Loading...
HomeMy WebLinkAboutContracts & Agreements_52-2000_CCv0001.pdf State of California Business,Transportation&Housing Agency PROJECT NUMBER OFFICE OF TRAFFIC SAFETY RS0028 GRANT AGREEMENT PAGE 1 (To be completed by applicant Agency) 1. PROJECT TITLE TRAFFIC DATA COLLECTION AND ANALYSIS PROGRAM 2. NAME OF APPLICANT AGENCY 4. PROJECT PERIOD CITY OF REDLANDS Month-Day-Year From: 3-01-2000 3. AGENCY UNIT TO HANDLE PROJECT To: 2-28-2001 PUBLIC WORKS DEPARTMENT 5. PROJECT DESCRIPTION (Sununarize the project plan covering the objectives, method of procedures, evaluation,and end product in approximately 100 words. Space is limited to 11 lines.) The City of Redlands in San Bernardino County will enhance public safety involving engineers and administrators in conjunction with new state-of-the-art computer technologies for developing a continual data collection and analysis program. This program integrates comprehensive traffic data into a geographic information system (GIS). It involves purchasing comprehensive data gathering, storage and analysis systems, and conducting counts of traffic volumes, and counting and classification of instruments to develop and maintain a database of information related to traffic safety issues. It involves procedures for evaluating on a monthly basis data collection points and effectiveness of related software to traffic engineering studies. Through community traffic safety outreach, the progress of the grant will be publicized in the media as well as at public venues through the use of a portable modular exhibit. The intended outcomes are maximizing public safety, and increasing staff productivity for developing and maintaining more effective traffic safety measures. 6. FEDERAL FUNDS ALLOCATED CINDER THIS AGREEMENT SHALL NOT EXCEED: S 64,173.00 7. APPROVAL SIGNATURES A. PROJECT DIRECTOR B. AUTHORIZING OFFICIAL OF APPLICANT AGENCY N,kw: Ronald C. Mutter PHONE 909-798-7655 NAME: Pat Gilbreath PHONE 909-798-7510 TITLE: Public Works Director FAx: 909-798-7697 TITLE: Mayor FAx: 909-798-7503 ADDRESS: Post Office Box 3005 ADDRESS: Post Office Box 3005 Redlands, CA 92373 Redlands, CA 923.733 �Gv v E-MAIL: rmutter@.eee.org E-MAIL: NoneMay r L ao une 6, 2000 T t nature X C ate (Signature) (Date) Signature)� � C. FISCAL OR ACCOUNTING OFFICIAL D. OFFICE AUTHORIZED To RECEIVE PAYMENTS N,v%iE: Bonnie Johnson PHONE 909-798-7543 NAMF: Public Works Department TITLE: Finance Director FAx: 909-3354735 ADDRESS: Post Office Box 3005 SDs` Post Office Box 3005 Redlands, CA 92373 Redlands, CA 923? E-MAIL: None ATTES { ^'�iti L rie oyzer, lerk S gnat reJ (Date) Page 2 (Office of Traffic Safety Use Only) EFFECTIVE DATE OF AGREEMENT: 3/1/00 GRANTEE CITY OFREDLANDS PROJECT NO. RS0028 8. Action No. 1 Date: 7/24/00 10. TYPE OF AGREEMENT 1 Initial X I Revision Cont. FUND PROGRAM TASK NO. F.Y. Revision No. Date: 402 00-RS 1 2 — 2000 19. Action Taken 1. FUNDING DISPOSITION&STATUS Initial approval, 2000 HSP funds obligated. Fiscal Year Amount 1999-00 $63,173,00 2000-01 $ 1,000.00 Total $ 64,17100 Obligated This Action $ 63,173.00 Previously Obligated $ - Total Amount Obligated $ 63,173,00 Amount Suspended $ 1,000.00 State FY 1999-00 2700-101-0890(50/1999) TOTAL FUNDS PROGRAMMED $ 64,17100 Federal Catalog No. 20.600 12. BUDGET SUMMARY(From Schedule B Detail)-FISCAL YEAR GRANT PERIOD ENDING: 9/30/00 2000 2000 TOTAL PROJECT COST CATEGORY GRANT PERIOD PRIOR GRANT TOTAL GRANT BUDGET ESTIMATE Personnel Costs B. Travel Expenses 2,000-00 2,000-00 $3,000-00 C. Contractual Services D. Nonexpendable Property 17,444.00 17,444.00 $17,444.00 43,729.00 43,729.00 $43,729.00 C D E. Other Direct Costs F. Indirect Costs TOTAL FEDERAL FUNDS . $ 63,173,00 $ 63,173.00 $ 64,173,00$ — I 13. PROJECT APPROVAL&-AUTHORIZATION TO EXPEND OBLIGATED FUNDS A. APPROVAL RECOMMENDED BY —77TB. AGREEMENT&FUNDING AUTHORIZED BY NAME; DENNIS HALL NAME: TERESA BECHER TITLE: TITLE: Regional Coordinator Interim Director PHONE: (916)262-0999 E-MAIL: dhall@ots.ca.gov Office of Traffic Safety Office of Traffic Safety 7000 Franklin Blvd., Suite 440 7000 Franklin Blvd., Suite 440 Sacramento, CA 95823 Sacramento, CA 95823 Signature ignature OTS-38a* (Rev 5/98) BACKGROUND A.GENERAL CHARACTERISTICS The City of Redlands is located at the eastern end of the San Bernardino Valley along the Interstate 10 Freeway approximately 70 miles east of Los Angeles. Features include the Santa Ana Wash to the north,the Crafton Hills to the east, the San Timoteo Canyon to the south and the City of Loma Linda to the west define and delimit the existing community of Redlands. Currently the population is 68,000. Adjoinin't,g Jurisdictions and communities include the jurisdictions counties of San Bernardino and Riverside and the cities of Yucaipa, Highland, Loma Linda, and San Bernardino. B. STREETS AND HIGHWAYS Redlands is situated along two major freeway systems, including connections to the employment centers of Los Angeles County via the San Bernardino Freeway (Interstate 10). To the north, State Highway 30 connects with Interstate 10, to Highland, San Bernardino, Las Vegas, Salt Lake City and beyond. Interstate 10 runs east and west and is an important link through San Bernardino County, into Palm Springs, Arizona and beyond. The Interstate 10 effectively bisects the City, east to west, dividing the population base in half. The roadway system in Redlands has a total of(282.6) miles of paved roadway. There are a total of(94.2),miles of arterial roadway conforming to the grid plan that connects to roadways of a similar nature in those cities and areas bordering Redlands. The remaining (223.14)miles of paved roadways are made of collector and residential streets. The Public Works Department consists of 59 total personnel, as follows: Engineering Administration 12 Street Division 15 Electrical Division 4 Building Maintenance Division 2 Parks Division 13 Street Tree Division 6 Cemetery Division 7 The Engineering/Administration portion of the Public Works Department is responsible for all aspects of traffic safety demand and management. Currently, the Assistant Public Works Director and Computer Graphics Engineer assume all administrative responsibilities associated with that function. Therefore, the demand on available personnel must be augmented in order to maximize traffic safety efficiency. The roadway system in Redlands has a total of(282.6) miles of paved roadway. There are a total of(94.1) miles of arterial roadway conforming to the grid plan that connects to roadways of a similar nature in those cities and areas bordering Redlands. The remaining (223.14)miles of paved roadways are made of collector and residential streets. C. EXISTING SYSTEMS Currently, studies of problem traffic locations are usually initiated by complaints from the public. The City has a Traffic and Parking Commission which meets monthly to hear requests from the public. The requests usually have to do with excessive speed, perceived high accident locations, pedestrian safety, and school zone safety. At times, staff also generates items as locations of concern come to their attention. In addition, 45 streets must have engineering, traffic and speed surveys completed every five years in order to support existing speed limits. Each request or area of concern is handled individually. Traffic studies are prepared by the Assistant Public Works Director and presented along with recommendations for action to the Traffic and Parkitip"Commission. The Traffic and Parking Commission is advisory to the City Council. All traffic control of a regulatory nature must be adopted by the City Council by resolution. Because of unreliable and inefficient equipment, it is often not possible to obtain complete information upon which to base the traffic studies. When the data is gathered and the studies completed, there is currently no unified system with which to store the data in a readily usable way. A two-person Street Division crew is responsible for all sign and street marking maintenance. As studies are completed and additional traffic control devices are approved,the Street Division im receives work orders for their installation. Additional responsibilities for these personnel include paving and grading One person in the Street Division is responsible for traffic signal maintenance. The City currently has 48 traffic signals under Its responsibility, and 3 installations pending. PROBLEM STATEMENT The proceeding summarizes the current practice regarding traffic issues. Following is a list of problems with the current practice that we hope to effectively address if the OTS grant is obtained: • Lack of comprehensive database to develop comparative accident rate studies Citywide. • Lack of integrated method to store traffic related data including accidents, speeds, volumes, and existing traffic controls. 0 Lack of comprehensive traffic counting program. 0 Lack of accurate sign and pavement marking inventory. A. Traffic Management Issues As previously stated,the current population of the City of Redlands is 68,000. The 20-year General Plan build-out is projected for 90,000 citizens. Therefore, it is incumbent upon the current administration to identify improved technology to assist in meeting the safety needs of the citizens for many years to come. A Copy of the Circulation Element is consistent in its focus throughout the circulation network, in these respects. The City of Redlands has experienced a population growth rate of 34.7% over the past ten years, Public Works Department staffing decreased by six Street and Electrical Division personnel over the past ten years. During the same period, departmental demands have risen significantly because of citywide reorganization and reassignment of responsibilities to the Public Works Department. Therefore, the current Public Works Department staff is operating at a minimum. As an example, since 1988 the City has annexed 9,579.28 acres of land. This includes 28 miles of paved roadway,including 5.6 miles of thoroughfare in high traffic collision areas, such as San Timoteo Canyon,portions of Live Oak Canyon Road and Alessandro Road. These roads were previously in the County of San Bernardino. In that period alone, there have been 5,160 traffic collisions in the City of Redlands. Of that, five percent, or 233 collisions and 252 injuries have occurred in the general annexation areas. Three quarters of those collisions have occurred on San Timoteo Canyon Road. Most collisions have not involved drugs or alcohol,but have been attributed to unsafe speed, inattention and unfamiliarity with the road. The General Plan states that, "Additionally, the major potential source of new traffic in the City will be the East Valley Corridor, where an anticipated 90,000 jobs are expected to be created. Redlands is projected to be a significant 'importer' of commuters and retail customers whereas today it is a net 'exporter.' The regional growth projections also assume substantial residential and job grow-th by 2010 from development in communities on each side of Redlands in San Bernardino and Riverside Counties. Consequently, demands for traffic safety have and will continue to increase, significantly. B. State Rankings I I Eighty-one cities compose our Population Group. According to the 1998 "Collision Rankings developed by OTS and the State Department of Finance, Redlands ranking for total fatal and injury collisions is high. For example: Ranking by Ranking by Totals Vehicle Miles Population STATEWIDE POP, GRP. STATEWIDE POP.GRP- FATAL AND NJURY COLI ASION TYPE 310 215 39184 124 Total Fatal and Injury 32/84 3 Alcohol Involved 263 19 57/84 303 59,184 Speed Related 49 54/84 293 64184 237 Nighttime 23 270 54/84 211 54/84 Ranking by Ranking by PMLatio Totals— Vehicle Miles STATEWIDE POP. GRP. STATEWIDE POP,GRP. FATAL AND INJURY COLLISION TYPE.contd. Hit and Run 366 7 82/84 370 80/84 HBD Driver<21 270 1 76/84 271 77/84 HBD Driver 21-34 7 274 59/94 252 53/84 Composite 287 66/84 352 71/84 KILLED AND INJURED VICTIM TYPE 22 268 53/84 Pedestrians 224 45/84 Pedestrians 65-' 217 1 59/84 222 64/84 Pedestrians<15 150 10 20,184 183 35/84 Bicyclists 17 319 66/84 278 60/84 Bicyclists<15 164 8 3184 209 38i84 DUI ARRESTS 329 (0.82%) These rankings suggest that improvements could be made in all but one category if the Public Works Department were to revolutionize the Department's ability to gather data efficiently and to use the data in an effective manner to determine appropriate measures to improve traffic safety in the City. In fact,the only area where the City is above the fiftieth percentile is"Hit and Run." This category is indistinct where related to the problem statement. C. Current EguiDment and Data Manap-ement Presently,there is not a comprehensive method for unifying the functions of Traffic Safety used by the Public Works Department. Each function is performed independently from others and the resulting Output from the functions, such as data from a traffic count, are stored individually. To 4 address the data for a Traffic Study often requires searching many locations for data. In addition, the methods used for storing the data are outdated. The data is cataloged using index cards or filed in file cabinets. The traffic counters that the Department uses are over eight years old and have recently become non-operable from use. When the counters were in use it was difficult to obtain reliable data because of problems with their power systems, as the batteries in the units were consistently losing their charge, and subsequently, the data from the traffic counts. The average daily traffic (ADT) from the traffic counts is stored in a card file and the tabular data is stored in a filing cabinet. The Public Works Department currently does not have a traffic counting system to regularly determine traffic volumes on streets within the City. Additionally,the City is using a "manual" method to quantify traffic collisions, in the form of a"pin map." A photograph of the I I map is attached. Therefore, the City cannot perform such vital functions as four-way stop warrant analysis, traffic signal analysis, full traffic studies of high accident locations, Citywide correlation between traffic volume and accident occurrence frequency, nor meet many of the Guiding or Implementing Policies identified in its current General Plan, adopted October 19, 1995. Traffic Collision data is supplied from the Redlands Police Department in the form of photocopied police reports. The data from the police reports are manually entered into a database for reports and queries. The database (Berkeley Traffic System) is over 10 years old and is not very efficient by todayos standards. Redlands PD performs Engineering Speed Surveys with its radar equipment. The report for the survey is completed utilizing the data obtained from observing traffic in the field and relevant traffic collision and traffic count data. The current program is inefficient because of lack of coordinated data. Mapping for the functions described above is produced from AutoCAD drawings. Plotting large ri data sets using this method is time consuming, as the operator must replicate the original data a set onto a base map. ATTEMPTS TO SOLVE THE PROBLEM The City is applying for this Grant in order to purchase a comprehensive data gathering, storage and analysis system, and traffic volume collection, counting and classification instruments that will function at optimum levels, for a period of many years, to develop and maintain a database of information related to traffic safety. In order to accomplish this goal, an investigation was launched into a variety of products. Research and analysis included evaluation of scope of I I tr serviceability, adaptability to local government and cost of purchase and administration,ation. We based our cost estimates with special focus on durability, reliability, and compatibility with our local environment. 5 A new system is proposed to enable staff in the Public Works Department to maximize public safety while increasing productivity of existing staff members. The core of a new system is to be composed of a GIS database and mapping program. The GIS program will enable staff to assemble, collate, analyze, and query data obtained from the field, and other sources, and produce maps that represent the data. Use of this system will reduce the amount of time necessary to perform the current functions of the Department and further enhance the Department's ability to make timely and sound engineering decisions. The City of Redlands rated lower than average in the Office of Traffic Safety rankings in t996 In the areas of total fatal injury accidents and nighttime accidents. There is a need to enhance the Department's ability to gather data efficiently and to use the data in an effective manner to determine appropriate measures to improve traffic safety in the City. A. BACKGROUND D.GENERAL CHARACTERISTICS The City of Redlands is located at the eastern end of the San Bernardino Valley along the Interstate 10 Freeway approximately 70 miles east of Los Angeles. Features include the Santa Ana Wash to the north,the Crafton Hills to the east, the San Timoteo Canyon to the south and the City of Loma Linda to the west define and delimit the existing community of Redlands. Currently the population is 68,000. Adjoining jurisdictions and communities include the 11 IP I counties of San Bernardino and Riverside and the cities of Yucaipa, Highland, Loma Linda, and San Bernardino. Proposed Equipment and Functions ArcView Software is a Geographic Information System (GIS) produced by Environmental Systems Research Institute (SSRI) located in Redlands, California. ESRI is the world leader in GIS technology. The City of Redlands currently has a favorable association with the company. The ArcView software will enable the Public Works Department to assemble, collate, query and analyze vast amounts of data and spatially represent them onto maps. ArcView will replace existing data storage systems, as data will be stored in a single database that will include all relevant data features for easy and efficient access. An upgraded computer is necessary to run ArcView and database software. Increased operating speed I and storage capacity is necessary to ensure optimum performance of the new system. A color plotter will enable the production of large-scale maps for analysis and presentation of traffic safety functions. New traffic counters and ancillary equipment will enable the Department to develop and implement a traffic counting system for streets Citywide. The data from the counters is used for many traffic safety functions. Traffic count data will be entered into the GIS database for retrieval and query. 6 PROJECT GOALS The goal of this engineering project is to identify, develop and support a program that will g am enhance the systems and the staff expertise to enable the City to improve the efficiency and accuracy of its identification, analysis and subsequent mitigation of critical collision locations. The goal of this project is to also ensure that the City of Redlands Public Works Department, as the agency charged with the responsibility of traffic safety, has timely access to current and complete traffic-related data. Further, the data captured should identify and isolate critical traffic safety issues. PROJECT OBJECTIVES 1. To identify fifty(50) critical intersections and locations where collisions exceed established definitions of a high collision location within two months of procuring necessary hardware/software. Traffic Control Device Inventory 2. To identify, assess and inventory all traffic control devices for 3)00 miles of streets or highways by March 31, 2001. Data will be updated. 3. To assess the condition of existing traffic signs and striping and develop a schedule of maintenance and repair by March 31, 2001. 4. To complete a Citywide TCD1 that will include the location, type, installation date, and condition of all signs by March 31, 2001. 5. Cross-reference any changes/modifications to the existing traffic control, sign, striping, z:1 etc. to the master database by March 31, 2001. 6. To perform traffic counts at 26 locations at least once each year and to maintain traffic volume data in a traffic volume database within one year of procuring necessary hardware;software. Geographic Information Systems (GIS) or Other Automated Collision Analysis System 7. To develop a street centerline map of 300 miles of streets including the geographical coordinates of each identifiable node and the ability to provide data to Arclnfo or some I procuring similar automated mapping application within two months of procu ing necessary hardware/software by March 31, 2001. 8. To provide a comprehensive electronic traffic records network including hardware, software and network cabling or other linking media for the Public Works Department by March 31, 2001. 9. To establish regular meetings between the Police Department and the Public Works Department to share the collected traffic-related data by March 31, 2001. 10. To provide the ability to generate daily, weekly, monthly or annual activity reports within six months of procuring necessary hardware./software. Reports must be customizable and 7 traffic engineering activities by March contain data relevant to traffic enforcement, and/or traff 31, 2001.IL To provide application g, i ide a sof on with the means of producing current reports ranking collision locations by number and primary collision factor(PCF)by March 31, 2001. 12. To train four staff members in the usage and maintenance of the finalized version of the system software within one year of procuring necessary hardware/software by March 31, 2001. 1 with components such as 13. To implement software with the ability to correlate collisions w roadway design, signal timing, visibility, traffic volumes, and other relevant factors not within the control of the drivers by March 31, 2001. 14. To establish regular meetings between the Police Department and Public Works Department to share the collected traffic-related data by March 31, 2001. 15. To ensure that the network system includes a relational database management system (RDMS) for storing and processing data for the following by March 31, 2001: Z- • I I Collisions-Files containing all fields included in the current collision report (CHP Form 555) Arrests and Citations-Files containing records of all traffic law violations for which citations were issued or violators were arrested. The data in these files should include case dispositions and BAC levels when appropriate. Roadway Location File—Using a Geographical Information System, a computer-based application that references relevant geographic reference points such as latitude and longitude or points on a grid. The developed system must also provide for data output in the form of drawing or plotting software such as AutoCAD. • Highway Inventories-File which typically include a Traffic Control Device Inventory(signs, signals, pavement markings), and an inventory of roads, including pavement type, alignment,curvature, capacity and structure with specific location identifiers. Operational characteristics—a computer application providing the ability to track average daily traffic volumes, peak hour volumes, turning movements, speed limits and actual speeds. It may include descriptors of adjacent land use and environmental conditions affecting traffic. 16. To identify 15 high collision locations to be improved, scheduled for improvement or recommended for improvement by June 1, 2000. 17. To increase the number of collision locations analyzed by 100 percent from the calendar base year total from 15 to 30 by September 1, 2000. and 18. To reduce the time that it takes to identify high collision locations,produce special statistical analyses, and collision research by 50 percent from the 2000 base year of 20 hours and zero minutes to 5 hours and zero minutes by March 1, 2001. The corresponding salary savings are to be tracked and reported. METHOD OF PROCEDURE Phase 1 Pro ram Preparation - '3/01/00 - 7130/40) During this phase,we will evaluate, select and purchase all computer equipment and Traffic Classifier Systems. We will also select,purchase, catalog and inventory all supplies to establish the Program for Year 1. Evaluate by March 1, 2000. a. Computer Hardware b. Traffic volume Collection, Counting and Classification Instruments Software C. ArcView/GIS Supportive Traffic Data Software 2. Initiate a Purchase Order by May 1, 2000. a. Computer Hardware b. Traffic Volume Collection, Counting and Classification instruments Software C. ArcView/GIS Supportive Traffic Data Software d. Traffic Classifier Supplies,Plotter Paper and Ink Accept Delivery by May 15, 2000. Computer Hardware a. bTraffic Volume Collection, Counting and . Classification Instruments Software C. ArcView/GIS Supportive Traffic Data Software d. Traffic Classifier Supplies, Plotter Paper and Ink 4. Install and configure computer hardware by May 22, 2000. 5. Install and configure computer software by May 30, 2000. i. ArcView/GIS Supportive Traffic Data Software 9 4 6. Catalog and inventory Traffic Classifier Equipment, Supplies, Plotter Paper and Ink by May 1, 2000. Phase Personnel and TraininLL'8/1/00—9/30/001 We will develop expertise in using the new Traffic Classifier Equipment using manuals,on-line tutorials, and vendor instructional support services. 1. Self-train existing staff by September 30, 2000. Phase -Rviad nataBase 10/1/00—2/28/014 During this phase,we will identify and select all available internal database information, import the data and direct and monitor data entry. I Direct and monitor staff on method of data collection of information by May 15, 2000. 2. Identify ready resources within existinolg City databases, inc2 luding Traffic Counts, Speed Surveys, Sign Surveys and Traffic Clision Data by May hiding 3. Import existing computerized information from SWITRS or Redlands Police Department into database by May 31, 2000. Phase —Operational Phase During this phase,we will establish the traffic counting program by first identifying significant ve ons u links on the arterial system and choosingreidentify suspected trouble spots and include those inithefilrst phaseoof the cotingWe program. Secondarily,we will count representative locations on collector streets. As the program progresses,various counts will have to be inserted into the program in order to prepare staff reports for items on the Traffic and Parking Commission agenda as well as for the San Bernardino County's Congestion Management Program updates. The program will have to be flexible enough to fulfill those needs. 1. Establish traffic counting program by June 1, 2000. 2. Establish signalized information program by July 1, 2000. 3. Develop mapping of primary target traffic counting program by August 1, 2000. 4. Develop mapping of recognized problem intersections by July 1, 2000. pu. 4 Data GatheriU,& Analysis 10 Statistical data relating to the project goals and objectives will be collected, analyzed and Z:I I rt ending September 30 will incorporated in quarterly reports. The quarterly report for the quarter e include the year-to-date comparison of goals and objectives. These reports will compare actual project accomplishments with planned accomplishments and will include information concerning changes made by the project director in planning and guiding the project efforts. The following are some of the methods to be used in constant monitoring and evaluation of the project: Computerized reports. Statistical information concerning the data listed in the project goals and objectives will be available on a timely basis throughout the project. This information will provide an ongoing evaluation to measure project goals and objectives and aid in the proper deployment of resources. Supervision. Director who will deploy Supervision be assigned to a Assistant Public Works Di Supervi of the project will the project personnel and maintain the maximum project effectiveness. Phase 6 Final Report and Executive Summary Complete the final report, Executive Summary and final plan and submit to the Office of Traffic Safety by April 30, 2001. METHOD OF EVALUATION Using the data compiled, the project manager will evaluate: (1)how well the stated project goals(s) and objectives were accomplished; all the agreement lidecot cstprocedures were performed in accordancewith therant ; and(3)was the proj effective? 11 s SCHEDULE A PROJECT No: RS0028 PAGE 12 PROJECT DESCRIPTION — STATEMENT OF INTENT The The City intends to contribute the personnel costs and associated benefits to establish this program. Four individuals are involved. le for the operation and Computer Graphics Engineer. He will be responsib '11 also supervise The primary staff member is a Comp collection equipment, and related reports. He wi maintenance of the hardware, software, data c 'bil*t*es related to this project. the proposed intern. He will spend at least four hours per week on responsi i I The Assistant Public Works Director will be responsible for supervision of the overall program. The Public Works Director will review and approve all activities related to this program for conformance with local budget,personnel rules, and regulations. The Cost Recovery Administrator will be responsible for preparation of Quarterly Reports and other activity associated with monitoring the Grant for conformance with state and federal laws, rules and regulations. The annual contribution value is $62,322• The City has considered the continuing operational costs of this Traffic Data Collection and Analysis Program, and it is the intent of the City of Redlands to absorb the entire cost of this project after the expiration date. AGENCY CONTRIBUTION Percentage of Time FY I FY 2 85% $25,818 $25,818 Com uter En ineer 5% 1,531 1,531 Associate Engineer 2.295 2,295 Assistant Director 5% - 1,517 Administrator 5% 1,517 $31,161 Total $31,161 OTS-38A(Rev 5/98) im-me sctwmu A-1 PROJECT No.: ADMINISTRATIVE SUPPORT STATEMENT—Explain what type of priority this project has in your jurisdiction. The City intends to contribute the direct salaries and associated benefits to establish this pro-gram. Four individuals are involved: The primary staff member is a Computer Graphics Engineer. He will be responsible for the operation and maintenance of the hardware, software, data collection equipment and related reports. He will also supervise the proposed intern. He will spend at least four hours per week on responsibilities related to this project. The Assistant Public Works Director will be responsible for supervision of the overall program. The Public Works Director will review and approve all activities related to this program for conformance with local budget, personnel rules and regulations. I The Cost Recovery Administrator will be responsible for preparation of Quarterly Reports and other activity associated with monitoring the Grant for conformance with state and federal laws, rules and regulations. SCHEDULE B PAGE I DETAILED BUDGET ESTIMATE PROJECT NO. RS0028 FISCAL YEAR ESTIMATES COST CATEGORY FY-1 FY-2 FY-3 TOTAL COST 03-01-00 10-01-00 To PROJECT ESTIMATES A. PERSONNEL COSTS 09-30-00 02-28-01 Positions and—Salaries $0.00 0.001 0,00) 0.00 0.00, 0.001 0.00 Employee Benefits @—0/o Category Sub-Total $0.00 $0.001 $0.001 $0.00 FBTRAVEL EXPENSE �000.0000 $1 $1 i000 $1,000.00 OTS Summit In-State or out-of-State Traffic Engineers 2,000-00 2,000,00 Conference 0.00 Category Sub-Total $2,000-001 $1,000.00 $0.00 $3,000-00 C. CONTRACTUAL SERVICES $0.00 0,00 0.00 Category Sub-Total $0.00 $0.00 $0.00 L= Budget Revised: 5/17/00 OTS-38d(Rev-10199) SCHEDULE B PAGE 2 DETAILED BUDGET ESTIMATE PROJECT NO. RS0028 FISCAL YEAR ESTIMATES COST CATEGORY FY-1 FY-2 FY-3 TOTAL COST 03-01-00 10-01-00 TO PROJECT D. NON-EXPENDABLE PROPERTY 09-30-00 02-28-01 $7,159-00 $7,159-00 1 Color Plotter I Scanner 10,285.00 10,285,00 0.00 0,001 0.00 1 Category Sub-Total $17,444.04 $0.00 $0.00 $17,444-00 1 '". E. OTHER DIRECT COSTS 1,512.00 $1,512.00 Plotter Paper, Ink Supplies Supportive Traffic Data Software 30,000.00 30,000-00 800 MHz Computer with 384 mb ram 3,527.00 3,527.00 8 Traffic Classification Instruments, Software 5,490-00 5,490.00 and Equipment 1,500-00 1,500-00 1 Color Printer Promotional Printing Costs 200-00 200-00 Portable Modular Exhibit 1,500-00 1,500,00 0.00 0.00 0,00 00 $0.00 . j $43,729.00 PF. INDIRECT (COSTS Categ ry Sub-Total $43,729.001 $0 $0.00 Category Sub-Total $0.00 $0.00 $0.00 $0.00 00 PROJECT TOT)11,11 31i,11 73.00 $64,173.00 Budget Revised:5117100 OTS-38d(Rev.10/99) SCHEDULE B-1 PROJECT NO. RS0028 BUDGET NARRATIVE Page I The City of Redlands needs $64,173.00 to complete the project. These funds will be used for the following: PERSONNEL COSTS None TRAVEL EXPENSE--LIFESAVERS CONFERENCE LIFESAVERS 2000 CONFERENCE IN ATLANTA, GA Airfare, round trip (estimated) $ 600 Lodging, Hyatt-Regency $ 476 Transportation(shuttle service) $ 17 Per Diem, March 11-15, 2000 ($28/day) $ 140 Tips, Fees, Misc. $ 50 TOTAL $1283 Funds for travel to OTS Summits 2000 and 2001. CONTRACTUAL SERVICES–NONE NON V-DU-InAttl V PROPERTY Non-expendable property includes one color plotter and one scanner for use in outputting the GIS plot maps. OTHER DIRECT COSTS Other direct costs include the Supportive Traffic Data Software, one 800 MgHertz Computer with _3)84 mb ram, eight traffic classification instruments, one color printer, one portable modular exhibit, and promotional printing costs. PROGRAM INC—ONE�– NONE OTS-381'(Rev 10/99) State of California DRUG-FREE WORKPLACE CERTIFICATION STD.21 (New 11-90) COMPANY/ORGANIZATION NAME CITY OF REDLANDS The contractor or grant named above hereby certifies compliance with Government Code Section 8355 in matters relating to providing a drug-free workplace. The above named contractor or grant recipient will: 1. Publish a statement notifying employees that unlawful manufacture, distribution, dispensation, possession, or use of a controlled substance is prohibited and specifying actions to be taken against employees for violations, as required by government Code Section 8355(a). 2. Establish a Drug-Free Awareness Program as required by government Code Section 8355(b), to inform employees about all of the following: (a) The dangers of drug abuse in the workplace, (b) Any available counseling, rehabilitation and employee assistance programs, and (c) Any available counseling, rehabilitation and employee assistance programs, and (d) Penalties that may be imposed upon employees for drug abuse violations. 3. Provide as required by Government Code Section 8355 (c), that every employee who works on the proposed contract or grant: (a) Will receive a copy of the company's drug-free policy statement, and (b) will agree to abide by the terms of the company's statement as a condition of employment on the contract or grant. CERTMCATION I. the official named below, hereby swear that I am duly authorized legally to bind the contractor or grant recipient to the above described certification. I am fully aware that this certification, executed on the date and in the county below, is made under penalty of perjury under the laws of the State of California. OFFICIAL'S NAME Pat Gilbreath EXECUTED UT DATE EXECUTED EXECUTED IN TifE COUNTY OF June 6, 2000 SAN BERNARDINO CONTOR OR GfNTY�CIPIENT SI NATURE ATTEST: �2 'TiTLE Cay Clerk V Mayor FEDERAL I.D. NUMBER 95-6000766 STATF,,OF CALIFORNIA 0 OFFICE OF TRAFFIC SAFETY ACCEPTANCE OF CONDITIONS AND CERTIFICATIONS Page I of 2 OTS-33 (Rev 4/98) ACCEPTANCE OF CONDITIONS COMPANY ORGANIZATION NAME CITY OF REDLANDS The following are included herein and constitute a part of this Agreement: OTS-38 Page I Schedule B-I Budget Narrative Schedule A Project Description Schedule C Quarterly Evaluation Data Administrative Support&Contribution OTS-33 Acceptance of Conditions and Certifications Schedule A-I Schedule B Detailed Budget Estimate STD. 21 Drug-Free Workplace Certification I. TERMS AND CONDITIONS It is understood and agreed by the Project Director and Authorizing Official that any grant received as a result of this Agreement is subject to all federal and state regulations governing grants and to those controls expressed in the California Traffic Grant Program Manuals which include, but are not limited to: (a) Quarterly Performance Reports and Reimbursement Claims must be submitted by the Project Director to the Office of Traffic Safety by January 31, April 30,July 31,and October 31, during each year of project operation; or deny future grant funding anytime a grantee (b) OTS will withhold or disallow grant payments, reduce or terminate grant funds,and/or (Volume 11,Chapter 3.9). This may include, fails to comply with any term or condition of the grant contract or program guideline but is not limited to,the following: • Failure to submit acceptable and timely reimbursement claims; • Failure to submit acceptable and timely quarterly performance reports;and • Failure to submit an acceptable and timely Schedule C(Quarterly Evaluation Data(OTS-38g) (c) If,during the term of the grant award, federal funds become reduced or eliminated, OTS may immediately terminate or reduce the grant award upon written notice to the project director. (d) By October 31, "continuing"projects must submit a September 30 claim and a written justification to support carrying forward prior year unexpended funds. September 30 claims and written justifications, supporting the carrying forward of prior year unexpended funds, submitted after November 30, will not he processed. The prior claim(i.e.,June 30)will he considered the year-end claim in order to close out the federal fiscal year ending September 30. In addition,prior year unexpended funds will be deobligated and allocated to new projects. (e) All documentation required to request a project revision(i.e., time extensions,budget category changes,and etc.)must be submitted to OTS prior to the effective date of change(s). For example: OTS will not consider a request for a grant period time extension unless all necessary paperwork is submitted prior to the existing grant termination date. Prior approval is required for all project revisions (Volume 11, Chapter 3.8). No alteration or variation of the terms of this Agreement shall be valid unless made in writing and signed by the parties hereto,and no oral understanding or agreement not incorporated herein shall be binding on any of the parties hereto. GENERAL CERTIFICATIONS 11. EQUAL OPPORTUNITY ASSURANCE Pursuant to the requirements of Title VI provisions of the Civil Rights Act of 1964, the certifying applicant acting through its chief administrative officer,desiring to avail itself of the benefits of Chapter 1, Title 23, United States Code,and as a condition to obtaining the approval of the Secretary of Transportation and Governor of California of any highway safety projects as provided for in Title 23, United States Code, Section 105(a),hereby gives its assurance that all provisions of Equal Opportunity Assurance with regard to the Highway Safety Program will be complied with fully. 111, MINORITY AND WOMEN BUSINESS ENTERPRISE (a) It is the policy of the Office of Traffic Safety and the certifying applicant that minority and women business enterprises as defined in 49 CFR Part 23 shall have the maximum opportunity to participate in the performance of contracts financed in whole or in part with Federal funds under this agreement. Consequently, the MWBE requirements of 49 CFR Part 23 apply to this agreement." (b) "MWBE Obligation. The certifying applicant or its contractor agrees to ensure that minority and women business enterprises as defined in 49 CFR Part 23 have the maximum opportunity to participate in the performance of contracts and subcontracts financed in whole or in part with Federal funds provided under this agreement. In this regard the certifying applicant and all contractors shall take all necessary and reasonable steps in accordance with 49 CFR Part 23 to ensure that minority and women business enterprises have the maximum opportunity to compete for and perform contracts. The certifying applicant and its contractors shall not discriminate on the basis of race, color,national origin, or sex in the award and performance of DOT assisted contracts." IV. SECTION 504, REHABILITATION ACT OF 1973 Pursuant to Section 504 of the Rehabilitation Act of 1973, no qualified handicapped person shall,because of a certifying applicant's facilities are inaccessible to or unusable by, handicapped persons, be denied the benefits of, be excluded from participation in,or otherwise be subjected to discrimination under any program or activity funded under the Highway Safety Act of 1966(U.S. Code, Title Section 23, Section 402 et. seq.). V. HATCH ACT Page 2 of 2 All employees of this certifying applicant whose principal employment is in connection with any Highway Safety Project financed in whole or in part by loans or grants under the Highway Safety Act of 1966 have been made aware of the provisions of Section'12(a)of the Hatch Act [5.U.S.C. 118k(a)]. VI. NON-DUPLICATION OF GRANT FUND EXPENDITURE The certifying applicant has no ongoing or completed projects under agreement with TOPICS, CCCJ{LEGA), HEW,or other Federal fund sources, which duplicate or overlap any work contemplated or described in this Traffic Safety Project. It is further agreed that any pending or proposed request for other Federal grant foods which would duplicate or overlap work under this Traffic Safety Project, will be revised to exclude any such duplication of grant fund expenditures. It is understood that any such duplication of Federal fund expenditures subsequently determined by audit will be subject to recovery by the Office of Traffic Safetv. VII. LOBBYING RESTRICTIONS The undersigned certifies,to the best of his or her knowledge and belief, that: (a) No Federal appropriated funds have been paid or will be paid,by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any agency.a Member of Congress,an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan,the entering into of any cooperative agreement, and the extension, continuation,renewal,amendment, or modification of any Federal contract, grant, loan,or cooperative agreement. (b) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency,a Member of Congress,an officer or employee of Congress,or an employee of a member of Congress in connection with this Federal contract,grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying", in accordance with its instructions. (e) The undersigned shall require that the language of this certification be included in the award documents for all sub-awards at all tiers (including subcontracts,sub-grants,and contracts under grants, loans,and cooperative agreements)and that all sub-recipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S, Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than$10,000 and not more than$100,000 for each such failure. VIII. RECYCLING At intervals designated by the State, contractor shall certify in writing,under penalty of perjury, the minimum,if not exact,percentage of recycled content of materials,goods or supplies offered or products used in the performance of the contract,pursuant to the requirements of Public Contract Code Section 10223. Contractor may certify that the product contains zero recycled content. Definitions of recycled content are contained in Public Contract Code Sections 12161 and 12200. CERTIFICATION We, the officials named below,hereby swear that we are duly authorized legally, to bind the contractor or grant recipient to the above described conditions and certifications. Executed on the date and in the county below,and is made under penalty of perjury under the laws of the State of California. PROJE'C'T DIRECTOR'S NAME Ronald C. Mutter DA,iii ExFctmu) EXECUTED IN TuE CouN7Y or 2-0 San Bernardino PR� � RE,CTOR'S SIGNATURE — - T Public Works Director All 1110RIZING OFFIcim-'s NA.mE- Pat Gilbreath I)Xrii EuCITIT EXECUTED INTIIE COUNVFY OF June 6, 2000 San Bernardino