HomeMy WebLinkAboutContracts & Agreements_238-2019FIRST AMENDMENT TO AGREEMENT TO PERFORM PROFESSIONAL SERVICES This first amendment ("First Amendment") to the agreement for the provision of professional engineering services for supervisory control and data acquisition (SCADA) design and integration ("Agreement") dated December 18, 2018 ("Agreement"), by and between the City of Redlands, a municipal corporation ("City"), and Tesco Controls, Inc ("Consultant"), is made and entered into this 3rd day of December, 2019 RECITALS WHEREAS, it is the desire of City and Consultant to amend Article 2 1 of their existing Agreement more particularly described in Exhibit "A," "Scope of Services" to include "Additional Scope of Services," which is attached hereto by reference, and WHEREAS, it is the desire of City and Consultant to amend Article 3 2 of their existing Agreement to correct the name of the City's representative from former representative, Paul Toor to the current representative, Chris Boatman, and WHEREAS, it is the desire of City and Consultant to amend Article 5 1 of their existing Agreement to increase Consultant's present total compensation of Three Hundred Three Thousand Four Hundred Thirty Four Dollars ($303,434) to the amount of Four Hundred Sixteen Thousand Eighty Nine Dollars ($416,089), NOW, THEREFORE, City and Consultant agree as follows AGREEMENT Section 1 The scope of work performed by Consultant pursuant to Exhibit "A" of the Agreement, titled "Scope of Services," is hereby amended to include the work that is identified in Exhibit "1," which is attached hereto and incorporated herein by this reference Section 2 Article 3 of the Agreement, titled "Responsibilities of City," is hereby amended to read as follows "3 2 City designates Chris Boatman, Municipal Utilities and Engineering Interim Director, as City's representative with respect to performance of the Services, and such person shall have the authority to transmit instructions, receives information, interpret and define City's policies and decisions with respect to performance of the Services " Section 3 Article 5 of the Agreement, titled "Payment to Consultant," is hereby amended to read as follows "5 1 The total compensation for Consultant's performance of the Services shall not exceed the amount of Four Hundred Sixteen Thousand Eighty Nine Dollars ($416,089) City shall pay Consultant on a time and materials basis up to the not to exceed amount, in accordance with 1 L 1caldimlAgreements\First Amendment to Tesco Controls Agreement.docx�n Exhibit "C" titled "Updated Cost Proposal," attached hereto and incorporated herein by reference " Exhibit "2" is attached hereto and incorporated herein by this reference Section 4 All other provisions of the Agreement shall remain unchanged by this First Amendment and in effect IN WITNESS WHEREOF, the parties have executed this First Amendment, to be effective as of December 3, 2019 CITY OF REDLANDS TESCO CONTROLS, INC BY -LA) -SU Paul W Foster, Mayor ATTEST Donaldson, City Clerk 2 L 1caldjmlAgreements\First Amendment to Tesco Controls Agreement.docx.jn EXHIBIT "1" ADDITIONAL SCOPE OF SERVICES Through the course of the current ongoing design phase, scope additions and changes have been requested by City which adds to the scope of the original specifications defined in agreement Therefore, the scope of the current job has expanded to account for these necessary changes and all of these items have been reflected in the first amendment. The additions include new instrumentation, equipment, and input and output points that need to be updated within the design plans and specifications being developed by Consultant Below for a listing of each site additions and the applicable services Item Qty Description AGATE WELL #2, BOOSTER PUMP STATION, & RESERVOIR 1 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language n New Instrumentation (LT -41, FIT -75, ZSC-75A, FIT -76, ZSC-76A, FIT -77, ZSC-77A, ZSC-91, ZS -93, ZS -94A to I) 9. New PLC I/O Points (P10 Dump -to -Waste Switch in "Waste", ATS in Emergency, Stair Intrusion, MCC/ATS Intrusion, CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Pump Fault, 4" Valve 1 Closed, 8" Valve 2 Closed, 12" Valve 3 Closed, CL2 Pump Flow, Well Level, 4" Valve Flow, 8" Valve Flow, 12" Valve Flow) • Updates/Additions to PLC Program(s) & SCADA Application New PLC UO Points (reference [/O points listed in Item 1 above) DEARBORN RESERVOIR 2 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language New Instrumentation (FIT -73, ZSC-73A, FIT -74, ZSC-74A, FIT -75, ZSC-75A, AIT -81, ZS -94, ZS -95A to C) New PLC IIO Points (4" Valve Closed, 8" Valve Closed, 12" Valve Closed, Hatch Intrusion 2, MCC Intrusion, CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Residual, 4" Valve Flow, 8" Valve Flow, 12" Valve Flow) • Updates/Additions to PLC Program(s) & SCADA Application New PLC UO Points (reference I/O points listed in Item 2 above) ARROYO RESERVOIR Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language New Instrumentation (AIT -81, ZS -93) D New PLC UO Points (Valve Opened, Valve Closed, Hatch Intrusion 2, Stair Intrusion, CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, Valve Open, Valve Close) • Updates/Additions to PLC Program(s) & SCADA Application New PLC IIO Points (reference I/O points listed in Item 3 above) 3 L Ica\djm\Agreements\First Amendment to Tesco Controls Agreement.docx.in Item Qty Description CRAFTON RESERVOIR 4 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language New Instrumentation (LIT -51, ZS -93, ZS -94) New PLC I/O Points (SolarBee Running, Stair Intrusion, CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, Tank Hatch Intrusion 2) • Updates/Additions to PLC Program(s) & SCADA Application New PLC I/O Points (reference 1/0 points listed in Item 4 above) FIFTH AVENUE RESERVOIR 5 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language o New Instrumentation (PIT -61, PIT -63, FIT -75A1, FIT -75A2, FIT -76B1, 76132, FIT -76B3, AIT -81, ZSC-91A1, ZSC-91A2, ZS -95, ZSC-96B1, ZSC-96B2, ZSC-96B3) o New PLC I/O Points (Hatch Intrusion 2, Alternate Valve Open, Zone 1900 Pressure, Valve AI Flow, Valve A2 Flow, Valve BI Flow, Valve B2 Flow, Valve B3 Flow) • Updates/Additions to PLC Program(s) & SCADA Application New PLC I/O Points (reference I/O points listed in Item 5 above) MARGARITA RESERVOIR 6 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language New Instrumentation (AIT -81) o New PLC I/O Points (Alternate Valve Opened, Alternate Valve Closed, CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, Alternate Valve Open, Alternate Valve Close) • Updates/Additions to PLC Program(s) & SCADA Application New PLC I/O Points (reference I/O points listed in Item 6 above) SAND CANYON RESERVOIR 7 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language o New Instrumentation (LIT -51, AIT -81, ZSO-91, ZSC-91, ZS -93A) New PLC I/O Points (ATS in Emergency, Stair Intrusion, Valve Opened, Valve Closed) • Updates/Additions to PLC Program(s) & SCADA Application New PLC I/0 Points (reference I/O points listed in Item 7 above) SOUTH AVENUE RESERVOIR 8 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language o New Instrumentation (FIT -76, AIT -81, ZSO-91A, ZSC-91A, ZSC-91 B, ZS -93A) a New PLC I/O Points (Stair Intrusion, CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, 4" Valve Flow) 4 L 1caldjmlAgreements\First Amendment to Tesco Controls Agreement.docx jn Item Qty Description • Updates/Additions to PLC Program(s) & SCADA Application 6 New PLC I/O Points (reference I/O points listed in Item 8 above) SMILEY RESERVOIR 9 Lot Professional Services to include- ■ Updates/Additions to Plans, Specifications, & Scope Language n New Instrumentation (LIT -51, PIT -61, ZS -93, ZS -94, ZS -95, ZSC-94, ZSC-95) n New PLC I/O Points (Pump 10 Valve Closed, Pump 20 Valve Closed, MCC Intrusion, Stair Intrusion) • Updates/Additions to PLC Program(s) & SCADA Application d New PLC I/O Points (reference U0 points listed in Item 9 above) TEXAS STREET RESERVOIR 10 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language n New Instrumentation (LT -41, LT -51, LT -61, LIT -51, AIT -81, ZS -30A, ZS -91, FIT -78) o New Equipment (I0 Radio 1, I0 Radio 2) d New PLC I/O Points (Pump 10 in Auto, Pump 10 Running, Pump 10 Fail, Pump 10 Discharge Pressure Confirm, Pump 20 in Auto, Pump 20 Running, Pump 20 Fail, Pump 20 Discharge Pressure Confirm, Alternate Valve Open, ATS in Emergency, Stair Intrusion, Well 30A Intrusion, SWGR Intrusion, Pump 10 Start/Stop, Pump 20 Start/Stop, Pump 10 Flow Rate, Pump 10 Discharge Pressure, Pump 20 Flow Rate, Total Booster Flow, Pump 20 Discharge Pressure, Well 30A Depth, Well 31A Depth, Well 32 Depth) • Updates/Additions to PLC Program(s) & SCADA Application New PLC I/O Points (reference I/O points listed in Item 10 above) WARD WAY RESERVOIR 11 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language o New Instrumentation (PIT -62, FIT -71, FIT -72, AIT -81, ZS -94) o New PLC 1/0 Points (Alternate Valve Opened, Alternate Valve Closed, Stair Intrusion) • Updates/Additions to PLC Program(s) & SCADA Application New PLC U0 Points (reference I/O points listed in Item 11 above) FORD & REDLANDS VALVE VAULT 12 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language n New Instrumentation (FIT -71, FIT -72, ZSC-91, ZSC-92, ZSC-93) n New PLC U0 Points (4" Valve 1 Flow, 8" Valve 2 Flow, 12" Valve 3 Flow, Pressure 1900 Zone, Pressure 1750 Zone) • Updates/Additions to PLC Program(s) & SCADA Application New PLC I/0 Points (reference U0 points listed in Item 12 above) 5 L 1caldjmlAgreements\First Amendment to Tesco Controls Agreement.docx�n Item Qty Description NORTH ORANGE WELL #1 13 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language ▪ New Instrumentation (LT -41, ZS -98) • New PLC I/O Points (P10 Dump -to -Waste Switch in "Waste", CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Pump Fault, MCC Intrusion, Well Level, CL2 Pump Flow) • Updates/Additions to PLC Program(s) & SCADA Application ▪ New PLC I/O Points (reference I/O points listed in Item 13 above) NORTH ORANGE WELL #2 14 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language ▪ New Instrumentation (LT -41, ZS -98) ▪ New PLC U0 Points (P10 Dump -to -Waste Switch in "Waste", CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Pump Fault, ATS Intrusion, MCC Intrusion, Well Level, CL2 Pump Flow) • Updates/Additions to PLC Program(s) & SCADA Application ▪ New PLC U0 Points (reference I/O points listed in Item 13 above) 2330 BOOSTER PUMP STATION 15 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language • New Instrumentation (FIT -71) HIGHLAND AVENUE WATER COMPLEX WELL, BOOSTER PUMP STATION, & RESERVOIR 16 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language ▪ New PLC 110 Points (Group #1 Load Shed, Group #2 Load Shed, Hydro Tank Pressure) CRESCENT & CROWN (PRESSURE ZONE 1900) 17 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language • New Instrumentation (PIT -61) WABASH & I-10 (PRESSURE ZONE 2100) 18 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language o New Instrumentation (PIT -61, ZSO-91, ZSC-91) • New PLC U0 Points (Valve 1 Opened, Valve 1 Closed) COUNTRY CLUB RESERVOIR 19 Lot Professional Services to include ■ Updates/Addttions to Plans, Specifications, & Scope Language ▪ New Instrumentation (PIT -62, FIT -75, AIT -81, AIT -82) 6 L IaaldjmlAgreements\First Amendment to Tesco Controls Agreement.docxjn Item Qty Description New PLC I/O Points (SWBD/ATS Intrusion, ATS in Emergency, Chlorine Residual Reservoir 2) MILL CREEK RESERVOIR 20 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language o New Instrumentation (AIT -82, ZS -93A, ZS -94A) New PLC I/O Points (Backup Pump Running, ATS in Emergency, Ladder 1 Intrusion, Ladder 2 Intrusion) SUNSET RESERVOIR 21 Lot Professional Services to include = Updates/Additions to Plans, Specifications, & Scope Language o New Instrumentation (LIT -51, AIT -8I, ZS -93) New PLC I/O Points (Stair Intrusion) TEXAS GROVE RESERVOIR 22 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language New Instrumentation (AIT -81, ZS -94, ZS -95A -D) n New PLC I/O Points (Valve 1 Opened, Valve 1 Closed, Valve 2 Opened, Valve 2 Closed, Valve 1 Open, Valve 1 Close, Valve 2 Open, Valve 2 Close, Vault Intrusion, Ladder Intrusion) MENTONE & CRAFTON VALVE VAULT 23 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language o New Instrumentation (FIT -71, FIT -72, ZSC-91, ZSC-92) A New PLC UO Points (6" Valve Opened, 6" Valve Closed, 8" Valve Opened, 8" Valve Closed, 6" Valve Flow, 8" Valve Flow) AGATE WELL #1 24 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language New Instrumentation (LT -41) d New PLC I/O Points (P10 Dump -to -Waste Switch in "Waste", Starter Intrusion, Well Level) AIRPORT WELL #1 25 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language o New Instrumentation (LT -41, ZSC-91, ZS -98) o New PLC I/O Points (P10 Dump -to -Waste Switch in "Waste", CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Pump Fault, MCC Intrusion, Well Level, CL2 Pump Flow) AIRPORT WELL #2 7 L \ea\dim\Agreements\First Amendment to Tesco Controls Agreement.docxdn Item Qty 26 Lot Description Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language • New Instrumentation (LT -41, ZSC-91, ZS -98) • New PLC 110 Points (P10 Dump -to -Waste Switch in "Waste", CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Pump Fault, MCC Intrusion, Well Level, CL2 Pump Flow) CALIFORNIA STREET WELL 27 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language ▪ New Instrumentation (LT -41, LIT -51, ZSO, ZSC) ▪ New Equipment (Compressor) • New PLC I/O Points (SWBD Intrusion, Valve Opened, Valve Closed, Well Level, Hydro Tank Level) CHICKEN HILL WELL 28 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language • New Instrumentation (LT -41, ZSO-91, ZSC-91) • New PLC I/O Points (P10 Dump -to -Waste Switch in "Waste", MCC Intrusion, Well Level) CHURCH STREET WELL 29 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language u New Instrumentation (LT -41, ZSC-91, ZS -93A & B, ZS -98) • New PLC 110 Points (P10 Dump -to -Waste Switch m "Waste", Surge Anticipator Valve Opened, Surge Anticipator Valve Closed, CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Pump Fault, Well Level, CL2 Pump Flow) CRAFTON WELL 30 Lot Professional Services to include ▪ Updates/Additions to Plans, Specifications, & Scope Language • New Instrumentation (LT -41, ZSO-91, ZSC-91) • New Equipment (Cla-Val Valve) • New PLC I/O Points (P10 Dump -to -Waste Switch in "Waste", Pump 10 Valve Opened, Pump 10 Valve Closed, MCC Intrusion, Well Level) EAST LUGONIA WELL #3 31 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language ▪ New Instrumentation (LT -41, ZSO-91, ZSC-91) • New PLC 110 Points (P10 Dump -to -Waste Switch in "Waste", CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Pump Fault, Well Level, CL2 Pump Flow) 8 L 1ca\djm\Agreements\First Amendment to Tesco Controls Agreement.docxjn Item Qty Description EAST LUGONIA WELL 44 32 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language i. New Instrumentation (LT -41, ZSO-91, ZSC-91, ZS -98) New PLC I/O Points (P10 Dump -to -Waste Switch in "Waste", CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Pump Fault, MCC Intrusion, Well Level, CL2 Pump Flow) EAST LUGONIA WELL #6 33 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language d New Instrumentation (LT -41, AIT -81, ZSO-91, ZSC-91, ZS -98) New PLC I/O Points (P10 Dump -to -Waste Switch in "Waste", CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Pump Fault, CL2 Building Intrusion, MCC Intrusion, Well Level, CL2 Pump Flow) HOG CANYON WELL #2 34 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language New Instrumentation (LT -41, ZSO-91, ZSC-91) o New Equipment (Radio Panel) o New PLC I/O Points (P10 Dump -to -Waste Switch m "Waste", MCC Intrusion, Well Level) MADEIRA WELL 35 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language o New Instrumentation (LT -41, ZSC-91, ZS -92, ZS -98) New Equipment (Pedestal) o New PLC I/O Points (P10 Dump -to -Waste Switch in "Waste", CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Pump Fault, CL2 Building Intrusion, MCC Intrusion, Well Level, CL2 Pump Flow) MAGUET WELL #2 36 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language n New Instrumentation (LT -41, LIT -51, ZSO-91, ZSC-91, ZS -92, ZS -98) o New Equipment (Pedestal) New PLC I/O Points (P10 Dump -to -Waste Switch in "Waste", CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Pump Fault, CL2 Building Intrusion, MCC Intrusion, Well Level, CL2 Pump Flow) MENTONE ACRES WELL #2 37 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language New Instrumentation (LT -41, ZSC-91, ZS -98) 9 L.1caldjmlAgreements\First Amendment to Tesco Controls Agreement.docx jn Item Qty Description • New PLC UO Points (P10 Dump -to -Waste Switch in "Waste", CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Pump Fault, CL2 Building Intrusion, MCC Intrusion, Well Level, CL2 Pump Flow) MILL CREEK WELL #2 38 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language New Instrumentation (LT -41, ZSO-91, ZSC-91) • New PLC UO Points (P10 Dump -to -Waste Switch in "Waste", Well Level) MILL CREEK WELL #2A 39 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language • New Instrumentation (LT -41, ZSO-91, ZSC-91) • New PLC UO Points (P10 Dump -to -Waste Switch m "Waste", Well Level) MILL CREEK WELL #4 40 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language • New Instrumentation (LT -42, ZSO-91, ZSC-91) ▪ New Equipment (Cla-Val Valve) • New PLC I/O Points (P10 Dump -to -Waste Switch in "Waste", Well Level) MUNI WELL 41 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language n New Instrumentation (LT -41, ZS -98) • New PLC I/O Points (CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Pump Fault, CL2 Building Intrusion, Well Level, CL2 Pump Flow) NEW YORK STREET WELL 42 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language ▪ New Instrumentation (LT -41) ▪ New PLC I/O Points (Well Level) ORANGE STREET WELL 43 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language ▪ New Instrumentation (LT -41, ZSC-91, ZSO-93, ZSC-93, ZSO-94, ZSC- 94, ZS -98) • New Equipment (Pedestal) 10 L IcaldimlAgreements\First Amendment to Tesco Controls Agreement.docx.jn Item Qty Description New PLC I/O Points (P10 Dump -to -Waste Switch in "Waste", Surge Anticipator Valve Opened, Surge Anticipator Valve Closed, Secondary Waste Valve Opened, Secondary Waste Valve Closed, ATS in Emergency, CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Pump Fault, MCC Intrusion, Secondary Waste Valve Call, Well Level, CL2 Pump Flow) REDLANDS HEIGHTS WELL 44 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language o New Instrumentation (LT -41) New PLC I/O Points (Pond High Level, Pond Low Level, MCC Intrusion, Well Level) REES WELL 45 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language o New Instrumentation (LT -41, PIT -61, PIT -62, PIT -63A, PIT -63B, DPIT-64A, DPIT-64B, DPIT-65, ZS -84, ZS -98) New PLC 110 Points (Blowdown Active, Blowdown Not Active, CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Pump Fault, CL2 Building Intrusion, SWBD Intrusion, Pump 20 in Auto, Pump 20 Running, Pump 20 Fail, Sump High Level, B/D Vessel 1 High Level, B/D Vessel 2 High Level, B/D Vessel 3 High Level, BID Vessel 4 High Level, Pump 20 Start/Stop, Well Level, CL2 Pump Flow, Treated Water Flow, Chemical Tank Level / Volume, Chlorine Residual, Pump 20 VFD Speed, Pump 20 Suction Pressure, Pump 20 Discharge Pressure, Filter Lead Differential Pressure, Filter Lag Differential Pressure, Basket Strainer Differential Pressure, Pump 20 VFD Command) WELL #34 46 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language o New Instrumentation (AIT -81) New PLC U0 Points (CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Residual) WELL #38 47 Lot Professional Services to include • Updates/Additions to Plans, Specifications, & Scope Language o New Instrumentation (LT -41, ZSC-91, ZS -93, ZS -94, ZS -95, ZSO-96, ZSC-96, ZS -98) o New PLC I/O Points (P10 Dump -to -Waste Switch in "Waste", ATS in Emergency, Surge Anticipator Opened, Surge Anticipator Closed, CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Pump Fault, SWBD/ATS/Starter Intrusion, Well Level, CL2 Pump Flow) 11 L \caldjmlAgreements1First Amendment to Tesco Controls Agreement.docx jn Item Qty Description WELL #39 48 Lot Professional Services to include ■ Updates/Additions to Plans, Specifications, & Scope Language New Instrumentation (LT -41, ZSC-91, ZS -93, ZS -94, ZSO-96, ZSC-96, ZS -98) o New PLC I/O Points (P10 Dump -to -Waste Switch in "Waste", Surge Anticipator Opened, Surge Anticipator Closed, CL2 Analyzer Flow OK Status, CL2 Analyzer Fault, CL2 Pump Fault, SWBD/ATS/Starter Intrusion, Well Level, CL2 Pump Flow) CONSTRUCTION SUPPORT SERVICES 49 Lot Professional Services to include ■ Construction Inspection Services (Onsite) Post -Installation Inspection 12 L lealdim\Agreements\First Amendment to Tesco Controls Agrecment.docx.in EXHIBIT G32" AMENDED COST PROPOSAL 13 L 1ca\djm\Agreements\First Amendment to Tesco Controls Agreement.docx.jn Prwhin,. 1 p...... lugger 9 1u Z ; 2,!i g 0 i/ h pp Y6 et 214 1 5014 a - i TaskDnlaeionut ICW .1_ I PrajM Rate: 5145.00 0155.04 5155.00 5145.00 0145.071 5145.00 5135.00 511 W 50.00 TAW 0 007671014 W W 50,00 10.00 MA: 0000 Ganser, Ayoiranlxfa 11Pr4dist Caelmilivir 50.00 0001.10 RwdMO/ Mswmce!Pbrnilll ER. 4 $2,95000 53,530.00 03007.00 Preirc1 Management&Reale/R.0rer in.YWleg 50.0 00012.01 60..*. 4.66ei lhlralion 4 4500.07 000107 Seamier,. f Vdwea 2 279000 0002.03 Oechion Log 3 5135.00 0007.01 Su6nrhal lag 7 929000 0002.05 ProOtt Scheduling (Lhmegh.A 40oject 0010005 10 55.444.00 0307.06 Flaming & Resource Leading 9 4970.00 0002.07 Site 1a(ely ma. 7n PR hNlw541005 1 5560.00 0001.00 General 4. 4 *len & Regneamroef 3 5412.10 0002.09 Payment Ape/Radom 4 056000 9003.00 0197601 Management Pan Submittal 1 51,160,40 5060 MA41 RVVEST70ATRORl4 5000 $0.60 110141 0010 lowed athrr 5090 001100 Won Review 4000 001101 Review Ea151.3ng Plana &Recordgr.whgs 11 2 2 52,4000 0017.02 Review ALARM,. 0 41,240.00 1412,00 field R1Wew & Assmergen 50,00 0017.01 2004701020147231401203574560151 sltesl 00 9 ' 16 6 00 55.16700 532.717.00 1412.02 Peeper Report of Re*u113Ateaemlendatlan0 2 16 1 1 1 2 03.47500 001100 Wx4shopc Review Meeting SOW 0013,01 Prepantl003 & Agenda Oeae1epenenl 2 429000 001307 Met411 4 1 5105.00 51.705.00 101303 Oocomen1Mfan & Meeting Minutes 2 S290.00 $0.00 TAM 4 4110GIU [0,007f, ftOMPIAMON 0000 00.00 arm 1600 0451100 441411141401046II410 5040 0021.14 Plan 4 Sisecilketlen Update 50.14 002101 Review ExiMing Phi1&5 0704* 16 1 1 53,215.00 1021.117 lvalun6.. &151457 Reeenenenda66113 1 2 1 51,715.0 0221.00 Vinaseem Oe.ign Wmashop(R.rkw Sam 9021.04 fume. len, & Agend,, 0evelapl.nt 2 579000 002505 Meeting A 4 5505.0 51.705.00 0107506 Oecumwreadon & Marli1g11lnuae 2 5250.00 0021.07 Mediae Mem. Speer. end Eatim.les (60%7 2 32 55250,20 007100 CM Arvlrw of WSi0pWrdSer 5000 0021.04 Wplsho.: fyulp.ncml5ahw.r.ALC 5eleninn 04061509 50.30 1421.10 Poeparattme & Agenda Development 2 $79600 0021.11 Meo6ag 4 1 1 5166.00 52,106.00 1421,12 f70 nentatlan & Methlg MX1a005 2 420040 0021,15 Update Pam, Speer, and Er4enalo4190%1 1 20 2 1 53.720.00 9021.11 O0y grate. of 90% 4pdated Set 5000 0021.15 Wlx6shop Coneteu teleRy workshop 50.00 0221,16 Pea paten 001 & agenda awak:mem 2 129000 9021.17 Met6g 6. 6 5155.00 57.455.W 0021,16 Ceeementatien & Meeting Minutes les 2 62417.02 0071.19 Update Wane, Specs, and reline. 10 51,590.00 1021.20 ClIT flrorre of 10011 UodeledSe 50.00 002121 Wxlthen: Orslgn Reeked 10.00 0021.23 Pmena4ons& Age»4. 0ernlatemam 1 0145.10 0021.23 M .ding 4 4 5506.00 31.705.10 0021.21 Ooclmentelbn&Meting Mlnoles 1 5145.W 107700 Final X16" See Oeliw.Y 1 5670.30 404.1 Addltbial Change R.Ruect 0894. 1910054.01 COM 2401.00 30415 WELL RLIO05/ERPUMP3,A,1011. 41.1055000 4 20 31 111,640,00 0007.00 0,00,0601114 Mame g a M 3x,50570 _ 0002.00 ARROYO RE51Rv0tt L 12 12 53,035.0 0504.00 1211111201 1100202021 1 4 6 52.473,00 0005.00 3IFM AIWA RE31RVOIR a 30 30 29.322.0 0146.90 RNROAARAASSERVOIR 1 9 5 52,765,10 0007.01 SANDCANTUN 0FS1i1V01R 2 5 6 02.050.10 0066.10 SOUTH AVENUE PEAOVOIR 2 4 9 12,920.10 0009.00 SM11E3 Kist Rv10R 2 1 6 $7.050.0 1010.00 TEN155111E11413014014 20 60 66 120.50000 0011.30 WARD NM RES111VOIR 1 4 a 51.215.00 001200 !ORO &100 L4105wI1EVAUtT 5 14 14 55.705.0 0013.00 a01560045025VE(L el 7 14 11 31,950.70 0011.00 NORM 0 ARM W0142 2 10 11 05.470.00 0015,00 7130110053111. au -ma 5.441201 1 3052.00 0016.00 6040/4 WELL 6006540F00764147101e.4000095e60 2 511000 007.00 C0FSCENT i CPOWN(a0ESLJRI 2014E lead 1 5101.00 0011.00 21A0410 &I.10177issimemit zoo 1 3153.00 0019,00 [WNW! 0. OM 11707*0024 3 5310454 002000 1111.23004151305011 1 5310.00 0021.00 155101121010040 1 5155.00 0022.00 TE1030210416163614011 1 5310.2 0023.00 1415300160013500VALV270413 2 5310.00 0071.00 460119311.1 1 0155.00 002500 AIRPORTWrl202 2 541500 0071,00 AIRPOITWEuur 3 5165.44 0027.0 CALIFORNIA SIRED- WUL 2 4310.0 3028.00 C10512.11411.1.1.1241 7 5155.00 1029.00 CIIURCNSTIIEETWSLL 1 1465.00 003000 [AAFTOR NEIL 1 5155.00 003500 1357 00001405 56L11 a1 1 5155.00 0032.00 EAST L030I61 WflM al 2 131000 13 L 1ca\djm\Agreements\First Amendment to Tesco Controls Agreement.docx.jn EXHIBIT "2" CONTINUTED AMENDED COST PROPOSAL 00}5,00 SIXTiudOIIA Yeat.4 1 5465.00 003400 MOO CANTON 140LR 562000 003500 06101111.416311. 1 346500 003600 1742073400193 1 54405.00 0037.00 1MFMONC MILS 16411 02 5 5465.00 007800 MIYLGEOUWNla2 1 $lccm 0039.00 MILLCR31134104024 1 $505.00 0040.00 49420110.453111 1 515000 0041.10 MOA/ Wel, 4 $310.00 0042.00 NSW YORK f1RUTTVICLL 1 1165.09 0013,00 ONaif 411641 04114 5 5773.00 0041.00 RIDI4N05N[3G1115 W[1L _ -. 1 5155.00 0045.00 0211 4W1r 11 $1,40010 0046.00 W0111,31 t 5155.2 0011.40 WC1La16 7 5465.05 248.00 3401031 1 5415.00 0049.90 [0N57RI1CTI0N 10pl0RT51RYK6 12 W 52.596.00 516835.00 44300 1990110]lIMQS 50.00 50-2 NW: 46911 Wig Swim 55 r 14 AN) 5000 9051.00 R roeerflo6l4 RFIs 4woe4 13ajecl40.3:5tnon1 10 $1.550.00 4011au 6 Clry C0OrdIeleAlls 005200 Addenda 40w S 5775.00 $0.00 704501 CONTNWK710N 11Ar0ONTS(RP6214 - 50.00 5600 OVA 4W C.18001806110444120147504115(Ir 34 Mx) 50.00 0041.00 Prr.Onserunion 1430n( 57 51.140.00 0061.01 haplr4Han5 6 AMMI E40elwearre 4 5304 00 0011.07 Mooring R 4 $745.00 51.14600 0061.03 D40030891404 6 24.024 M4aRas 2 52902)0 0042.00 S 3hm1Na100Y4erd 12 40 511.040.00 0017,00 Mania Orders 17 16 54.77000 0064.4 64e0040.131n04 20 04,100.045 TASKS - SCAM MIN M0470 RATION 5000 .- 5600 50.00 ITEM: 4400 MCAS1Ao.r 6.14P.Nanfel S4 sil.4 50.00 007100 Invealgalloeol feeing SCAM Inteeralkn It 514. 70 6 554000 $4,90100 0072.00 Plan Rode 6.Coet410414n16ake 943160 6 6 2 - 53.000.00 5000 0073.00 Workshop: Graphical 0srr IMMace OntenotaUons so/00s 50.00 007101 Preparations 6Agtod4 Do .444 tint 7 5290.90 907302 M0N641 4 4 521600 51.17600 007303 06[urn4M.lWn 6 Meep4g Min1406 2 5290.00 5600 0071.00 Plcir4mm111. 5430441 i. Cpn54.nekm IlnIxoration lank 5000 0074.01 454833 004040(3019 113811011 412 40 1 512,110.00 0074.02 11e10804446e04'3lr 37 74 4 54,70000 0014.03 400443Reservoir 20 165560000 0070.04 Graeae Reservoir IG 17 4 Stumm 0014.05 1111, 84e0040 Resta/ea 40 60 A 515040.00 0074.06 Marea.11. 0.s.31)4 20 114 55,80000 0074.07 Sand Canyon Ress.wir -_ 39 20 4 57.430.00 001400 1e145 080a0. 0.1001 - 60 40 4 517.79000 0071.09 Smiley gcscrmlr M 20 4 57.930111 0074.10 0e.4. 54eet (03001,( Ment 100 110 A $32,41000 007111 Ward Way Resenok 30 70 4 57270.00 907112 44746 Redlands 0uuluw, 4 20 16 .1 50.20000 9074.13 North Ommope 511401 Well 1 ----- 10 74 4 54,41000 0074.18 50141 Orange 1040 Wal 2 30 24 4 11.41600 0074.15 440305 20 1214 56.06000 007300 541.1391 Tcuing el Ott 0. 9.44645C4136530e0. 5600 007501 Agate 203.0.0 Panto Mallon 2 2 0 536600 51024.00 007507 GArh.n a*memoir7 2 0 SWAM 51.02000 4075.03 Amps 801171,88{ 2 2 8 5144.90 42024.09 002504 Cation Neste 2,k _ 2 2 4 5156.00 52.02400 007505 f1Nh Avon. Rasnvoir 2 2 1 5360.0 52020.00 007506 1174$4154 00540000 2 2 5 5236.00 52,02600 0075.07 Sand Canyon Rrxe+wl7 7 2 0 $1130 GO 5.0262 0075.00 South Avenue lemarealr 2 1 0 5366.00 52.026.90 5075.09 50e043 8833eralr 27 0. 5104.00 67.076.00 0075.10 Twat Spout Pumping Hee 2 2 6 5366.00 12026.2 0075.13 Wed Wry 0eMIVE e 2 2 N 5364.00 53,02600 0935.12 Ford & Redlands Ourle12,1 2 2 R 536600 52.070.00 0075.13 Nodls Ontnne 547401 We01 22 g 1364.00 51026.00 007544 Node Grant Short Wolf 2 7 7 0 534090 $7.02600 5000 50.2 301404.11 527,20008 567,730.00 52,640-00 51724115.00 5111,271.00 513130.00 516,410.00 52,45044 517,3245.4 3416,44 .4 Sunman/an .lpanne. 134 544 1e 1.17 713 14 _.. 156 .- /7EN:0 00 20 126 146 9 0 52.970 SO 554.04000 [1449:70 10 101 175 133 5 12 10 SS 6/1 041,57200 17050:21 Al 765 4 4 3 0 $0 61720 551,98100 17(14: SO S 10 0 0 0 0 50 50 12.271,00 77£49:00 34 114 0 0 0 0 59 5745 574.115.00 77(49:75 0 5 572 503 82 114 50 06.106 5174.036.00 p 0 0 0 0 0 50 SO 5000 0 0 0 0 0 0 50 SO 50.00 0 0 0 0 0 0 40 SO 50.00 0 0 0 0 0 0 SO 70 5000 Total Hours 1N 166 1 042 703 16 1116 0492 794503 527.26010 107,7504 02,14444 5122,410.00 5111,275.00 511,615.4 414A4564 63454.4 011,321.00 5416404544 14 L IcaldlmlAgreements\Flrst Amendment to Tesco Controls Agreement.docx.fn