HomeMy WebLinkAbout7845RESOLUTION NO 7845
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS
ESTABLISHING A CHECKLIST OF REQUIREMENTS FOR EXPEDITED REVIEW OF
ELECTRICAL VEHICLE CHARGING STATIONS
WHEREAS, Government Code section 65850 7 requires all cities within the State to adopt
procedures for the administrative review, on an expedited basis, of applications for electric vehicle
charging stations, and
WHEREAS, the City Council of the City of Redlands has adopted Ordinance No 2869
establishing an administrative process for the expedited review of electric vehicle charging stations
by the City's Chief Buildmg Official, and
WHEREAS, Government Code section 65850 7 further requires the City to adopt a checklist
of all requirements with which an electric vehicle charging station shall comply to satisfy the City's
expedited review process,
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
REDLANDS AS FOLLOWS
Sectionl The "Checklist of Requirements for Expedited Review of Electric Vehicle
Charging Stations," which is attached hereto as Exhibit "A," is hereby adopted
Section 2 The checklist and all required permitting documentation for the expedited review
of electric vehicle charging stations shall be published on the City's publicly available website, and
such documentation may be submitted to the City by an apphcant using an electronic signature for
the applicant
ADOPTED, SIGNED AND APPROVED this 5th day of June, 2018
ATTEST
Donaldson, City Clerk
(3u
Paul W Foster, Mayor
1
11Resoluhons\R.es 7800-789917845 Checklist for Electric Vehicle Charging Stations.docx
I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certify that the foregoing resolution
was duly adopted by the City Council at a regular meeting thereof held on the 5th day of June,
2018, by the following vote
AYES Councilmembers Mayor Pro Tem Barich, Tejeda, Momberger, James, Mayor Foster
NOES. None
ABSENT None
ABSTAIN None
e Donaldson, City Clerk
2
1.1Resolutions\Res 7800 7899\7845 Checkhst for Electric Vehicle Charging Stations.docx
Exhibit "K
CITY OF REDLANDS
RESIDENTIAL AND NON-RESIDENTIAL
CHECKLIST FOR PERMITTING ELECTRIC VEHICLES --
AND ELECTRIC VEHICLE SERVICE EQUIPMENT (EVSE)
Piease complete the following information related to permitting and installation of
Electric Vehicle Service Equipment (EVSE) as a supplement to the application for a
building permit This checklist contains the technical aspects of EVSE installations
and is intended to help expedite permitting and use for electric vehicle charging
Upon this checklist being deemed complete, a permit shall be issued to the applicant
However, if it is determined that the installation might have a specific adverse impact
on public health or safety, additional verification will be required before a permit can
be issued
This checklist substantially follows the "Plug -In Electric Vehicle Infrastructure
Permitting Checklist" contained in the Governor's Office of Planning and Research
"Zero Emission Vehicles in California Community Readiness Guidebook" and is
purposed to augment the guidebook's checklist
Job Address
Permit No
❑Single -Family nMulti-Family (Apartment) [Multi -Family (Condominium)
❑Commercial (Single Business) ❑Commercial (Multi -Businesses)
_ Mixed -Use n Public Right -of -Way
Location and Number of EVSE to be Installed
Garage Parking Level(s)
Parking Lot
Street Curb
Description of Work
Applicant Name
Applicant Phone & email
Contractor Name
License Number & Type
Rating of Existing Main Electrical Service Equipment =
Voltage EVSE = V
Contractor Phone & email
Owner Name
Owner Phone & email
EVSE Charging Level
Level 1 (120V) Level 2 (240V) —_Level 3 (480V)
Maximum Rating (Nameplate)
of EV Service Equipment = kW
Rating of Existing Main Electrical Service Equipment =
Voltage EVSE = V
Manufacturer of EVSE
Rating of Panel Supplying EVSE (if not directly from Main Service) =
Mounting of EVSE LWall Mount _ Pole Pedestal Mount
❑ Other
Amps
System Voltage
❑ 120/240V, 14), 3W ❑ 120/208V, 34), 4W ❑ 120/240V, 34), 4W
_277/480V, 34), 4W ._..Other
Rating of Existing Main Electrical Service Equipment =
Amperes
Rating of Panel Supplying EVSE (if not directly from Main Service) =
Amps
Rating of Circuit for EVSE Amps / Poles
AIC Rating of EVSE Circuit Breaker (if not Single Family, 400A) =
A 1C
(or verify with Inspector in field)
Specify Either Connected, Calculated or Documented Demand Load of Existing Panel
• Connected Load of Existing Panel Supplying EVSE = Amps
• Calculated Load of Existing Panel Supplying EVSE = Amps
• Demand Load of Existing Panel or Service Supplying EVSE = Amps
(Provide Demand Load Reading from Electric Utility)
Total Load (Existing plus EVSE Load) = Amps
For Single Family Dwellings, if Existing Load is not known by any of the above methods,
then the Calculated Load may be estimated using the "Single -Family Residential
Permitting Application Example" in the Governor's Office of Planning and Research
"Zero Emission Vehicles in California Community Readiness Guidebook" ,
https //www opr ca gov
EVSE Rating Amps x 1 25 = Amps = Minimum Ampacity
of EVSE Conductor = # AWG
For Single -Family Size of Existing Service Conductors = #
- or - Size of Existing Feeder Conductor
Supplying EVSE Panel
(or Verify with Inspector in field)
AWG or kcmil
AWG or kcmil
I hereby acknowledge that the information presented is a true and correct
representation of existing conditions at the job site and that any causes for concern as
to life -safety verifications may require further substantiation of information
Signature of Applicant Date
06 05 18