Loading...
HomeMy WebLinkAboutContracts & Agreements_22-1988_CCv0001.pdf ALTA/BROCKTON TRUNK SEWER PROJECT NO. 4-8825 SECTION 1.8 AGREEMENT THIS AGREEMENT, made and entered into this 21st day of .dune , 1988, by and between the City of Redlands, a Municipal Corporation, hereinafter called City, and Kershaw Construction Co. , hereinafter called Contractor. WITNESSETH, that the parties hereto do mutually agree as follows: ARTICLE I: For and in consideration of the payments and agreements hereinafter mentioned to be made and performed by said City, said Contractor agrees with said City to perform and complete in a workman- like manner all work required under the Section 1.4, "Bid Proposal," for the: Alta/Brockton Trunk Sewer Project No. 4-8825 in accordance with the Specifications and Drawings therefor, to fur- nish at his own expense all labor, materials, equipment, tools, and services necessary therefor, except such materials, equipment and services as may be stipulated in said Specifications to be furnished by said City, and to do everything required by this Agreement and the said Specifications and Drawings. ARTICLE II: For furnishing all said labor, materials, equipment, tools, and services; furnishing and removing all temporary plant, structures, tools, and equipment; and doing everything required by this Agreement and the said Specifications and Drawings; also for all loss and damage arising out of the nature of the work aforesaid, or from the action of the elements, or from any unforeseen difficulties which may arise during the prosecution of the work until its accep- tance by said City, and for all risks of every description connected with the work, except as in the said Specifications are expressly stipulated to be borne by said City; and for completing the work in accordance with the requirements of said Specifications and Drawings, said City will pay and said Contractor shall receive, in full compen- sation therefor, the price{s} named in the above-mentioned Contract Proposal. ARTICLE III: The City hereby contracts said Contractor to perform the work according to the terms of this agreement for the above-mentioned price(s) , and agrees to pay the same at the time, in the manner, and upon the conditions stipulated in the said Specifications; and the said parties for themselves, their heirs, executors, administrators, 1.8.1 successors, and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE IV: The Notice Inviting Bids, Proposal Information Required of Bidder, Certificate of Non-Discrimination by Contractors, Specifi- cations, Drawings, and all addenda issued by the City with respect to the foregoing prior to the opening of bids, are hereby incorporated in and made part of this Agreement. ARTICLE V: The work specified shall be completed within ninety (90) calendar days from and after the date of receipt of the Notice to Proceed. The Contractor shall pay to the City the sum of three hundred dollars ($300.00) per day for each and every working day's delay in finishing the work in excess of the number of calendar days prescribed herein. IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed the day and year first above written. CITY OF REDLANDS (Owner) By: Mayor, City of Redlands, County of San Bernardino, California ATTEST' By: City glerk, Cit ,,,q' ]Redlands, County of San Bernardino, California s cf1 (C9_4 actor) (Signature) (Title) ATTEST; By: ze "k zz" . (Signature) w (Title)(1 1.5.2