HomeMy WebLinkAboutContracts & Agreements_46-1989_CCv0001.pdf CONTRACT
THIS AGREEMENT, made and concluded, in quadruplicate, this 31st day of
July One thousand nine hundred and eighty-eight between the City of Redlands,
CaJifomia(the'owner) and nine
Larry Jacinto Construction , Inc .
(the*contractor).
ARTICLE I. For and in consideration of the payments and agreements hereinafter mentioned, to be
made and performed by the owner, and under the conditions expressed in the Performance Bond
and Labor and Material Bond hereto annexed, the contractor agrees with the owner, at his own
cost and expense, to do all the work and furnish all the material, except such as are mentioned in
the specifications to be furnished by the owner, necessary to construct and complete In a good,
workmanlike and substantial manner, and to the satisfaction of the owner, and in full compliance
with the Contract Documents,the following work:
APRON,TAXIWAY, DRAINAGE,
FENCING, LIGHTING AND FIRE HYDRANTS
REDLANDS MUNICIPAL AIRPORT
REDLANDS, CALIFORNIA
ARTICLE 11. And the said contractor agrees to receive and accept the following prices as full com-
pensation for furnishing all materials and for doing all the work contemplated and embraced in this
agreement;also for all loss or damage, arising out of the nature of the work aforesaid,and from the
action of the elements, or from any unforeseen difficulties or obstructions which may arise or be
encountered in the prosecution of the work until its acceptance by the owner, and for all risks of
expenses incurred by or in consequence of the suspension or discontinuance of work,and for well
and faithfully completing the work, and the whole thereof, in the manner and according to the
plans and specifications,and the requirements of the engineer under them, to wit:
CF-1
SCHEDULES OF CONTRACT PRICES
ITEM ESTIMATED UNIT
NO. ITEM QUANTITY PRICE AMOUNT
BASE BID
SCHEDULE X' CLEARING
Al Clear/Dispose of 13.7 Acres of Citrus Orchard I LS 39,750.00 39,750.00
A2 Strip/Dispose of 24"of Material from
13.5 Acres of Citrus Orchard 1 LS 89,455.00 89,455.00
A3 Strip/Dispose of 3*of Material from
11.8 Acres of Airfield Area I LS 24,945.00 24,945.00
SCHEDULE A TOTAL
$154,150.00
BASE BID
SCHEDULE B: GRADING FOR TAXIWAY, DRAINAGE,AND 13.3 ACRE APRON
Bi Unclassified Excavation 32,633 CY 1.99 64,939.67
B2 36*Subgrade Preparation 85,514 SY 1.99 170,172.86
SCHEDULE B TOTAL
$235,112.53
BASE BID
SCHEDULE C: DRAINAGE
C11 18"Dia. Culvert Installation
Including Catch Basin I LS 9,117.00 9,117.00
C2 36*Dia. Culvert Installation 1 LS 8,316.00 8,316.00
C3 42'Dia- Culvert Installation 1 LS 9,229.00 9,229.00
C4 V-Thick Soll-Carment Channel Lining 60,603 R-Y , 8.00 36,800.00
-G& PeMend Gengent fef Seil Gement -29g--TONT
Ghennel lzisip*—
SCHEDUI E C TOTAL
$63,462.00
BASE BID
SCHEDULE D: FIRE HYDRANTS
Di Fire Hydrant Installations including hydrants, 1 LS 34,048.00 34,048.00
burys, protectors,thrustblocks, 6*valve,
6"diameter pipe, 8*diameter pipe,and fittings.
SCHEDULE D TOTAL $34,048.00
CF-2
SCHEDULES OF CONTRACT PRICES
ITEM ESTIMATED UNIT
NO. ITEM QUANTITY PRICE AMOUNT
BASE BID
SCHEDULE E: UNDERGROUND ELECTRIC FOR 13.3 ACRE APRON
El 3*Dia. Double Encased Conduit 351 LF 23.10 8,108.10
E2 3'Dia. Single Encased Conduit 502 LF 13.5-3 6,792.06
E3 1-1/2"Dia. Single Encased Conduit 1,531 LF 5.83 8,925.73
E4 2*Dia. Single Conduit 1,842 LF 6.05 11,144.10
E5 Electrical Handholes 3 EA 2,750.00 8,250.00
E6 Light I Base Junction Boxes 24 EA 550.00 13,200.00
SCHEDULE E TOTAL
$56,419.99
BASE BID
SCHEDULE F: TAXIWAY AND 5.2 ACRE APRON PAVING,ANCHORS, MARKING,AND LIGHTING
F1 2-1/2'Bituminous Surface Course 4,372 Ton 32.95 144,057.40
F2 Aircraft Tiedown Anchors 168 EA 80.00 13,440.00
F3 Pavement Marking 3,150 SF 0.81 2,551.50
F4 Apron Security Lighting Power Pedestal 1 . LS 7,425.00 7,425.00
Including Light Base Junction Box
FS AWG 8-5KV Single Conductor 2,100 LF 0.77 1,617.00
F6 50 Apron Light Poles 2 EA 5,445.00 10,890.00
SCHEDULE F TOTAL
$179,980.90
BASE BID
SCHEDULE G: AIRPORT SECURITY FENCING
G1 6'Chain Link Fence 2,283 LF 14.76 33,697.08
G2 14'Vehicle Gate Installation 1 EA 1,331.00 1,331.00
G3 Pedestrian Gate Installations 2 EA 817.00 1,634.00
G4 Security Fence Signs 8 EA 46.00 368.00
SCHEDULE G TOTAL
$37,030.08
BASE BID TOTAL- SCHEDULES A+B+C+D+E+F+G $760,203.50
CF-3
SCHEDULES OF CONTRACT PRICES
ITEM ESTIMATED UNIT
NO. ITEM QUANTITY PRICE AMOUNT
ADDITIVE
SCHEDULE 1: 2.7 ACRE APRON PAVING,TIEDOWN ANCHORS, MARKING,
AND SECURITY LIGHTING
1.1 2-1/2*Bituminous Surface Course 1,710 TON 30.68 52,462.80
1.2 Aircraft Tiedown Anchors 112 EA 80.00 8,960.00
1.3 Pavement Marking 1,200 SF 0.81 972.00
1.4 AWG 8-5KV Single Conductor 540 LF 0.77 415.80
1.5 50'Apron Light Poles 1 EA 5,445.00 5,445.00
ADDITIVE SCHEDULE 1 TOTAL
$68,255.60
ADDITIVE
SCHEDULE 2: 2.7 ACRE APRON PAVING,TIEDOWN ANCHORS, MARKING,
AND SECURITY LIGHTING
2-1 2-1/2'Bituminous Surface Course 1,710 TON 30.68 52,462.80
2.2 Aircraft Tiedown Anchors 132 EA 80.00 10,560.00
2.3 Pavement Marking 993 SF 0.81 804.33
2.4 AWG 8-5KV Single Conductor 920 LF 0.77 708.40
2.5 50'Apron Light Poles 2 EA 5,445.00 10,890.00
ADDITIVE SCHEDULE 2 TOTAL $75,425.53
ADDITIVE
SCHEDULE 3: 2.7 ACRE APRON PAVING,TIEDOWN ANCHORS, MARKING,
AND SECURITY LIGHTING
3.1 _ 2-1/2'Bituminous Surface Course 1,719 TON 30.68 52,738.92
3.2 Aircraft Tiedown Anchors 110 EA 80.00 8,800.00
3.3 Pavement Marking 1,253 SF 0.81 1,014.93
3.4 AWG 8-5KV Single Conductor 460 LF 0.77 354.20
3.5 50'Apron Light Poles 1 EA 5,445.00 5,445.00
ADDITIVE SCHEDULE 3 TOTAL
$68,353.05
CF-4
ARTICLE 111. The owner hereby promises and agrees with the contractor to employ,and does
hereby employ, the said contractor to provide the materials and to do the work according to the
terms and conditions herein contained and referred to, for the prices aforesaid, and hereby con-
tracts to pay the same at the time, In the manner, and upon the conditions above set forth-, and the
said parties for themselves, their heirs, executors, administrators, successors, and assigns, do
hereby agree to the full performance of the covenants herein contained.
ARTICLE IV. The term*Contract,*'Agreemerif or*Contract Documents* consists of the Notice to
Contractors; the Airport Development Aid Program Requirements, the Federal Prevailing Wage
Rate Determination,the Instructions to Bidders,the Proposal, the Contract, the Bonds,the General
Provisions. the Special Provisions, the Technical Provisions, the Plans, all addenda Issued prior to
the execution of the written agreement, and all modifications thereof. The foregoing documents
are complementary and anything required by or called for In one of said documents shall be bind-
Ing as If it were called for or required by all of the documents. Should there be any conflict be-
tween the terms of this form and the Bid or Proposal of said contractor, then this Instrument shall
control and nothing herein shall be considered as an acceptance of any term of said proposal con-
flicting herewith.
Any alteration or alterations made In this contract, in the work to be done thereunder, or any pan
thereof, shall not operate to release any surety from liability on any bond given pursuant to the
provisions of this contract, and the consent-of such surety to such alteration or alterations Is
hereby given.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands on the year
and date first above written.
FOR THE CITY OF REDLANDS
Z" Date
A 1989
Mayor
ATTEST:
Cit CXer' k
FOR THE CO CTORI
Larwr_y--4aci ff o C trust Inc.
Date AucTust I a 1989
Tide Pp4s/i6ent
NOTE: If the contractor Is a corporation, attach to this contract a certified copy of the bylaws,
resolution, or minute order of the Board of Directors of the Corporation authorizing person to ex-
ecute for the firm.