabama Street in the vicinity of Plunge Creek. The District is currently processing a permit for the portion of the construction that is within District owned land. The District has reviewed the Cities' proposal and has determined that their proposed use is coupatible with the District's use of the lard. This agreement provides for the continual operation and mainte wx::e of and liability for the permitted improvements. REASON FOR ON: Board approval is required to effect this Agreev nt. REVIEW BY OTBE2 DEPARTT2Fd4TS: This Agreement was reviewed by Deputy County Counsel Charles S. Scolastico on July 11, 1991, and by Risk Management personnel on July 25, 1991. FINANCIAL DATA: No financial impact to the District will result from this agreement. PRESSER: Keri A. Miller Action of the Board of Supervisors cc: Flood Control AGREEMENT NO. 92-623 City of Redlands wlagree APPRC) � �� � ERVISORS c/o Flood Control CO INC} Auditor w/agreement Purchasing - Contract N10TION sr ri � MOTION Compliance s Risk Management EARLENE P ARD PWG BY ch File DATED: JULY 14-9507-400 41 Rev. 14/81 ITEM- FOR COUNTY USE ONLY o� x%.a fte°� E New Vendor Coder Dept. Contract Number M Change (/''`� /R� " X Cancel ` SC a?'1 A e+ County Department Dept. Orgn. Contractor's License No. Flood Con r l District 093 093 t4trroe>t+ Flood Control District Contract Representative Ph. Ext. Amount of Contract 381-2597 -0- SAN BERNARDINO COUNTY Fund Dept, Organization Appr, ObiJRev Source Activity GRCJPROJfJOB Number FLOOD CONTROL DISTRICT RFL 093 FA 108 CotntnAtl�4y Code Estimated Payment Total by Fiscal Year FAS , fm FY Amount IfD FY Amount IJD STANDARD CONTRACT Project Name 21 ung Creek at _ Algia Street _ THIS CONTRACT is entered into in the State of California by and between the San Bernardino County Flood Control District, hereinafter called the District, and Name CITY OF REDLANDS hereinafter called--"CITY" Address P.O. BOX 3uO5 Redlands, CA 92373 Phone Birth Date 798-7503 Federal ID No.or Social Security No. IT IS HEREBY AGREED AS FOLLOWS: (Use space below and additional bond sheets. Set forth service to be rendered,amount to be paid, manner of payment,time for performance or completion, determination of satisfactory performance and cause for termination, other terms and conditions, and attach plans,specificatio , and addenda, if any.) THIS AGIRMNEN ', made and entered into this day of , 19 , by and between the CI'T'Y OF REDLANDS, a municipal corporatiog of e State of California, hereinafter referred to as "CITY", and the SAN HERNARDINO CC3WrY FLOOD CONTROL DISTRICT, a body corporate and politic of the State of California, hereinafter referred to as "DISTIRICT"'. WITNESSETH WHEREAs, CI'T'Y desires to effect, at no cost to the District, the construction, operation and maintenance of a mad widening project on Alabama street at plunge Creek, which construction, operation and maintenance will necessitate CITY'S use of certain District owned lands for road purposes; and. WHEREAS, CITY desires to construct, operate and maintain said widening project and appurtenances within DISTRICT LANDS and, within adjoining CITY lands, which DISTRICT lams are hereinafter referred to as "AREA OF M24ON USE", which ,A OF COMMON USE is described on attached "Exhibit A" and shown on attached plat map marked "EXHIBIT IV'; and WHEREAS, DISTRICT desires to preserve, maintain, construct and operate flood control and water conservation works within and across said AREA OF COMMON USE; FA39108 02-12,459-69r > , 1,91 NOW, TfD=URE, IT IS UNDEFSIOOD AND MUTUALLY AGPEED AS FOIMWS: 1. DISIRICr hereby consents to the construction, reconstruction, maintenance and operation of a street widening project and appurtenances thereto, at no expense to the District within the AREA OF C CU MC3N USE and to allow CITY and the traveling public to occupy and use said AREA OF CC MON USE for street and highway purposes; provided, however, that no such use, occupancy, construction, reconstruction or maintenance, shall be effected by the CITY, its successors or assigns, in any manner which, in the opinion of the Chief Engineer of the DISTRICT,may interfere or conflict with any structures, facilities, operation or uses which DISTRICT has or intends to have upon said lands,without first submitting plans of such occupancy or use to DISTRICT'S Chief Engineer at least thirty days prior to the date of such intended occupancy or use and obtain his written approval therefore, which approval shall not be unreasonably withheld, if in the opinion of the Chief Engineer, the proposal does not interfere or conflict with the DISTRICT'S interests or the purpose of this agreement. 2. CITY, its successors and assigns shall assume full responsibility for the operation and maintenance of and liability for the roadway facilities installed by the CITY (including all roadways, pipes, approaches, sidewalks and other appurtenant works installed by the CITY) . 3. CITY acknowledges DISTRICZ"S right to AREA OF COMi40N USE and the priority of DISTRICT'S right within AREA of CUMN USE. Except in emergencies, CITY shall give reasonable notice to and obtain written approval frcm the DISMICT before performing any work on CITY facilities in said AREA OF CCHMON USE, where such work will be performed within channel or levee areas, if said work will in any way alter or obstruct the flow of or potential flocs of waters within said flood control and water conservation works. 4. CITY shall indemnify and hold DISIRICr and County and their officials, office, agents, employees and agents free and harmless frcm any ard all liability fran loss, damage or injury to' property or persons, including wrongful death, arising our of any negligent acts, omissions, or willful misconduct of CI`T'Y arising out of or in connection with CITY'S performance of this Agreement. CITY shall require its contractor to obtain insurance of the types and in the amounts described bele: A. ooamercial General Liability Insurance: CITY'S Contractor shall maintain occurrence version cxaxcial general liability insurance or equivalent form with a c cubined single limit of not less than $1,000,000 per occurrence. Such insurance shall: 1. Name District, the County of San Bernardino and City, their officials officers, employees, agents, and consultants as insureds with respect to performance of work under this Agreement. Such insured status shall contain no special limitations on the scope of its protection to the above listed insureds. 2. Be primary with respect to any insurance or self insurance programs covering Com, DIS'T'RICT' or County of San Bernardino, their officials, officers, employees, agents and consultants. 3. Contain standard separation of insureds provisions. B. Business Autcmobile Liability Insurance: CITY'S Contractor shall maintain business au bile liability insurance or equivalent form with a combined single limit of not less than $1,000,000 per occurrence. Such insurance shall include coverage for owned, hired and non-owned automobiles. C. Workers! Compensation Insurance: CITY'S Contractor shall maintain workers' compensation insurance with statutory limits and employers' liability insurance with limits of not less than $1,000,000 per accident. D. certificates/Insurer Rating/Cancellation Notices: CITY shall require its Contractor, prior to t of the Services, to furnish DISTRICT with properly executed certificates of insurance, and certified copies of endorsezents which shall clearly evidence all insurance required in this Section. CITY shall require that Contractor shall not allow such insurance to be cancelled or allowed to expire except on 30 days' prior written notice to DISTRICT and CI'T'Y. All policies, with respect to the insurance coverage above required, except for the Workers' Compensation insurance coverage, shall obtain additional endorsements naming the DISTRICT and the County, their employees, agents, volunteers arra officers as additional named insureds with respect to liabilities arising out of the performance of services hereunder. All policies required above are to be primary and non-contributing with any insurance or self-insurance carried or administered by the County. 5. DISTRICT and the County of San Bernardino shall indemnify and hold CITY, its officials, officers, employees and agents free and harmless from any and all liability from loss, damage, or injury to property or persons, including wrongful death, arising out of or incident to any negligent acts, omissions or willful misconduct of DISTRICT and/or County of San Bernardino arising out of or in connection with DISTRICT IS or County of San Bernardino's performance of this Agreement. 6. CITY, its successors and assigns, agrees that in the event the DISTRICT proposes an improvement within the Area of Common Use which interferes with the CITY'S facilities, the CITY will relocate its facilities within the Area of Common Use at its own expense provided the DISTRICT gives the CITY sufficient notice to do so. For the purposes of this clause relocation is deemed to be all or any portion of CITY facilities. The CITY shall construct any relocation in a manner that is acceptable to the DIS . CT. 7. DISTRICT has and reserves the right to use AREA OF QCMZ)N USE in any manner not in conflict with CITY'S needs for the proposed road widening project, without necessity for any further permit or permission from CITY. DISTRICT shall, except in emergencies, give reasonable notice to CITY before performing any work which may affect CITY'S facilities in said AREA OF CCMMDN USE. THIS AGREEMWr shall inure to the benefit of and be binding upon the successors and assigns of both parties. COUNTY OF IAN BERNARDI 0 OOD CONTROL DISTRICT ► CITY OF REDLANDS Chair , Board of pervisors (Statp-41 nar cation, company, etc.) 6 1992 Dated JUL Arized S ature) SIGNED AND CERTIFIED THAT A COPY OF THIS pate MAY -1, 19 9 2 DOCUMENT HAS BEAN-0E-L-IVEftD TO THE CHAIRMAN OF THE BOARD ' T Title MAYOR Me;k all 01 SaA fiQFRawiAddress P. 0. BOX 3005 SECRETARY IA*'I'� I� }moi. i:;N! )U ISTRICT By ) REDLANDS, CA 92373 Approved as to + m" r Revie d as to 7ffi Reviewed for Processing County Counsel _ Agency AdministratorICAO Date / i - Date ^ Date 02-12311-000 Rev.11190 Page of AREA OF CC043N USE The West 70.00 feet of that portion of the Northwest quarter of Section 9, Township 1 South, Range 3 West, San Bernardino Meridian, according to United State Goven vent Survey, described in d=mlent recorded in Book 5995, page 97, Official Reoords of San Bert,�rt3ino County. Fy$ �,,xtr r� COUNTY Of SAN 5ERNARDINO YLOO D CONTROL DISTRICT *� °� ENVIRONMENTAL 825 East Third Street • San Bernardino,CA 92415PUBLIC WORKS AGENCY r � �ri tl p*1Ef y ' C P=CATE OF ZNSURUANtE NOTE TO This form is to be completed by your hlsur e =Tpany. C0-TIFICA7ES` CIW,.MffS-`TWO"ONLY;=WILL BE°'A=MMUUE: Return completed form to San Bernardino County Flood Control District, Flood Control Permit Section, 825 East Third Street, San Bernardino, CA 92415-0835. In accordance with permit requirements, the undersigned does hereby represent to the San Bernardino County Flood Control District and the County of San Bernardino the following policy or policies "iasued to City Of Redlands fullv ccmmlies with the following Flood Control District insurance requirements: 1. PUBLIC' LIABILITY AND PROPERTY DAMAGE - The limits of liability in the Public Liability and Property Damage policy or policies shall not be less than $1,000,000 combined single limit. TYPE OF INSURANCE COMPANY & POLICY NO. EXP. DATE =IS OF LIABILITY GENERAL LIABILITY GENERAL STAR NATIONAL 7/1/92 $2,000,000 GA* NMR 100761 $1,000,000 OCC * POLICY IS SUBJECT TO A $1,000,000 SELF-INSURED RETENTION. 2. ENDORSEMENT NAMING ADDI'T'IONAL INSURED - Both the San Bernardino County Flood Control District and the County of San Bernardino are hereby named as additional insured for the purpose of the Permit, No. P- FA 39108 . Inclusion herein of any person or organization as an additional insured shall not affect any right which such person or organization would have as a claimant if not so included. This insurance coverage shall be primary insurance with respects to the San Bernardino County Flood Control District and the County of San Bernardino. 3. THIRTY (30) DAY WRI= NOTICE OF CANCELSATION - Your policy shall state that thirty (30) day prior written notice of cancellation, change or expiration.will. endeavor to b given tothe San Bernardino County r'lood Control DisLLi,_i:, FICA-.4 C,nt.vim r­ui . .awt :JI�i, East Third Stree*�., San Bernardino, CA 92415-0835. INSURANCE OCMPANY: GENERAL STAR NATIONAL THROUGH iiRysnN ASSOCIATES BY. DAVIS & GRAEBER INSURANCE SERVICES, INC. 6/11/92 . COMPANY AUTHORIZED SIGNATURE DATE AG ,S ADDRESS: P.O. BOX 750 A=11S PHONE _(714) 793-2373 REDLANDS, CA 92373 Sheet of Exhibit Map Permit No. File REV. 3/92 COST ESTIMATI; ALABAIJ& h�JELET WIDENING USUEFACING Total area of existing pavement 71,700 Redlands Area = 29, 600 41.3% San Bernardino Area = 36, 220 = 50.5% Highland Area 5, 880 = 8 .2% Area of Pavement Widening 20,465 Redlands Area = 19, 145 93 .5% Highland Area 1, 320 = 6.5% No widening in San Bernardino Excavation = Widening Area Assune Avenue excavation depth = 1.01 Area of excavation = 20,465 sq. ft. 1 760 c.y. Volume of excavation = 20,465 x 1 x - Cost = $6/c.y. x $760 = $4 , 560 27 Redlands cost = $4 , 560 x .935 = $4 , 265 Highland cost = $4 , 560 x .065 = $295 Aggregate Base Depth of Base = 0.5 ft. Same area as excavation Volume = 20465 x 0-5 v - = 380 c.y. 380 c.y. x 2T/cy -27760 tons Cost = 760 T x $5/ton = $3 , 800 Redlands Cost = 3800 x .935 = $3,550 Highland Cost = 3800 x . 065 = $250 Grind 11 Existing Pavement 71,700 s. f. - 9 = 8,410 s.y. Cost = 8,410 s.y. x $0.50.s.y. . = $4,200 Redlands Cost = 4200 x .413 = $1,730 San Bernardino cost = 4200 x .505 = $2,130 Highland Cost = 4200 x . 082 = $340 2LI &.C. over Existing Pavement 8410 S-y- X 3 in X 10 1390 tons 2000 411 A.C. Widened Area 20,465 s.f. - 9 = 2, 300 s.y. 2300 x 4 X 100 = 2300 s.y. 2000 510 T x $26/ton $13 , 260 Redlands Cost = $13 , 260 x .935 = $12,400 Highland Cost = $13 , 260 x . 065 = $860 RSD LMDS Double yellow - 1320 ft. x 0. 15 = $198 Solid white - 610 ft. x 0.10 - 61 Dash while - 330 ft. x 0.05 = 16 Total $275 EM BERNARDINO Double yellow - 200 ft. x 0. 15 = $ 30 Solid white - 1270 ft. x 0. 10 = 127 Total $157 HIGHLAND Double yellow - 840 ft. x 0. 15 = $126 Dashed white - so ft. x 0. 05 = 4 Total $130 SIGNS All signs are for benefit of whole project, therefore arbitrary percentage established for dividing cost, 45% for Redlands, 45% for San Bernardino, + 10% for Highland. 6 Standard signs at $100/ea. = $600 2 Special signs at $200/ea. = $400 Total $1000 Redlands = $450.00 San Bernardino = 450. 00 Highland = 100. 00 Sig CRY QE JQTA &:0ST ALLOChT,101i 12 CITIES RED DS M BEREAR12INO HI.CHLAND Excavation 4 , 265 -------- $ 295 Aggregate Base 3 ,550 --------- 250 Grinding 1,730 $ 2, 230 340 3" A.C. Overlay 14,900 18,200 3,000 4" A.C. Widening 11,930 ________ 820 Striping 275 150 130 Signs 450 450 100 TOTALS $ 37, 100 $ 20,930 $ 4,935 If businesses in the project area participate: in improvements, the cost to Cities will decrease proportionally. } r rtn ►-3 9 7Ca izr G"t H "Lt r`t7 t" txl y ' — 1 MOCHUM