HomeMy WebLinkAbout6793RESOLUTION NO. 6793
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS
ADOPTING FINDINGS OF FACT PURSUANT TO THE STATE SUBDIVISION
MAP ACT FOR TENTATIVE PARCEL f'IAP NO 18550
AND APPROVING TENTATIVE PARCEL MAP NO 18550
WHEREAS, the Redlands Planning Commission has adopted its Resolution No 1175
recommending approval of Tentative Parcel Map No 18550 to the City Council of the City of
Redlands ("this City Council"), and
WHEREAS, a certified copy of Planning Commission Resolution No 1175 and related
material has been forwarded to this City Council,
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF REDLANDS AS FOLLOWS
Section 1 The City Council of the City of Redlands hereby approves Tentative Parcel
Map No 18550 for the Redlands Commons Project, subject to the conditions of approval
identified in Exhibit "A" of this Resolution, and based upon the following findings which apply
to both the tentative and final maps for Tentative Parcel Map No 18850
A The proposed map is consistent with applicable General and Specific Plans, as
well as applicable provisions of the City of Redlands Municipal Code
The property within Tentative Parcel Map No 18550 ("TPM 18550") is located in the
and will consist of 20,000 square feet of single -story office space, 75,000 square feet of inline
retail space, and 10,500 square feet of restaurant space and will encompass 12 95 net acres As
addressed in greater detail in the EIR prepared in connection with TPM 18550, which analyzed
the environmental effects of TPM 18550 pursuant to the California Environmental Quality Act
(Public Resources Code Section 21000 et seq) ("CEQA"), TPM 18550 advances the goals and
policies of the City of Redlands General Plan (the "General Plan") as well as the East Valley
Corridor Specific Plan (the "EVCSP")
On the General Plan Land Use Map, TPM 18550 is designated foi `Commercial" land
uses The General Plan contains Guiding Policies which influence planning decisions within the
City The Guiding Policies that are applicable to TPM 18550 are as follows
Policy 4 40g — "Locate High and Medium -Density development neat regional
access routes, employment centers, shopping areas, and public services "
Policy 4 50a — "Encourage development of office space in the East Valley
Cori idor "
Policy 4 62a — "Develop the EVCSP so as to promote and facilitate high-quality
commercial and industrial development within the Corridor area "
J \Cit) Council Reporis\Planning\CC 01 06.09\6793 1PM 18550 Redlands Commons January 6, 2009 doc 1
1PM 18550 is, and will be, consistent with the General Plan, development of TPM 18550
would not conflict with the General Plan policies and it is consistent with the intent of the
General Plan since it locates Medium -Density development with a floor area ratio ("FAR") of
0 19 (approximately 105,500 square feet/12 95 acres), close to majoi access routes, employment
centers. and services TPM 18550 is a "keystone' location within the EVCSP area due to its
proximity to the I-210 and San Bernardino Avenue, and as such, has the unique ability to create a
highly accessible and visible master planned development within contiguous property boundaries
without the limitations imposed by property ownership patterns and existing street systems seen
throughout most of the EVCSP area TPM 18550 creates a fully integrated development of
office and commercial uses rather than development of less desirable fragmented land uses
spread out over several locations Also, because TPM 18550 consists of high-quality
commercial components, it will create significant employment opportunities foi the
local/regional population Therefore, the City finds that TPM 18550 is and will be consistent
with the General Plan
In addition to the General Plan, TPM 18550 is subject to the EVCSP The EVCSP tailors
the policies of the General Plan for the characteristics of the East Valley Corridor area and
indicates that the intent is to develop the East Valley Corridoi into commercial areas will create
employment opportunities foi City residents as well as commuters into the City from other areas
TPM 18550 will be neat existing and proposed residential uses so that employees and visitors
will not have to travel long distances, thereby reducing commuting distances and improving the
jobs to housing ratio
Much like the General Plan, the EVCSP contains a number of policies untended to guide
growth and development within the East Valley Corridoi The applicable EVCSP goals include
Goal EV2 0205(a) — "Develop the EVCSP so as to facilitate the high-quality
commercial, industrial, and residential development within the corridor area "
Goal EV2 0205(a)(1) — "Maximize generation of employment opportunities rn a
region which has a significant imbalance of housing versus employment
opportunities "
Goal EV2 0205(a)(2) — "Facilitate location in the project area of a wide range of
commercial uses to serve the region, local industry, and residential
neighborhoods
As noted above, TPM 18550 contains commercial and office uses that would provide a
range of new employment opportunities within the area Furthermore, the development within
TPM 18550 is consistent with the EVCSP in that it includes setbacks, building heights, massing,
meandering pathways, landscaping, architectural features, and artwork that will result in an
aesthetically high quality development Therefore, TPM 18550 is and will be consistent with the
EVCSP
With regard to the Redlands Municipal Code, Concept Plan No 7 for Redlands
Commons and Trojan Groves (the "Concept Plan"), and the regulations contained therein, have
been designed to be consistent with the City's Municipal Code The Concept Plan is intended to
J \City Council Reports\Pianning\CC 01 06.09\6793 TPM 13550 Redlands Commons January 6 2009 doc
allow foi development standards that specifically address the needs of TPM 18550, while
insuring substantial compliance with the spirit, Intent, and provisions of the vanous City
ordinances TPM 18550 will comply with all applicable development standards contained in the
Concept Plan Consequently, the City finds that TPM 18550 is and will be consistent with the
General Plan, the EVCSP, as well as all applicable provisions of the Municipal Code
B The design and improvement of the proposed subdivision are consistent with
applicable General and Specific Plans
The General Plan contains a number of Implementing Policies that are intended to
impose development guidelines for developments within the City The applicable Implementing
Policies include
Policy 4 621 — "Maximize generation of employment policies in a region which
has a significant imbalance of housing versus employment opportunities "
Policy 4 62m — "Facilitate location in project area of a wide range of commercial
uses to serve the region, local industry, and residential neighborhoods "
Policy 4 62u — "Develop opportunities foi community oriented services within the
General Plan arca "
Policy 4 62gg — "Enhance the beauty of the East Valley Corridor and the overall
quality of life foi users and residents of the area "
Upon build out, TPM 18550 will consist of commercial uses that will conform to the
requirements of the General Plan For example, the General Plan states, "[t]he East Valley
Corridor is the best, perhaps only, location capable of attracting the office, high-tech and
distribution jobs the eastern portion of San Bernardino Valley needs " See General Plan, Section
4 0, p 36 To this end, TPM 18550 consists of office, retail and restaurant uses and encompasses
12 95 net acres and 15 22 gross acres The office component will include two single -story office
buildings of 9,000 and 11,000 square feet The retail component will include a neighborhood
inline retail center and various outparcels that would serve the growing needs of the existing
neighborhoods and the new households moving to the area It will include 75,000 square feet of
retail space and 10,500 square feet of restaurant space Building heights foi the retail buildings
will range from 20 to 60 feet, with the office buildings ranging in height from 20 to 54 feet
inclusive of parapets and mechanical equipment All commercial buildings would be set back at
least 40 feet from proposed residential uses, and there would be a 35 foot landscaped buffer
separating FPM 18550 from proposed uses to the north The retail component will be designed
to provide high visibility foi the retailers and for the entire commercial portion of Redlands
Commons The buildings will be set back from San Bernardino Avenue and Texas Street with
landscaping and possible outdoor seating
\Vith regards to the EVCSP, TPM 18550 is within the Special Development District To
this end, the Concept Plan establishes development standards that apply to all land and buildings
within the Development Envelope The Concept Plan's development standards governing TPM
18550 include
J \City Council Reports\Planning\CC 01 06.09\6793 TPM 18550 Redlands Commons January 6 2009 doc 3
a All lots shall have adequate width, depth and area to accommodate all parking
setbacks, landscaping, loading, trash enclosures, and access requirements
b Maximum building height of 60 feet for structures located on TPM 18550
c No minimum lot coverage is required
d Setbacks front yard — 25 feet, street side yard — 25 feet, side and real yards —
none (when adjoining a residential district, 40 feet from the building to the
abutting residential lot line)
c In addition to the above development standards there are also landscaping,
paiking, site lighting, trash enclosure, screening, fencing, wall, and sign
requirements
The design and improvement proposed for this property will be consistent with the uses
permitted and conditionally permitted within the Special Development District within the
EVCSP, as well as consistent with the development and design standards of the Concept Plan
The required yards, setbacks, walls, and landscaping features associated with TPM 18550 would
adequately buffer TPM 18550 from adjacent uses, yet would also ensure integration with othei
surrounding uses The property is more than adequate to accommodate TPM 18550, and
associated improvements required by the EVCSP, including parking, Landscaping, and off-site
improvements Since TPM 18550 will conform to applicable design guidelines associated with
the Special Development District and the Concept Plan, the City finds that the design and
improvements of the subdivision is and will be consistent with the EVCSP
TPM 18550 is a well designed commercial development that will provide a wide range of
commercial opportunities as well as services to the local community as well as the region at
lame The design and improvements will incorporate landscaping, setbacks, trees, art work and
other fixtures to attract high-quality tenants as well as create a substantial number of new jobs
while enhancing the overall character of the community Consequently, the City finds that the
design and improvement of TPM 18550 is and will be consistent with the General Plan and the
EVCSP
C The site is physically suitable for the proposed type of development
TPM 18550 is currently in use as an active citrus grove, but will ultimately be developed
to accommodate a mixed use, commercial/office development TPM 18550 is physically
suitable for the proposed type of development because there are no environmental hazards, thei e
is suitable roadway access, and TPM 18550 will be connected to the City's utility infrastructure
Furthermore, the land is relatively flat, with low potential for soil subsidence or erosion There
are no known locally active or potentially active faults trending toward of through TPM 18550
Because TPM 18550 is not in an Alquist-Priolo Earthquake Fault Zone, the potential for damage
as a result of direct rupture is remote, and TPM 18550 would not present any adverse unpacts
with respect to exposing people 01 property to hazardous conditions resulting from rupture of a
known earthquake fault in TPM 18550 TPM 18550 is, however, like much of Southern
California located in Seismic Zone 4 As a result, there is a risk of seismic shaking
1 \City Council Rcports\Planntng\CC 01 06.09\:6793 TPM 18550 Redlands Commons Januar 6, 2009.doc 4
Accordingly, development will be required to comply with all design standards applicable to
Seismic Zone 4 (the most stringent in the state) in order to reduce risk to TPM 18550 occupants
TPM 18550 has not been identified as being in an area subject to potentially susceptible
liquefaction by the California Geologic Survey (the "CGS") or the County of San Bernardino
Regional groundwatei maps and groundwater data indicate that shallow groundwatei conditions
do not exist locally, nor have they existed historically As a result, the potential for liquefaction
to occur on-site is very low In addition, TPM 18550 is outside any Landslide Hazard Zone
defined by the state TPM 18550 does not contain any marsh of riparian woodland acreage,
wetlands, or urban streams of watercourses Therefore, the City finds that the Site is physically
suitable for the type of development
D The site is physically suitable foi the proposed density of development
The office and retail component would encompass 12 95 net acres of the Redlands
Commons TPM 18550 This site is more than adequate to accommodate the 9,000 square foot
and 11,000 square foot single story garden office buildings, 75,000 square feet of inline retail
space and 10,500 square feet of restaurant space, and associated improvements required by the
EVCSP, including parking, landscaping, and off-site improvements Within the EVCSP area, the
General Plan indicates that building density standard for nonresidential uses permits a maximum
FAR of 0 25 to 0 6 foi commercial uses, and 0 6 to 0 9 for office uses See General Plan, Section
4 0, p 4 The EVCSP, howevei, further limits the FAR in the East Valley Corridor to 0 6 foi
office, and 0 25 for commercial See EVCSP, p D4-65 The FAR for TPM 18550 is 0 19, well
below the maximum for commercial and office uses Therefore, upon build out, TPM 18550 will
not exceed the FAR imposed under the General Plan and the EVCSP The EVCSP contains
development and performance standards which are designed to ensure an orderly transition from
Special Development District uses to existing residential uses TPM 18550 has been configured
in a way that minimizes impacts generated by the proximity of the commercial portion of TPM
18550 to the residential
The commercial uses will be located along San Bernardino Avenue Retail uses will be
concentrated on the western, northern and southern edges of the commercial center Office uses
will be concentrated on the eastern edge of the area, at the intersection of Texas Street and San
Bernardino Avenue All commercial uses will be set back at least 40 feet from residential uses,
including a 35 foot landscaped buffet The required yards, setbacks, walls, and landscaping
featui es associated with TPM 18550 would adequately buffer the commercial portion of TPM
18550 from adjacent uses, yet would also ensure integration with other surrounding uses
Sut face parking spaces and landscaping will occupy the rcmaindei of the site The General
Commercial component will also include approximately 2 93 acres of open space/landscaping
A landscaped area is also proposed along the northeily edge of the Redlands Commons
commercial area to separate the residential and commercial land uses
Furthermore, the commercial uses proposed for this property will be consistent with the
uses permitted and conditionally permitted 1\ ithin the General Commercial District of the
EVCSP Sections EV3 0710 and EV3 0713 of the EVCSP also allow permitted and
conditionally penmitted uses Listed in the Neighborhood Commercial and Administrative
Professional Districts in the EVCSP General Commercial District In addition, individual
J \City Council Reports'Plannmg\CC 01 06.09\6793 FPM 18550 Redlands Commons Januar) 6, 2009.doc
buildings will be constructed in accordance with established height restrictions and setbacks
contained in the Concept Plan The extertot design, including landscaping, signage, and lighting
will conform to all applicable design guidelines contained in the Concept Plan TPM 18550 will
also have adequate packing, ingress and egress and loading areas for the density proposed
Infrastructure serves FPM 18550 and improvements will be made to accommodate the proposed
density Therefore, the City finds that TPM 18550 is physically suitable foi the proposed density
of development
E The design of the subdivision and the proposed improvements are not likely to
cause substantial environmental damage of substantially and avoidably unsure fish 01 wildlife or
their habitat
The design of the subdivision and the proposed improvements will not cause substantial
environmental damage 01 substantially and avoidably injure fish or wildlife or their habitat
TPM 18550 does not include habitat corridors, linkages, crossings, or travel routes and is,
therefore, not expected to support any appreciable terrestrial 01 avian wildlife movement TPM
18550 does not connect two or more significant wildlife habitats because the surrounding areas
are completely developed with urban and agricultural uscs to the north and south of TPM 18550
On the western portion of TPM 18550, 1-210 creates a significant bamei to movement TPM
18550 does not contain any marsh 01 riparian woodland acreage, wetlands, or urban streams or
watercourses, and extensive mitigation measures will mitigate any potential impacts to sensitive
species to a less than significant level The mitigation measures noted in the EIR include
MM 4 4-1(a) Surveying fon nesting special -status avian specials not more than 30
days prior to construction The results of surveys to be submitted to the U S Fish
and Wildlife Services and/or the California Department of Fish and Game, as well
as the City of Redlands In the alternative the developer can begin construction
after the previous season for local raptors and other special species has ended
(after August 15) and before the next breeding season begins (Before February
15)
MM 4 4-1(b) if active nests for special -status avian species or raptor nests are
found within the construction footprint, constriction activities shall be delayed
within a minimum 500 -foot buffei zone surrounding active raptor nests and a
minimum 250 -foot buffer zone surrounding nests of other special -status avian
species until the young have fledged
MM 4 4-2 One day prioi to disturbance of the citrus trees within the orchard
located on TPM 18550, at least two biologists, one of which shall hold a valid
California Scientific Collection Permit, shall conduct a pre -construction survey of
the area in order to relocate any individual silvery legless lizards This can be
achieved through active capture and relocation to other suitable habitat outside of
the potential areas of impact (i e , outside TPM 18550)
The EIR's analysis indicates that there are no significant and avoidable impacts relating
to the nesting habitat foi migratory avian species of special concern and/or raptors on Redlands
Commons, the loss of the silvery legless lizard, the loss of foraging areas for sensitive bat
J \City Council Reports\Planning\CC 01 06.09\6793 IPM 18550 Redlands Commons January 6 2009 doc 6
species, and the movement of any native resident or migratory fish 01 wildlife species The
environmental impacts of the commercial development were analyzed in the EIR See EIR,
Section 4 4 Therefore, the City finds that design of the subdivision and the proposed
Improvements will not cause substantial environmental damage 01 substantially and avoidably
injure fish or wildlife or their habitat
F The design of the subdivision and the proposed improvements are not likely to
cause serious public health problems
The design of the subdivision and the proposed improvements are not likely to cause
serious public health problems Construction of TPM 18550 '111 not endanger, jeopardize or
otherwise constitute a menace to the public convenience, health, interest, safety, o' the general
welfare of persons residing 01 working in the vicinity of TPM 18550 TPM 18550 will be
designed in such a manner so that potentially conflicting uses will be segregated from one
another in order to reduce potential public health problems The Project will provide all
Infrastructure necessary for TPM 18550 Including adequate sewei and water systems
TPM 18550 is required to be connected to the City's sanitary sewei system where the
sewage will be directed to facilities administered by the City of Redlands Municipal Utilities and
Engineering Department (the "MUED") As reflected un the EIR, the MUED has reported that
TPM 18550 would not violate the existing California Watei Code because the subdivision will
be connected to the public sewer system and will only have a minor incremental impact on the
quantity of the effluent from facilities administered by the MUED TPM 18550 will consist of
commercial and office uses and will not discharge pollutants such as industrial sludge, noxious
gasses, medical wastes or radioactive materials TPM 18550 will not exceed the City's capacity
to treat wastewater as the City has the ability to process 9 5 mgd The facility is currently only
processing 6 5 mgd Uses within Parcel Map 18550 will generate 7,925 gallons per day As a
result, the Parcel Map will only reflect a slight imposition on the City's wastewater capacity
With regard to solid waste, TPM 18550 will result in a new source of solid waste The
City operates the California Street Landfill, which is a Class III landfill that accepts all solid
waste generated within the City's boundaries The total permitted daily throughput capacity fot
the landfill is 829 tons Currently, the average daily disposal is approximately 320 tons pet day
The residual average capacity is approximately 509 tons per day Operation of TPM 18550 will
general 0 13 tons per day, of 48 tons pet yea' As a result, the City has more than adequate
capacity to serve TPM 18550 Furthermore, TPM 18550 will observe the Municipal Code's
regulations that govern the procedures for collection, transfer, processing, and disposal of solid
waste With regards to stormwatei drainage, TPM 18550 will upgrade all curbs and gutters
where appropriate in order to accommodate all drainage flowing from TPM 18550 As a result.
the City finds that the design of the subdivision and the proposed improvements are not likely to
cause serious public health problems
1 \Cir Council Reports\Planning\CC 01 06.09\6793 PPM 18550 Redlands Commons Januar) 6, 2009 doc 7
G The design of the subdivision and the proposed improvements will not conflict
with easements acquired by the public at large foi access through 01 use of property within the
proposed subdivision
The design of the subdivision and the proposed improvements will not conflict with
easements acquired by the public at large foi access through of use of property within the
proposed subdivision No such easements are known to exist Needed public access foi roads
and utilities will be acquired by the City and/oi appropriate utilities prior to recordation of the
proposed tract All easements and public rights of way to serve TPM 18550 will be designated
on the Final Map Therefore, the City finds that the design of the subdivision and the proposed
improvements will not conflict with easements acquired by the public at large for access through
or use of property within the proposed subdivision
H The proposed subdivision will not result in parcels that would be too small to
sustain their agricultural use pursuant to the California Land Conservation Act ("Williamson
Act")
The proposed subdivision will not result in parcels that would be too small to sustain
then agricultural use pursuant to Williamson Act contracts Although the area comprising TPM
18550 currently consists of an active citrus grove, TPM 18550 is not located in a City designated
Agricultural Preserve area, nor is it subject to a Williamson Act contract As noted in the
analysis of the Concept Plan, the property comprising TPM 18550 is within a SD District, which
envisions future development within the East Valley Corridoi that will pi ovide new residences
and businesses to that will potentially attract growth to the area To this end, as demonstrated in
the Measure U findings, the proposed density increase would not convert viable agricultural land
to non-agricultural uses The area surrounding the Project is becoming urbanized, with the
potential of Wal-Mart to the south, existing residential uses to the northeast, proposed
commercial development to the east, a proposed high school to the north and the existence of 1-
210 to the west With its prime access to freeways and major arterials, the property comprising
TPM 18550 has been the logical place where this growth would occur While most of the
growth has occurred south of the I-10, residential developments and neighborhood retail centers
have sprung up in the northern portion of the City as well, particularly in the area surrounding
TPM 18550 Agricultural uses on-site arc not capable of success or continuing effectiveness, nor
are they practicable
Further, as demonstrated in the EIR Findings, the property comprising TPM 18550 is
designated as containing Prime Farmland and Farmland of Statewide Importance and will
convert this land from agricultural to urban uses, including commercial and residential This
property, however, is currently designated as Commercial by the City General Plan and as a
Special Development District by the EVCSP, which anticipates future urban dek elopment,
including commercial and office development Further, the East Valley Corridoi area is
considered a prime location for commercial and industrial development due to its proximity to
large urban areas and relatively fcw topographic and environmental constraints TPM 18550
would not, however, instigate a change that that is not already reasonably foreseeable under the
applicable land use plans and zoning assessed in the EVCSP of the General Plan
J \City Council RcportsWPlannmg\CC 01 06.09\6793 PM 18550 Redlands Commons January 6 2009 doc 8
Presently, agriculture has been permitted as an interim use on the land, but was not
anticipated as a long term use As there are a number of current and future non-agricultural
developments in the area, the transition into a more intensive use represents a logical, outward
expansion of urban development Thus, the City finds that approval of the proposed subdivision
will not result in parcels of land that would be too small to sustain their agricultural use pursuant
to the Williamson Act
ADOPTED, SIGNED AND APPROVED this 6th day of January. 2009
i
ATTEST
tor of the City of Redlands
City C)4k
1, Lorrie Poyzer, City Clerk of the City of Redlands, California. do hereby certify that the
foregoing Resolution No 6793 was duly adopted by the City Council at a regular meeting
thereof held on the 6th day of January, 2009, by the following vote
AYES Councilmcmbers Gilbreath, Gallaghei, Aguilar, Mayor Harrison
NOES Councilmember Bean
ABSENT None
ABSTAIN None
Lorne poyzei, Cit 1 er
City off` Redlands, al' rnia
ce.lerk'Resolutions'Res 6700 6799'6793 TPM 1855( Redlands Commons January 6 2009 doe. 9
EXHIBIT A
COMMUNITY DEVELOPMENT DEPARTMENT
PLANNING DIVISION
CONDITIONS OF APPROVAL
MINOR SUBDIVISION NO 314 (PARCEL MAP 18550)
Prepared on. January 12, 2009
Applicant: On Texas Street LLC
Location. The northwest corner of Texas Street and San Bernardino Avenue
CONDITIONS OF APPROVAL
MINOR SUBDIVISION NO 314
The issuance of any permits shall comply with all provisions of the Redlands
Municipal Code.
2 Unless the map has been recorded or a time extension is granted in accordance
with Code, this application shall expire two (2) years from the date of approval.
3 This approval is for a Minor Subdivision to subdivide approximately 36 acres into
11 lots for property on the north side of San Bernardino Avenue, the south side of
Pioneer Avenue, the west side of Texas Street, and east of Tennessee Street in
the EV/SD Special Development District of the East Valley Corridor Specific
Plan (proposed for change to Concept Plan No 7).
4 The applicant shall record the lots by Final Parcel Map
5 The applicant shall insure that the project shall be kept in weed and dust free
condition throughout all periods of development.
6 The applicant for this subdivision, and its heirs, successors and assigns shall
defend indemnify and hold harmless the City of Redlands, its elected officials
officers, agents and employees from and against any claim, action, or proceeding
to attack, set aside, void and annul the approval of this subdivision by the City
provided such action is brought within the time period provided for in Section
66499 37 of the California Government Code The City will promptly notify the
applicant of any claim. action, or proceeding that may be brought against it.
7 Recorded easements are required for all cross lot drainage in the subdivision.
CONDITIONS OF APPROVAL
MINOR SUBDIVISION NO 314
8 Pursuant to Government Code Section 66020(d), certain fees, dedications,
reservations or exactions imposed by the City as a condition of approval of this
project are subject to a statutory ninety (90) day protest period. Please be
advised that the ninety (9U) day protest period for those fees, dedications,
reservations and exactions which are subject to Government Code Section
66020(a) has commenced to run on the date this project was approved by the
City
9 Prior to recordation of the Final Map, the applicant shall submit a final grading
plan that shows how off-site drainage from adjacent, up stream, private
properties will be picked up and carried to a City storm drain system. The plan
shall identify the contours, improvements (buildings, driveways, walls, etc.),
landscaping and existing drainage systems of adjacent properties. The plan, at a
minimum, shall show the area twenty (20) feet from the tract property line. The
plan shall identify the relationship of the subdivision and its proposed grading and
improvements to adjacent properties and their grading and improvements and
show that the adjacent properties will not be negatively impacted as a result of
the acceptance of drainage or on-site improvements. Plans are to be submitted
to reviewed and approved by the Community Development Department and the
Public Works Department prior to approval of the Final Map.
10 The final map shall conform with the tentative map as approved by the Planning
Commission.
11 All plans submitted to the City shall reflect all Planning Commission approvals
and any other changes required by the Commission and/or staff. This condition
applies to site plans, landscape plans, elevations, grading, and all other
illustrations, text, or plans submitted to the City in connection with the project
12. The applicant shall provide plans that detail retaining walls or obtainment of slope
easements to maintain property lines at the tops of all slopes prior to approval of
final map
13 Any conditions of approval determined by the City to not be completed prior to
Final Map approval shall be the subject of a Subdivision Improvement Agreement
entered into by the developer with the City
CONDITIONS OF APPROVAL
MINOR SUBDIVISION NO 314
14 All slopes in excess of three (3) feet in height shall be landscaped and
irrigated. Landscaping for slopes in excess of three (3) feet in height shall
be shown on the final landscape plan.
15. The recorded map shall provide a reciprocal parking and access
agreement to be recorded over all properties to provide unrestricted
access to parking spaces, drive aisles and driveways.
16. The applicant shall establish a Property Owners Association for the
project. The Association shall be responsible for the care and
maintenance of all property improvements held in common ownership of
the subdivision as well as other improvements constructed for the
common benefit of the project. Conditions, Covenants and Restrictions
(CC&R's) shall be prepared, submitted for review and approval by the City
Attorney prior to approval of the final map. The CC&R's shall include
provisions covering the care and maintenance of all property and
improvements held in common ownership of the subdivision as well as
other improvements on private property constructed for the common
benefit of the project including parking area improvements, all
landscaping, fountains, and walkways.
17 Conditions, Covenants and Restrictions ("CC&Rs") shall be prepared by
the applicant and approved by the City for the project which address the
conditions of approval imposed upon the project and address the
responsibilities of the Propertyowners' Association ("POA'). The CC&Rs
shall contain the following:
a. a provision which reads substantially as follows: 'The City shall
have the right to review and approve any propose amendment or
termination of [the CC&Rs] when such termination or amendment
would alter amend, terminate or otherwise impair the rights of the
City under those provisions of [the CC&Rs] which satisfy the
conditions of approval imposed by the City for the project. All
proposed amendments shall be submitted to the City's Community
development Director and shall be approved in writing by the City
Attorney as a precondition of and prior to the recordation of such
amendment.
b. a provision which reads substantially as follows: '[The CC&Rs]
shall be covenants running with the land, and shall, in any event,
and without regard to technical classification or designation, legal or
otherwise, be, to the fullest extent permitted by law and equity
binding for the benefit and the favor of and enforceable by the City
of Redlands. Although the City of Redlands shall be a beneficiary of
[the CC&Rs], and shall have a right to enforce [them], the City of
CONDITIONS OF APPROVAL
MINOR SUBDIVISION NO 314
Redlands shall not be obligated hereunder to exercise such rights
of enforcement.
18 The CC&Rs shall be subject to a joint review by the all affected City
Department Directors and the City Attorney's Office. The applicant shall be
required to pay for the review of the CC&Rs by the affected Department
Directors and the City Attorney's Office at such persons' hourly billing
rates.
19 The CC&Rs shall be submitted to the City at least twenty (20) days prior to
the submission of any request for approval of the final map. The CC&Rs
shall subsequently be recorded, in the form approved by the City prior to
or at the same time as the final map.
20 As an alternative to the Property Owners Association providing for the
care and maintenance of common and privately owned improvements
specified in Condition No. 16, the applicant may annex into a Community
Facilities District (CFD) at the discretion of the City The cost for ongoing
maintenance shall be financed through an assessment placed on lots
within the subdivision. In the event the property owners opts out of the
CFD the Property Owners Association shall assume responsibility for the
care and maintenance of improvements as outlined in the CC&R's
prepared for the project.
21 The applicant shall comply with all applicable Mitigation Measures
included in the Mitigation Monitoring Program prepared for the Redlands
Commons Environmental Impact Report.
22. As a condition of and prior to final map approval, the applicant shall (1)
petition the City for annexation of the property comprising Tentative Parcel
Map No 19078 to the City's Community Facilities District No. 2004-1 or a
similar City community facilities district, as designated by the City (2) take
all actions reasonable or necessary to annex such property to the
community facilities district; and (3) pay the reasonable and actual costs
incurred by the City in annexing the property to the community facilities
district; all for the purpose of the maintenance of landscaping of private
common areas and public rights-of-way
23. Landscaped fingers will be added to the landscaping in the commercial
area along San Bernardino Avenue, which will eliminate nine parking
spaces on the commercial portion of the development.
24 Prior to the installation of any Mexican Fan Palm (Washingtonia robusta)
proposed in the Landscape Plan, the developer shall work with the City of
Redlands to identify and acquire Mexican Fan Palms owned by the City
CONDITIONS OF APPROVAL
MINOR SUBDIVISION NO 314
that would be removed by the City pursuant to the City s efforts to remove
such trees located under power lines. For such identified Mexican Fan
Palm located under interfering, or anticipated to interfere with overhead
power lines, the developer at its sole cost and expense, shall remove the
tree and relocate to the Redlands Commons property pursuant to the
Landscape Plan. The developer shall provide the City with a replacement
minimum 15 -gallon tree listed on the city s approved tree list that is
suitable to grow under power lines ("Replacement Tree). Within 12
months of planting of the Replacement Tree, if the tree does not survive,
the developer shall replace the Replacement Tree with another 15 -gallon
tree listed on the City s approved tree list. The City shall not charge the
developer any fee to implement the provisions contained within this
subsection.
6.9
Oscar Orci
Community Development Director
MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT
DEVELOPMENT REQUIREMENTS
MINOR SUBDIVISION NO. 314 (Parcel Map No. 18550; CRA No. 851)
Date of P.C. Meeting: May 13, 2008
Applicant: On Texas Street
Location: Property Bounded by Pioneer Avenue, Texas Street and San
Bernardino Avenue
The applicant shall comply with the following engineering requirements as necessary because
the required construction is a necessary prerequisite to the orderly development of the
surrounding area and for public health and safety
All requirements for development shall be consistent with requirements set forth in the East
Valley Corridor Specific Plan.
A. The following items are required prior to issuance of the GRADING PERMIT.
No Grading Permit is required.
B. The following items are required prior to RECORDATION OF PARCEL MAP
1. Pay plan check fee as established per resolution. The amount is to be determined
at plan check submittal.
2. All support documentation shall be submitted with the parcel map to be checked.
Submission shall include but not be limited to:
Title Reports for the property
All tract maps and deeds referenced on the Tract Map
Easement Documents
Boundary and Lot Closure Calculations
3. Requirements for San Bernardino Avenue.
a. Dedicate to provide for a 60 foot half street right-of-way width including
corner cutoff at the property line return to accommodate a 35 foot radius
curb return and pedestrian ramp.
4. Requirements for Texas Street.
a. Dedicate to provide for a 44 foot half street right-of-way width.
5. Requirements for Pioneer Avenue
a. Dedicate to provide for a 33 foot half street right-of-way width including
corner cutoff at the property line return to accommodate a 30 foot radius
curb return and pedestrian ramp.
MS 314
May 13, 2008
Page 2
6. Survey and Monumentation bond must be posted.
7 Execute Subdivision Improvement Agreement.
8. Owner's Civil Engineer shall furnish tie sheets for all points set or found 'n public
right-of-ways and one mylar copy of recorded parcel map to the City Engineer.
C. The following items are required prior to issuance of the BUILDING PERMIT
1 No Building Permit is allowed or required.
D. The following items are required prior to issuance of the ENCROACHMENT
PERMIT
1 No Encroachment Permit is required.
E. The following items are required prior to issuance of CERTIFICATE OF
OCCUPANCY
1. No Certificate of Occupancy will be issued or required.
F The following items are required prior to release of BONDS/WARRANTIES.
I Prior to the release of the bonds for the project, all requirements outlined in
Section B of these conditions of approval shall be satisfied.
2. Owner's Civil Engineer shall famish tie sheets for all points set or found in public
right-of-way and one mylar of recorded parcel reap to the City Engineer.
3. Monurnentation letter shall be submitted certifying that all monuments have been
set as required.
A//
ROSEMARY HOERNING 0
Director of Municipal Utilities
and Public Works Engineering/City Engineer
7tr
1 I r :akc
FILE: MS No. 314 (CRA NO. 851)
MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT
DEVELOPMENT REQUIREMENTS
CRA 851, AND MS 314
Date: May 13, 2008
Applicant: Gretchen Sauer
Location: NWC San Bernardino Avenue and Texas Street
The specific fee amounts to be paid by the applicant or its successor shall be those established by
the city and in effect on the date the permit or other conditioned approval noted below is issued.
The fees specified herein are based on estimated flows for a retail/office use identified on the
submitted plans. If there is a change in use or tenant improvement resulting in higher estimated
flows due to the proposed use, the fees for the additional flows will be due at that time. The fees
estimated herein are advisory only
GENERAL,,.
Comply with Title 13 and other sections of the Redlands Municipal Code in effect at the time of
approval or issuance of permits, as applicable.
WATER SECTION
THE DEVELOPER SHALL.
Pay the Water Source Acquisition Charge at $33.70 per 100 cubic feet/month estimated
monthly flow for retail/office, as a condition of approval of the parcel map.
55.200
2. Pay the Water Capital Improvement Charge at $220.00 per 100 cubic feet/month estimated
monthly flow for retail/office, as a condition of approval of the application for a water
service connection prior to meter installation.
$33.700
3. Pay applicable non -potable development impact fees for landscape areas as a condition of
approval for the application for a non -potable water service connection prior to meter
installation.
4 Pay the Water Main Frontage Charge at $30 per linear foot of frontage (490 feet) in Texas
Street, as a condition of final approval of the parcel map.
514.700
5 Install a water main, from an existing 12 -inch water main in the intersection of San
Bernardino Avenue and Texas Street across the frontage of San Bernardino Avenue and
extending approximately 400 feet west of the west property line, as approved by the
Municipal Utilities and Engineering Director Hydraulic calculations are required to be
Redlands Commons, CRA 851 NWC of San Bernardino Avenue and Texas Street
May 13, 2008
Page 2
submitted as a basis for sizing of the water main, with a 8 -inch diameter water main being
the minimum, based on fire flow requirements, as approved by the Municipal Utilities and
Engineering Director
6. Install a 16 -inch diameter non -potable water main along the frontage in Texas t and the
an extension to approximately 470 feet south of Pennsylvania Avenue, as approved
Municipal Utilities and Engineering Director. If the 16 -inch diameter non -potable water
main exists along the frontage then pay non -potable water main frontage fee at $23 per
linear foot as a condition of final approval of parcel map.
7 Install 6 -inch diameter non -potable water main along the frontage in San Bernardino
Avenue from the proposed 16 -inch diameter non -potable water main in Texas Street, as
approved by the Municipal Utilities and Engineering Director.
8. Install commercial fire hydrants as required by the Redlands Fire. Department and
approved by the Municipal Utilities and Engineering Director.
9 Install reduced pressure principle backflow devices on all water services as approved by
the Municipal Utilities and Engineering Department and double detector check valve
backflow devices on any separate fire service for fire sprinklers.
THE DEVELOPER SHALL.
1 Pay the Sewer Capital Improvement Charge at $2,210 per 100 gallons per day estimated
flow for retail/office, as a condition of issuance of a building permit.
2. Pay the Sewer Main Frontage Charge at $30 per foot of frontage (1,330 feet) in San
Bernardino Avenue, as a condition of final approval of the parcel map.
$39.900
DW
THE DEVELOPER SHALL.
I Pay the Solid Waste Capital Improvement Charge of $52 per pound per day estimated
waste stream flow as a condition of issuance of a building permit.
i21.800
2. Comply with the Solid Waste Recycling Access Act of 1991 (AB 1327), and install double
Redlands Commons, CRA 851 NWC of San Bernardino Avenue and Texas Street
May 13, 2008
Page 3
solid waste bin enclosure(s) as approved by the Municipal Utilities and Engineering
Department. Prior to the issuance of a Building Permit, submit a plan, prepared by a
licensed engineer on a copy of the site plan showing bin enclosure location(t) and turning
and/or turn around movements, and areas, for solid waste collection trucks.
Submit site and building recycling plans in accordance with Chapter 13.66 of the Redlands
Municipal code, and comply with the plans as approved by the Municipal Utilities and
Engineering Department.
AIRPORT SECTION
THE DEVELOPER SHALL.
(No Requirements.)
,g, .17 r< '• ce
ROSEMARY HOERNING
Director of Municipal Utilities &
Public Works Engineering/City Engineer
COMMUNITY DEVELOPMENT
BUILDING AND SAFETY
COMMISSION
COND AL USE PERMIT 907
GENERAL PLAN AMENDMENT NO.. 111APPROVAL NO.
7 51
SPECIFIC PAL N0.40 AMENDMENT NO. 31
CONCEPT PLAN NO. 7
MINOR SUBDIVISION NO. 341
TENTATIVE TRACT NO. 18444
eparation: April 14, 2008
Commission Date: May 13, 2000
Applicant: On Texas Street LLC
Attn. Gretchen Sauer
South skis of Pioneer Avenue, the west side of Texas
Street and east of Tennessee Street.
Location:
1 In compliance with the California Building Code (Application for Permit) and prior to the
plan check process, the applicant must submit five (5) complete sets of construction
plans and two (2) seM of specificadons, engineering calculations, diagrams, soils
Investigation reports
, epochal Inspection and structural observation rams End other
data to the building division for review and approval to the issuance of a bunting
permit halli be of Plans ard�ent specifications shell be drawn to scale upon aubatantias paper and
proposed and show In detail thatto �witi con location,te the nature and extent of the a work
relevant laws, ordinances, rules, and fnrrrr to the provisions o/ codes and all
regulations.
2. In compliance with the City of Redlands plan check requirement and part of the plan
check process, the applicant shah Insert the Conditions of Approvals from each city
departments as part of the General Notes.
3. In compliance with the California Plumbing Code and prior to the plan check process,
the applicant must submit three (3) complete sets of on-site sew and water plans to the
building division for review and approval prior to the Issuance of a plumbing permit.
4. In compliance with the California Code of Regulations, This 24, Part 2, Appendix Chapter
1 (AdminStradon), the structures shall not be occupied until a certificate of occupancy
has been granted by the City of Redlands.
5. In compliance with the Redlands City Ordinances and during the plan check process, the
applicant must submit four (4) sets of fire sprinkler or fire alarm plans for plan check
review and approvals prior to building permits.
8. In compliance with the California Building Code (Excavation and Grading) and prior to
the issuance of a building permit, a soil testing laboratory must submit a final compaction
report showing all fills have been compacted to a minimum of 90 percent of maxirnum
density to the Building Division for review and approval prior to the issuance ofa building
permit
T In compliance with the California Buiktlng Code (Excewtion and G
the issuance of a building penult.
certification to the building division for nsvlaw end approved prior to
building permit.
8 In compliance with the California Code of Regulations, Title 24 Part 2, (Acxeseibi lly
Standards) and prior to the building plan check approval, the designer, Architect or
Engineer must provide project designs for accessibility for the physically challenged to
the building division. Submit the design to the Building Division for their review and
approvals prior to the issuance of a building permit.
9. In compliance with the City of Redlands Municipal Code (Title 1B - Easements) and prior
to the Issuance of a building permit, the applicant must provide copies of the recorded
easement documentation for water drainage, utilities, or private sewer (on-site) lines to
the Building Division for their review and approval prior to the Issuance of a building
permit.
10. Prior to the start of construction and prior to the first building inspection, project address
shill be posted, sanitation facility provided, and erosion controls par the City Engineer
approved plana shall be in place.
11 In compliance with the Redlands Municipal Code (Land Development Standards) slopes
exceeding three (3) fest in height shall be provided with irrigation systems and sufficient
plants chosen from a list of erosion -resisting planta available at the Department of
Building and Safety or design slopes with an approved matting materiel designed by the
project engineer and submit the design to the Building Division with the grading plan
check for review and approval.
12. In compliance with the Redlands Municipal Code and prior to the Issuance of grading
permits, the applicant shall receive necessary approvals and perMte for the demolition
of structure's on the site.
13. In compliance with the California Building Codes and prior to Certificate of Occupancy
or electilc/gsa releasee, the stricture ahal be provided with sanitation facilities. Such
facilities shall be located either In such building or conveniently In a building adjacent
thereto on the same properly.
14. Prior to Final Occupancy, the design architect/engineer and/or developer shall submit
to the Building and Safety office a complete set of approved structural and architectural
drawings for the construction of structural and architectural work, including truss,
electrical, plumbing, and mechanical plana, which will be transmitted on CD, TIF or GIF
imaging file, for archiving purposes per the State of California Requirements.
R�pper
Chief Building Official