Loading...
HomeMy WebLinkAboutContracts & Agreements_217-2003_CCv0001.pdf ' State of California Business,Transportation& Housing Agency �e PROJECT NUMBER OFFICE OF TRAFFIC SAFETY AM04114 GRANT AGREEMENT 1. PROJECT PAGE I (To be completed by applicant Agency) ' TITLE SOBRIETY CHECKPOINT PROGRAM FOR LOCAL LAW ENFORCEMENT AGENCIES 2. NAME OF APPLICANT AGENCY REDLANDS POLICE DEPARTMENT 4. PROJECT PERIOD 3. AGENCY UNIT TO HANDLE PROJECT Month—Day-Year TRAFFIC DIVISION From: 12/01/03 To: 9/30/04 5. PROJECT DESCRIPTION (Summarize the project plan covering the objectives,method of procedures,evaluation,and end prods in approximately 100 words. Space is limited to six lines.) The goal of the Sobriety Checkpoint Program for Local Law Enforcement Agencies is to re victims killed and injured in alcohol involved crashes in cities participating in this program.duce the number o agencies will conduct sobriety checkpoints Burin a 17 da p gam• �"�'enforcement 16 day period in June-July 2004, in support of he "You Drink&Drive. You Lose"natio2003 - nal campaign.2004, and a 6. FEDERAL FUNDS ALLOCATED UNDER THIS AGREEMENT SHALL NOT EXCEED: S27,528.00 7. APPROVAL SIGNATURES A. PROJECT DIRECTOR NAME: James R. Bueermann PHONE:909-798-7661 N ME AUTHORIZING OFFICIAL OF APPLICANT AGENCY Kar! N. Haws PHONE:909-798-7533 TITLE: CHIEF OF POLICE FAx: 909-3354754 TITLE: Mayor ADDRESS: 212 Brookside Avenue FAX: 909-798-7503 Redlands, California 92373 ADDRESS: 35 Cajon Street Redlands, California 92373 E-MAIL: jbueermann@redlandspolice.org E-MAIL: citycouncil@cityofredlands.org ------------- (Signature) (Date) C. FISCAL OR ACCOUNTING OFFICIAL (Signature) Date} D. OFFICE AUTHORIZED TO RECEIVE PAYMENTS NAME: Tina Kundig PHONE:909_79$_7543 NAME: TITLE: Finance Director City of Redlands FAx: 909-335-4735 ADDRESS: 35 Cajon Street Redlands, California 92373 ADDRESS: 35 Cajon Street Redlands, California 92373 E-MAIL: tkundig@cityofredlands.org Attest: IL (Signature) �)J LORRIE POYZER,CITY CLERK OTS-38(Rev. 3/03) -00 f r !�, r ,,,- s�p'�1,`s��1�J�„. % -:�..Y�.3 „��' ,, ✓- ' � .ri ��j/ °e`�f °� �Cz^��,a;. SCHEDULE A PRo wr No: AM04114 PROJECT DESCRIPTION PAGE 1 FpROTECTGOAL To reduce the number of victims killed in alcohol involved crashes by 0/6 from same e s and period total peDece Aber 19, 2002-January 4, 2003 and June 25, 2003 -July 10, 2003)of 0 t y year later(December 19, 2003 -January 4, 2004, 2004 and June 25, 2004-July 10, 2004) To reduce the number of victims injured in alcohol involved crashes 00333 3o Z by the same fti period total lb day (Decemberl9, 2002 -January 4, 2003 and June 25, 2002-July 1 ) periods a year later(Decemberl9, 2003 -January 4, 2004 and June 25, 2004-July 10, 2004). To reduce nighttime(8 p.m. to 4 a.m.) single vehicle fatal crashes by 0% from the base period total lb day (Decemberl9, 2002 -January 4, 2003 and June 254220 2003) of 0 to 0 by the same 17 and 04 and June 25, 2004-July 10, 2004) periods a year later(December 19, 2003 -January , eri To reduce nighttime(8 p.m. to 4 a.m.) single vehicle injury rhes y 100/ o lr m 0 by the same omtheasep d tend 16 day (December 19, 2002 -January 4, 2003 and June 25, 2003 -July , ) periods a year later(December 19, 2003 -January 4, 2004, and June 2, 2004-July 10, 2004) o To reduce hit and run fatal crashes by 0% from the base period total (December 19, 2002 January 4, 2003 and June 25, 2003 - July 10, 2003)of 0 to 0 by the same 17 and 16 day periods a year later(December 15, 2003 - January 4, 2004 and June 25, 2004-July 10, 2004) To reduce hit and run injury crashes by 50% from the base period total (December 19, 2002-January 4, 2003 and June 25, 2003 -July 10, 2003 of 2 to 1 by the same 17 and 16 day periods a year later(December 29, 2003 -January 4, 2004 and June 2, 2004-July 10, 2004 PROTECT OBJECTIVES 1. To participate in DUI roll call training classes for officers and clerical personnel selected to participate in operational phase by December 19, 2003. 2. To collect OTS baseline DUI data from two base year periods,December 19, 2002 thru January 4, 2003, and from June 25, 2003 thru July 10, 2003, by December 1, 2003 (OTS-137a and OTS 137b) 3. To conduct at least 2 DUI Checkpoints during first operational period (December 19, 2003 thru January q 2004) 4. To report to OTS DUI checkpoint enforcement data and corresponding 6e year DUI dataS-13 from first b January 2004 operational period (December 19,2003 thru January 4, 2004) Y 5. To conduct at least 2 DLII Checkpoints during second operational period(June 25, 2004 thru July 10, 20C OTS-38b(Rev. 3/03) We, the officials named below, hereby swear that we are duly authorized legally, to bind the contractor or grant recipient to the above described terms and conditions. Ex and in the count below, and is made under penalty of e ' Executed on the date Y p Y p rJury under the laws of the State of California. PROJECT DIRECTOR'S NAME James R. Bueermann DATE EXECUTED EXECUTED IN THE COUNTY OF PRO JEC DIRECTOR'S SIGNATURE San Bernardino Ief of Police AUTHORIZING OFFICIAL'S NAME Karl N. Haws DATE EXECUTED EXECUTED IN THE COUNTY OF November 4 2003 San Bernardino AUTHORIZING OFFICI ' SIGNATURE ➢ TITLE Mayor Attest: E - Lorri Poyzer t�Clerk �� -2- v, r r'✓ r r�'fs �.-� �. :- � - �� n k rr�"��������i�lrF�r/'` k ���>���c..�,.�_..�_.._.. ✓:_�.__.:: �.✓.�„�;__� -� ��,�"��yia„r�'sl"-,•e'k/'F'''z�, .r. "`. SCHEDULE A PROJECT NO: AMo4114 PROJECT DESCRIPTION PAGE 6. To Report to OTS DUI checkpoint enforcement data and corresponding baseear DUI da operational period (June 25, 2004 thru July 10, 2004)by July 16, 2004 (OTS Y 137b) to from second T To mail or FAX to OTS, any pertinent local media releases (electronic or print.) 8. To mail Project Claim Invoice(OTS-39), for first enforcement period by February 20, 2004 9. To mail Project Claim Invoice(OTS-39), for second enforcement period by August 2, 2004 10. All sobriety checkpoints identified for funding reimbursement in this grant agreement are over other checkpoints that may be included in another OTS and above grant for sobriety checkpoint funding. Note:Nothing is this agreement shall be interpreted as a requirement,formal or informal, that a particular police officer issue a specified or predetermined number of citation in pursuance of the obligation. METHOD OF PROCEDURE Operational Plan Phase I Preoperational Data Collection (October 1, 2003-December 19, 2003) Base year data will be collected by existing staff for the two enforcement ods January 4, 2004 and June 25, 2003 thru July 10, 2003) identified for DUI checkpoint enforcement(OTScember 19, 2003 -13 7a and OTS-137b). Phase II Personnel Selection and Training(October 1, 2003 —December 19, 2003) It is anticipated that a predetermined number of supervisors, uniformed officers, and clerical staff, communit service officers or lab Technician will staff each DUI Checkpoint on an overtime basis. Any roll call DLJI y Checkpoint Training needed must be provided by the applicant agency. (N for training.) o overtime funds will be allocated Phase III Overtime Checkpoint Operational Periods _ Supervisors, Officers, and support personnel will be deployed, on anovertimebasis,at ocations an selected for DUI checkpoints. don dates Phase IV Post Operational Data Collection (January 4, 2004-January 16, 2004) Prepare and submit to OTS, enforcement data report from First Checkpoint Operational Period, along with corresponding base year data from First Operational Period (OTS- 137a). Phase V Overtime Checkpoint Operation Period (June 25, 2004 thru July 10, 2004) Officers and support personnel will be deployed on an overtime basis at locations and on dates selected for DUI checkpoints, OTS-38b(Rev. 3/03) no ,00 � SCHEDULE A PRotEcr No: AM04114 PROJECT DESCRIPTION PAGE 3 Phase VI Post Operation Data Collection (July 10, 2004- July 23, 2004) Prepare and submit to OTS, enforcement data Report from the PSecond Checkpoint point Operational Period along (OTSwith corresponding base year data for the Second Operational OTS-38b(Rev. 3/03) -77 ��_�� 4 SCHEDULE B PAGE 1 DETAHXD BUDGET ESTIMATE PROJECT NO. AM04114 FISCAL YEAR ESTIMATES COST CATEGORY FY-1 TOTAL COS 12/01/03 FY_2 FY-3 TO PROJEC 9/30/04 OVERTIME FOR SOBRIETY $13,764.00 $13,764 CHECKPOINTS December 19, 2003-January 4, 2004 #of Checkpoints: 2 $6,882.00 per Checkpoint OVERTIME FOR SOBRIETY 13,764.00 13,764.1 CHECKPOINTS June 25, 2004-July 10, 2004 #of Checkpoints: 2 $6,882.00 per Checkpoint PROJECT TOTALI $27,528sool $0.00 $0.00r- $27,528.0 OTS-38d(Rev. 3/03) SCHEDULE B-1 PROJECT NO: AM04114 BUDGET NARRATIVE PAGE 1 OVERTIME CHECKPOINT COSTS The applicant agency will receive a flat rate of $ 6,882.00 per checkpoint for conducting a minimum of 4 DUI checkpoint during the periods from December 19, 2003 through January 4, 2004, and from June 25, 2004 through July 10, 2004. This checkpoint compensation is based on the following minimum criteria. Each checkpoint will be operational for a minimum of 6 hours and will be staffed on an overtime basis only, by a minimum of 11 sworn personnel, 1, of which will be supervisory level, and 5 non-sworn personnel. This flat rate was calculated based on the average hourly overtime salary costs including benefits of the following: #10 sworn(non-supervisory @ $55.45per hour #1 sworn (supervisory) @ $74.56 per hour #5 non-sworn @ $ 30.38 per hour OTS-38f(Rev. 3/03) cs � STATE OF CALIFORNIA OFFICE OF TRAFFIC SAFETY ACCEPTANCE OF CONDITIONS AND CERTIFICATIONS AL Mini-Grants M OTS-33(Rev. 3103) Terms, Conditions, and Certifications Agreement Between the Office of Traffic and the Applicant Agency A Y APPLICANT AGENCI' Redlands Police De artment OTS PROJECT NUMBER AM04I 14 The following are included herein and constitute a part of this Agreement: OTS — e 1 Schedule A— OTS-33 — Terms, Conditions, and Pro'ect Descri tion Certifications Specific to the Agreement Schedule B —Detailed Bud et Estimate Between OTS and the Applicant Agency Schedule B-1 —Bud et Narrative General Terms, Conditions, and Certifications* *See OTS Grant Program Manual, Volume II, Chapter 6. Volume II is available on-line at www.ots.ca ov. TERMS AND CONDITIONS It is understood and agreed by the Project Director and Authorizing Official that any grant received as a result of this Agreement is subject to all federal and state regulations governing grants and to those controls expressed in the California Tr include, but are not limited to: affic Grant Program Manuals which I. Operational Reports and Reimbursement Claims must be submitted by the Project Director to the Office of Traffic Safety by February 20, 2004, and August 2, 2004. 2. OTS will withhold or disallow grant payments, reduce or terminate grant funds, and/or deny future grant funding anytime a grantee fails to comply with any term or condition of the grant . This may include, but is not contract or program guidelines (Volume II, Chapter 3.9) limited to, the following: • Failure to submit acceptable and timely reimbursement claims. • Failure to submit acceptable and timely Base Year and Operational reports. 3. If, during the term of the grant award, federal funds become reduced or eliminated, OTS may immediately terminate or reduce the grant award upon written notice to the project director. 4. All documentation required to request a project revision (i.e., time extensions, budget category changes, and etc.) must be submitted to OTS prior to the effective date of change(s). For example: OTS will not consider a request for a grant period time extension unless necessary paperwork is submitted prior to the existingall II, Chapter 3.8) is required for all project revisions(Volume grant termination date. Prior approval 5. No alteration or variation of the terms of this Agreement shall be valid unless made in writing and signed by the parties hereto, and no oral understanding or agreement not incorporated herein shall be binding on any of the parties hereto. We, the officials named below, hereby swear that we are duly authorized legally, to bind the contractor or grant recipient to the above described terms and conditions. Executed on the date and in the county below, and is made under penalty of perjury under the laws of the State of California. ---------------- PROJECT DIRECTOR'S NAME James R. Bueermanrt DATE E.YECL*rED EXECUTED IN THE COUNTY OF San Bernardino PROJECT DIRECTOR'S SIGNATURE !`y TITLE Chief of Police AUTHORIZING OFFICIAL'S NAME Karl N. Haws DATE EXECUTED EXECUTED IN THE COUNTY OF San Bernardino AUTHORIZING OFFICIAL'S SIGNATURE TITLE Mayor -2- STATE OF CALIFORNIA•OFFICE OF TRAFFIC SAFETY ACCEPTANCE OF CONDITIONS AND CERTIFICATIONS AL Mini-Gants OTS-33(Rev. 3/03) Terms, Conditions, and Certifications Specific to the Agreement Between the Office of Traffic Safety and the Applicant Agency APPLICANT AGENCY OTS PRoIEcT NUMBER Redlands Police Department AM04114 The following are included herein and constitute a part of this Agreement: OTS-38 —P e I OTS-33 —Terms, Conditions, and Schedule A—Project Description Certifications Specific to the Agreement Schedule B —Detailed Budget Estimate Between OTS and the Applicant Agency Schedule B-I —Bud et Narrative JGeneral Terms, Conditions, and Certifications* *See OTS Grant Program Manual, Volume M Chapter 6. Volume H is available on-line at wwW.0ts.ca.20y. TERMS AND CONDITIONS It is understood and agreed by the Project Director and Authorizing Official that any grant received as a result of this Agreement is subject to all federal and state regulations governing grants and to those controls expressed in the California Traffic Grant Program Manuals which include, but are not limited to: I. Operational Reports and Reimbursement Claims must be submitted by the Project Director to the Office of Traffic Safety by February 20, 2004, and August 2, 2004. 2. OTS will withhold or disallow grant payments, reduce or terminate grant funds, and/or deny future grant funding anytime a grantee fails to comply with any term or condition of the grant contract or program guidelines (Volume M Chapter 3.9). This may include, but is not limited to, the following: • Failure to submit acceptable and timely reimbursement claims. • Failure to submit acceptable and timely Base Year and Operational reports. 3. If, during the term of the grant award, federal funds become reduced or eliminated, OTS may immediately terminate or reduce the grant award upon written notice to the project director. 4. All documentation required to request a project revision (i.e., time extensions, budget category changes, and etc.)must be submitted to OTS prior to the effective date of change(s). For example: OTS will not consider a request for a grant period time extension unless all necessary paperwork is submitted prior to the existing grant termination date. Prior approval is required for all project revisions (Volume M Chapter 3.8) 5. No alteration or variation of the terms of this Agreement shall be valid unless made in writing and signed by the parties hereto, and no oral understanding or agreement not incorporated herein shall be binding on any of the parties hereto. "✓ ,l yr°,-lA �9Ji' 'o- ,'• � ..,y'""w' , ✓ 3 ✓" ✓ ,-T���tYl��,„ � ter, ;' ,,,a.,,. :`s a4 We, the officials named below, hereby !;wear bed terms and conditions. legally, on he date contractor or grant recipient to the above under the laws of the State of and in the county below, and is made under penalty of perJury California. PROTECT DIRECTOR'S NAME James R. Bueermann EXECUTED IN THE COUNTY OF DATE EXECUTED San Bernardino PROTECT DIRECTOR'S SIGNATURE TITLE Chief of Police AUTHORIZING OFFICIAL'S NAME Karl N. Haws DATE EXECUTED EXECUTED IN THE COUNTY OF San Bernardino AUTHORIZING OFFICIAL'S SIGNATURE TITLE Mayor -2- STATE OF CALJ FORK IA•OFFICE DECEMBE OF TRAFFtc SAFETY OTS-137a New g/03) DATA "YOU D RINK & DRIVE, YOU LOSE" DUI ENFORCEMENT OPERATONS 2002/2003 Base Year ��- 2003/2004 Operational Data' Data2 Number of Checkpoints 0 Vehicles Throu Chec int 0 Drivers Screened 0 Field Sobriety Tests 0 DUI Arrests 0 Vehicles Im unded 0 Criminal Arrests 0 Nighttime Fatal Single Vehicle 0 Collisions(8 M.to 4 am.) Nighttime Injury Single Vehicle 0 Collisions(8 M. to 4 am.) Persons Killed in Alcohol 0 Involved Collisions Persons Injured m Alcohol 2 Involved Collisions Hit and Run Fatal Collisions 0 Hit and Run Injury Collisions 1 #'s of ress Releases3 0 #'s of Media Events 0 #'s of Print Ads° 0 #'s of Radio Ads 0 #'s of TV Stories 0 ' December 19,2002 to January 4,2003 2 December 19,2003 to January 4,2004 3 Please attach copies ° Please attach copies STATE OF CALIFORNIA•OFFICE OF TRAFFIC SAFETY JUNE/JULY DATA OTS-137b(New 8/03) "YOU DRINK & DRIVE, YOU LOSE" DUI ENFORCEMENT OPERATONS Z 2003 Base Year Data' 2004 Operational Data 0 Number of Chec rots 0 Vehicles Throu Ch int 0 Drivers Screened 0 Field Sobriety Tests 0 DUI Arrests 0 Vehicles Im unded 0 Criminal Arrests 0 Nighttime Fatal Single Vehicle Collisions(8 .m.to 4 am.) I Nighttime Injury Single Vehicle Collisions 8 Persons Killed in Alcohol Involved Collisions I Persons Injured in Alcohol Involved Collisions 0 Hit and Run Fatal Collisions I Hit and Run In' Collisions 0 #`s of rens ReleaseS3 0 #'s of Media Events 0 #'s of print Ads° 0 #'s of Radio Ads 0 VS of TV Stories ' June 25,2003 to July 10,2003 a June 25,2004 to July 10.2004 3 Please attach copies a ° Please attach copies ,sur '. y 5 r ✓l J �l 3� � �a� x�