Loading...
HomeMy WebLinkAboutContracts & Agreements_204-2013_CCv0001.pdf AGREEMENT TO PERFORM NON-PROFESSIONAL SERVICES This agreement for the provision of janitorial services and supplies at various City facilities ("Agreement") is made and entered in this I'a day of October, 2013 ("Effective Date"), by and between the City of Redlands, a municipal corporation ("City)" and PROgreen Building Maintenance ("Contractor"). City and Contractor are sometimes individually referred to herein as a"Party"and,together, as"Parties." In consideration of the mutual promises contained herein, City and Contractor agree as follows: ARTICLE I —ENGAGEMENT OF CONTRACTOR 1.1 City hereby engages Contractor to provide janitorial services and supplies to approximately nineteen (19) City facilities at various locations specified by City (the "Services"). 1.2 The Services shall be performed by Contractor in a professional manner, and Contractor represents that it has the skill and the professional expertise necessary to provide the Services to City at a level of competency presently maintained by other practicing professional Contractors in the industry providing like and similar types of Services. 1.3 The term of this Agreement shall be for thirty six (36) months, commencing on the Effective Date of this Agreement. ARTICLE 2—SERVICES OF CONTRACTOR 2.1 The Services that Contractor shall perform are more particularly described in Exhibit "A." entitled "Scope of Services," which is attached hereto and incorporated herein by reference. 2.2 Contractor shall comply with applicable federal, state and local laws and regulations in the performance of this agreement including, but not limited to State prevailing wage laws. ARTICLE 3—RESPONSIBILITIES OF CITY 3.1 City shall make available to Contractor information in its possession that may assist Contractor in performing the Services. 3.2 City will make provision for Contractor to enter upon City-owned/leased property to perform the Services. 3.3 City designates Fred Cardenas, its Quality of Life Director, as City's representative with respect to performance of the Services, and such person shall have the authority to transmit instructions, receive information, interpret and define City's policies and decisions with respect to performance of the Services. F%ca\djm'AgreernentsTraGreen Building Maintenance Final,doc ARTICLE 4-PERFORMANCE OF SERVICES 4.1 Contractor shall perform and complete the Services in a prompt and diligent manner in accordance with the schedule set forth in Attachment "A" of "Exhibit "B," entitled "Task/Specific Duty Requirements for Each City Facility," which is attached hereto and incorporated herein by reference. The Services shall commence within ten (10) days of the Effective Date of this Agreement. 4.2 During the term of this Agreement, City may request that Contractor perform Extra Services. As used herein, "Extra Services" means any work that is determined necessary by City for the proper completion of the Services, but which the Parties did not reasonably anticipate would be necessary at the time of execution of this Agreement. Provided the Extra Services do not exceed twenty percent (20%) of the compensation to be paid by City to Contractor for the Services, such Extra Services may be agreed to by [.he appropriate City official in accurdaticc xith Chapter -2.16 cif the Redlands Manicipal Code. Contractor shall not perform, nor be compensated for, Extra Services without such written authorization from City. ARTICLE 5-PAYMENTS TO CONTRACTOR 5.1 The total annual (12 consecutive months) compensation for Contractor's performance of the Services shall be in the amount of One Hundred Forty One Thousand Eight Hundred Forty Dollars ($141,840). City shall pay Contractor on a monthly basis the amount of Eleven Thousand Eight Hundred Twenty Dollars ($11,820). The monthly payment amount shall be pro-rated for any partial month in which Contractor performs Services. 5.2 Contractor shall submit monthly invoices to City describing the Services performed during the preceding month. Contractor's invoices shall include a brief description of the Services performed, the dates the Services were performed, the number of hours spent and by whom, and a description of reimbursable expenses, if any, related to the Services. City shall pay Contractor no later than thirty (30) days after receipt and approval by City of Contractor's invoice. 5.3 All notices shall be given in writing by personal delivery or by mail. Notices sent by mail should be addressed as follows: City Contractor Fred Cardenas, Quality of Life Director Mike Sullivan, President Quality of Life Department PROgreen Building Maintenance City of Redlands 10834 E Whittier Blvd. 35 Cajon Street, Suite 222 Whittier, CA 90606 P.O. Box 3005 (mailing) Redlands, CA 92373 1:'lea"djiu,.Agreements'ProGre,en Building Maintenance FinaLdoc When so addressed, such notices shall be deemed given upon deposit in the United States Mail. Changes may be made in the names and addresses of the person to whom notices and payments are to be given by giving notice pursuant to this section 5.3. ARTICLE 6—INSURANCE AND INDEMNIFICATION 6.1 Insurance required by this Agreement shall be maintained by Contractor for the duration of its performance of the Services. Contractor shall not perform any Services unless and until the required insurance listed below is obtained by Contractor. Contractor shall provide City with certificates of insurance and endorsements evidencing such insurance prior to commencement of the Services. Insurance policies shall include a provision prohibiting cancellation or modification of the policy except upon thirty (30) days prior written notice to City, U.2 Contractor shall secure Workers' Con,lpensaiiun and L,,niplo,11cr's Liability inAtrance if, accordance with the laws of the State of California, with an insurance carrier acceptable to City as described in Exhibit "C," entitled "Workers' Compensation Insurance Certification," which is attached hereto and incorporated herein by this reference. 6.3 Contractor shall secure comprehensive general liability insurance with carriers acceptable to City. Minimum coverage of One Million Dollars ($1,000,000)per occurrence and Two Million Dollars ($2,000,000) aggregate for public liability, property damage and personal injury is required. City shall be named as an additional insured and such insurance shall be primary and non-contributing to any insurance or self-insurance maintained by City. 6.4 Contractor shall secure business auto liability coverage, with minimum limits of One Million Dollars ($1,000,000)per occurrence, combined single limit bodily injury liability and property damage liability. This coverage shall include all Contractor owned vehicles used in connection with Contractor's provision of the Services, hired and non-owned vehicles, and employee non-ownership vehicles. City shall be named as an additional insured and such insurance shall be primary and non-contributing to any insurance or self insurance maintained by City. 6.5 Contractor shall defend, indemnify and hold harmless City and its elected officials, employees and agents from and against any and all claims, losses or liability, including attorneys' fees, arising from injury or death to persons or damage to property occasioned by and negligent act or omission, or willful misconduct, by Contractor, its officers, employees and agents in performing the Services. ARTICLE 7—CONFLICTS OF INTEREST 7.1 Contractor covenants and represents that it does not have any investment or interest in any real property that may be the subject of this Agreement or any other source of income, interest in real property or investment that would be affected in any manner or degree by the performance of Contractor's Services. Contractor further covenants and 3 1:'ca',d.,im,,Agreements:lProGreen Building Maintenance Final.doc represents that in the performance of its duties hereunder, no person having any such interest shall perform any Services under this Agreement. 7.2 Contractor agrees it is not a designated employee within the meaning of the Political Reform Act because Contractor: A. Does not make or participate in: (i) the making or any City governmental decisions regarding approval of a rate, rule or regulation, or the adoption or enforcement of laws; (ii) the issuance, denial, suspension or revocation of City permits, licenses, applications, certifications, approvals, orders or similar authorization or entitlements. (iii) authoring City to enter into, modify or renew a contract; (1v) grainGtig City approvat to a contrlact that rucluire-s City approval and to which City is a party, or to the specifications for such a contract; (v) granting City approval to a plan, design, report, study or similar item; (vi) adopting, or granting City approval of policies, standards or guidelines for City or for any subdivision thereof. B. Does not serve in a staff capacity with City and in that capacity,participate in making a governmental decision or otherwise perl'onn the same or substantially the same duties for City that would otherwise be performed by an individual holding a position specified in City's Conflict of interest Code under Government Code section 87302. 7,3 In the event City officially determines that Contractor must disclose its financial interests, Contractor shall complete and file a Fair Political Practices Commission Form 700, State of Economic Interests with the City Clerks' office pursuant to the written instructions provided by the City Clerk. ARTICLE 8 —GENERAL CONSIDERATIONS 8.1 In the event any action is commenced to enforce or interpret any of the terms or conditions of this Agreement the prevailing Party shall, in addition to any costs and other relief, be entitled to the recovery of its reasonable attorneys' fees, including fees for the use of in-house counsel by a Party. 8.2 Contractor shall not assign any of the Services, except with the prior written approval of City and in strict compliance with the terms, and conditions of this Agreement. 8.3 Contractor is for all purposes under this Agreement an independent contractor and shall perform the Services as an independent contractor, Neither City nor any of its agents shall have control over the conduct of Contractor or Contractor's employees, except as herein set forth. Contractor shall supply all necessary tools and instrumentalities required to perform the Services. Assigned personnel employed by Contractor are for its account only, and in no event shall Contractor or personnel retained by it be deemed to have been 4 1:'ca',,d,ini\,Agreenten&,PrcyGreeti Building Maintenance Final.doc employed by City or engaged by City for the account of, or on behalf of City. Contractor shall have no authority, express by City for the account of, or on behalf of City. Contractor shall have no authority, express or implied, to bind City to any obligation. 8.4 This Agreement shall terminate on September 30, 2016, provided, however, this Agreement may be earlier terminated by City, in its sole discretion,by providing five (5) days prior written notice to Contractor (delivered by certified mail, return receipt requested) of City's intent to terminate. If this Agreement is terminated by City, an adjustment to Contractor's compensation shall be made, but (1) no amount shall be allowed for anticipated profit or unperformed Services, and (2) any payment due Contractor at the time of termination may be adjusted to the extent of any additional costs to City occasioned by any default by Contractor. Upon receipt of a termination notice, Contractor shall immediately discontinue its provision of the Services. Contractor shall be compensated on a pro-rata basis for Services completed up to the date of termination. 8.5 Contractor shall maintain books, ledgers, invoices, accounts and other records and documents evidencing costs and expenses related to the Services for a period of three (3) years, or for any longer period required by law, from the date of final payment to Contractor pursuant o this Agreement. Such books shall be available at reasonable times for examination by City at the office of Contractor. 8.6 This Agreement, including the Exhibits incorporated herein by reference, represents the entire agreement and understanding between the Parties as to the matters contained herein, and any prior negotiations, written proposals or verbal agreements relating to such matters are superseded by this Agreement. Except as otherwise provided for herein, an amendment to this Agreement shall be in writing, approved by City and signed by City and Contractor. 8.7 This Agreement shall be governed by and construed in accordance with the laws of the State of California. 5 1:,Icadjin',Agreemen&,ProGre,en Building Maintenance Final.doc IN WITNESS WHEREOF, duly authorized representatives of the City and Contractor have signed in confirmation of this Agreement. CITY OF REDLANDS PROGREEN BUILDING MAINTENANCE By: F By: Pete Aguilar, Mayor Mike S divan, President �x Attest: s Sam Irwin, C* Clerk. 6 I:ca`tiljin.Agreements FroGreen Building Maintenance Final.doe EXHIBIT A SCOPE OF SERVICES A. Where work is to be performed in City facilities, Contractor shall have examined the site of work and shall be responsible for having acquired full knowledge of the job and of any and all problems affecting it. No variations or allowance from the cost breakdown for the Services will be made because of lack of such examination. B. Damage to existing construction, equipment, planting, etc., by Contractor in the performance of the Services shall be replaced or repaired and restored to original condition by and at the expense of Contractor. C. Contractor shall at all times, keep the -facilities clean from accumulation of waste or recyclable materials caused by employees or Janitorial work and shall remove all resulting materials from site(s)where the Services are performed. D. Contractor shall appoint an experienced supervisor to be responsible for all Services required and performed under this Agreement. The Supervisor must be acceptable to City and have the authority to receive on behalf of Contractor any order or communication relating to the Services. The Supervisor shall be readily accessible to staff of the City at all times and have communication equipment(cell phone or pager). Contractor shall distribute to all employees assigned under this Agreement a copy of the "Scope of Services." Contractor shall provide City with a signed distribution sheet of all employees responsible for any Services required under this Agreement verifying that they have received a copy of the "Scope of Services" section. Contractor shall give efficient supervision to the Services. Failure to provide supervision, adequate to ensure conformance with the requirements of this Agreement will be considered deficient performance. Failure to correct a notice of deficient performance from City will constitute cause for termination of this Agreement. E. A checklist will be completed by Contractor, or a designated super-visor, ensuring that all required tasks are completed according to each time frame indicated in the scope of services. This checklist shall be turned in to City's representative as often as is necessary to ensure efficient performance of the job requirements. Contractor will correct, within 24 hours, deficiencies for any task labeled as daily weekly or monthly. Contractor will correct, within 48 hours, any deficiencies for any task labeled as semi- monthly, quarterly or annually. City reserves the right to procure services for the correction of the deficiency from other sources and hold Contractor responsible for any costs incurred. Failure to correct a notice of deficient performance from City will constitute cause for termination of this Agreement. A-1 1:':ca\djiii',,Agreements\ProGreen Building Maintenance Final.doe F. Invoices submitted must be itemized to include monthly costs for a given time period, and include City's purchase order number. Any additional charges need to be detailed on the invoice. G. Contractor shall submit to City upon request, names and addresses of all individuals who will be performing the Services. City requires a background check clearance and that personnel not approved for clearance be replaced. Contractor shall provide evidence that all employees engaged in providing the Services are covered under terms of Contractor's insurance policy and have passed a thorough background check. Background checks are to be performed at the expense of Contractor. H. Contractor is responsible for supplying, at its own expense, uniforms to all employees, which will be unvarying in style. All employees are expected to be in uniform while on duty, and the uniform is to be kept clean and in good condition. Employees., likewise, should be neat and clean and present a good image I. Contractor shall make available upon request the following: the Health and Safety Plan for the Workers and an accident record from the last 5 years, including the details of Contractor's response, actions and outcomes. 1. General Requirements. I. All keys entrusted to Contractor for the fulfillment of this Agreement must be fully protected at all times. In the event of any loss of key(s), it will be the responsibility of Contractor to cover the cost of having the locks re-keyed. All rooms/buildings are to be secured after cleaning by ensuring all windows are closed/locked and doors that are required to be locked are locked. 2. Upon completion and during the sequence of their duties, janitorial personnel will turn off all lights in unoccupied areas unless otherwise directed. 3. Prior to leaving the building each night, Contractor shall check to see that all outside doors are locked and that the building is secure. Emergency phone numbers will be provided to Contractor and Contractor shall notify the appropriate person in a timely manner of any difficulties in securing the buildings, 4. Any conditions in the facilities that may require repair shall be reported to City in a timely manner (i.e..- dripping faucets, damaged walls, burned out lights, etc.). 11. RECYCLING—REQUIRED FOR EACH FACILITY/BUILDING/OFFICE It is the objective of City to minimize disposal and maximize recycling of waste materials from City facilities. Contractor plays a vital role in achieving this objective. A-2 l'ca'�qitii,A,-reements',ProGrezn Building Maintenance Final,doc Contractor shall coordinate recycling activities with City's representative to minimize refuse disposal and maximize recycling from City facilities. Contractor shall empty recyclable materials contained within designated recycling containers throughout the facility, This includes all blue, recycling desk-side containers and larger,blue 32® gallon recycling containers. Recyclable materials shall be emptied into the white recycling dumpster at the rear of City Hall off Citrus Avenue. Recyclable materials set aside due to an office clean-out should be collected and emptied into the white recycling dumpster. This includes office clean-out materials such as paper (e,g., boxes, blueprints, plans, files, etc.) that may not be placed inside of a recycling container due to inadequate capacity. Contractor shall contact City's representative if the janitorial staff or supervisor is in doubt regarding the proper separation of materials due to all office clean-out. Contractor is encouraged to contact City's representative to apprise him of improper separation of materials by City staff. Materials listed below should be separated for recycling by City office staff. Newspapers Magazines Office paper Junk Mail Envelopes Phone Books Blueprints Catalogs Paper Bags Computer Paper Colored Paper Aluminum cans Tin(steel) cans Pie Pans All glass bottles and jars Empty Aerosol cans Milk Jugs Soda, Water and Juice Bottles Flattened Cardboard Boxes All other plastic bottle or containers Contractor shall meet with City's representative a minimum of once every six months to review their performance related to the requirements under this section. 111. Equipment and Supplies: Contractor will provide City with records to indicate the specifications, details and any other information available concerning the supplies and equipment used at City facilities. Supplies and materials used in performing the scope of services contained herein under this Agreement shall conforrn to the following specifications listed in the chart below: (any non- conforming specification must be provided in the blank column for consideration and approval by City) A-3 Building Maintenance Final.doc Janitorial Supply Specifications*** ITEM 4IINIMInlII REQUIRED BIDDER'S SPECIFICATIONS{'} SPECIFICATIONS LINERS I Meavy duty small trash Grainger,500 count, 10 gallon.24 x can liner 23,Flack or approved functionally equivalent 2 Heavy duty medium Grainger,250 count.20-30 gallon, trash can liner 30 x 36,black or grey,or approved functional) =e ivalent 3 Heavy duty large trash 100 per case,40-50 gallon, gray,90 can liner, ib or approved functionally e uivalent PAPER SUPPLIES 4 Toilet tissue,coreless 2-ply, 1000 sheets per roll,36 roll rolls;%case or approved functionally equivalent. 5 Toilet tissue to match 2-ply,white,Kleenex Cottonelle,or various dispensers approved functionally equivalent 6 Paper towels,single Must fit each specific dispenser at fold to match various each location(to be noted during dis users facility walk-thtou h 7 Paper towels,multifold Must fit each specific dispenser at to match various each location(to be noted during dispensers facility walk-through) 8 Toilet Seat covers Waxie,or equivalent,250 Count, 20 pack/case or approved functionally equivalent. 9 Paper Towels, 10" x 800',6 rolls/case,touchless EnMotion,used in two roll or approved functionally City.Dispensers equivalent. JANITORIAL SUPPLIES 10 Glass cleaner Trigger Spray Bottle,non-streaking I 1 Disinfectant Aerosol Must be:pseudomoacidal,vitcidal against IHV, salmonellacidal, bactericidal,fungicidal, sta h locidal,tuberculocidal 12 Urinal deodorizing Waxie,deluxe urinal deodorizing screens screen, 12/ea or approved functionally e ivalent 13 Soap-liquid hand Gojo Castulian Ltn Soap cleaner 14 Hand soap Push Pack Waxie,push pack,pink lotion,33.8 fl.Oz.or approved functionally e uivalent 15 Hand soap medicated Provon Medicated Lotion soap with Chlovoxylenal,33.8 fl. Oz. or a roved functionaliv e ivalent 16 Toilet bowl cleaner Acid Base, Squeeze Bottle 17 Industrial strength Lysol or approved functionally disinfectant e uivalent A- 1.icaldjm,,Agreements�FroGreen Building Maintenance Final.doc ITEM MININIUM/REQUIRED BIDDER'S SPECI1l«ICr TIC)NSIt SPECIFICATIONS 1 Furniture palish Pledge or approved functionally e uivalent. 19 Cleanser Comet or approved functionally equivalent,cleanerwith elalorinal 20 Roam Deodorizer Air Freshener,Airlift Aerosol,or a roved fu�actionall e ivalent. 1. Industrial strength Any brand bleach 22 Floor Stripper Baseboard stripper or approved functional) e uivalent* 23 Carpet Stain Remover Spray Bottle* 2�1 Mop =�jzy brand* . 25 Carpet Shampoo for Carpet Cleaning Machines* 26 Floor wax � Any brand* For treatment of various types of flooring, carpeting, etc,, only materials recommended and approved by the flooring manufacturers shall be used. It shall be the prime responsibility of the successful bidder to protect the owner's property at all times, and to use only materials and treatments that will enhance the appearance of the flooring, etc., and preserve the surface against deterioration. tl}Actual specifications must be provided in this column for any non-conforming specification Mechanical and other Equipment *** Brooms, brushes, mops, rags, waxes, vacuums, buckets, gloves, carts, paper goods, all ancillary supplies, tools and components, and other janitorial supplies, as well as all power equipment such as floor machines, vacuum systems, and all other equipment will be furnished by the successful bidder, and must be approved by City. If for any reason Contractor fails to provide adequate supply of the above mentioned materials during the work day, any supplies furnished by City shall be done at the expense of Contractor. Contractor shall allow City's representative to inspect facilities during office hours to assure compliance with this Agreement. Upon request, Contractor shall provide City with written certification of all services and supplies provided to City. V. Task/Specific Duty Requirements for Each City Facility Specific requirements for each City facility are specified in "Task,,' Specific Duty Requirements for Each City Facility," attached hereto and incorporated herein by this reference (Attachment A). A-5 1aca',�ljn-�,,,kgreements\ProGreza Building Maintenance Final,doc: EXHIBIT "B" COST BREAKDOWN SCHEDULE TOTAL MONTHLY COST PRICE PER JANITORIAL MONTHLY MONTHLY (INCLUDES INDIVIDUAL ITEM SERVICES PER ADDRESS COST FOR COST FOR LABOR AND SERVICE EXHIBIT A AND LABOR SUPPLIES SUPPLIES)PER (LABOR AND ATTACHMENT A ONLY ONLY "EXHIBIT A"AND SUPPLIES) "ATTACHMENT A" Animal Shelter 504 North $50.00 $10.00 $60.00 $7.50 Kansas Street Hillside 1540 Memorial Park Alessandro $400,00 $35.00 $435.00 55438 located Road Police 3 Administrative 30 Cajon $650.00 $100.00 $750.00 $93.75 Offices Street Development 210 East 4 Services Dept. Citrus $90.00 $10.00 $100.00 $12.50 Avenue Municipal 1745 5 Airport Sessums $100.00 $10.00 $110.00 $13.75 Drive 6 Civic Center 35 Cajon $1300.00 $150.00 $1450.00 $181.25 Street 7 Joslyn Senior 21 Grant $550.00 $100.00 $650.00 $32.50 Center Street 8 Police Sub- 212 $75.00 $10.00 $85.00 $85.00 Station Brookside 1150 9 Police West Sub- Brookside $75.00 $10.00 $85.00 $85.00 Station Avenue#J 1- A B-1 I:\caliijnr,Agreernents,PwGreen Building Maintenance Final-doc TOTAL MONTHLY COST PRICE PER JANITORIAL MONTHLY MONTHLY (INCLUDES INDIVIDUAL ITEM SERVICES PER ADDRESS COST FOR COST FOR LABOR AND SERVICE EXHIBIT A AND LABOR SUPPLIES SUPPLIES)PER ATTACHMENT A ONLY ONLY "EXHIBIT A"AND (LABORAND "ATTACHMENT SUPPLIES) A" Police Narcotics 1740 W. 10 Sub-Station Redlands $100.00 $15.00 $15.00 $115.00 Blvd 11 Smiley Library 125 WestAnd Lincoln $2600,00 $175.00 52775.00 $227.I0 Shrine Vine Street Corporate Yard, 12 Buildings A,B, 1270 W. Park $1050.00 $100.00 $1150.00 $143.75 C, D,E, Avenue Community 13 Center& III W $2100.00 $175.00 $2275.00 $11175 Community Lugonia Ave. Senior Center 14 Waste Water 1950 Nevada $275.00 $75.00 $350.00 $29.17 Treatment Plant Street 15 Water Production 955 Parkford $100.00 $10.00 $110.00 $13.75 And Operations Drive Park Avenue 1270 W. Park 16 Police Station, Avenue $950.00 $150.00 $1100.00 $55.00 Building C/Jail, California Street 17 Landfill Trailer 2151 Nevada $100.00 $10.00 $110.00 $13.75 Carriage House 1325 18 at Prospect Park Prospect $100.00 $10.00 $110.00 $110.00 Drive TOTAL $10,665.00 $1155.00 $11,820.00 B-2 1:"ca',,,qjm�Agreements',ProGreen Building Maintenance Fifial,doc Attachment A to Exhibit B -l'a,,,k-,/Specific Duty Requirements for Each City Facility JANITORIAL SPECIFICATIONS FOR CITY OF REDLANDS ANIMAL SHELTER 504 NORTH KANSAS STREET CLEANING SHALL BE PERFORMED EVERY SUNDAY AND THURSDAY BETWEEN THE HOURS OF 5:30 P.M. AND 7:30 A.M. Tile Floor Care(Lobby, Hallways and Offico) Dust mop all hard surface floors with treated or Once a week electrostatic dust mop Wet mop entire area Once a week Vacuum walk-offmats Once a week Machine scrub hard surface floor and apply one coat of Once a month polish, allow time to dry, then buff Strip hard surface floor and recoat with three coats of Once a year floor polish Carpeted Areas(Reception2 Vacuum all areas Once a week Spot clean carpets Once a week Dust all ftimiture, fixtures and equipment Once a week Clean all walls, light switches, doors and baseboards Once a month Shampoo carpets using an extraction method Twice a year Vacuum all ceiling vents, should coincide with window Twice a year cleaning 1:'ca,djnlAgreenients',ProGre-en Building Maintenance Final.doe Restrooms Refill dispensers, empty trash, clean and sanitize all Twice a week restroom,fixtures, wipe all counters, clean mirrors, wipe chrome, spot wipe partitions, sweep and damp mop floors using a germicidal cleaner Scrub and sanitize sinks and toilets using Twice a week sanitizer/disinfectant Empty all trash receptacles and replace liners as Twice a week necessary Empty all blue recycling containers into recycling Twice a week dumpster or cart Machine scrub hard surface floor and apply one coat of Four times/year polish, allow time to dry, then buff Strip hard surface floor and recoat with three coats of Once a year floor polish Windows Windows shall be cleaned completely inside and outside. Twice a year (Cleaning is to be performed between March I and April 30 and between September I and October 3 1) 2 Building IM annenance Final,doc JANITORIAL SPECIFICATIONS FOR CITY OF REDLANDS HILLSIDE MEMORIAL PARK 1540 ALESSANDRO ROAD CLEANING SHALL BE PERFORMED AFTER 4:30 P.M. EVERY TUESDAY AND FRIDAY General offices, Carpeted Areas and Vin V1 Tiled Areas Dust and spot clean all horizontal surfaces Once a week Spot clean all walls, light switches atid doors Once a week Empty all trash receptacles and replace liners as Twice a week necessary Empty all blue recycling containers into recycling Twice a week durripster or cart Remove all collected trash to designated area Twice a week Vacuum all carpeted areas Twice a week Using approved spotter, spot clean carpeted areas as Twice a week needed Dust all chairs, table legs and rungs, baseboards, ledges Twice a month moldings and other low reaching areas Dust all surfaces above normal reach including window Once a month sills, ledges, moldings, shelves, door frames, pictures, etc. Restrooms Refill dispensers, empty trash, clean and sanitize all Twice a week restroom fixtures, wipe all counters, clean mirrors, wipe chrome, spot wipe partitions, sweep and damp mop floors using a germicidal cleaner 1:',Ica',djm',Agreeme-n&iProGreei3 Building Maintenance Final.doc Scrub and sanitize sinks and toilets using germicidal Twice a week cleaner Empty all trash receptacles and replace liners as Twice a week necessary Empty all blue recycling containers into recycling Twice a week dumpster or cart Vacuum all ceiling vents, should coincide with window Twice a year cleaning �Vindowv Windows shall be cleaned completely inside and outside Twice a year (Cleaning is to be performed near the end of May before Memorial Day and mid November) Mausoleums Windows shall be cleaned inside and outside (Cleaning Twice a year is to be performed end of May before Memorial Day and mid November) Mop/Wax and buff terrazzo floors (Cleaning is to be Twice a year performed end of May before Memorial Day and mid November) Break Room Clean all counters, chairs and table Once a week Clean and sanitize sink, and front of reffigerator Once a week Sweep and empty trash and recyclable material Twice a week receptacles and replace liners as necessary Damp mop Once a week 4 1:'ca\djmIAgroements\ProGreen Building Maintenance Final.doc JANITORIAL SPECIFICATIONS FOR CITY OF REDLANDS POLICE ADMINISTRATIVE OFFICES 30 CAJON STREET CLEANING SHALL BE PERFORMED BETWEEN THE HOURS OF 3:00 P.M. ,AND 5:00 P.M. ON EVERY TUESDAY AND THURSDAY jVain Floor Offices and Common Area Empty all trash receptacles and replace liners as Twice a week necessary Empty all blue recycling containers into recycling Twice a week dumpster or cart Remove all collected trash and recyclable material to Twice a week designated areas Clean and polish all drinking fountains, removing water Once a week marks, scale and splash marks on the sides and front Dust mop all hard surface floors with treated or Twice a week electrostatic mop Damp mop the entire area Once a week Vacuum all carpeted areas Twice a week Clean both sets of glass doors Once a week Using approved spotter, spot clean carpeted areas Once a week Dust mop stairs, dust railings, ledges and spot clean Once a week Dust all furniture, fixtures, equipment and accessories Once a week Dust high and low areas: i.e., pictures, clocks, partition Once a month tops, etc. Clean all ceiling vents Once a month 5 l:1ca\djm',Agreemen&,ProGreen Building Maintenance Final,doc Machine scrub hard surface floors and apply on coat of Once a month polish, allow time to dry, then buff Shampoo carpet using rotary machine Every 4 months Strip hard surface floors and recoat with three coats of Once a year floor polish Second Floor Empty all trash and.recyclable material receptacles and Twice a week replace liners as necessary Empty all blue recycling containers into recyclinc, Twice a week dunipster or cart Remove all collected trash and recyclable material to Twice a week designated area Clean and polish all drinking fountains, removing water Once a week marks, scale and splash marks from the sides and front Vacuum all carpeted. areas 'Twice a week Dust mop all hard surface floors with treated or Twice a week electrostatic mop Damp mop entire area Once a week Using approved spotter, spot clean carpeted areas Once a week Dust all furniture, fixtures, equipment and accessories Once a week Dust high and low areas; i.e., pictures, clocks, partition Once a month tops, etc. Machine scrub hard surface floors and apply one coat of Once a month polish, allow time to dry, then buff Strip hard surface floors and recoat with three coats of Once a year floor polish 6 1.\ca,,djm\Agreemenvs\ProGrmn Building Maintenance Final.doc Restrooms—All Three Floors Refill dispensers, empty trash, clean and sanitize all Twice a week restroom fixtures, wipe all counters, clean mirrors, wipe chrome, spot wipe partitions, sweep and damp mop floors using a germicidal cleaner Machine scrub hard surface floors Once a month Clean/scrub toilets using a germicidal cleaner Once a year .basement and Kitchen Empty all trash and recyclable material receptacles and Twice a week- replace liners as necessary Empty all blue recycling containers into recycling Twice a week dumpster or cart Remove all collected trash and recyclable material to Twice a week designated area Vacuum all carpeted areas/walk-off mats Twice a week Dust mop all hard surface floors with treated or Twice a week electrostatic dust mop Damp mop entire area Once a week Using approved spotter, spot clean carpeted areas Once a week Machine scrub hard surface floors and apply one coat of Every 4 months polish, allow time to dry, then buff Strip hard surface floors and recoat with three coats of Once a year floor polish Windows Windows shall be cleaned completely inside and outside Twice a year (To be performed between March I't and April 30'11 and again between September I"and October 31't) 7 1:'Ica,djrn�AgreetnentsTroGreen Building Maintenance Final,doc JANITORIAL SPECIFICATIONS FOR CITY OF DLANDS DEVELOPMENT SERVICES DEPARTMENT 210 EAST CITRUS AVENUE CLEANING SHALL BE PERFORMED TUESDAY AND FRIDAY AFTER 5:30 P.M. General Offices, Carpeted Areas and Vinyl Tiled Areas Dust and spot clean all horizontal surfaces Once a week Spot clean all walls, light switches and doors Once a week Empty all trash receptacles and replace liners as Twice a week necessary Empty all blue recycling containers into recycling Twice a week dumpster or cart Remove all collected trash to designated area Twice a week Vacuum all carpeted areas Twice a week Using approved spotter, spot clean carpet areas as Twice a week needed Dust all chairs, table legs and rungs,baseboards, ledges, Twice a month moldings and other low-reaching areas Dust all surfaces above normal reach, including window Once a month sills, ledges, moldings, shelves, door frames, pictures, etc. Restrooms Refill dispensers, empty trash, clean and sanitize all Twice a week restroom fixtures, wipe all counters, clean mirrors, wipe chrome, spot wipe partitions, sweep and damp mop floors using a germicidal cleaner 8 1:',ea',djiT`tAgreementsk,ProGre�n Building Maintenance Final.doc Scrub and sanitize sinks and toilets using germicidal Twice a week cleaner Empty all trash receptacles and replace liners as Twice a week necessary Empty all blue recycling containers into recycling Twice a week dumpster or cart Vacuum all ceiling vents (should coincide with window Twice a week cleaning) Break Room Clean all counters, chairs and tables Twice a week Clean and sanitize sink and front of refrigerator Twice a week Sweep and empty trash replace liners as necessary or at Twice a week least twice a week Empty all blue recycling containers into recycling Twice a week dumpster or cart Damp mop hard surface floors Once a week Windows Windows shall be cleaned completely inside and outside Twice a year (Cleaning is to be performed at the end of May before Memorial Day and again in mid-November) 9 1:ca'dini�Agreements",ProGreen Building Maintenance Final.doc JANITORIAL SPECIFICATIONS FOR CITY OF REDLANDS MUNICIPAL AIRPORT 1745 SSSS MS DRIVE CLEANING SHALL BE PERFORMED TUESDAY AND FRIDAY AFTER 5:30 P.M. Lobby Area, Carpeted Areas and VinVI Tiled Areas Dust and spot clean all horizontal surfaces Once a week of clean all walls, light switches and doors 0�.i e a week Empty all trash and recyclable material receptacles and Twice a week replace liners as necessary Empty all blue recycling containers into recycling Twice a week dumpster or cart Remove all collected trash to designated area Twice a week Vacuum all carpeted areas Twice a week Using approved spotter, spot clean carpet areas as Twice a week needed Dust all chairs, table legs and rungs,baseboards, ledges, Twice a month moldings and other low-reaching areas Dust all surfaces above normal reach, including window Once a month sills, ledges,moldings, shelves, door frames, pictures, etc. Restrooms Refill dispensers, empty trash, clean and sanitize all Twice a week restroom fixtures, wipe all counters, clean mirrors, wipe chrome, spot wipe partitions, sweep and damp mop floors using a germicidal cleaner Twice a week Scrub and sanitize sinks and toilets using germicidal cleaner 10 1:\ca\dini'%,Agreements'ProGreen Building Maintenance Final,doe Empty all trash and recyclable material receptacles and replace liners as necessary Twice a week Empty all blue recycling containers into recycling dumpster or cart Twice a week Vacuum all ceiling vents (should coincide with window cleaning) Twice a week Break Room Clean all counters, chairs and tables Twice a week Clean and sanitize sink and front of refrigerator Twice a week Sweep Twice a week Empty all trash and recyclable material receptacles and replace liners as necessary Twice a week Empty all blue recycling containers into recycling dumpster or cart Twice a week Damp mop hard surface floors Once a week Windows Windows shall be cleaned completely inside and outside (Cleaning is to be performed at the end of May before Twice a year Memorial Day and again in mid-November) 11 1:"ca\djiiivlgreements',ProGreen Building Maintenance Final.doc JANITORIAL SPECIFICATIONS FOR CITY OF REDLANDS CIVIC CENTER 35 CAJON STREET CLEANING SHALL BE PERFORMED BETWEEN THE HOURS OF 6:00 P.M. AND 6:00 A.M. EVERY TUESDAY AND SUNDAY EACH OFFICE IS TO BE CLEANED WITH THE EXCEPTION OF THE TREASURER'S OFFICE —TO BE CLEANED BETWEEN 7:30 A.M.AND 5:30 P.M. ON TUESDAY AND THURSDAY Lobbies Clean entry to buildings Twice a week Empty all trash and recyclable material receptacles and Twice a week replace liners as necessary Empty all blue recycling containers into recycling Twice a week dumpster or cart Remove all collected trash to designated area Twice a week Vacuum all carpeted areas/walk-off mats Twice a week Clean both sides of all glass doors Twice a week Dust all hard surface floors with treated dust mop using Twice a week approved spotter, spot clean carpeted areas Dust all chair, table legs and rungs,baseboards, ledges, Once a month moldings and other low-reaching areas Brush furniture Once a month Dust all surfaces above normal reach, including window Once a month sills, ledges, moldings, shelves, door frames, pictures, etc. Vacuum furniture Once a month 12 l.'ca"djfnl,--kgreements',-ProGreen Building Maintenance Final.doc Corridors Dust all hard surface floors with treated dust mop Twice a week Damp mop all hard surface floors Twice a week Fully vacuum all carpets from wall to wall Twice a week Spot clean all walls, light switches and doors Twice a week Clean and polish all drinking fountains Twice a week Using approved spotter, spot clean carpeted area Twice a week General Offikes, Carpeted Areas and Vinyl Tiled Areas Empty all trash and recyclable material receptacles and Twice a week replace liners as necessary Empty all blue recycling containers into recycling Twice a week dumpster or cart Remove all collected trash to designated area Twice a week Dust and spot clean all horizontal surfaces Twice a week Spot clean all walls, light switches and doors Twice a week Vacuum all carpeted areas Twice a week Dust mop all hard surface floors with treated dust mop Twice a week Clean both sides of glass door Twice a week Using approved spotter, spot clean carpeted areas Twice a week Dust all chair, table legs and rungs,baseboards, ledges, Once a month moldings and other low-reaching areas Damp mop entire hard surface areas Once a month Dust all surfaces above normal reach including window Once a month sills, ledges, moldings, shelves, door frames, pictures, etc. 13 1:\ca'dja\Affeemen&-,ProGreen Building Maintenance Final,doc Vacuum all ceiling vents, should coincide with window Once a month cleaning Stairwells Sweep stairs Once a week Damp mop any spillage Once a week Dust rails and ledges Once a week Damp mop completely Once a week Elevators Clean elevator completely Once a month Restrooms and Locker Rooms Clean and sanitize fixtures, mirrors, counters, polish Twice a week chrome. Scrub and sanitize sinks and toilets using germicidal Twice a week cleaner Mop floors completely Twice a week Refill dispensers Twice a week Empty all trash and recyclable material receptacles and Twice a week replace liners as necessary Empty all blue recycling containers into recycling Twice a week dumpster or cart Remove all collected trash to designated area Twice a week Spot clean all walls, light switches and doors Once a month Spot wash all restroom partitions Once a month Wash all restroom partitions on both sides Once a month 14 L\ca\.djm'Agreentents\ProGreen Building Maintenance Final.doe Dust air vents Once a month Dust tops of lockers Once a month Machine scrub all restroom floors using a germicidal Once a month detergent and rec;oat with two coats of scaler/finish Vacuum all ceiling vents, should coincide with window Once a month cleaning CaMed"unchroom Clean sink, countertop and appliances Twice a week Damp wipe all cafeteria, lunchroom tables and vending Twice a week machines Empty all trash and recyclable material receptacles and Twice a week replace liners as necessary Empty all blue recycling containers into recycling Twice a week dumpster or cart Remove all collected trash to designated area Twice a week Dust mop all hard surface floors with treated dust mop Twice a week Mop all stains and spills from hard surface floors Twice a week Spot clean all walls, light switches and doors Twice a week Damp wipe chairs Twice a week Floor Care Services Machine polish, scrub or strip all vinyl, ceramic, or tile Once a month floors and apply adequate coatings of floor sealer/finish to required floors Machine scrub, apply approved wax and polish wood Once a month floor 15 L',ca'%djmkAgreernentsxProGreen Building Maintenance Final.doe Window Cleaning Set-vices All windows shall be cleaned inside and outside Twice a year (cleaning is to be performed between March I st and April 30th and between September I" and October 314`) 16 1:\ca\djmlAgreements\PmGre,en Building Maintenance Final,doc JANITORIAL SPECIFICATIONS FOR CITY OF REDLANDS JOSLYN SENIOR CENTER 21 GRANT STREET CLEANING SHALL BE PERFORMED BETWEEN THE HOURS OF 7:00 P.M. AND 6:00 A.M.—5 DAYS A WEEK—MONDAY THROUGH FRIDAY Lobbv Clean entry to building Three times/week Empty all trash and recyclable luall-crial receptacles aad Three times,"week replace liners as necessary Empty all blue recycling containers into recycling Three times/week dumpster or cart Remove all collected trash and recyclable material to Three times/week designated area Three times/week Vacuum carpeted areas Three times/week Clean both sides of all glass doors Three times/week Dust all hard surface floors with treated dust mop Three times/week Using approved spotter, spot clean carpeted areas Damp mop all hard surface areas Three times/week Dust all chairs, table legs and rungs, baseboards, ledges, Once a week moldings, and low-reaching areas Brush furniture Once a week Dust all surfaces above normal reach, including window Once a month sills, ledges, moldings, shelves, door frames, pictures, etc. Vacuum furniture Once a month Clean/vacuum air conditioning vents Twice a year 17 1:'ca'�,djm--A_greements\ProGre4m Building Maintenance Final.doc Corridors Dust all hard surface floors with treated dust mop Three times/week Darnp mop all hard surface floors Three times/week Spot clean all walls, light switches and doors Three times/week Clean and polish all drinking fountains Three times/week Using approved spotter, spot clean carpeted area Three times./week Clean translucent panels that cover ceiling light fixtures Twice a year Clean air conditioning vents Twice a year General Offices, Carpeted Areas and Vinyl Tiled Areas Empty all trash and recyclable material receptacles and Three times/week replace liners as necessary Empty all blue recycling containers into recycling Three times/week dumpster or cart Remove all collected trash and recyclable material to Three times/week designated area Empty and damp wipe ashtrays located outside building Three times/week entrances Dust and spot clean all horizontal surfaces Three times/week Spot clean all walls, light switches and doors Three times/week Vacuum carpeted areas Three times/week Dust mop all hard surface floors with treated dust mop Three times/week Mop stains and spillage Three times/week Using approved spotter, spot clean carpeted areas Three times/week Dust all chair, table legs and rungs,baseboards, ledges, Once a week molding and other low-reaching areas 18 1:'ca%djjn'Agree-ments',ProGreen Building Maintenancel'inal.doc Damp mop entire hard surface areas Once a week Dust all surfaces above normal reach, including window Once a month sills, ledges, moldings, shelves, door frames, pictures, etc. Clean air conditioning vents Twice a year Clean translucent panels covering ceiling light fixtures Twice a year Restrogffls Clean and sanitize fixtures,mirror, counters, polish Monday through Friday chrome and toilets Mop floors completely Monday through Friday Refill dispensers Monday through Friday Empty all trash and recyclable material receptacles and Monday through Friday replace liners as necessary Empty all blue recycling containers into recycling Monday through Friday dumpster or cart Remove all collected trash and recyclable material to Monday through Friday designated area Spot clean walls, light switches and doors Monday through Friday Spot wash all restroom partitions and doors Once a week Wash all restroom,partitions on both sides Once a month Dust air vents Once a month Machine scrub all restroom floors using a germicidal Once a month detergent Clean air conditioning vents Twice a year 19 1:"calr3_imsAgreement--\ProGreen Building Maintenance Final.doc Kitchen Clean sink, countertop and appliances Three times/week Damp wipe all cafeteria counter areas Three times/week Empty all trash and recyclable material receptacles and Three times/week replace liners as necessary Remove all collected trash and recyclable material to Three times/week designated area Dust mop all hard surface floors with treated dust mop Three times/week Mop all stains and spills from hard surface floors Three times/week Spot clean all walls, light switches and doors Three times/week Damp wipe chairs Once a week Clean air conditioning vents Twice a year Clean translucent panels that cover ceiling light fixtures Twice a year Machine scrub hard surface floors and apply one coat of Once a month polish, allow time to dry, then buff Strip hard surface floors and recoat with three coats of Once a year floor polish Floor Care Services Machine polish, scrub or strip all vinyl, ceramic, or the Once a month floors and apply adequate coatings of floor scaler/finish to required floors Window Cleaning Services All windows shall be cleaned inside and outside Twice a year (cleaning is to be performed between March I" and April 30`x' and between September I"and October 31'x) ?0 l:,,ca`,djtnAgreements`iPt-oGreen Building Maintenance Final-doe JANITORIAL SPECIFICATIONS FOR THE CITY OF REDLANDS POLICE SUB-STATION 212 BROOKSIDE Restrooms Refill dispensers, empty trash, clean and sanitize all Once a month restroom fixtures, wipe all counters, clean mirrors, wipe chrome, spot wipe partitions, sweep and damp mop floors using a germicidal cleaner Empty all trash and recyclable material receptacles and Once a month replace liners as necessary Empty all blue recycling containers into recycling Once a month dumpster or cart Machine scrub hard surface floor and apply one coat of Once a month polish, allow to dry,then buff Strip hard surface floor and recoat with three coats of Once a year floor polish. 21 1:1ca',djm�Agireements,ProGreen Building Maintenance Final,doc JANITORIAL SPECIFICATIONS FOR THE CITY OF REDLANDS POLICE WEST SUB-STATION 1150 BROOKSIDE AVENUE # JIA CLEANING SHALL BE PERFORMED EVERY SUNDAY Lobbv,Hallways, Offices, and Kitchens Dust mop all hard surface floors with treated or Once a week electrostatic dust mop Wet mop entire area Once a week Vacuum all carpeted areas/walk-off mats Once a week Using approved spotter, spot clean carpeted areas Once a week Dust all furniture, fixtures, equipment and accessories Once a week Dust high and low areas; i.e., pictures, clocks, partition Once a week tops, etc. Empty all trash and recyclable material receptacles and Once a week replace liners as necessary Empty all blue recycling containers into recycling Once a week dumpster or cart Damp mop entire area in kitchen Once a week Vacuum all ceiling vents Twice a year Machine scrub hard surface floor and apply one coat of Once a month polish, allow to dry, then buff Shampoo carpet using rotary machine Twice a year Strip hard surface floor and recoat with three coats of Once a vear floor polish 22 1:'.ca';d.im',Aermments,,Pro(irem Building Maintenance Final.doc Restrooms Refill dispensers, empty trash, clean and sanitize all Once a week restroom fixtures, wipe all counters, clean mirrors, wipe chrome, spot wipe partitions, sweep and damp mop floors using a germicidal cleaner Empty all trash and recyclable material receptacles and Once a week replace liners as necessary Empty all blue recycling containers into recycling Once a week dui-npster or cart Machine scrub hard surface floor and apply one coat of Once a month polisti, allow to dry, then buff Strip hard surface floor and recoat with three coats of Once a year floor polish. Kitchens Empty all trash and recyclable material receptacles and Once a week replace liners as necessary Empty all blue recycling containers into recycling Once a week dumpster or cart Windows Windows shall be cleaned completely inside and outside Once a month 23 1:'cakijiiil,.Agreements',ProGfeen Building Maintenance Final,doc JANITORIAL SPECIFICATIONS FOR THE CITY OF REDLANDS POLICE NARCOTICS SUB-STATION 1740 W. DLANDS BLVD CLEANING SHALL BE PERFORMED EVERY TUESDAY Lobby,Hallways, Offices, and Kitchens Dust mop all hard surface floors with treated or Once a week electrostatic dust mop Wet mop entire area Once a week Vacuum all carpeted areas/walk-off mats Once a week Using approved spotter, spot clean carpeted areas Once a week Dust all furniture, fixtures, equipment and accessories Once a week Dust high and low areas-, i.e., pictures, clocks, partition Once a week tops, etc. Empty all trash and recyclable material receptacles and Once a week replace liners as necessary Empty all blue recycling containers into recycling Once a week dumpster or cart Damp mop entire area in kitchen Once a week Vacuum all ceiling vents Twice a year Machine scrub hard surface floor and apply one coat of Once a month polish, allow to dry, then buff Shampoo carpet using rotary machine Twice a year Strip hard surface floor and recoat with three coats of Once a year floor polish 24 1:"Ca,d-itW,Xgreement-q\ProGreen Building Maintenance Final.doc Restrooms Refill dispensers, empty trash, clean and sanitize all Once a week restroom fixtures, wipe all counters, clean mirrors, wipe chrome, spot wipe partitions, sweep and damp mop floors using a germicidal cleaner Empty all trash and recyclable material receptacles and Once a week replace liners as necessary Empty all blue recycling containers into recycling Once a week dumpster or cart Machine scrub hard surface floor and apply one coat of Once a month polish, allow to dry, then buff Strip hard surface floor and recoat with three coats of Once a week floor polish. Kitchens Empty all trash and recyclable material receptacles and Once a week replace liners as necessary Empty all blue recycling containers into recycling Once a week dumpster or cart Windows Windows shall be cleaned completely inside and outside Once a month 25 l:',,,ca\djm'-,Agreements',PmGreen Building Maintenance Final,doe JANITORIAL SPECIFICATIONS CLEANING FOR FOR THE CITY OF REDLANDS THE LINCOLN SHRINE SHALL BE SMILEY LIBRARY AND LINCOLN PERFORMED SHRINE BETWEEN THE 125 WEST VINE STREET HOURS OF 7:00 A.M. AND 5:00 P.M. CLEANING FOR THE SMILEY LIBRARY SHALL SMILEY BE PERFORMED SUNDAY THROUGH LIBRARY THURSDAY BETWEEN THE HOURS OF 10:00 P.M. AND 6:00 A.M. Lobbies Clean entry to buildings Sunday- Thursday Empty all trash and recyclable material receptacles and Sunday- Thursday replace liners as necessary Empty all blue recycling containers into recycling Sunday- Thursday dumpster or cart Remove all collected trash to designated area Sunday- Thursday Vacuum all carpeted areas/walk-off mats Sunday- Thursday Clean both sides of all glass doors Sunday- Thursday Dust all hard surface floors with treated dust mop using Sunday- Thursday approved spotter, spot clean carpeted areas Dust all chair, table legs and rungs, baseboards, ledges, Once a month moldings, and other low-reaching areas Dust all surfaces above normal reach, including window Once a month sills, ledges, moldings, shelves, door frames, pictures, etc. Once a month Vacuum furniture Corridors Dust all hard surface floors with treated dust mop Sunday- Thursday 26 1:',ca'1djm'kAgreernen&%ProGreen Building Maintenance Final.doc Damp mop all hard surface floors Sunday- Thursday Fully vacuum all carpets, wall to wall Sunday-Thursday Spot clean all walls, light switches and doors Sunday - Thursday Empty and damp wipe ashtray outside entry way Sunday - Thursday Clean and polish all drinking fountains Sunday - Thursday Using approved spotter, spot clean carpeted areas Sunday - Thursday General offices,All Areas Empty all trash and recyclable material receptacles and Sunday - Thursday replace liners as necessary Empty all blue recycling containers into recycling Sunday-Thursday dumpster or cart Remove all collected trash to designated areas Sunday - Thursday Dust and spot clean all horizontal surfaces Sunday - Thursday Spot clean all walls, light switches and doors Sunday- Thursday Vacuum all carpeted areas/walk-off mats Sunday- Thursday Dust mop all hard surface floors with treated dust mop Sunday- Thursday Mop all stains and spillage Sunday- Thursday Using approved spotter, spot clean carpeted areas Sunday- Thursday Damp mop entire hard surface areas Once a week Dust all chair, table legs and rungs, baseboards, ledges, Once a month moldings, and other low-reaching areas Dust all surfaces above normal reach, including window Once a month sills, ledges, moldings, shelves, door frames, pictures, etc. Vacuum ceiling vents, should coincide with window Once a month cleaning 27 1:'ca,,djm%AgTeements',JlroGreen Building Maintenance Final.doe Stairwells Sweep stairs Sunday- Thursday Damp mop any spillage Sunday -Thursday Dust rails and ledges Once a week Damp mop completely Once a week Elevators Clean and vacuum carpeted elevators completely Sunday- Thursday Using approved spotter, spot clean carpeted areas Sunday- Thursday Detail clean threshold plates, removing all visible spoil Sunday- Thursday Restrooms Once a week Clean and sanitize fixtures, mirrors, counters, and polish chrome Once a week Mop floors completely Once a week Refill dispensers Once a week Empty all trash and recyclable material receptacles and replace liners as necessary Once a week Empty all blue recycling containers into recycling dumpster or cart Once a week Remove collected trash to designated area Once a week Spot clean walls, light switches and doors Once a week Spot wash all restroom partitions Once a month Wash restroom partitions on both sides Once a month Dust air vents 28 1:'ca\djnfAgreement,�.,ProGreen Building Maintenance Final.doe Machine scrub all restroom floors using a germicidal Once a month detergent and recoat with two coats of sealer/finish CafeterialLunchroom Clean sink, countertop and appliances Three times/week Damp wipe all cafeteria, lunchroom tables and vending Three times/week machines Empty all trash and recyclable material receptacles and Three times/xveek replace liners as necessary En-ilyty all blue recycling containers into recycling Three times;week dumpster or cart Remove all trash collected to designated area Three times/week Dust mop all hard surface floors with treated dust mop Three times/week Mop all stains and spills from hard surface floors Three times/week Spot clean all walls, light switches and doors Three times/week Damp wipe chair Once a week Floor Care Services Machine polish, scrub or strip vinyl, ceramic, or the Once a month floors and apply adequate coatings of floor sealer/finish to required floors Machine scrub, apply approved wax and polish wood Two times a year floor -)9 1:"ca\qittn Agreements'lProGreen Building Maintenance Final.doe Window Cleaning Services All windows shall be cleaned inside and outside Twice a year (cleaning is to be performed between March I and April 30 and between September I and October 3 1) LINCOLN SHRINE Shampoo carpet in all areas Two times a year Deep clean entire building Once a year All windows shall be cleaned inside and outside Two times a year (cleaning is to be performed between March I and April .30 and between September I and October 3 1) 30 l:',ca\dj&.-Agreementv,ProGreen Building Maintenance Filial doc I— -- -- --- I---------- JANITORIAL SPECIFICATIONS FOR CITY OF REDLANDS CORPORATE YARD 1270 W. PARK AVENUE CLEANING SHALL BE PERFORMED EVERY TUESDAY AND THURSDAYS AFTER 4:30 P.M.EXCEPT FOR BUILDING"All PURCHASING DEPT. WHICH IS TO BE CLEANED BETWEEN THE HOURS OF 7:30 A.M. AND 4:30 P.M. AND THE GAS ISLAND RESTROOM S WHICH ARE TO BE CLEANED EVERY SUNDAY, TUESDAY AND THURSDAY AFTER 4:30 P.M. General Oaces- C eted Areas and Vi 1filed Areas Empty all trash and recyclable material receptacles and replace liners as necessary Twice a week Empty all blue recycling containers into recycling dumpster or cart Twice a week Remove all collected trash to designated area Twice a week Dust and spot clean all horizontal surfaces Once a week Spot clean all walls, light switches and doors Once a week Vacuum all carpeted areas Once a week Dust mop all hard surface floors with treated dust mop Twice a week Mop all stains and spillage Twice a week Using approved spotter, spot clean carpeted areas Twice a week Dust all chair, table legs and rungs, baseboards, ledges. moldings and other low-reaching areas Once a month Damp mop entire hard surface areas Once a week Vacuum walk-off mats Once a week Dust all surfaces above normal reach including window sills, ledges, moldings, shelves, door frames, etc. Twice a week 31 1:,ca'djm'-,Agreements'iProGreen Building Maintenance Final.doc Machine scrub hard surface floor and apply one coat of Once a week polish, allow time to dry, then buff Strip hard surface floor and recoat with three coats of Once a year floor polish Lunchroom Buffigna "E Clean sink, countertop and appliances Once a week Damp wipe all cafeteria, lunchroom tables and vending Once a week machines Empty all trash and recyclable material receptacles and Twice a week replace liners as necessary Empty all blue recycling containers into recycling Twice a week dumpster or cart Remove all collected trash to designated area Twice a week Dust mop all hard surface floors with treated dust mop Twice a week Mop all stains and spills from hard surface floors Twice a week Spot clean all walls, light switches and doors Once a week Damp wipe chairs Once a week Restrooms and Locker Rooms all buildin-as as necessary Restrooms in Building"A" (Cleaned between 7:30 Once a week a.m.- 5:00 p.m.) Restrooms in Building"B," "E" & "M" Twice a week Restrooms in Building"D" (Gas Island) Three times/week Fully clean all showers Twice a week 32 1:1ca,,dim',A.9-reements,ProGreen Building Maintenance Final.doe Refill dispensers, waterproof sand paper on water Twice a week mineral in sinks empty trash, clean and sanitize all restroom fixtures, wipe all counters, clean mirrors, wipe chrome, spot wipe partitions, sweep and damp mop floors using a germicidal cleaner/scrub/sanitize sinks. Toilets scrub using sanitizer/disinfectant Twice a week Empty all trash and recyclable material receptacles and Twice a week replace liners as necessary Empty all blue recycling containers into recycling Twice a week dumpster or cart Grout. strip Twice a year Dust high and low areas: i.e., pictures, clocks, partition Once a month tops, etc Machine scrub hard surface floor and apply one coat of Once a month polish, allow time to dry, then buff Strip hard surface floor and recoat with three coats of Once a year floor polish Window cleaning services Windows shall be cleaned completely inside and outside Twice a year Cleaning is to be performed between March I and April 30 and September 1 —October 31 Building"C" Park Avenue Police Station—EOC OperadonslOfflce Only Vacuum all carpeted areas Once a week Using approved spotter, spot clean carpeted areas Once a week Dust all chair, table legs and rungs, baseboards, ledges Once a week Moldings and other low-reaching areas Once a week 33 Fca\djm\Agreernents:NProGreen Building Maintenance Final,doc Vacuum walk-off mats Once a week Tiled floor clean, strip and shine (monthly) Once a week K tchenlB atlt/Resta oom Dust mop all hard surface floors with treated dust mop Once a week Mop all stains and spillage Once a week Damp mop entire hard surface areas Once a week Scrub toilets using sanitizerldisinfectant Once a week 34 l;lca'',djzn,Agree-ments,ProGreen Building:Maintenance Final.doc JANITORIAL SPECIFICATIONS FOR CITY OF REDLANDS COMMUNITY CENTER & COMMUNITY SENIOR CENTER 111 W. LUGONIA AVE. CLEANING SHALL BE PERFORMED BETWEEN THE HOURS OF 11:00 P.M— 6:00 A.M. TUESDAY THROUGH SATURDAY COMMUNITY SENIOR CENTER Iti- Purpose Room Clean floors of dirt, dust, scuff marks and stains. Tuesday- Saturday Sweep up debris. Tuesday - Saturday Dust all hard surface floors with treated dust mop Tuesday - Saturday Damp mop all hard surface areas Tuesday- Saturday Tuesday- Saturday Senior Center and Restrooms in the Nutrition Site Kitchen Clean and sanitize fixtures, mirrors, counters.. polish Tuesday- Saturday chrome. Mop floors completely Tuesday- Saturday Refill all dispensers (toilet, paper towels and soap) Tuesday- Saturday Empty all trash and recyclable material receptacles and Tuesday- Saturday replace liners as necessary Empty all blue recycling containers into recycling Tuesday- Saturday dumpster or cart Remove all collected trash to designated area Tuesday- Saturday 35 1:',ca"djfn',,Agreements=ProGreen Building Maintenance Final.doc Strip polish hardwood floors Tuesday- Saturday Spot clean all walls, light switches and doors Tuesday- Saturday Spot wash all restroom partitions Once a month Strip and apply adequate coatings of floor sealer/finish Once a month COMMUNITY RECREATION CENTER Hardwood Floors— G Imnasium,Racquetball Courts& Alutti-Puryose Room Damp mop with approved cleaner and designed mop Tuesday - Saturday heads Dust mop with Hydroline Dust Mop Treatment and Tuesday- Saturday Maintainer Restrooms Clean and sanitize fixtures, mirrors, counters, polish Tuesday- Saturday chrome. Mop floors completely Tuesday- Saturday Refill all dispensers (toilet, paper towels and soap) Tuesday- Saturday Empty all trash and recyclable material receptacles and Tuesday- Saturday replace liners as necessary Empty all blue recycling containers into recycling Tuesday- Saturday dumpster or cart Remove all collected trash to designated area Tuesday- Saturday Spot clean all walls, light switches and doors Tuesday- Saturday Spot wash all restroom partitions. Once a month 36 l:'ca,,,qjmVAgreernentskProGreen Building Maintenance Final.doc Apply uniform coat of self-polishing floor wash with Once a month clean synthetic mop, allow time to dry, apply second coat, after allowing time for an overnight cure, buff with white-fine polish pad with machine under 175 RPM.* *Please note. Saturday night for this procedure is best. Center is closed on Sundays JANITORIAL SERVICE PROVIDER TO SUBMIT SCHEDULE OF MONTHLY STRIPPING AND POLISHING DATES TO COMMUNITY CENTER SUPERVISOR. 37 I:'ea?djmy�greements'TroGreen Building MaintenanceFinal.dnc JANITORIAL SPECIFICATIONS FOR CITY OF REDLANDS WASTE WATER TREATMENT PLANT 1950 NEVADA STREET CLEANING SHALL BE PERFORMED SUNDAY, TUESDAY AND THURSDAY AFTER 7:00 P.M. General Offices, Carpeted Areas and Vinyl Tiled Areas Dust and spot clean all horizontal surfaces Every Tuesday Spot clean all walls, light switches and doors Three times a week Z__ Empty all trash receptacles and replace liners as Three times a week necessary Empty all blue recycling containers into recycling Three times a week dumpster or cart Remove all collected trash to designated area Three times a week Vacuum all carpeted areas Three times a week Using approved spotter, spot clean carpet areas as Three times a week needed Dust all chairs, table legs and rungs,baseboards, ledges, Three times a week moldings and other low-reaching areas Dust all surfaces above normal reach, including window Once a month sills, ledges, moldings, shelves, door frames, pictures, etc. Restrooms Refill dispensers, empty trash, clean and sanitize all Three times a week restroom fixtures, wipe all counters, clean mirrors, wipe chrome, spot wipe partitions, sweep and damp mop floors using a germicidal cleaner 38 1;'�ca`,.djm,A.-reernen&,ProGreen Building Maintenance Final.doc Scrub and sanitize sinks and toilets using germicidal Three times a week cleaner Empty all trash receptacles and replace liners as Three times a week necessary Empty all blue recycling containers into recycling Three times a week dumpster or cart Vacuum all ceiling vents (should coincide with window Three times a week cleaning) Break Room Clean all counters, vending machines, chairs and tables Three times a week Clean and sanitize sink, drinking fountain and front of Three times a week refrigerator Sweep and empty trash replace liners as necessary or at Three times a week least twice a week Empty all blue recycling containers into recycling Three times a week dumpster or cart Damp mop hard surface floors Three times a week Windows Windows shall be cleaned completely inside and outside Twice a year (Cleaning is to be performed at the end of May before Memorial Day and again in mid-November) Carpeft Carpets shall be shampooed(Cleaning is to be performed Twice a year at the end of May before Memorial Day and again in mid-November) Tiled Floors Tiled Floors shall be waxed(Cleaning is to be performed Twice a year at the end of May before Memorial Day and again in mid-November) 39 1:',cadjm',Agreements;ProGrecm Building Maintenance Final,doc JANITORIAL SPECIFICATIONS FOR CITY OF REDLANDS WATER PRODUCTION AND OPERATIONS 955 PARKFORD DRIVE CLEANING SHALL BE PERFORMED SUNDAY AND WEDNESDAY AFTER 7:00 P.M. General Offices, Carpeted Areas an d Vin V1 Tiled Areas Dust and spot clean all horizontal surfaces Every Sunday Spot clean all walls, light switches and doors Twice a Week Empty all trash receptacles and replace liners as necessary Twice a Week Empty all blue recycling containers into recycling dumpster or cart Twice a Week Remove all collected trash to designated area Twice a Week Vacuum all carpeted areas Twice a Week Using approved spotter, spot clean carpet areas as needed Twice a Week Dust all chairs, table legs and rungs, baseboards, ledges, Once a Month moldings and other low-reaching areas Dust all surfaces above normal reach, including window Once a Month sills, ledges, moldings, shelves, door frames, pictures, etc. Restrooms Refill dispensers, empty trash, clean and sanitize all Twice a Week restroom fixtures, wipe all counters, clean mirrors, wipe chrome, spot wipe partitions, sweep and damp mop floors using a germicidal cleaner 40 1:'ca',djm',AgreementsProGreen Building Maintenance Final,doc Scrub and sanitize sinks and toilets using germicidal cleaner Twice a Week Empty all trash receptacles and replace liners as necessary Twice a Week Empty all blue recycling containers into recycling dumpster or cart Twice a Week Vacuum all ceiling vents (should coincide with window cleaning) Twice a Week Break Room Clean all counters, vending machines, chairs and tables Twice a Week Clean and sanitize sink, drinking fountain and front of refrigerator Twice a Week Sweep and empty trash replace liners as necessary or at least twice a week Twice a Week Empty all blue recycling containers into recycling dumpster or cart Twice a Week Damp mop hard surface floors Twice a Week Windows Windows shall be cleaned completely inside and outside Twice a Year (Cleaning is to be performed at the end of May before Memorial Day and again in mid-November) Tiled Floors Tiled Floors shall be waxed (Cleaning is to be performed Twice a Year at the end of May before Memorial Day and again in mid-November) 41 1:',CaldinYxAgreemen�'xProGrmn Building Maintenance Final.doc JANITORIAL SPECIFICATIONS FOR CITY OF REDLANDS PARK AVENUE POLICE STATION / JAIL 1270 W. PARK AVENUE CLEANING SHALL BE PERFORMED BETWEEN THE HOURS OF 7:00 A.M. AND 5:00 P.M.—5 DAYS A WEEK—MONDAY THROUGH FRIDAY Lobby Clean entry to building Three times/week Empty all trash and recyclable material receptacles aild Tbree times./week replace liners as necessary Empty all blue recycling containers into recycling Three times/week dumpster or cart Remove all collected trash and recyclable material to Three times/week designated area Three times/week Vacuum carpeted areas Three times/week Clean both sides of all glass doors Three times/week Dust all hard surface floors with treated dust mop Three times/week Using approved spotter, spot clean carpeted areas Damp mop all hard surface areas Three times/week Dust all chairs, table legs and rungs, baseboards, ledges, Once a week moldings, and low-reaching areas Brush furniture Once a week Dust all surfaces above normal reach, including window Once a month sills, ledges, moldings, shelves, door frames, pictures, etc. Vacuum furniture Once a month Clean/vacuum air conditioning vents Twice a year 42 1:',cardimkAgreeme-nt,,ProGreen Building Maintenance Final,doe Corridors Dust all hard surface floors with treated dust mop Three times/week Damp mop all hard surface floors Three times/week Spot clean all walls, light switches and doors Three times/week Clean and polish all drinking fountains Three times/week Using approved spotter, spot clean carpeted area Three times/week Clean translucent panels that cover ceiling light fixtures Twice a year Clean air conditioning vents Twice a year General Offices, Carpeted Areas and Vinyl Tiled Areas Empty all trash and recyclable material receptacles and Three times/week replace liners as necessary Empty all blue recycling containers into recycling Three times/week dumpster or cart Remove all collected trash and recyclable material to Three times/week designated area Empty and damp wipe ashtrays located outside building Three times/week entrances Dust and spot clean all horizontal surfaces Three times/week Spot clean all walls, light switches and doors Three times/week Vacuum carpeted areas Three times/week Dust mop all hard surface floors with treated dust mop Three times/week Mop stains and spillage Three times,/week Using approved spotter, spot clean carpeted areas Three times/week Dust all chair, table legs and rungs, baseboards, ledges, Once a week molding and other low-reaching areas 43 1:',,ca',djiifiAgreementskProGree,n Building Maintenance Final.doc Damp mop entire hard surface areas Once a week Dust all surfaces above normal reach, including window once a month sills, ledges, moldings, shelves, door frames, pictures, etc. Clean air conditioning vents Twice a year Clean translucent panels covering ceiling light fixtures Twice a year Restrooms Clean and sanitize fixtures,mirror, counters, polish Monday through Friday chronic and toilets Mop floors completely Monday through Friday Refill dispensers Monday through Friday Empty all trash and recyclable material receptacles and Monday through Friday replace liners as necessary Empty all blue recycling containers into recycling Monday through Friday dumpster or cart Remove all collected trash and recyclable material to Monday through Friday designated area Spot clean walls, light switches and doors Monday through Friday Spot wash all restroom,partitions and doors Once a week Wash all,restroom partitions on both sides Once a month Dust air vents Once a month Machine scrub all restroom floors using a germicidal Once a month detergent Clean air conditioning vents Twice a year 44 Building Maintenance Final,doc Kitchen Clean sink, countertop and appliances Three times/week Damp wipe all cafeteria counter areas Three times/week Empty all trash and recyclable material receptacles and replace liners as necessary Three times/week Remove all collected trash and recyclable material to designated area Three times/week Dust mop all hard surface floors with treated dust mop Three times/week Mop all stains and spills from hard surface floors Three times./week Spot clean all walls, light switches and doors Three timeshweek Damp wipe chairs Once a week Clean air conditioning vents Twice a year Clean translucent panels that cover ceiling light fixtures Twice a year Machine scrub hard surface floors and apply one coat of polish, allow time to dry, then buff Once a month Strip hard surface floors and recoat with three coats of Once a year floor polish Floor Care Services Machine polish, scrub or strip all vinyl, ceramic, or the Once a month floors and apply adequate coatings of floor sealer/finish to required floors Window Cleaning Services All windows shall be cleaned inside and outside Twice a year (cleaning is to be performed between March I"and April 3O`" and between September I't and October 3 Is) 45 1:',,ca'zdjiif,Agreemen&TroGreen Building Maintenance Final.doc JANITORIAL SPECIFICATIONS FOR CITY OF REDLANDS LANDFILL TRAILER 2151 NEVADA STREET Restrooms Refill dispensers, empty trash, clean and sanitize all Twice a week restroom fixtures, wipe all counters, clean mirrors, wipe chrome, spot wipe partitions, sweep and damp mop floors using a germicidal cleaner Twice a week Scrub and sanitize sinks and toilets using stu�i tizer/disinfCcUalt Twice a week Empty all trash receptacles and replace liners as necessary Twice a week Empty all blue recycling containers into recycling dumpster or cart Four times/year Machine scrub hard surface floor and apply one coat of polish, allow time to dry, then buff Once a year Strip hard surface floor and recoat with three coats of floor polish JANITORIAL SPECIFICATIONS FOR CITY OF REDLANDS CARRIAGE HOUSE 1325 PROSPECT DRIVE LANE Kitchen, 2 bathrooms, Main Floor, Museum, Garage, Apartment(AS NEEDED ONTLY) 46 1:'ca\(titn'Agreements\ProGreen Building Nlaintenance Final,doc