Loading...
HomeMy WebLinkAboutContracts & Agreements_21-2002_CCv0001.pdf SOUTHERN CALIFORNIA EDISONGENERATING FACILITY INTERCONNECTION AGREEMENT An EDISON INTERNATIONAL Company GFID 2530 (Wastewater Treatment Plant) This Generating Facility Interconnection Agreement("Agreement's is entered into by and between the City of Redlands("Producer"), a California Municipal Corporation, and Southern California Edison Company("SCE"), a California Corporation. Producer and SCE are sometimes also referred to in this Agreement jointly as"Parties" or individually as"Party." In consideration of the mutual promises and obligations stated in this Agreement and its attachments,the Parties agree as follows: 1. SCOPE AND PURPOSE This Agreement provides for Producer to interconnect and operate a Generating Facility in parallel with SCE's Distribution System to serve the electrical loads connected to the electric service account that SCE uses to interconnect Producer's Generating Facility (or, where permitted under Section 218 of the California Public Utilities Commission Code CPU Code"),the electric loads of an on-site or neighboring party lawfully connected to Producer's Generating Facility through Producer's circuits). 2. SUMMARY AND DESCRIPTION OF PRODUCER'S GENERATING FACILITY 2.1 A description of the Generating Facility, including a summary of its significant components and a single-line diagram showing the general arrangement of how Producers Generating Facility and loads are interconnected with SCE's Distribution System, are attached to and made a part of this Agreement. (Supplied by Producer as Appendix A). 2.2 Generating Facility identification number: 2530 2.3 Producer's electric service account number: 3-000-0015-86 2.4 Name and address used by SCE to locate the electric service account used to interconnect the Generating Facility with SCE's Distribution System: City of Redlands 1950 Nevada St. Redlands, CA 92373 2.5 The Gross Nameplate Rating of the Generating Facility is: 1213 W. 2.6 The Net Nameplate Rating of the Generating Facility is 1018 W 2.7 The expected annual energy production of the Generating Facility is 8,497,200 kWh. 2.8 For the purpose of securing the Competition Transition Charge exemption available under Section 372 of the California Public Utilities Code ("PUC"), Producer hereby declares that the Generating Facility meets the requirements for "Cogeneration"as such term is used in Section 218.5 of the PU Code. 2.9 The Generating Facility's expected date of Initial Operation is June 1,2002. The expected date of Initial Operation shall be within two years of the date of this Agreement. 3. DOCUMENTS INCLUDED; DEFINED TERMS 3.1 When this Agreement is completed, it may include the following exhibits that are specifically incorporated herein and made a part of this Agreement. Appendix A- Description of Generating Facility and Single-Line Diagram (Supplied by Producer) January 3,2002(Form 14-731) GENERATING FACILITY INTERCONNECTION AGREEMENT SOUTHERN CALIFORNIA EDISON CITY OF REDLANDS GFID 2'530 Appendix B- Copies of Rules 2 and 21 and other selected rules and tariffs of SCE (Supplied by SCE) Appendix C- A Copy of an interconnection facility financing and ownership agreement, if applicable, (Supplied by SCE) 3.2 When initially capitalized,whether in the singular or in the plural,the terms used herein shall have the meanings assigned to them either in this Agreement or in SCE's Rule 21, Section N. 4. TERM AND TERMINATION 4.1 This Agreement shall become effective as of the last date entered in Section 16, below. The Agreement shall continue in full force and effect until the earliest date that one of the following events occurs. (a) The Parties agree in writing to terminate the Agreement. (b) unless otherwise agreed in writing by the Parties, at 12:01 A.M. on the day following the date the electric service account through which Producer's Generating Facility is interconnected to SCE's Distribution System is closed or terminated. (c) At 12:01 A.M. on the 61st day after Producer or SCE provides written Notice pursuant to Section 9 below to the other Party of Producer or SCE's intent to terminate this Agreement. 4.2 Producer may elect to terminate this Agreement pursuant to the terms of Section 4.1(c)for any reason. SCE may elect to terminate this Agreement pursuant to the terms of Section 4.1(c)for one or more of the following reasons: (a) A change in applicable rules,tariffs, and regulations, as approved or directed by the Commission, or a change in any local,state or federal law, statute or regulation, either of which materially alters or otherwise affects SCE's ability or obligation to perform SCE's duties under this Agreement, or, (b) Producer fails to take all corrective actions specified in SCE's Notice that Producer's Generating Facility is out of compliance with the terms of this Agreement within the time frame set forth in such Notice; or, (c) Producer fails to interconnect and operate the Generating Facility per the terms of this Agreement prior to 120 days after the date set forth in Section 2.9, above, as the Generating Facility's expected date of Initial Operation; or, (d) Producer abandons the Generating Facility. SCE shall deem the Generating Facility to be abandoned if SCE determines, in its sole opinion, the Generating Facility is non-operational and Producer does not provide a substantive response to SCE's Notice of its intent to terminate this Agreement as a result of Producer's apparent abandonment of the Generating Facility affirming Producer's intent and ability to continue to operate the Generating Facility. 4.3 Notwithstanding any other provisions of this Agreement, SCE shall have the right to unilaterally file with the Commission, pursuant to the Commission's rules and regulations, an application to terminate this Agreement. January 3,2002(Form 14731) 2 GENERATING FACILITY INTERCONNECTION AGREEMENT SOUTHERN CALIFORNIA EDISON CITY OF REDLANDS GFID 2530 4.4 Any agreements attached to and incorporated into this Agreement shall terminate concurrently with this Agreement unless the Parties have agreed otherwise in writing. 5. GENERATING FACILITY, OPERATION AND CERTIFICATION REQUIREMENTS 5.1 The electric power produced by Producer's Generating Facility shall be used solely to serve electrical loads connected to the electric service account that SCE uses to interconnect Producer's Generating Facility (or,where permitted under Section 218 of the PUC,the electric loads of an on-site or neighboring party lawfully connected to Producer's Generating Facility through Producer's circuits). Producer shall attempt in good faith to regulate the electric power output of Producer's Generating Facility so as to prevent the flow of electric energy from the Generating Facility to SCE's electric system. Unless otherwise agreed upon in writing by the Parties, this Agreement does not provide for, nor otherwise require SCE to receive, purchase, transmit, distribute, or store the electrical power produced by Producers Generating Facility. 5.2 If Producer declares that its Generating Facility meets the requirements for "Cogeneration"as such term is used in Section 218.5 of the PUC (or any successor definition of"Cogeneration") ("Cogeneration Requirements7), Producer warrants that, beginning on the date of Initial Operation and continuing throughout the term of this Agreement, its Generating Facility shall continue to meet such Cogeneration Requirements. If Producer becomes aware that its Generating Facility has ceased to meet the Cogeneration Requirements, Producer shall promptly provide SCE with Notice of such change pursuant to Section 9.1 below. If at any time during the term of this Agreement SCE determines in its sole discretion that Producer's Generating Facility may no longer meet the Cogeneration Requirements, SCE may require Producer to provide evidence that its Generating Facility continues to meet the Cogeneration Requirements within 15 business days of SCE's request for such evidence. Additionally, SCE may periodically (typically, once per year) inspect Producer's Generating Facility and/or require documentation from Producer to monitor the Generating Facility's compliance with Section 218.5 of the PUC. If SCE determines in its sole judgment that Producer either failed to provide evidence in a timely manner or that it provided insufficient evidence that its Generating Facility continues to meet the Cogeneration Requirements,then the Cogeneration status of the Generating Facility shall be deemed ineffective until such time as Producer again demonstrates to SCE's reasonable satisfaction that the Generating Facility meets the requirements for a Cogeneration facility (the "Status Change*). 5.2.1 SCE shall revise its records and the administration of this Agreement to reflect the Status Change and provide Notice to Producer of the Status Change pursuant to Section 9.1 below. This Notice shall specify the effective date of the Status Change. This date shall be the first day of the calendar year for which SCE determines in its sole discretion that the Generating Facility first ceased to meet the Cogeneration Requirements. SCE's Notice shall include an invoice for Competition Transition Charges CCTCsJ that were not previously billed during the period between the effective date of the Status Change and the date of the Notice in reliance upon Producer's representations that the Generating Facility complied with the Cogeneration Requirements and therefore was eligible for the exemption from CTCs available under Section 372 of the PLIC. January 3,2002(Form 14-731) 3 GENERATING FACILITY INTERCONNECTION AGREEMENT SOUTHERN CALIFORNIA EDISON CITY OF REDLANDS GFID 2630 5.2.2 Any amounts to be paid or refunded by Producer, as may be invoiced by SCE pursuant to the terms of this Section 5.2, shall be paid to SCE within 30 days of Producer's receipt of such invoice. 6. INTERCONNECTION FACILITIES 6.1 Producer and/or SCE, as appropriate, shall provide Interconnection Facilities that adequately protect SCE's Distribution System, personnel, and other persons from damage or injury, which may be caused by the operation of Producer's Generating Facility. 6.2 Producer shall be solely responsible for the costs, design, purchase, construction, operation, and maintenance of the Interconnection Facilities that Producer owns. 6.3 If the provisions of SCE's Rule 21, or any other tariff or rule approved by the Commission, requires SCE to own and operate a portion of the Interconnection Facilities, Producer and SCE shall promptly execute an Interconnection Facilities Financing and Operation Agreement that establishes and allocates responsibility for the design, installation, operation, maintenance, and ownership of the Interconnection Facilities. This Interconnection Facilities Financing and Operation Agreement shall be attached to and made a part of this Agreement as Appendix C. 7. LIMITATION OF LIABILITY Each Party's liability to the other Party for any loss, cost, claim, injury, liability, or expense, including reasonable attorney's fees, relating to or arising from any act or omission in its performance of this agreement, shall be limited to the amount of direct damage actually incurred. In no event shall either Party be liable to the other Party for any indirect, special, consequential, or punitive damages of any kind whatsoever. 8. INSURANCE 8.1 In connection with Producers performance of its duties and obligations under this Agreement, Producer shall maintain, during the term of this Agreement, general liability insurance with a combined single limit of not less than: (a) Two million dollars ($2,000,000)for each occurrence if the Gross Nameplate Rating of Producer's Generating Facility is greater than one hundred (100) kW; (b) One million dollars($1,000,000) for each occurrence if the Gross Nameplate Rating of Producer's Generating Facility is greater than twenty (20) kW and less than or equal to one hundred (100) kW; and (c) Five hundred thousand dollars ($500,000) for each occurrence if the Gross Nameplate Rating of Producer's Generating Facility is twenty(20) kW or less. (d) Two hundred thousand dollars($200,000) for each occurrence if the Gross Nameplate Rating of Producer's Generating Facility is ten (10) kW or less and Producer's Generating Facility is connected to an account receiving residential service from SCE. Such general liability insurance shall include coverage for"Premises-Operations, Owners and Contractors Protective, Products/Completed Operations Hazard, Explosion, Collapse, Underground, Contractual Liability, and Broad Form Property Damage including Completed Operations.* fl January 3,2002(Form 14-731) 4 GENERATING FACILITY INTERCONNECTION AGREEMENT SOUTHERN CALIFORNIA EDISON CITY OF REDLANDS GFID 2630 8.2 The general liability insurance required in Section 8.1 shall, by endorsement to the policy or policies, (a) include SCE as an additional insured; (b) contain a severability of interest clause or cross-liability clause; (c) provide that SCE shall not by reason of its inclusion as an additional insured incur liability to the insurance carrier for payment of premium for such insurance; and (d) provide for thirty (30) calendar days'written notice to SCE prior to cancellation, termination, alteration, or material change of such insurance. 8.3 If Producer's Generating Facility is connected to an account receiving residential service from SCE and the requirement of Section 8.2(a) prevents Producer from obtaining the insurance required in Section 8.1,then upon Producer's written Notice to SCE in accordance with Section 9.1, the requirements of Section 8.2(a) shall be waived. 8.4 Evidence of the insurance required in Section 8.2 shall state that coverage provided is primary and is not in excess to or contributing with any insurance or self-insurance maintained by SCE. 8.5 Producer agrees to furnish the required certificates and endorsements to SCE prior to Initial Operation. SCE shall have the right to inspect or obtain a copy of the original policy or policies of insurance. 8.6 If Producer is self-insured with an established record of self-insurance, Producer may comply with the following in lieu of Sections 8.1 through 8.4: (a) Producer shall provide to SCE, at least thirty(30) calendar days prior to the date of Initial Operation, evidence of an acceptable plan to self-insure to a level of coverage equivalent to that required under Section 8.1. (b) If Producer ceases to self-insure to the level required hereunder, or if Producer is unable to provide continuing evidence of Producer's ability to self-insure, Producer agrees to immediately obtain the coverage required under Section 8.1. 8.7 All insurance certificates, statements of self insurance, endorsements, cancellations,terminations, alterations, and material changes of such insurance shall be issued and submitted to the following: Southern California Edison Company Attention: Director, OF Resources 2244 Walnut Grove Ave. P.O. Box 800 Rosemead, CA 91770 9. NOTICES 9.1 Any written notice, demand, or request required or authorized in connection with this Agreement ("Notice"} shall be deemed properly given if delivered in person or sent by first class mail, postage prepaid,to the person specified below: If to SCE: Southern California Edison Company Attention: Director, OF Resources 2.244 Walnut Grove Avenue P.O. Box 800 Rosemead, CA 91770 Phone: (626) 302-1212 FAX: (626) 302-9622 11 January 3,2002(Form 14731) 5 GENERATING FACILITY INTERCONNECTION AGREEMENT SOUTHERN CALIFORNIA EDISON CITY OF REDLANDS GFID 2530 If to Producer: City of Redlands Attn: Chief Of Water Resources Address: PO Box 3005 City: Redlands, CA 92373 Phone: (909) 798-7698 FAX: (909) 798-7670 9.2 A Party may change its address for Notices at any time by providing the other Party Notice of the change in accordance with Section 9.1. 9.3 The Parties may also designate operating representatives to conduct the daily communications, which may be necessary or convenient for the administration of this Agreement. Such designations, including names, addresses, and phone numbers may be communicated or revised by one Party's Notice to the other. 10. REVIEW OF RECORDS AND DATA 10.1 SCE shall have the right to review and obtain copies of Producer's operations and maintenance records, logs, or other information such as, unit availability, maintenance outages, circuit breaker operation requiring manual reset, relay targets and unusual events pertaining to Producer's Generating Facility or its interconnection with SCE's Distribution System. 10.2 Producer authorizes SCE to release to the California Energy Commission (CEC) information regarding Producer's Generating Facility, Including customer name, location, size, and operational characteristics of the Generating Facility, as requested from time to time pursuant to the CEC's rules and regulations. 11. ASSIGNMENT Producer shall not voluntarily assign its rights nor delegate its duties under this Agreement without SCE's written consent. Any assignment or delegation Producer makes without SCE's written consent shall not be valid. SCE shall not unreasonably withhold its consent to Producer's assignment of this Agreement. 12. NON-WAIVER None of the provisions of this Agreement shall be considered waived by a Party unless such waiver is given in writing. The failure of a Party to insist in any one or more instances upon strict performance of any of the provisions of this Agreement or to take advantage of any of its rights hereunder shall not be construed as a waiver of any such provisions or the relinquishment of any such rights for the future, but the same shall continue and remain in full force and effect. 13. GOVERNING LAW, JURISDICTION OF COMMISSION, INCLUSION OF SCE's TARIFF SCHEDULES 13.1 This Agreement shall be interpreted, governed, and construed under the laws of the State of California as if executed and to be performed wholly within the State of California without giving effect to choice of law provisions that might apply to the law of a different jurisdiction. 13.2 This Agreement shall, at all times, be subject to such changes or modifications by the Commission as it may from time to time direct in the exercise of its jurisdiction. 13.3 The interconnection and services provided under this Agreement shall at all times be subject to the terms and conditions set forth in the tariffs and rules applicable to January 3,2002(Form 14731) 6 GENERATING FACILITY INTERCONNECTION AGREEMENT SOUTHERN CALIFORNIA EDISON CITY OF REDLANDS GFID 2630 the electric service provided by SCE, which tariffs and rules are hereby incorporated into this Agreement by this reference. 13.4 Notwithstanding any other provisions of this Agreement, SCE shall have the right to unilaterally file with the Commission, pursuant to the Commission's rules and regulations, an application for change in rates, charges, classification, service, tariff or rule or any agreement relating thereto. 14. AMENDMENT AND MODIFICATION This Agreement can only be amended or modified by a written agreement signed by both Parties. 15. ENTIRE AGREEMENT This Agreement, including any incorporated tariffs and rules, contains the entire agreement and understanding between the Parties, their agents, and employees as to the subject matter of this Agreement. Each party also represents that in entering into this Agreement, it has not relied on any promise, inducement, representation,warranty, agreement or other statement not set forth in this Agreement or in the incorporated tariffs and rules. 16. SIGNATURES IN WITNESS WHEREOF,the Parties hereto have caused two originals of this Agreement to be executed by their duly authorized representatives. This Agreement is effective as of the last date set forth below. CITY OF REDLANDS -SOUTHERN CALIFORNIA EDISON COMPANY By: By: Name: Karl N. "Kasey" Haws Name: Lars E. Beigmann Title: Mayor Title: Director, QF Resources Date: Date: February 5, 2002 February 13 , 2002 Attest: By: —Lor ie Poyzltty Clerk January 3,2002(Form 14-731) 7 GENERATING FACILITY INTERCONNECTION AGREEMENT SOUTHERN CALIFORNIA EDISON CITY OF REDLANDS GFID 2530 APPENDIX A DESCRIPTION OF GENERATING FACILITY AND SINGLE-LINE DIAGRAM, (Provided by Producer) a January 3,2002(Form 14731) A 1 ^ EKxUSON ^=.�~~~°=~—=~~� Sou\han� Ca0omka Edson Revised Cal. PUC Sheet No. 22926'E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 19892'E Rule 2 Sheet 1 of 16 (T) DESCRIPTION OF SERVICE A, General 1. The character of service available at any particular location should be ascertained by inquiry at Edison's off ice. (T) 2. The rate schedules included herein are applicable to both electric service and Edison (T) services provided beyond Edison's Point of Delivery. (T) 3. The rate schedules included herein are applicable for service where the customer purchases his entire electrical requirements from Edison, except where such schedules (T) specifically provide otherwise, and are not applicable where a part of the customer's electrical requirements are supplied from some other source. 4. The rate schedules included herein are only applicable for service provided from overhead distribution facilities (or where underground distribution facilities are provided for Edison's operating convenience or in accordance with the provisions of Rules (T) Nos. 15, 16, and 20) except where schedules specifically provide otherwise. 5. Afternating current service of approximately 60-cycle frequency will be supplied. 6. Voltages referred to in the tariff schedules are nominal voltages. B, Phase and Voltage Specifications 1 Stenclard nominal voltages of Edison are as follows: (T) a. Distribution voltages: 120, 120/240, 240, 240/480, 277/480, 2,400, 4,160 volts; or,depending on location,4,800, 12,000, 14,400/24,900, 16,500 or 33,000 volts. b. Voltages in excess of 33,000 volts are transmission voltages. For its operating convenience, Edison may elect to supply a customer from lines of transmission (T) voltage. In such case, the customer may select as a standard delivery voltage one of the following- 2,400, 4,160, 6,900, 12,000, 13,800, 16,500 volts, or such other voltage as Edison may approve, provided that in no case shall a customer (T) be required to advance to Edison a greater amount of money to obtain service (T) than he would be required to advance under Edison's rules applicable to the (T) particular load, if he were regularly served from Edison's nearest appropriate (T) facilities ordinarily employed. C. Where Edison maintains four-wire wye-connected polyphase secondary (T) mains: (1) 120, 120/208,and 208 volts, d. Where Edison maintains four-wire delta-connected polyphase secondary (T) mains: 120, 120/240, and 240 volts. e. In Santa Catalina Islan& 120, 120/240,277/480,and 2,400 volts. (Tnbeinserted byutility) Issued by (To beinserted byCal. PUC) Advice 1268-E John Fielder Date Filed Decision 97-10-087 Effective RULE2.DDC Vice President Resolution . " , 880Y� EDnS^0m ~ California Edison Revised Cal. PUC Sheet No. 22927-E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 19893-E Rule 2 Sheet 2 of 16 (T) DESCRIPTION OF SERVICE B. Phase and Voltage Specifications (Continued) 2. Customer Service Voltages a. Under all normal load conditions, distribution circuits will be operated so as to maintain secondary service voltage levels to customers within the voltage ranges specified below: Maximum Service Maximum Nominal Voltage On Service Voltage Two-Wire Minimum Residential On Agricultural and Multi-Wire Voltage to and Commercial and Industrial Service Voltage All Services Distribution Circuits Distribution Circuits 120 114 120 126 208 197 208 218 240 228 240 252 277 263 277 291 480 456 480 504 b. Exceptions to Voltage Limits. Voltage may be outside the limits specified when the variations: (1) Arise from the temporary action of the elements. (2) Are infrequent momentary fluctuations of a short duration. (3) Arise from service interruptions. �4) Arise from ternporary separation of parts of the system from the main system. . (5) Are from causes beyond the control of Edison. (T) 3. Customer Utilization Voltages a. All customer-owned utilization equipment must be designed and rated in accordance with the following utilization voltages specified by the American National Standard C84.1 if customer equipment is to give fully satisfactory Nominal Minimum Maximum Utilization Utilization Utilization Voltage Voltage Voltage 120 110 125 208 191 216 240 220 250 277 254 289 480 440 500 (To beinserted byutility) Issued by (To b*inserted byCal. PUC) Advice 1268-E John Fielder Date Filed Decision 97-10-087 Effective RULE2.DOC Vice President Resolution ' ED8S0/N �°~�~.�="�^—~~ Sou�hennCa|ih�niuEdison Revised Cal. PUC Sheet No, 22828'E Rosemead, California Canoo||ingRevised Cal. PUC Sheet No. 19894-E DESCRIPTION OF SERVICE . (Continued) B, Phase and Voltage Specifications(Continued) 3. Customer Utilization Voltages (Continued) b. The differences between service and utilization voltages are allowances for voltage drop in customer wiring. The maximum allowance is 4 volts (120 volt base)for secondary service. C. Minimum utilization voltages from American National Standard C84.1 are shown for customer information only as Edison has no control over voltage drop in (T) customer's wiring. d. The minimum utilization voltages shown in a. above, apply for circuits supplying lighting loads. The minimum secondary utilization voltages specified by American National Standard C84.1 for circuits not supplying lighting loads are 90 percent of nominal voltages (108 volts on 120 volt base)for normal service. e. Motors used on 208 volt systems should be rated 200 volts or(for small single phase motors) 115 volts. Motors rated 230 volts will not perform satisfactorily on these systems and should not be used. Motors rated 220 volts are no longer standard, but many of them were installed on existing 208 volt systems on the assumption that the utilization voltage would not be less than 187 volts (90 percent of 208 volts). 4. Single-phase Service a. General Minimum Load Maximum Load Voltacie Required Allowed 120 volts None 1-15 amp and 1-20 amp branch circuit 120/240 or 240 volts None 400 amp main switch 240/480 volts 15 kVA 200 amp main switch 2,400 volts or over Varies with location 40 amp main switch b. The maximum size 120 volt single-phase motor allowed is 1 hp and the maximum size 240 volt, or higher voltage. single-phase motor allowed is 10 hp. (To bainserted byutility) |sauedby (To beinserted byCal. PUC) Advice 1268-E JohnFielder Date Filed Decision 97-10-087 Effective RULE2.O[>C Vice President Resolution . . ^ . EDUSON ���'���� "��~ Suu�hemCaU�miaEdioon Revised Cal. PUC Sheet No. 22929'E Rosemead. California Cancelling Revised Cal. PUC Sheet No. 19885-E Rule 2 Sheet 4 of 16 (T) DESCRIPTION OF SERVICE . (Continued) B. Phase and Voltage Specifications (Continued) 4. Single-phase Service (Continued) C. Single-phase service may be supplied to installations having a proposed main service switch in excess of the switch capacities specified above provided the approval of Edison has been first obtained as to the number and size of (T) switches, circuits, and related facilities. 120/240 volt installations will be supplied by one of the following methods as determined by Edison. (T) (1) From two or three separate 120/240 volt service connections at one location. Energy so supplied will be totalized for billing purposes. The connected load on any service connection shall not be greater than twice that on any other service connection. (2) From one 120/240 volt connection where the proposed main service switch does not exceed 600 amperes capacity. d. Where Edison maintains four-wire wye-connected 1201208 volt secondary (T) mains, single-phase service is supplied at 120/208 volts, three-wire, for which the maximum allowed is a 100-ampere main switch. Loads in excess of a 100- ampere main switch will be supplied at 120/208 volts,four-wire. Three-phase Service. a. General. Minimum Maximum Maximum Connected Demand Main Switch Voltage Load Required Allowed Caj3acj!y Allowed 240 volts 3 kVA 1,000 kVA 4,000 Amperes 277/480 volts 25 kVA 3,000 kVA 4,000 Amperes 2,400 volts or 4,160 volts Varies wAocation 12,000 kVA 3,000 Amperes 12,000 volts or 16,500 volts Vanes w/location 30,000 kVA Not Specified b. Single-Family Domestic Service. In areas where Edison does not maintain (T) three-phase secondary mains, only single-phase service will be supplied unless the applicant's load includes at least one motor rated in excess of 10 hp. C. Where three-phase service is supplied from a four-wire wye-connected 120/208 volt service, the maximum demand allowed is 1,000 kVA. (To beinserted byutility) !aauedby (To beinserted byCal. PUC) Advice 1268-E John Fielder Date Filed Decision 97-10-087 Effective RULE2.DDC Vice President Resolution . ' . ' . . ' . . ED8SON � Southern California Edison RevisedCa|. PUC Sheet No. 22930-E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 19896'E Rule 2 Sheet 5 of 16 (T) DESCRIPTION OF SERVICE . (Continued) BPhase and Voltage Specifications. (Continued) 5. Three-phase Service. (Continued) d. Service to all loads of 1,000 WA maximum demand, or over, must be approved by Edison as to adequacy of facilities for service. IT) e. Loads on three-phase service must be balanced between phases in accordance with good engineering practice. f. Three-phase service may be supplied to installations having a proposed main service switch in excess of the switch capacities specified above provided approval of Edison has first been obtained as to the number and size of (T) switches,circuits and related facilities. Such service will be supplied from two or three separate service connections at one location. Energy so supplied will be totalized for billing purposes. The loads will be balanced as closely as practicable between the services. 6. Combined Single-phase Service and Three-phase Service. a. Service may be supplied at 120/208 volts four-wire wye-connected where Edison does not maintain tour-wire secondary polyphase mains (T) provided: (1)written application is made for such service by the customer; (2)the customer's load is of such a size as to require an individual transformer installation of not less than 15 WA of transformer capacity, and (3)the customer provides space acceptable to Edison on his (T) premises to accommodate the installation of Edison's facilities when, in the (T) opinion of Edison, such space is considered necessary. (T) b. In underground areas where Edison maintains 120/208 volt or 240 volt (T) three-phase mains, service may be supplied at 277/480 volts, four-wire provided: (1) written application is made for such service by the customer, and (2) the customer provides space acceptable to Edison on his (T) premises to accommodate the installation of Edison's facilities when, in the (T) opinion of Edison, such space is considered necessary. (T) (To beinserted byutility) Issued by (To beinserted byCal. PUC) Advice 1268-E John Fielder Date Filed Decision 97-10-087 Effective RULE2.D(]C Vice President Reao!uUon . ' E0USON ��~=~~~�"~~^~~_~ Bou\hemCaUhorniaEdinon Revised Cal. PUC Sheet No. 22931-E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 19897-E Rule 2 Sheet 6 of 16 (T) DESCRIPTION OF SERVICE . (Continued) & Phase and Voltage Specifications. (Continued) 6. Combined Single-phase Service and Three-phase Service. (Continued) C. Service may be supplied at 120/240 volts four-wire delta-connected where Edison does not maintain four-wire secondary polyphase mains provided: (1) (T) written application is made for such service by the customer, (2)the customer's load is of such a size as to require an individual transformer installation of not less than 15 WA of transformer capacity; (3)the unbalance between phases is less than 100 kW;and(4)the customer provides space acceptable to Edison on (T) his premises to accommodate the installation of Edison's facilities when, in the (T) opinion of Edison, such space is considered necessary. (T) d. The maximum demand allowances for combined single-phase and three-phase are as set forth in B.5.above. 7. At the option of Edison, the above voltage and phase specifications may be modified (T) because of service conditions at the location involved. C. Motor Protection and Equipment. Customer's motor equipment must conform with the following 1. Motors that cannot be safely subjected to full rated voltage on starting or that drive machinery of such a nature that the machinery, itself, or the product it handles will not permit the motor to resurne normal speed upon the restoration of normal supply voltage shall be equipped with devices that will disconnect them from the line upon failure of supply voltage and that will prevent the automatic reconnection of the motors upon restoration of normal supply voltage. 2. All motors of I hp or larger shall be equipped with thermal relays, fuses, or other automatic overcurrent interrupting devices to disconnect completely such motors from the line as a protection against damage due to overheating. 3. Three-phase motors driving elevators, hoists, tramways, cranes, conveyers, or other equipment, which would create hazard to life in the event of uncontrolled reversal of motor rotation, shall be provided with reverse-phase and open-phase protection to disconnect completely the motors from the line in the event of phase reversal or loss of one phase. (To bainserted byutility) Issued by (To beinserted byCal. PUC) Advice 1268-E John Fielder Date Filed Decision 97-10-087 Effective RULE2.DOC Vice President Resolution � .. ' . . . . E"~^-~~^'~ �=~^=°�~°=~�� Revised PUC No 22B�-E Bou�hern Cuik»rui� Edison � � � Rosemead, California Cancelling Revised Cal. PUC Sheet No. 19888'E Rule 2 Sheet 7 of 16 (T) DESCRIPTION OF SERVICE . (Continued) CMotor Protection and Equipment. (Continued) 4. Wind machines thermostatically controlled with automatic reclosing switches must be equipped with suitable time-delay devices, as hereinafter specified, at the customer's expense, to permit the required adjustment of the time of reclosure after interruption of A suitable time-delay device, within the meaning of this rule, is a relay or other type of equipment that can be preset to delay with various time intervals the reclosing of the automatic switches (and the consequent starting up of the electric motors on the wind machines) and to stagger the reconnection of the load on Edison's system, and such (T) device must be constructed so as effectively to permit a variable overall time interval of not less than five minutes with adjustable time increments of not greater than ten seconds. The particular setting to be utilized for each separate installation is to be determined by Edison from time to time in accordance with its operating requirements, (T) and the customer is to obtain from Edison the setting for each installation as thus (T) D. Allowable Motor Starting Currents. 1. The starting current drawn from Edison's lines shall be considered the nameplate locked (T) rotor current or that guaranteed by the manufacturer. At its option Edison may (T) determine the starting current by test, using a stop ammeter with not more than 15% overswing or an oscillograph, disregarding the value shown for the first 10cycles subsequent to energizing the motor. It the starting current for a single motor exceeds the value stated in the following tables, reduced voltage starting or other suitable means must be employed, at the customer's expense, to limit the current to the value specified, except where specific exemptions are provided in Sections D.2.,3,,and 4. ' (To beinserted byutility) Issued by (To beinserted byCal. PUC) Advice 1268'E John Fielder Date Filed Decision 97-10-087 Effective RULE2.DOC Vice President Resolution - . . ED8SOm . ~ Sou\hemCaIUbmia Edison Revised Cal. PUC Sheet No. 22833'E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 19899'E Rule 2 Sheet 8 of 16 (T) DIESCRIPT ON OF SERVICE . (Continued) D, Allowable Motor Starting Currents. (Continued) TABLE 1 Alternating Current- Single-phase Motors Allowable Locked Rotor Currents Rated Size 120 Volts 240 Volts 1 hp and less 50 amperes 36 amperes 1 1/2 hp 48 amperes 2 hp 60 amperes 3 hp 80 amperes 5 hp 120 amperes 7 1/2 hp 170 amperes 10 hp 220 amperes TABLE 2 Alternating Current-Three-phase Motors Allowable Locked Rotor Currents Rated Size 240 Volts 480 Volts 2,400 Volts 3 hp 64 amperes 32 amperes 5 hp 92 amperes 46 amperes 7 112 hp 127 amperes 63 amperes 10 hp 162 amperes 81 amperes 15 hp 232 amperes 116 amperes 20 hp 290 amperes 145 amperes 25 hp 365 amperes 183 amperes 30 hp 435 amperes 218 amperes 40 hp 580 amperes 290 amperes 50 hp 725 amperes 363 amperes 70 amperes 60 hp 435 amperes 87 amperes 75 hp 535 amperes 107 amperes 100 hp 725 amperes 142 amperes Over 100 hp-Edison should be consulted for allowable locked rotor currents. 2. Where service conditions permit, subject to Edison approval, reduced-voltage starters (T) may be omitted in the original installation until such time as Edison may order the installation of a reduced-voltage starter to be made, and, similarly, Edison may at any (T) time require starting current values lower than set forth herein where conditions at any (T) point on its system require such reduction to avoid interference with service. (T) (To beinserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1268-E JohILfFielde Date Filed Decision 97-10-087 Effective RULE2.DOC Vice President Resolution . . ED"S~,." ~~�=~=~~=='~~—' Revised PUC 22�34 E SouLhorn California Edison . � ' Rosemead. California Cancelling Revised Cd. PUC Sheet No 13900'E Rule 2 Sheet 9 of 16 (T) DESCRIPTION OF SERVICE - (Continued) D. Allowable Motor Starting Currents. (Continued) 3. Reduced-voltage starters may be omitted on any motor of a group installation provided that its starting current does not exceed the allowable starting current of the largest motor of the group. 4. A reduced-voltage starter may be omitted on any motor in a group installation provided that its starting current does not exceed three times the maximum demand in amperes of the entire installation. E. Interference With Service. 1 Customers who operate equipment which causes detrimental voltage fluctuations (such as, but not limited to. hoists, welders, radio transmitters, X-ray apparatus, elevator motors, compressors, and furnaces) must reasonably limit such fluctuations upon request by Edison. The customer will be required to pay for whatever corrective (T) measures are necessary. 2. Prior to the installation of any new arc furnace or design modification of an existing furnace, the customer shall provide basic design information for the installation to aid Edison in determining a method of service and the allowable level of load fluctuations. (T) 3. Any customer who superimposes a current of any frequency upon any part of his electrical system, other than the current supplied by Edison, shall, at his expense, prevent the trans i-TJssion of such current beyond his electrical system. (T) F, Power Factor. Edison may require the customer to provide, at his own expense, equipment to increase the operating power factor of each complete unit of neon, fluorescent, or other gaseous (T) tube lighting equipment to not less than 90%, lagging or leading. GWave Form. Edison may require that the wave form of current drawn by equipment of any kind be in conformity with good engineering practice, (T) H, Added Facilities. 1. Where an applicant requests and Edison agrees to install facilities which are in addition to, or in substitution for the standard facilities Edison would normally install. the costs (T) thereof shall be borne by the applicant. Such costs shall include continuing ownership (T) costs as may be applicable. Unless otherwise provided by Edison's filed tariff schedules, these added facilities (special facilities) will be installed, owned and maintained or (T) allocated by Edison solely as an accommodation to the applicant, Added Facilities are defined as: (T) (To beinserted byutility) Issued by (To beinserted byCal- PUC) Advice 1268-E John Field Date Filed Decision 97-10-087 Effective RULE2.DOC Vice President Resolution . - . ~ . . ^ . ' . ' tD8SON �~~~~~.~~-~~~�' Souihern �a�onnieEdiaon Revised Cal, PUC Sheet No. 22935-E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 19901'E Rule 2 Sheet 10 of 16 (T) DESCRIPTION OF SERVICE - (Continued) H. Added Facilities. (Continued) a. Facilities requested by an applicant which are in addition to or in substitution for standard facilities which Edison would normally provide for delivery of service at (T) one point, through one meter,at one voltage class under its tariff schedules,or b. A pro rata portion of the facilities requested by an applicant, allocated for the sole use of such applicant, which would not normally be allocated for such sole Added Facilities may include, but are not limited to, all types of equipment normally installed by Edison in the development of its electrical transmission and distribution systems and facilities or equipment related to Edison's provision of service to a customer (T) or a customer's receipt or utilization of Edison's electrical energy. Added Facilities also (T) include the differential costs for equipment for electrical transmission and distribution (T) systems designed by Edison which, in Edison's sole opinion, is in excess of equipment required for Edison's standard serving system. Added Facilities may include poles, lines, (T) structures, fixtures, transformers, service connections, load control devices and meters. (T) However, the installation of meters capable of recording and providing interval data that are in addition to or in substitution for standard meters shall be provided under the (N) provisions of Rule 2, Section J, Interval Metering Facilities as Added Facilities. 2. Added facilities will be installed under the terms and conditions of a contract in the form (N) on file with the California Public Utilities Commission. Such contract will include, but is not limited to,the following terms and conditions: a. Where new facilities are to be installed for applicant's use as added facilities, the applicant shall advance to Edison the additional installed cost of the added facilities over the cost of standard facilities. At Edison's option, Edison may finance the new facilities. (T) b. The following monthly ownership charges are applicable to Added Facilities Contracts with an effective date prior to 1/20/96: (1) Applicants being served by Edison-financed added facilities shall pay a monthly charge of 1.31% of the cost associated with the added facilities. (T) (2) Applicants being served by the Custom er-fi nanced added facilities shall pay a monthly cnarge of O43% of the cost associated with the added (To beinserted byutility) Issued by (To beinserted byCal. PUC) Advice 1268-E JohnLFielde Date Filed Decision 97-10-087 Effective RULE2DOC Vice President Resolution . ' EDVSON _ ' ~=~~~~�~�~~^�~� So��omCaU�mkaEdison Revised Cal. PUC Sheet No. 22936'E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 19902-E Rule 2 Sheet 11 of 16 (T) DESCRIPTION OF SERVICE H, Added Facilities. (Continued) 2. (Continued) b. (Continued) (3) Where existing facilities are allocated for applicant's use as added facilities, the applicant shall pay a monthly charge for the added facilities of 1.31%of Edison's Reconstruction Cost New Less Depreciation value (T) of that portion of the existing facilities which are allocated to the customer as Added Facilities. C. The following monthly ownership charges include a replacement component into perpetuity and are applicable to Added Facilities Contracts with an effective date on or after 1/20/96: (1) Applicants being served by Edison-financed added facilities shall pay a (T) monthly charge of 1.38% of the cost associated with the added (2) Applicants being served by the Customer-financed added facilities shall pay a monthly charge of 0.43% of the cost associated with the added (3) Where existing facilities are allocated for applicants use as added facilities, the applicant shall pay a monthly charge for the added facilities of 1.38%of Edison's Reconstruction Cost New Less Depreciation value 11 T) of that portion of the existing facilities which are allocated to the customer as Added Facilities. Where Edison agrees to provide replacement options, Applicant shall pay the (T) following monthly ownership charges: Edison-Financed Customer Financed (T) Without With Without With Replacement Replacement Replacement Replacement Perpetuity 20 Yr. Term PerpetuiLt 20 Yr-Term Under these options, where existing facilities are allocated for applicant's use as added facilities. the applicant shall pay a monthly ownership charge equal to the applicable Edison-financed monthly rate, Edison-financed monthly rate will be (T) applied to Edison's Reconstruction Cost New Less Depreciation value of that (T) portion of the existing facilities which are allocated to the customer as Added (To beinserted byutility) Issued by (To heinserted byCal. PUC) Advice 1268'E John Fielde1 Date Filed Decision 97-10-087 Effective RULE2,DDC Vice President Reaq!udn* EDISON I-- �o�uth—ern—C—al—ifo—mia Edison Revised Cal. PUC Sheet No. 22937-E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 19903-E Rule 2 Sheet 12 of 16 (T) DESCRIPTION OF SERVICE - (Continued) H. Added Facilities. (Continued) 2. (Continued) d. Where Edison determines the collection of continuing monthly ownership (T) charges is not practicable, the applicant will be required to make an equivalent one-time payment in lieu of the monthly ownership charges. The applicable payment options, if any, will be selected solely by Edison. (T) e. All monthly ownership charges shall be reviewed and refiled with the Commission when changes occur in Edison's costs for providing such service. (T) However, Edison will not refile if Edison's cost change is less than 10 basis (T) points. 3. Edison shall not be liable for any loss, damage, or injury arising from Edison's (T) installation, operation, maintenance, or control of the Added Facilities, unless such loss, damage, or injury results from Edison's sole negligence, and, in no event, shall Edison (T) be liable for loss of profits, revenues, or other consequential damages. No adjustment (T) shall be made to reduce the billings if damage to, or malfunction of the Added Facilities results from any cause other than the negligence or willful act of Edison. I. Welder Service. (T) 1. Rating of Welders. Electric welders will be rated for billing purposes as follows: a. Motor Generator Arc Welders. The horsepower rating of the motor driving a motor generator type arc welder will be taken as the horsepower rating of the welder. b. Transformer Arc Welders. Nameplate maximum kVA input (at rated output amperes)will be taken as the rating of transformer type arc welders. C. Resistance Welders. Resistance welder ratings will be determined by multiplying the welder transformer nameplate rating (at 50% duty cycle) by the appropriate factor listed below: (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1268-E John Fielder Date Filed Decision 97-10-087 Effective RULE2.DOC Vice President Resolution EDISON Southern California Edison Revised Cal. PUC Sheet No. 22938-E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 19904-E Rule 2 Sheet 13 of 16 (T) DESCRIPTION OF SERVICE (Continued) I. Welder Service (Continued) 1. Rating of Welders (Continued) C. (Continued) Factor Transformer Nameplate Edison-Owned Customer-Owned (T) Type of Welder Rating_ @ 50% Duty Cycle Distrib.Transt. Distrib.Transf. Rocker Arm, Press or Projection Spot 20 kVA or less .60 Zo Rocker Arm or Press Spot Over 20 Kva Projection Spot 21 to 75 kVA, incl. '80 .60 Flash or Butt 100 kVA or over Seam or Portable Gun All sizes Flash or Butt 67 to 100 kVA, incl. Projection Spot Over 75 kVA Flash or Butt 66 kVA or less 1.20 .90 Each flash or butt welder in this group will be rated at 80 kVA where distribution transformer is owned by Edison or 60 kVA where distribution transformer is owned by the customer. M d. Ratings prescribed by a., b., and c., above, normally will be determined from nameplate data or from data supplied by the manufacturer. If such data are not available or are believed by either Edison or customer to be unreliable,the rating will be determined by test. (T) e. If established by seals approved by Edison, the welder rating may be limited by the sealing of taps which provide capacity greater than the (T) selected tap and/or by the interlocking lockout of one or more welders with other welders. f. When conversion of units is required for tariff application, I welder kVA will be taken as 1 horsepower for tariffs stated on a horsepower basis and 1 welder kVA will be taken as 1 kilowatt for tariffs stated on a kilowatt basis. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1268-E John Fielder Date Filed Decision 97-10-087 Effective RULE2.DOC Vice President Resolution . . . EDVSOro ~�=.=°~~~~�.~~� �ou�hernCa|ifomiaEdison Revised Cal. PUC Sheet No. 22839'E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 19905-E Rule 2 Sheet 14 of 16 (T) DESCRIPTION OF SERVICE - (Continued) 1. Welder Service. (Continued) 2. Billing of Welders. Welders will be billed at the regular rates and conditions of the tariffs on which they are served subject to the following provisions: a. Connected Load Type of Schedule. Welder load will be included as part of the connected load with ratings as determined under Section 1., above, based on maximum load that can be connected at any one time, and no allowance will be made for diversity between welders. b. Demand Metered Type of Schedule. Where resistance welders are served on these schedules the computation of diversified resistance welder load shall be made as follows: Multiply the individual resistance welder ratings,as prescribed in Sections 1.c. to 1.f. inclusive, above, by the following factors and add the results thus obtained: 1.0 times the rating of the largest welder 0.8 times the rating of the next largest welder 0.6 times the rating of the next largest welder 0.4 times the rating of the next largest welder 0.2 times the ratings of all additional welders If this computed diversified resistance welder load is greater than the metered demand, the diversified resistance welder load will be used in lieu cf the metered demand for rate computation purposes. J. Interval Metering Facilities As Added Facilities 1 This section is applicable to the installation of Interval Metering and associated I devices that are not part of other transmission and distribution facilities installed as I Added Facilities under Rule 2, Section H. 2. Interval Metering may include, but is not limited to the components as defined in I - Rule I under Metering Facilities. 3. Where a customer elects, and Edison agrees, Edison will install, own. and maintain I Interval Metering which are in addition to, or in substitution for, standard metering for I the customer's use. The costs of such metering shall be borne by the customer. I (To beinserted byutility) Issued by (To bainserted byCal. PUC) Advice 1268-E John Fielder Date Filed Decision 97-10-087 Effective RULE2.DDC Vice President Resolution .- - ^~~~~~~'' ~��=if_ia Edison original Cal. PUC Sheet No. 22940-E Rosemead, California Cancelling Cal.PUC Sheet No. -E Rule 2 Sheet 15 of 16 DESCRIPTION OF SERVICE - (Continued) 1 interval Metering Facilities As Added Facilities (Continued) 4. The costs of Interval Metering will be as set forth in Schedule Customer Choice - Service Fees (Schedule CC-SF). 5. Interval Metering Charges a. Interval Metering will be installed, owned, and maintained under the terms of and conditions of a contract entitled "Interval Metering Facilities Agreement' (IMFA), on file with the Commission. Where a customer requests, Edison may agree to own and finance the Interval Metering facilities. b. Edison Ownership: Where Edison financing is offered, the customer shall pay for the costs associated with installing and purchasing Interval Metering through a monthly capital-related charge based on a monthly percentage times the cost of the Interval Metering. The rate shall be 1.93% per month. The following provisions will apply: (1) The customer will be obligated to pay the monthly capital-related charge for the useful life of the interval Metering facilities, but no less than ten years. Should the customer request removal of the Interval Metering facilities prior to completing ten years of payments, the customer shall be responsible for paying the Termination Charge specified in the IMFA. (2) Edison may remove the Interval Metering facilities and replace them with standard Metering Facilities or may require the customer to replace the Interval Metering facilities, at Edison's convenience. In the event Edison requires removal of the Interval Metering facilities, the customer shall not be obligated to pay any further monthly capital-related charges associated with the removed facilities, even if removal occurs during the first ten years. ' (To beinserted byutility) Issued by (To beinserted byCal.PUC) Advice12S8'E'A JohILFiekd±, Date Filed Feb 25, 1998 Decision 97-10-087 Effective RULE2.DOC Vice President Resolution ` �80v �� E��oS0/N �_^���_ ~��^ Sou�em Ca0omiaEdiso Original Cal. PUC Sheet No. 22841E Rosemead, California Cancelling Cal. PUC Sheet No. -E Rule 2 Sheet 16 of 16 DESCRIPTION OF SERVICE J. Interval Metering Facilities As Added Facilities (Continued) 5. interval Metering Charges(Continued) C. Maintenance Charge: For Edison-owned Interval Metering facilities,the customer shall pay the maintenance costs as set forth in Schedule CC-SF or, if applicable, arrange for maintenance service from their ESP if qualified. This charge shall include repair and/or replacement of the Interval Metering facilities, as necessary to provide for continued operation. The customer shall remain liable for repair or replacement due to damage from misuse, or hazards such as fire, theft, or vandalism. The customer shall pay the maintenance charge for the Interval Metering facilities during the useful life of such facilities, under the terms and conditions set out in the IMFA or arrange for maintenance service from their ESP if qualified. d. Edison will update the installation, purchasing and maintenance costs, and the monthly capital-related charges when changes occur in Edison's costs for providing such services and will file these updates with the Commission. (To beinserted byutility) Issued by (To beinserted byCal. PUC) Advice 1268'E'A John Fielder Date Filed Feb 25, 1998 Decision 97-10-087 Effective RULE2.D0C Vice President Resolution EDISON r+tr.-rr r+wnauu se.y.sy Southern California Edison Original Cal. PUC Sheet No. 27923-E Rosemead, California Cancelling Cal. PUG Sheet No. Rule 21 Sheet 1 GENERATING FACILITY INTERCONNECTIONS A. Applicability This Rule describes the interconnection, operating and metering requirements for Generating Facilities intended to be connected to SCE's Distribution System over which the Commission has jurisdiction. Subject to the requirements of this Rule, SCE will allow the interconnection of Generating Facilities with its Distribution System. Definitions for the capitalized terms used in this Rule and not otherwise defined in Rule 1 or within the text of this Rule are defined in Section H of this Rule. The definitions provided in this Rule shall only apply to this Rule and shall not apply to SCE's other tariffs. It is contemplated that the Applicant will be required to execute various enabling documents, such as but not limited to the Generating Facility Interconnection Agreement ("Agreement") (Form 14-731) and Application to Interconnect A Generating Facility ("Application") (Form 14-732). Such documents shall be on file with the Commission, and may be amended from time to time. B. General, Rules, Rights and Obligations 1. Authorization Required to Interconnect: A Producer must comply with this Rule, and the terms of the Agreement, and receive SCE's express written permission to interconnect before connecting or operating a Generating Facility in parallel with SCE's Distribution System. SCE shall apply this Rule in a non-discriminatory manner and shall not unreasonably withhold its permission to interconnect a Producer's Generating Facility. 2. Separate Arrangements Required for Other Services: A Producer requiring other electric services from SCE including, but not limited to, Distribution Service provided by SCE during periods of curtailment or interruption of a Generating Facility, must enter into separate arrangements with SCE for such services in accordance with SCE's Commission-approved Tariff Schedules. 3. Transmission Service Not Provided with Interconnection: Interconnection with SCE's Distribution System under this Rule does not provide a Producer any rights to utilize SCE's Distribution System for the transmission or distribution of electric power, nor does it limit those rights. 4. Compliance with Laws, Rules, and Tariff Schedules: A Producer shall ascertain and comply with applicable Commission-approved Tariff Schedules, and regulations of SCE; applicable Federal Energy Regulatory Commission (FERC) approved rules, tariffs, and regulations; and any local, state or federal law, statute or regulation which applies to the design,siting, construction, installation, operation, or any other aspect of the Producer's Generating Facility and Interconnection Facilities. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 149$-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 IC10 00-12-037 Resolution EDISiON nrsary rxrrnxwrmxns c�e.e, Southern Cali€ornia Edison Original Cal. PUC Sheet No. 27924-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 2 GENERATING FACILITY INTERCONNECTIONS (Continued) B. General, Rules, Rights and Obligations (Continued) 5. Design Reviews and Inspections: SCE shall have the right to review the design of a Producer's Generating Facility and Interconnection Facilities and to inspect a Producer's Generating and/or Interconnection Facilities prior to the commencement of Parallel Operation with SCE's Distribution System. SCE may require a Producer to make modifications as necessary to comply with the requirements of this Rule. SCE's review and authorization for Parallel Operation shall not be construed as confirming or endorsing the Producer's design or as warranting the Generating and/or Interconnection Facilities'safety, durability or reliability. SCE shall not, by reason of such review or lack of review, be responsible for the strength, adequacy, or capacity of such equipment. 6. Right to Access: A Producer's Generating Facility and Interconnection Facilities shall be reasonably accessible to SCE personnel as necessary for SCE to perform its duties and exercise its rights under its Tariff Schedules and Rules filed with and approved by the Commission,and any agreement between SCE and the Producer. 7. Confidentiality of Information: Any information pertaining to Generating and/or interconnection Facilities provided to SCE by a Producer shall be treated by SCE in a confidential manner. SCE shall not use information contained in the Application to propose discounted tariffs to the customer unless authorized to do so by the customer or the information is provided to SCE by the customer through other means. 8. Prudent Operation and Maintenance Required: A Producer shall operate and maintain its Generating Facility and Interconnection Facilities in accordance with Prudent Electrical Practices and shall maintain compliance with Commission adopted standards for the Producer's particular Generation and Interconnection Facilities. Said standards shall be those in effect at the time a Producer executes the Agreement with SCE. 9. Curtailment and Disconnection: SCE may limit the operation and/or disconnect or require the disconnection of a Producer's Generating Facility from SCE's Distribution System at any time, with or without notice, in the event of an Emergency or to correct Unsafe Operating Conditions. SCE may also limit the operation and/or disconnect or require the disconnection of a Producer's Generating Facility from SCE's Distribution System upon the provision of reasonable notice: 1) to allow for routine maintenance, repairs or modifications to SCE's Distribution System, 2) upon SCE's determination that a Producer's Generating Facility is not in compliance with this Rule, or 3) upon termination of the Agreement. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 2210 00-12-037 Resolution , E0^VSON ~~~�~—~���"~~~ Sou�harnCahh�n�iaEdi son Original Cad. PUC Sheet No. 27925-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 3 GENERATING FACILITY INTERCONNECTIONS C. Generating Facility Application and Interconnection Process 1. Generating Facility Application Process a. Applicant Initiates Contact with SCE: Upon request, SCE will provide information and documents (such as the Agreement and the Application, technical requirements, specifications, listing of Certified Equipment,application fee information, applicable rate schedules and metering requirements) in response to a potential Applicant's inquiry. Unless otherwise agreed upon, all such information shall normally be sent to an Applicant within three(3)business days following the initial request from the Applicant. SCE Mi I establish an individual representative as the single point of contact for the Applicant, but may allocate responsibilities among its staff to best coordinate the Interconnection of an Applicant's Generating Facility. b. Applicant Completes an Application: All Applicants shall be required to complete and file an Application and supply any additional information requested by SCE. The filing must include the completed Application, which may be in paper format or filed electronically, a fee for processing the Application and performing the Initial Review to be completed by SCE pursuant to Section C.1.c. The Application and Initial Review fee shall vary with the nature of the proposed Generating Facility as follows: Type of Generatina Facili Initial Review Fee Supplemental Review Fee Net Energy Metering None None (per Public Utilities Code Section 2827) All Others $800 $600 Note: Fifty percent of the fees associated with the Initial Review will be returned to the Applicant if the Application is rejected by SCE or the Applicant retracts the Application. The Applicant may propose,and SCE may negotiate specific costs for processing non-standard installations such as muffi-units, multi-sites, or otherwise as conditions warrant The costs for the Initial Review and the Supplemental Review contained in this Section, as well as the language provided in Sections C.1,c and C,1.d do not apply under such circumstances, Within ten(10)business days of receiving the Application, SCE shall normally acknowledge its receipt and state whether the Agreement has been completed adequately, If defects are noted, SCE and Applicantshall cooperate in a timely mannerto establish a satisfactoty Application. (To be inserted by utility) Issued by (Tu be inserted byCal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-1 Effective Jan 9, 2001 zco 00-12-037 Resolution ^ ' M EDU�K�N ~~^~~~~^�~~"~�~ iaEdi son Original Cal. PUC Sheet No. 27926-E . Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 4 GENERATING FACILITY INTERCONNECTIONS C. Generating Facility Application and Interconnection Process (Continued) I. Generating Facility Application Process (Continued) C. SCE Performs an Initial Review and Develops Preliminary Cost Estimates and Interconnection Requirements. (1) Upon SCE's receipt of a satisfactorily completed Application and any additional information necessary to evaluate the Interconnection of a Generating Facility- SCE shall perform an Initial Review using the process defined in Section 1. The Initial Review determines if (a) the Generating Facility qualifies for Simplified Interconnection, (b) the Generating Facility can qualify for Interconnection subject to minimal additional requirements, or (c) it will be necessary for SCE to perform an Interconnection Study to determine the Interconnection (2) SCE shall complete its Initial Review, absent any extraordinary circumstances,within 10 business days if the Agreement qualifies for Simplified Interconnection: If the Initial Review determines that the proposed Generating Facility can be interconnected by means of a Simplified Interconnection, SCE will provide the Applicant with a written description of the requirements for interconnection and the Agreement pursuant to Section C.1.e. (3) If the Generating Facility does not qualify for Simplified Interconnection as submitted in the Application, the Initial Review will include a Supplemental Review as described in Section 1: The Supplemental Review will provide either (a) Interconnection Requirements that may include requirements beyond those for Simple Interconnection, and an Agreement, or (b) a cost estimate and schedule for an Interconnection Study. The Supplemental Review shall be completed, absent any extraordinary circumstances, %vithin 20 business days of receipt of a completed Application. Payment for the Supplemental Review shall be submitted to SCE within 10 calendar days after the results of the Supplemental Review are provided to the Applicant. (To beinserted by utility) Issued by (To be inserted byCal. PUC) Advice 149Date Filed Jan B 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 4m 00-1�i-837 Resolution ~ ^ . . . . . . EDISON ~~-.~~~~~~�~~-' SoudhenmCm|�rnimEdiaon Original Cal. PUC Sheet No. 27927-E Rooennead, California Cancelling Cal. PIUC Sheet No. Rule 21 Sheet 5 GENERATING FACILITY INTERCONNECTIONS C. Generating Facility Application and Interconnection Process (Continued) 1. Generating Facility Application Process (Continued) d. When Required, Applicant and SCE Commit to Additional Interconnection Study Steps: When an Initial Review reveals that the proposed facility cannot be interconnected to SCE's system by means of a Simplified Interconnection and that significant SCE Interconnection Facilities or Distribution System improvements must be installed or made to SCE's Distribution System to accommodate the interconnection of an Applicant's Generating Facility, SCE and Applicant shall enter into an agreement that provides for SCE to perform additional studies,facility design, and engineering and to provide detailed cost estimates for fixed price or actual cost billing to the Applicant at the Applicant's expense. The interconnection study agreement shall set forth SCE's schedule for completing such work and the estimated or fixed price costs of such studies and engineering. Upon completion of an Interconnection Study, SCE shall provide the Applicant mfith the specific requirements, costs and schedule for interconnecting the Generating Facility to accommodate execution of agreements pursuant to Section CA.e. e. Applicant and SCE Enter Into a Generating Facility Interconnection Agreement and,Where Required, a Financing and Ownership Agreement for Interconnection Facilities or Distribution System Modifications: SCE shall provide the Applicant with an executable version of the Agreement, net energy metering agreement, or power purchase agreement appropriate for the Applicant's Generating Facility and desired mode of operation. Where the Initial Review or Interconnection Study performed by SCE has determined that modifications or additions are required to be made to its Distribution System, or that additional metering, monitoring, or protection devices will be necessary to accommodate an Applicant's Generating Facility,SCE may also provide the Applicant with an interconnection facilities financing and ownership agreement as necessary. These agreements shall set forth both SCE and the Applicant's responsibilities, completion schedules, and estimated or fixed price costs for the required work. f. Producer Installs or Constructs the Generating Facility. Where Applicable, SCE or Producer Installs Required Interconnection Facilities or Modifies SCE's Distribution System: After executing the appropriate Generating Facility Interconnection Agreement, and any other applicable agreements, such as, an interconnection facilities financing and operating agreement or a power purchase agreement, the Producer may install or construct its Generating Facility in accordance with the provisions of this Rule and the terms of the specific agreements formed between the Producer and SCE. Where appropriate, SCE will commence construction/installation of the system modifications and/or metering and monitoring requirements which have been identified. The parties will use good faith efforts to meet schedules and fixed costs or estimated costs as appropriate. (To be inserted by utility) Issued by (7o be inserted byCal. PUC) Advice 1498-E`4 John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2801 ,u, 00-/2-0// Resolution ^ ` . . , . . IEDISON ~.~'.~�~~~��aUh~�� Southamn xnia Edison Original Cal. PUC Sheet No, 27928-E Rosemead,California Cancelling Cal. PUC Sheet No. Rule 21 Sheet6 GENERATING FACILITY INTERCONNECTIONS' C. Generating Facility Application and Interconnection Process (Continued) 1. Generating Facility Application Process (Continued) 9- Producer Arranges for and Completes Testing of Generating Facility and, Where Applicable, Producer Installed Interconnection Facilities: New Generating Facilities and associated Interconnection Facilities must be tested to ensure compliance with the safety and reliability provisions of the Commission- approved rules and regulations prior to being operated in parallel with SCE's Distribution System. Certified Equipment will be subject to the tests specified in Section J. For non-Certified Equipment, the Producer Will develop a written testing plan to be submitted to SCE for its review and acceptance. Alternatively, the Producer and SCE may agree to have SCE conduct the required testing at the Producer's expense. Where applicable, the test plan shall include the installation test procedure(s) published by the manufacturer(s)of the generation or interconnection equipment, Facility testing shall be conducted at a mutually agreeable time, and depending on who conducts the tests, SCE or Producer shall be given the opportunity to witness the tests. h. SCE Authorizes Interconnection: The Producer's Generating Facility shall be allowed to commence parallel operation with SCE's Distribution System upon satisfactory compliance with the terms of the Generating Facility Interconnection Agreement and any other applicable agreements as described in Section C.M. Compliance may include, but not be limited to, provision of any required documentation and satisfactorily completing any required inspections or tests as described herein or in the agreements formed between the Producer and SCE. A Producer shall not interconnect a Generating Facility unless it has received SCE's express written permission to do so. i. SCE Reconciles Costs and Payments: If the Producer selected a fixed price billing for the Interconnection Facilities or Distribution System Modifications, no reconciliation will be necessary. If the Producer selected actual cost billing, a true-up will be required. Within a reasonable time after the interconnedon of a Producer's Generating Facility, SCE will reconcile its actual costs related to the Producer's facility against the generating facility application fee and any other advance payments made by the Producer. The Producer will receive either a bill for any balance due or a reimbursement for overpayment as determined by SCE's reconciliation. The Producer shall be entitled to a reasonably detailed and understandable report detailing SCE's reconciliation process. (To beinserted byutility) Issued by (To beinserted byCal. PUC) Advice 1498Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 m,o 08-12-037 Resolution .`~ ^ EDUSOM ~~~. ~.~~~~~.�~ BouU��nmCmU�rniaEdison Original Cal. PUC Sheet No. 27920-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 7 GENERATING FACILITY INTERCONNECTIONS D. Generating Facility Design and Operating Requirements 1. General Interconnection and Protection Requirements a. Automatic Lockout Required: The Protective Functions shall include an automatic means to prevent the Generating Facility from re-energizing a de- energized SCE Distribution System circuit. b. Protective Functions Required: The Protective Functions of a Generating Facility must include an over/under voltage trip function, an over/under frequency trip function, and a means for disconnecting the Generating Facility from SCE's Distribution System whenever a protective function initiates a trip. C. No Unintended Islanding: The Generating Facility and associated Protective Functions shall not contribute to the formation of an Unintended Island. d. Drawings Required: The Producer's protection and control diagrams for the interconnection shall be approved by SCE prior to completion of the Generating Facility Interconnection unless the Producer uses a protection and control scheme previously approved by SCE for system-wide application or uses only Certified Equipment. e. Required Delay on Reconnection: Protective Functions shall be equipped with automatic means to prevent reconnection of the Generating Facility with SCE's Distribution System unless SCE's Distribution System service voltage and frequency is of specified settings and is stable for at least 60 seconds. f. Certified Equipment: Certified Equipment contains certified functions that are accepted by all California Electric Corporations. Certified Equipment may be installed on SCE's Distribution System in accordance with an interconnection control and protection scheme approved by SCE. 9- Purpose of Protective Functions: The Protective Functions and requirements of this Rule are designed to protect SCE's Distribution System and not the Generating Facility. A Producer shall be solely responsible for providing adequate protection for the Producer's Generating Facility and Interconnection Facilities connected to SCE's Distribution System. The Producer's protective equipment shall not impact the operation of other protective devices utilized on SCE's Distribution System in a manner that would affect SCE's capability of providing reliable service to its Customers. (To beinserted byutility) Issued by (To beinserted byCal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 08-11-001 Senior Vice President Effective Jan 9, 2001 rco 00-12-03/ Resolution ' .. . . EDISON ~'~~~~~°.~.�~-_ Sou�h�mCalifonaEdbon Original Cal. PUC Sheet No. 27930-E ' Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet8 GENERATING FACILITY INTERCONNECTIONS D. Generating Facility Design and Operating Requirements (Continued) 1. General Interconnection and Protection Requirements (Continued) h. Suitable Equipment Required: Circuit breakers or other interrupting devices located at the Point of Common Coupling must be Certified or "Listed" (as defined in Article 100, the Definitions Section of the National Electrical Code) as suitable for their intended application. This includes being capable of interrupting the maximum available fault current expected at their location. The Generating Facility shall be designed so that the failure of any one device shall not potentially compromise the safety and reliability of SCE's Distribution i. Visible Disconnect Required: The Producer shall furnish and install a manual disconnect device that has a visible break to isolate the Generating Facility from SCE's Distribution System. The device must be accessible to SCE personnel and be capable of being locked in the open position. Generating Facilities with Non-Islanding inverters totaling one (1) WA or less are exempt from this provision. Momentarily Paralleling Facilities Excluded: Section D of this Rule is not intended to address the requirements for Generating Facilities that parallel momentarily (60 cycles or less) or Generating Facilities that operate independently of SCE's Distribution System. (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Effective JanQ 2U01 6C8 00-72-037 Fleou}mdion . . EDISON ~~~~~^~~~~~~~~~ SouthernCm|�xnimEdiamn Original Cal. PUC Sheet No. 27931-E Rosemead, California Cancelling Cmi' PUC Sheet No. Rule 21 Sheet 9 GENERATING FACILITY INTERCONNECTIONS D. Interconnection Facilities. (Continued) 2. Prevention of interference: The Producer shall not operate equipment that superimposes a voltage or current upon SCE's Distribution System that interferes with SCE operations, service to SCE customers, or SCE communication facilities. If such interference occurs, the Producer must diligently pursue and take corrective action at its own expense after being given notice and reasonable time to do so by SCE. If the Producer does not take timely corrective action, or continues to operate the equipment causing interference without restriction or limit, SCE may,without liability,disconnect the Producer's equipment from SCE's Distribution System, in accordance with Section B.9 of this Rule. To eliminate undesirable interference caused by the operation of the Generating Facility, each Generating Unit in a Generating Facility shall meet the following criteria: a. Normal voltage operating range: The voltage operating range for a Generating Unit shall be selected as a protection function that responds to abnormal Distribution System conditions and not as a voltage regulation (1) Small systems (11 kVA or less): Generating Units connected to a Generating Facility with a Gross Nameplate capacity of 11 kVA or less shall be capable of operating within the limits normally experienced on SCE's Distribution System. The operating window shall be selected in a manner that minimizes nuisance tripping and range between 106 volts and 132 volts (88-110% of nominal voltage) on a 120-volt base. Generating Facilities shall cease to energize SCE lines whenever the voltage at the Point of Common Coupling deviates from the allowable voltage operating range. (2) Large Systems (greater than 11 kVA): SCE may have specific operating voltage ranges for larger Generating Facilities, and may require adjustable operating voltage settings for these larger systems. In the absence of such requirements, the above principles of operating between 88% and 110% of the appropriate interconnection voltage should be followed. (To be inserted by utility) Issued by [To be inserted byCal. PUC) Advice 1498-E+4 John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 *cr 00-12-03/ Resolution ^ . El EDISON ~~~~ ~_~~~=~�~� SoudhonnC�U�nia Edison Original Cal. PUCSheet No. 27932-E Rosemead, California Cancelling Cm/. PUC Sheet No. Rule 21 Sheet 10 GENERATING FACILITY INTERCONNECTIONS D. Interconnection Facilities. (Continued) 2. Prevention of interference. (Continued) a. Normal voltage operating range. (Continued) (3) Voltage Disturbances: System voltage assumes a nominal 120 V base. For the convenience of those wishing to translate these guidelines to voltage bases other than 120 volts, the limits will also be provided as approximate percentages. Generating Units should sense abnormal voltage and respond accordingly, The following conditions should be met, with voltages in RMS and measured at the Point of Common Coupling: Table DA Maximum Trip Time* Voltage at Point of Common Coupling (Assuming 60 Cycles per Second) Less than 60 Volts 10 Cycles Greater than 60 volts but less than 106 volts 120 Cycles Greater than 106 volts but less than 132 volts Normal Operation Greater than 132 volts but less than 165 volts 120 Cycles (30 Cycles for facilities greater than 11kVA) Greater than 165 volts 6 Cycles "Trip time" refers to the time between the abnormal condition being applied and the Generating Facility ceasing to energize SCEs Distribution System. Certain circuits will actually remain connected to SCE's Distribution System to allow sensing of electrical conditions for use by the "reconnect"feature, The purpose of the allowed time delay is to fide through short-term disturbances to avoid excessive nuisance tripping. For Generating Facilities with a Gross Nameplate Rating of I I WA capacity or lass,the above set points are to be non-user adjustable. For Generating Facilities with a Gross nameplate Rating greater than 11 k VA, different voltage set points and trip time.$from those in Table D.I may be negotiated with SCE. b. Flicker: Any voltage flicker at the Point of Common Coupling caused by the Generating Facility should not exceed the limits defined by the "Maximum Borderline of Irritation Curve" identified in IEEE 519 (IEEE Recommended Practices and Requirements for Hannonic Control in Electric Power Systems, IEEE STD 519-1992, Institute of Electrical and Electronic Engineers, Piscataway, NJ. April 1992). This requirement is necessary to minimize the adverse voltage affects experienced by other customers on SCE's Distribution System. Induction Generating Units may be connected and brought up to synchronous speed (as an induction motor)provided these flicker limits are not (To beinserted byutility) Issued by (To beinserted byCal. PUC) Advice 1498Date Filed Jan 9, 2001 Decision Effective Jan 9, 2001 ,mo 0+12-037 Resolution ' EDISON �� ���'���_~��~��' Sou�hern����miaEdkaon Original Cal. PUC Sheet No. 27933'E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 11 GENERATING FACILITY INTERCONNECTIONS D. Interconnection Facilities. (Continued) 2. Prevention of interference. (Continued) C. Frequency: SCE controls system frequency, and the Generating Facility shall operate in synchronism with SCE's Distribution System. Small Generating Facilities should have a fixed operating frequency range of 59.3-60.5 Hertz. The Generating Facility must cease to energize the system in a maximum of ten cycles should SCE remain outside of the frequency limits. The purpose of the time delay is to allow the Generating Facility to ride through short-term disturbances to avoid excessive nuisance tripping. SCE may require adjustable operating frequency settings for Generating Facilities larger than 11 WA to assist the system during serious capacity shortages. Low frequency settings of 59.3 Hz and 58.0 Hz may be used with the consent of SCE. d. Harmonics: Harmonic distortion shall be in compliance with IEEE 519. Exception: The harmonic distortion of a Generating Facility located at a Customer's site shall be evaluated using the same criteria as the loads at that site. e. Direct Current Injection: Generating Facilities should not inject Direct Current greater than 0.5% of rated output current into SCE's Distribution System under either normal or abnormal operating conditions. f. Power Factor: Each Generating Unit in a Generating Facility shall be capable of operating at some point within a range of a power factor of 0.9 (either leading or lagging). Operation outside this range is acceptable provided the reactive power of the Generating Facility is used to meet the reactive power needs of on-site loads or that reactive power is otherwise provided under tariff by SCE. The Producer shall notify SCE if it is using the Generating Facility for power factor correction. (To beinserted byutility) Issued by (To beinserted byCal. PUC) Advice 1488-E-4 John R, Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 ,,m D0'12-U377 Resolution . . .' . F1 EIDISON ��­.�.�—�����_ Southann[�a|dbmnia Edioon Original Cal. PUC Sheet No. 27934-E Rooernead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 12 GENERATING FACILITY INTERCONNECTIONS D. Interconnection Facilities. (Continued) 3. Control, Protection and Safety Equipment Requirements a. Technology Specific Requirements (1) Limits Specific to Single-Phase Generating Facilities: For single-phase Generating Facilities connected to a shared single-phase secondary, the maximum capacity shall be 20 kVA. Generating Facilities applied on a center-tap neutral 240-volt service must be installed such that no more than 6 kVA of imbalance in capacity exists between the two sides of the 240-volt service. For dedicated distribution transformer services, the limit of a single-phase Generating Facility shall be the transformer nameplate (2) Three-Phase Synchronous Generating Facilities: For three phase Generating Facilities, the Generating Facility circuit breakers shall be three-phase devices with electronic or electromechanical control. The Producer shall be responsible for properly synchronizing its Generating Facility with SCE's Distribution System by means of either a manual or automatic synchronizing function. Automatic synchronizing is required for all synchronous Generating Units, which have a Short Circuit Contribution Ratio(SCCR) exceeding 0.05. A Generating Unit whose SCCR exceeds 0.05 shall be equipped with Protective Functions suitable for detecting loss of synchronism and rapidly disconnecting the Generating Facility from SCE's Distribution System. Unless otherwise agreed upon by the Producer and SCE, synchronous Generating Units shall automatically regulate power factor, not voltage, while operating in parallel with SCE's Distribution System. Power system stabilization is specifically not required for Generating Facilities under 10 MW Gross Nameplate Capacity. Synchronization means that at the time of connection, the frequency difference shall be less than 0.2 Hz, the voltage difference shall be less than 10%, and the phase angle difference shall be less than 10 degrees. (To be inserted by utility) Issued by (7o be inserted by Cal. PUC) Advice 1498-E-4 John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 12Cm 00-12-037 Resolution EDISON .D,�N.H,-max„ , Southern California Edison Original Cal. PUC Sheet No. 27935-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 13 GENERATING FACILITY INTERCONNECTIONS (Continued) D. Interconnection Facilities. (Continued) 3. Control, Protection and Safety Equipment Requirements (Continued) a. Technology Specific Requirements (Continued) (3) Induction Generators: Induction generator Generating Units do not require separate synchronizing equipment. Starting or rapid load fluctuations on induction generators can adversely impact SCE's Distribution System's voltage. Corrective step-switched capacitors or other techniques may be necessary and may cause undesirable ferro-resonance. When these counter measures (e.g. additional capacitors) are installed on the Producer's side of the Point of Common Coupling, SCE must review these measures. Additional equipment may be required to resolve this problem as determined in an Interconnection Study. (4) Inverter Systems: Utility-interactive inverters do not require separate synchronizing equipment. Non-utility-interactive or "stand-alone" inverters shall not be used for parallel operation with SCE's Distribution System. b. Supplemental Generating Facility Requirements (1) Unintended Islanding for Generating Facilities that Fail the Export Screen: Generating Facilities must mitigate their potential contribution to an Unintended Island. This can be accomplished by one of the following options: (1) incorporating certified Non-Islanding control functions into the Protective Functions, (2) verifying that local loads sufficiently exceed the load carrying capability of the Generating Facility, or (3) incorporating transfer trip or an equivalent function in the Protective Functions. (2) Fault Detection: A Generating Facility with an SCCR exceeding 0.1 or that does not meet any one of the options for detecting Unintended Islands in D.3.b.1. shall be equipped with Protective Functions designed to detect Distribution System faults, both line-to-fine and line-to-ground, and promptly remove the Generating Facility from SCE's Distribution System in the event of a fault. For a Generating Facility that cannot detect these faults within two seconds, transfer trip or an equivalent function may be required. Reclose-blocking of SCE's affected recloser(s) may also be required by SCE for Generating Facilities that exceed 15% of the peak load on the Line Section. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 fsc,o 00-12-037 Resolution 5611TNERItl CMIYO(iNtA EDISON s Southern California Edison Original Cal. PUG Sheet No. 27936-E Rosemead, California Cancelling Cal. PUG Sheet No. Rule 21 Sheet 14 GENERATING FACILITY INTERCONNECTIONS (Continued) D. Interconnection Facilities. (Continued) 3. Control, Protection and Safety Equipment Requirements (Continued) C. Generating Facility Types and Conditions Not Identified In the event that Section D of this Rule does not address the interconnection requirements for a particular Generating Facility, SCE and Producer may agree upon the technical requirements to interconnect the Generating Facility. E, Interconnection Facility Ownership and Financing 1. Scope and Ownership of Interconnection Facilities a. Scope: The interconnection of a Producer's Generating Facility with SCE's Distribution System is made through the use of Interconnection Facilities. Such interconnection may also require Distribution System improvements. The nature, extent and costs of Interconnection Facilities and Distribution System improvements shall be consistent with this Rule and determined through the Initial Review and/or Interconnection Studies described in Section C. b. Ownership: Subject to the limitations set forth in this Rule, Interconnection Facilities which may be installed on Producer's side of the Point of Common Coupling may be owned, operated and maintained by the Producer or SCE. Interconnection Facilities installed on SCE's side of the Point of Common Coupling and Distribution System improvements shall be owned, operated and maintained only by SCE. 2. Responsibility of Costs of Interconnecting a Generating Facility a. Study and Review Costs: A Producer shall be responsible for the reasonably incurred costs of the Initial Review and any Interconnection Studies conducted pursuant to Section C.2 of this Rule solely to explore the feasibility and determine the requirements of interconnecting a Generating Facility with SCE's Distribution System. b. Facility Costs: A Producer shall be responsible for all costs associated with Interconnection Facilities owned by the Producer. The Producer shall also be responsible for any costs reasonably incurred by SCE in providing, operating, or maintaining Interconnection Facilities and Distribution System improvements required solely for the interconnection of the Producer's Generating Facility with SCE's Distribution System. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 14C10 00-12-037 Resolution • StiU11iENN Gl4.lYORtiM EDISON S4+N IM6RNwTRM'.a[Grpany Southern California Edison Original Cal. PUC Sheet No. 27937-E Rosemead,California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 15 GENERATING FACILITY INTERCONNECTIONS (Continued) E. Interconnection Facility Ownership and Financing (Continued) 2. Responsibility of Costs of Interconnecting a Generating Facility (Continued) (c) Separation of Costs: Should SCE combine the installation of Interconnection Facilities, or Distribution System improvements with modifications or additions to SCE's Distribution System to serve other Customers or Producers, SCE shall not include the costs of such separate or incremental facilities in the amounts billed to the Producer for the Interconnection Facilities or Distribution System improvements required pursuant to this Rule. 3. Installation and Financing of Interconnection Facilities Owned and Operated by SCE (a) Agreement Required: Costs for Added Facilities as described in SCE's Rule 2.1-1, shall be paid by the Producer pursuant to the provisions contained in the Generating Facility Interconnection Agreement. Where the nature and extent of the Interconnection Facilities and Distribution System improvements warrant additional detail, the detail shall be found in separate interconnection agreements between the Producer and SCE, and SCE's applicable Tariff Schedules and Rules for Added Facilities, (b) Attachments and Modifications to Distribution System: Except as provided for in Section E.3.c. of this Rule, Interconnection Facilities connected directly to SCE's Distribution System and Distribution System improvements shall be provided, installed, owned and maintained by SCE as Added Facilities. (c) Third-Party installations: Subject to the approval of SCE, a Producer may, at its option, employ a qualified contractor to provide and install Interconnection Facilities or Distribution System improvements to be owned and operated by SCE. Such Interconnection Facilities and Distribution System improvements shall be installed in accordance with SCE's design and specifications. Upon final inspection and acceptance by SCE, the Producer shall transfer ownership of such Producer installed Interconnection Facilities or Distribution System improvements to SCE and such facilities shall thereafter be owned and maintained by SCE at the Producer's expense as Added Facilities. The Producer shall pay SCE's reasonable cost of design, administration, and monitoring of the installation for such facilities to ensure compliance with SCE's requirements. The Producer shall also be responsible for all costs, including any income tax liability, associated with the transfer of Producer installed Interconnection Facilities and Distribution System improvements to SCE. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 rscio 00-12-037 Resolution pi' Si}UYHENN SAiMOAMA Lj EDISON iEDtstlNlMERNATXONeIt C' pury Southern Califomia Edison Original Cal. PUC Sheet No. 27938-E Rosemead, California Cancelling Cal. PUG Sheet No. Rule 21 Sheet 16 GENERATING FACILITY INTERCONNECTIONS (Continued) E. Interconnection Facility Ownership and Financing (Continued) 3. Installation and Financing of Interconnection Facilities Owned and Operated by SCE (Continued) (d) Reservation of Unused Facilities: When a Producer wishes to reserve SCE- owned Interconnection Facilities or Distribution System improvements installed and financed as Added Facilities for the Producer, but idled by a change in the operation of the Producer's Generating Facility or otherwise, Producer may elect to abandon or reserve such facilities consistent with the terms of its agreement with SCE. If Producer elects to reserve idle Interconnection Facilities or Distribution System improvements, SCE shall be entitled to continue to charge Electrical Producer for the costs related to the ongoing operation and maintenance of the Added Facilities. (e) Refund of Salvage Value: When a Producer elects to abandon the Added Facilities for which it has either advanced the installed costs or constructed and transferred to SCE, the Producer shall, at a minimum, receive from SCE a credit for the net salvage value of the Added Facilities. F. Metering, Monitoring and Telemetry 1. General Requirements: All Generating Facilities shall be metered in accordance with this Section F and shall meet all applicable standards of SCE contained in SCE's applicable Tariff Schedules and published SCE manuals dealing with metering specifications. The requirements in this Section F do not apply to metering of Generating Facilities operating under SCE's Net Energy Metering tariff pursuant to California Public Utilities Code Section 2827. 2. Metering by non-SCE Parties: The ownership, installation, operation, reading, and testing of metering for Generating Facilities shall be by SCE except to the extent that the Commission has determined that all these functions, or any of them, may be performed by others as authorized by the Commission. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 ,ses 00-12-037 Resolution E DISON Southern Calfomia Edison Original Cal. PUC Sheet No. 27939-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 17 GENERATING FACILITY INTERCONNECTIONS (Continued) F. Metering, Monitoring and Telemetry (Continued) 3. Net Generation Metering: For purposes of monitoring Generating Facility operation for determination of standby charges and applicable non-bypassable charges as defined in SCE's Tariff Schedules, and for Distribution System planning and operations,consistent with Section B.4 of this Rule, SCE shall have the right to specify the type,and require the installation of, Net Generation Metering. SCE shall require the provision of Generating Facility output data to the extent reasonably necessary to provide information for SCE to administer its Tariff Schedules or to operate and plan its system. SCE shall only require Net Generation Metering to the extent that less intrusive and/or more cost effective options for providing the necessary Generating Facility output data are not available. In exercising its discretion to require Net Generation Metering, SCE shall consider all relevant factors,including but not limited to: a. Data requirements in proportion to need for information; b. Producer election to install equipment that adequately addresses SCE's operational requirements; C. Accuracy and type of required metering consistent with purposes of collecting data; d. Cost of metering relative to the need for and accuracy of the data; e. The Generating Facility's size relative to the cost of the metering/monitoring; f. Other means of obtaining the data (e.g. Generating Facility logs, proxy data etc.); g. Requirements under any Generating Facility Interconnection Agreement with the Producer. SCE will report to the Commission or designated authority, on a quarterly basis, the rationale for requiring net generation equipment in each instance along with the size and location of the facility. 4. Point of Common Coupling Metering: For purposes of assessing SCE charges for retail service, the Producer's Point of Common Coupling Metering shall be a bi-directional meter so that power deliveries to and from the Producer's site can be separately recorded. Alternately, the Producer may, at its sole option and cost, require SCE to install multi-metering equipment to separately record power deliveries to SCE's Distribution System and retail purchases from SCE. Such Point of Common Coupling Metering shall be equipped or designed to prevent reverse registration. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 17C9 00-12-037 Resolution EDISON Southern—Ca I—if omia Edison Original Cal. PUC Sheet No. 27940-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 18 GENERATING FACILITY INTERCONNECTIONS (Continued) F. Metering, Monitoring and Telemetry (Continued) 5. Telemetering: If the nameplate rating of the Generating Facility is 1 MW or greater, Telemetering equipment at the Net Generator Metering location may be required at the Producer's expense. If the Generating Facility is interconnected to a Distribution System operating at a voltage below 10 kV, then Telemetering equipment may be required on Generating Facilities 250 kW or greater. SCE shall only require Telemetering to the extent that less intrusive and/or more cost effective options for providing the necessary data in real time are not available. SCE will report to the Commission or designated authority, on a quarterly basis, the rationale for requiring Telemetering equipment in each instance along with the size and location of the facility. 6. Sunset Provision: Sections F.3 and F.5 are interim provisions only. SCE shall file permanent metering requirements with the Commission on or by December 31, 2002. At that time, SCE shall serve its application for approval of permanent metering requirements on the service list in OIR 99-10-025. 7. Location: Where SCE-owned metering is located on the Producer's premises, Producer shall provide,at no expense to SCE,a suitable location for all such metering.. 8. Costs of metering: The Producer will bear all costs of the metering required by this Rule,including the incremental costs of operating and maintaining the metering. G. Dispute Resolution Process 1. The following procedures will apply for disputes arising from this Rule: The Commission shall have initial jurisdiction to interpret, add, delete or modify any provision of this Rule or of any agreements entered into between SCE and the Producer to implement this tariff ("The Implementing Agreements") and to resolve disputes regarding SCE's performance of its obligations under its Tariff Schedules, the implementing agreements, and requirements related to the interconnection of the Producer's Generating or Interconnection Facilities pursuant to this Rule. 2. Any dispute arising between SCE and the Producer (individually "Party" and collectively "the Parties") regarding SCE's performance of its obligations under its Tariff Schedules, The Implementing Agreements, and requirements related to the interconnection of Producer's Facilities pursuant to this Rule shall be resolved according to the following procedures'. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 ,ecs 00-12-037 Resolution EDISON x rxrvx+san+.w,u,c.-®e.ey Southern California Edison Original Cat. PUC Sheet No. 27941-E Rosemead,California Cancelling Cal. PUC Sheet No, Rule 21 Sheet 19 GENERATING FACILITY INTERCONNECTIONS (Continued) G. Dispute Resolution Process 2. (Continued) (a) The dispute shall be reduced to writing by the aggrieved Party in a letter ("the dispute letter") to the other Party containing the relevant known facts pertaining to the dispute, the specific dispute and the relief sought, and express notice by the aggrieved Party that it is invoking the procedures under Section G.2. Within 45 calendar days of the date of the dispute letter, the Parties'authorized representatives will be required to meet and confer to try to resolve the dispute. (b) if the Parties do not resolve their dispute within 45 calendar days after the date of the dispute letter, the dispute shall, upon demand of either party, be submitted to resolution before the Commission in accordance with the Commission's Rules of Practice and Procedure Applicable to Customer Complaints. 3. Pending resolution of any dispute under this Section, the Parties shall proceed diligently with the performance of their respective obligations under this Rule and The Implementing Agreements, unless The Implementing Agreements have been terminated. Disputes as to the Application and implementation of this Section shall be subject to resolution pursuant to the procedures set forth in this Section. H. Definitions The definitions set forth in this Section H are applicable only to this Rule and its corresponding agreements including Form 14-731, Generating Facility Interconnection Facilities Agreement, and Form 14-732,Application to Interconnect a Generating Facility. Accredited, Nationally Recognized Testing Laboratory (NRTL): A laboratory approved to perform the certification testing requirements for Generating Facilities. Active Anti-Islanding Scheme: A control scheme installed with the Generating Facility that senses and prevents the formation of an Unintended Island. Applicant: An Applicant applying for interconnection, under the provisions of SCE's Rule 21 and Form 14-732,Application to Interconnect a Generating Facility. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 ,se,o 00-12-037 Resolution kg' 11 LJ EUDISON .fin—,- 15 /NY&4.v,et]ovwL CaxY�+Y Southern Cali€omnia Edison Original Cal. PUC Sheet No. 27942-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 20 GENERATING FACILITY INTERCONNECTIONS (Continued) H. Definitions (Continued) Certification; Certified; Certificate: The documented results of a successful Certification Testing, Certification Test: A test adopted by SCE that verifies conformance of certain equipment with Commission-approved performance standards in order to be classified as Certified Equipment. Certification Tests are performed by NRTL. Certified Equipment: Equipment used in a Generating Facility that has passed the Certification Test. Commissioning Test: A test performed during the commissioning of all or part of a Generating Facility system to achieve one or more of the following: • Verify specific aspects of its performance; • Calibrate its instrumentation; • Establish instrument or Protective Function set-points. Customer: A Distribution Customer who receives or is entitled to receive Distribution Service through the Distribution System. Dedicated Transformer; Dedicated Distribution Transformer: A transformer that provides Electricity Service to a single Customer. The Customer may or may not have a Generating Facility. Distributed Generation: Electrical power generation by any means, including from stored electricity, that is interconnected to SCE's Distribution System at a Point of Common Coupling under the jurisdiction of the Commission. Distribution Service: All services required by, or provided to, a Customer pursuant to the approved Tariff Schedules and Rules of SCE. Distribution System: All electrical wires, equipment, and other facilities owned or provided by SCE by which SCE provides Distribution Service to its Customers. Distribution System Island: A condition on SCE's Distribution System in which one or more Generating Unit(s), over which SCE has no direct control, and a portion of SCE's Distribution System operate while isolated from the remainder of SCE's Distribution System. Emergency: An actual or imminent condition or situation, which jeopardizes SCE's Distribution System Integrity. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal, PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2401 Decision 40-11-001 Senior Vice President Effective Jan 9, 2001 20070 00-12-037 Resolution EDISON xar ++rvtexuwrrrnrr..cc®sir Southern California Edison Original Cal. PUC Sheet No. 27943-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 21 GENERATING FACILITY INTERCONNECTIONS (Continued) H. Definitions (Continued) Field Testing: Testing performed in the field to determine whether equipment meets SCE's requirements for safe and reliable Interconnection Generating Facility: All Generating Units that are included in a Generating Facility Interconnection Agreement. Generating Facility Application: The standard Commission-approved form submitted to SCE for electrical interconnection of a Generating Facility with SCE. Generating Facility Interconnection Agreement: An agreement between SCE and the Producer that gives each the certain rights and obligations to effect or end Interconnection. Generating Unit: An individual electrical generator or generating system (including required equipment, appurtenances, protective equipment and structures) that is connected to and made a part of a Generating Facility. Gross Nameplate Rating: The gross generating capacity of a Generating Unit or the total of the gross generating capacity of the Generating Units comprising a Generating Facility as designated by the manufacturer(s) of the Generating Unit(s). Host Load: Electrical power that is consumed by the Customer at the property on which the Generating Facility is located. Initial Operation: The first time the Generating Facility is in Parallel Operation. Initial Review: The review by SCE, following receipt of an Generating Facility Application, to determine the following: If an Generating Facility Application qualifies for Simplified Interconnection, or If an Generating Facility Application can be made to qualify for Interconnection with supplemental review determining any potential additional requirements, or If an Interconnection Study is required, the cost estimate and schedule for performing the Interconnection Study In-rush Current: The current drawn by the Generating Unit during startup. Interconnection; (interconnected): The physical connection of a Generating Facility in accordance with the requirements of these rules so that Parallel Operation with SCE system can occur(has occurred). Interconnection Facilities: The electrical wires, switches and related equipment that interconnect a Generating Facility to SCE's Distribution System. 1 (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 21c9 00-12-037 Resolution Lj EDIS,ON Southern California Edison Original Cal. PUC Sheet No. 27944-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 22 GENERATING FACILITY INTERCONNECTIONS (Continued) H. Definitions (Continued) Interconnection Study: A study to establish the requirements for Interconnection of a Producer. Island; Islanding: A condition on SCE's Distribution System in which one or more Generating Facilities deliver power to Customers using a portion of SCE's Distribution System that is electrically isolated from the remainder of SCE's Distribution System. ISO: The California Independent System Operator, responsible for the management of electrical power flow through California's electrical transmission network. Line Section: That portion of SCE's Distribution System connected to a Customer bounded by automatic sectionalizing devices or the end of the line. Metering: The measurement of electrical power flow in kW and/or kWh, and, if necessary, kVAR at a point, and its display to SCE, as required by this Rule. Metering Equipment: All equipment, hardware, software including meter cabinets, conduit, etc. that is necessary for Metering, Net Energy Metering: Metering for the mutual purchase and sale of electricity between the Producer and SCE pursuant to Section 2827 of the Public Utilities Code. Net Generation Metering: The Metering of the net electrical energy output in kW and kWh from a given Generating Facility, This may also be the measurement of the difference between the total electrical energy produced by a Generating Unit and the electrical energy consumed by the auxiliary equipment necessary to operate the Generating Unit, For a Generating Unit with no Host Load and/or Section 218 Load, Metering that is located at the point of Common Coupling. For a Generating Unit with Host Load and/or Section 218 Load, Metering that is located at the Generating Unit bus after the point of auxiliary load(s) and prior to serving Host Load and/or Section 218 Load. Net Metering: Where electricity at a point may flow in both directions, the measurement of the net, or the algebraic sum, of electrical energy in kWh, that flows through that point in a given time-interval. Net Metering typically uses two meters, or in some cases a single meter with two or more registers, to individually measure a Customer's electric deliveries to, and consumption of retail service from, SCE's Distribution System. Over a given time frame (typically a month)the difference between these two values yield either net consumption or net surplus. The meter registers are ratcheted to prevent reverse registration. if available, a single meter may be allowed spin backward to yield the same effect as a two meter (or register) arrangement. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 22CIO 00-12-037 Resolution EDISON S_ou��h_emn~ =CaU~h�znaEdison Original a| Ca|. PUC Sheet No. 27945-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 23 GENERATING FACILITY INTERCONNECTIONS H. Definitions (Continued) Net Nameplate Rating: The gross generating capacity of a Generating Unit or the total of the gross generating capacity of the Generating Units comprising a Generating Facility as designated by the manufacturer(s) of the Generating Unit(s) minus the consumption of electrical power of the Generating Unit(s). Network Service: More than one electrical feeder providing Distribution Service at a Point of Common Coupling. Non-Exporting: Designed to prevent the transfer of electrical energy from the Generating Facility to SCE. Non-Islanding: Designed to detect and disconnect from a stable Unintended Island with matched load and generation. Reliance solely on under/over voltage and frequency trip is not considered sufficient to qualify as Non-Islanding, Parallel Operation: The simultaneous operation of a Generating Facility with power delivered or received by SCE while Interconnected. For the purpose of this Rule, Parallel Operation includes only those Generating Facilities that are so interconnected with SCE's Distribution System for more than 60 cycles (one second). Periodic Test: A test performed on part or all of a Generating Facility at pre-determined time or operational intervals to achieve one or more or the following: 1)Verify specific aspects of its performance, 2) Calibrate instrumentation, 3) Verify and re-establish instrument or Protective Function set-points. Point of Common Coupling (PCC): The transfer point for electricity between the electrical conductors of SCE and the electrical conductors of the Producer. Point of Common Coupling Metering: Metering located at the Point of Common Coupling. This is the same Metering as Net Generation Metering for Generating Facilities with no Host Load and/or Section 218 Load. Point of Interconnection: The electrical transfer point between a Generating Facility and the electrical distribution system. This may or may not be coincident with the Point of Common Producer: The entity that executes an Generating Facility Interconnection Agreement with SCE. The Producer may or may not own or operate the Generating Facility, but is responsible for the rights and obligations related to the Generating Facility Interconnection Agreement. Production Test: A test performed on each device coming off the production line to verify certain aspects of its performance. (Tobe inserted by utility) Issued by (To be inserted byCal. PUC) Advice 1498-E-ADeteH!ed Jan 9, 2001 --�------ Decision 08-11-001 --------� Senior Vice PresidentEffective Jan92001 cnum 00'12-037 Resolution ~ EDISON Southern California Edison Original Cal. PUC Sheet No. 27946-E Rosemead, California Cancelling Cal. PUC Sheet No, Rule 21 Sheet 24 GENERATING FACILITY INTERCONNECTIONS H, Definitions (Continued) Protective Function(s): The equipment, hardware and/or software in a Generating Facility (whether discrete or integrated with other functions) whose purpose is to protect against Unsafe Operating Conditions. Prudent Electrical Practices: Those practices, methods, and equipment, as changed from time to time, that are commonly used in prudent electrical engineering and operations to design and operate electric equipment lawfully and with safety, dependability, efficiency, and Scheduled Operation Date: The date specified in the Generating Facility Interconnection Agreement when the Generating Facility is, by the Producer's estimate, expected to begin Initial Operation. Secondary Network: A network supplied by several primary feeders suitably interlaced through the area in order to achieve acceptable loading of the transformers under emergency conditions and to provide a system of extremely high service reliability. Secondary networks usually operate at 600 V or lower. Section 218 Load: Electrical power that is supplied in compliance with California Public Utilities Code section 218 (PU Code 218). PU Code 218 defines an "Electric Corporation"and provides conditions under which a transaction involving a Generating Facility would not classify a Producer as an Electric Corporation. These conditions relate to "over-the-fence" sale of electricity from a Generating Facility without using SCE's Distribution System. Short Circuit Contribution Ratio (SCCR): The ratio of the Generating Facility's short circuit contribution to SCE's short circuit contribution for a three-phase fault at the high voltage side of the distribution transformer connecting the Generating Facility to SCE's system. Simplified Interconnection: Interconnection conforming to the minimum requirements under these rules,as determined by Section 1. Stability: The return to normalcy of an SCE Distribution System, following a disturbance. Stabilization is usually measured as a time period during which voltage and frequency are within acceptable ranges. Starting Voltage Drop: The percentage voltage drop at a specified point resulting from In-rush Current. The SVD can also be expressed in volts on a particular base voltage, (e.g. 6 volts on a 120-volt base, yielding a 5% drop). ([o be inserted by utility) Issued by (To be inserted byCal, PUC) Advice 1498-E-A John R, Fielder Date Filed Jan 9, 2001 Decision 00'11-001 Senior Vice President Effective Jan 9, 2001 z*cm 00-12-037 Resolution EDISON K.v rrsrexxwrraxu co.r+4r Southern California Edison Original Cal. PUC Sheet No. 27947-E Rosemead, California Cancelling Cal. RUC Sheet No. Rule 21 Sheet 25 GENERATING FACILITY INTERCONNECTIONS (Continued) H. Definitions (Continued) System Integrity: The condition under which a Distribution System is deemed safe and can reliably perform its intended functions in accordance with the safety and reliability rules of SCE. Telemetering: The electrical or electronic transmittal of Metering data on a real-time basis to SCE. Type Test: A test performed on a sample of a particular model of a device to verify specific aspects of its design, construction and performance. Unintended Island: The creation of an island, usually following a loss of a portion of SCE's Distribution System,without the approval of SCE. Unsafe Operating Conditions: Conditions that, if left uncorrected, could result in harm to personnel, damage to equipment, loss of System Integrity or operation outside pre-established parameters required by the Generating Facility Interconnection Agreement. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 25CIO 00-12-037 Resolution l SCiUtNfpN f.'M.!/"OgM4 EDISON n. rs itYMP.RM A6 CoaP+dY Southern Califomia Edison Original Cal. PUC Sheet No. 27948-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 26 GENERATING FACILITY INTERCONNECTIONS (Continued) 1. Initial Review Process For Applications To Interconnect Generating Facilities 1. Introduction: This Initial Review Process was developed to create a path for selection and rapid approval for the interconnection of those Generating Facilities that do not require an Interconnection Study. 2. Purpose: The Initial Review determines: a. If Generating Facility qualifies for Simplified Interconnection; b. If a Generating Facility can be made to qualify for Interconnection with a Supplemental Review determining any potential additional requirements, or C. If an Interconnection Study is required, the cost estimates and schedule for performing the Interconnection Study. Note: Failure to pass any screen of the Initial Review means only that further review and/or studies are required before the Generating Facility can be approved for interconnection with SCE's Distribution System. It does not mean that the Generating Facility cannot be interconnected. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 2609 00-12-037 Resolution EDIS+ON dnJSP+v rNYFRNAYYo.vAt tevpany Southern California Edison Original Cal. PUC Sheet No. 27949-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 27 GENERATING FACILITY INTERCONNECTIONS (Continued) L Initial Review Process For Applications To Interconnect Generating Facilities Initial Review Process Flow Chart Applicant provides completed Application 1. is the PCC on a Networked Secondary System? Yes No 2. Will Power be exported across the PCC? No 3 m 3. Is the Interconnection Equipment Certified for > the proposed application? or No m Does the Interconnection Equipment have Interim SCE Approval? Yes m 4. Is the aggregate Generating Facility Capacity E on the Line Section less than 15% of Line No Section peak load? a Yes W No E 5. Is the Starting Voltage Drop screen met? o Yes a� 6. Is the gross Generating Facility Capacity 11 kVa or less? No 7. Is the Short Circuit Current No Contribution screen met? Yes 8. is the Line Configuration No BPI Screen met? Yes Yes Does Supplemental Review determine requirements? Yes No Generating Facility qualifies for Generating Facility qualifies for SCE provides cost esti!ate Simplified Interconnection subject Interconnection subject to the and schedule far to provisions of this Rule 21 provision of this Rule 21 Interconnection Study (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 27c9 00-12-037 Resolution . / | EDISOM ~�~~~"~~.~~~._, Sou!hernCaiihniaEdieon Original Ca/. PUC Sheet No. 27850-E Rosemead, California Cancelling Ca/. PUC Sheet No. Rule 21 Sheet 28 GENERATING FACILITY INTERCONNECTIONS 1. Initial Review Process For Applications To Interconnect Generating Facilities 3. Initial Review Process Details a. Is the PCC on a Networked Secondary System? • If No, continue to next screen. • If Yes, Generating Facility does not qualify for Simplified Interconnection. Perform supplemental review. Significance: Special considerations must be given to Generating Facilities proposed to be installed on networked secondary distribution systems because of the design and operational aspects of network protectors. There are no such considerations for radial distribution systems. 4. Will power be exported across the PCC? If No, Generating Facility must incorporate one of the following four options: Option 1: To insure power is never exported, a reverse power Protective Function must be implemented at the PCC. Default setting shall be 0.1% (export) of transformer rating, with a maximum 2.0 second time delay. Option 2: To insure at least a minimum import of power, an under-power Protective Function must implemented at the PCC. Default setting shall be 5% (import) of Generating Facility Gross Nameplate Rating,with maximum 2.0 second time delay. Option 3: To limit the incidental export of power, all of the following conditions must be met: a) The aggregate capacity of the Generating Facility must be no more than 25% of the nominal ampere rating of the Producer's service equipment-, b) The aggregate capacity of the Generating Facility must be no more than 50% of the Producer's service transformer rating (This capacity requirement does not apply to customers taking primary service without an intervening transformer); c) The Generating Facility must be certified as Non-Islanding. Option 4: To insure that the relative size (capacity) of the Generating Facility compared to facility load results in no export of power without the use of additional devices, the Generating Facility capacity must be no greater than 50% of the Producer's verifiable minimum load, Continue to next screen. If Yes, Generating Facility does not qualify for Simplified Interconnection. Perform supplemental review. (To be inserted by utility) Issued by (To be inserted by Ca/, PUC) Advice 1498-E-A John R. Fielder Date Filed Jon 0 2001 Decision 00-11-001 Senior Vice President Effective Jan Q 2001 � 28c,o 60-12-037 Resolution uwflx�v caurdunn EDISON btS<Y+�s mTBMn'AT.f�Cmap�e} Southern California Edison Original Cal. PUC Sheet No. 27951-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 29 GENERATING FACILITY INTERCONNECTIONS (Continued) 1. Initial Review Process For Applications To Interconnect Generating Facilities 4. Will power be exported across the PCC? (Continued) Significance: a. If it can be assured that the Generating Facility will not export power, SCE's Distribution System does not need to be studied for load-carrying capability or Generating Facility power flow effects on SCE voltage regulators as the Generating Facility will simply be reducing load on SCE's Distribution System. b. This Screen permits the use of reverse-power relaying at the PCC as positive Anti-Islanding protection. 5. Is the Interconnection Equipment Certified for the Application or does the Interconnection Equipment have Interim SCE Approval? • If Yes, continue to next screen. • If No, Generating Facility does not qualify for Simplified Interconnection. Perform supplemental review. Significance: If the Generating Facility has been Certified or previously approved by SCE, SCE does not need to repeat its review and/or test of the Generating Facility's Protective Functions scheme. Site Commissioning Testing may still be required to insure that the system is connected properly and that the protective functions are working properly. Certification or SCE approval indicates the following criteria have been tested and verified: - Basic protective function requirements met. - Harmonic distortion limits met. - Synchronizing requirements met. - Power Factor regulation requirements met, - Nan-Islanding requirements met. - If used, reverse power function requirement met. - If used, under-power function requirement met. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-1701 Senior Vice President Effective Jan 9, 2001 2908 00-12-037 Resolution soc+nrturrv.wxean EDISON M fD1SDx INY'ERro.YRONat Cwppmy Southern California Edison Original Cal. PUG Sheet No. 27952-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 30 GENERATING FACILITY INTERCONNECTIONS (Continued) 1. Initial Review Process For Applications To Interconnect Generating Facilities 6. Is the aggregate Generating Facility Capacity on the Line Section less than 15% of Line Section Peak Load? • If Yes, continue to next screen. If No, Generating Facility does not qualify for Simplified Interconnection. Perform supplemental review to determine cumulative impact on Line Section. Significance: a. Low penetration of Generating Facility installations will have a minimal impact on the operation and load restoration efforts of SCE's Distribution System. b. The operating requirements for a high penetration of Generating Facilities may be different since the impact on SCE's Distribution System will no longer be minimal, therefore requiring additional study or controls. 7. Is the Starting Voltage Drop screen met? • If Yes, continue to next screen. • If No, Generating Facility does not qualify for Simplified Interconnection. Perform supplemental review. Note: This screen only applies to Generating Facilities that start by motoring the Generating Unit(s). SCE has two options in determining whether Starting Voltage Drop could be a problem. The option to be used is at SCE's discretion: Option 1: SCE may determine that the Generating Facility's starting inrush Current is equal to or less than the continuous ampere rating of the Producer's Service Equipment. Option 2: SCE may determine the impedances of the service distribution transformer (if present) and the secondary conductors to Producer's Service Equipment and perform a voltage drop calculation. Alternatively, SCE may use tables or nomographs to determine the voltage drop, Voltage drops caused by starting a Generating Unit as a motor must be less than 2.5% for primary interconnections and 5% for secondary interconnections. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 3008 00-12-037 Resolution S1?UtHENNCJi1KOtIWA EDISON DtsOh txtFRxA 4'aayny Southern California Edison Original Cal. PUC Sheet No. 27953-E Rosemead,California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 31 GENERATING FACILITY INTERCONNECTIONS (Continued) 1. Initial Review Process For Applications To Interconnect Generating Facilities 7. Is the Starting Voltage Drop screen met? (Continued) Significance. a. This screen addresses potential voltage fluctuation problems for Generating Units that start by motoring. b. When starting, Generating Facilities should have minimal impact on the service voltage to other SCE Customers. C. Passing this screen does not relieve the Producer from ensuring that its Generating Facility complies with the flicker requirements of Rule 21, Section 4. 8. Is the Gross Nameplate Capacity of the Generating Facility 11 kVA or less? • If Yes, Generating Facility qualifies for Simplified Interconnection. Skip remaining screens. • If No, continue to next screen. Significance: The Generating Facility will have a minimal impact on fault current levels and any potential line overvoltages from loss of system neutral grounding. 9. Is Short Circuit Current Contribution screen met? If Yes, continue to next screen. If No, Generating Facility does not qualify for Simplified Interconnection. Perform supplemental review. The Short Circuit Current Contribution Screen consists of two criteria; both of which must be met when applicable: a. When measured at primary side (high side) of a Dedicated Distribution Transformer serving a Generating Facility, the sum of the Short Circuit Contribution Ratios (SCCR) of all generating facilities connected to the particular Distribution System circuit that serves the Generating Facility must be less than or equal to 0,1. b. When measured at the secondary side (low side) of a shared distribution transformer, the short circuit contribution of the proposed Generating Facility must be less than or equal to 2.5% of the interrupting rating of the Producer's Service Equipment. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1438-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 M9 00-12-037 Resolution ' - ` EDISON ~~~�~~~`~~�~-� | Southern �a|�xnia Edi son Original [a|. PLIC Sheet No. 27054-E / Rosemead, California Cancelling Cal- PLIC Sheet No. Rule 21 Sheet 32 GENERATING FACILITY INTERCONNECTIONS Initial Review Process For Applications To Interconnect Generating Facilities 9. Is Short Circuit Current Contribution screen met? (Continued) If the Generating Facility passes this screen it can be expected that it will have no significant impact on SCE's Distribution System's short circuit duty, fault detection sensitivity, relay coordination or fuse-saving schemes 10. Is the Line Configuration screen met? If Yes, Generating Facility qualifies for Simplified Interconnection. Skip remaining screens, If No,then Generating Facility does not qualify for Simplified Interconnection. Perform supplemental review. Line Configuration Screen: Identify primary distribution line configuration that will serve the proposed Generating Facility. Based on the type of interconnection to be used for the Generating Facility, determine from table if the proposed Generating Facility passes the screen, Type of Interconnection Primary Distribution to be made to Line Type Primary Distribution Line Results/Criteria Three-phase,three wire Any type Pass Screen Three-phase,four wire Single-phase Pass Screen or line-to-neutral Three-phase,four wire All Others To pass,aggregate (For any line that has such a Generating Facility section OR mixed 3 wire&4 wire) Capacity must be less than or equal to 10%of Line Section Peak Load If the primary distribution circuit serving the Generating Facility is of a"three-wire"type, or if the Generating Facility's interconnection transformer is single-phase and connected in a line-to-neutral configuration, then there is no concern about overvoftages to SCE's, or other Customer's equipment caused by loss of system neutral grounding during the operating time of Anti-Islanding protection. (To be inserted by utility) Issued by (To be inserted by Cal, PUC) Advice 1498-E+4 John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan Q 2001 � y,Cm 00-12-037 Resolution �y ._.� EDISON Southern California Edison Original Cal. PUC Sheet No, 27955-E Rosemead,California Cancelling Cal. PUC Sheet No, Rule 21 Sheet 33 GENERATING FACILITY INTERCONNECTIONS (Continued) J. Generating Unit Testing And Certification Criteria 1. Introduction This Appendix describes the test procedures and requirements for equipment used for the Interconnection of Generating Facilities to SCE's Distribution System. Included are Type Testing, Production Testing, Commissioning Testing, and Periodic Testing. The procedures listed rely heavily on those described in appropriate Underwriters Laboratory (UL), Institute of Electrical and Electronic Engineers (IEEE), and International Electrotechnical Commission (IEC) documents—most notably UL 1741 and IEEE 929, as well as the testing described in May 9999 New York Standardized Interconnection Requirements. These procedures and requirements were developed prior to the completion of IEEE P1547 Standard for Distributed Resources Interconnected with Electric Power Systems, and should be revisited once that standard is published. The tests described here, together with the technical requirements in Section D of this Rule, are intended to provide assurance that the Generating Facility's equipment will not adversely affect SCE's Distribution System and that a Generating Facility will cease providing power to SCE's Distribution System under abnormal conditions. The tests were developed assuming a low level of Generating Facility penetration or number of connections to SCE's Distribution System. At high levels of Generating Facility penetration, additional requirements and corresponding test procedures may need to be defined. This test specification also provides a means of "certifying" equipment. Once a Generating Unit or device has been Certified per this Certification process, it may be considered to be suitable for use as part of a Generating Facility interconnected with SCE's Distribution System. Subject to the exceptions described in this Appendix, SCE will not require a Producer to repeat the design review or test the Protective Functions of equipment that has been Certified. It should be noted the Certification process is intended to facilitate Generating Facility interconnections. Certification is not a prerequisite to interconnect a Generating Facility. The use of non-certified equipment may be acceptable to SCE subject to testing and approval by SCE as discussed below. 2. Certification Criteria Equipment tested and approved (e.g. "Listed'') by an accredited, nationally recognized testing laboratory ("NRTL") as having met both the Type Testing and Production Testing requirements described in this document is considered to be "Certified Equipment" for purposes of Interconnection with SCE's Distribution System. Certification may apply to either a pre-packaged system or an assembly of components that address the necessary functions. Type Testing may be done in the manufactures' factory or test laboratory, or in the field. At the discretion of the testing laboratory, field-certification may apply only to the particular installation tested. In such cases,some or all of the tests may need to be repeated at other installations. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 33c9 00-12-037 Resolution SOiIFtFFRN CAtFfORNFA EDISON .ui tlrifSUry flmFRN,aittbrtLComp`ny Southern California Edison Original Cal. PUC Sheet No. 27956-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 34 GENERATING FACILITY INTERCONNECTIONS (Continued) J. Generating Unit Testing And Certification Criteria 2. Certification Criteria (Continued) For non-certified equipment, some or all of the tests described in this document may be required by SCE for each Generating Facility installation. The manufacturer or another laboratory acceptable to SCE may perform these tests. Test results for non- certified equipment must be submitted to SCE as part of the application process for SCE's review and approval under the supplemental review. Approval by SCE for equipment used in a particular application does not guarantee SCE's approval for use in other applications or by other California Electric Corporations. When equipment is Certified by a NRTL, the NRTL shall provide to the manufacturer, at a minimum, a certificate with the following information for each device: a. Administrative: (1) The effective date of certification or applicable serial number (range or first in series), and/or other proof that certification is current (2) Equipment model number(s)of the Certified equipment (3) The software version utilized in the equipment, if applicable (4) Test procedures specified (including date or revision number) (5) Laboratory accreditation (by whom and to what standard) b. Technical (As appropriate): (1) Device ratings (kW, kVA, Volts,Amps, etc.) (2) Maximum available fault current in Amps (3) In-rush Current in Amps (4) Trip points, if factory set(trip value and timing) (5) Trip point and timing ranges for adjustable settings (6) Nominal power factor or range if adjustable (7) If the device/system is certified as Non-Exporting and the method used (reverse power or under power) (8) If the device/system is Certified as Non-Islanding It is the responsibility of the equipment manufacturer to ensure that certification information is made publicly available by the manufacturer,the testing laboratory, or by a third party. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2601 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 34C9 00-12-0137 Resolution Y t EL)ISON Souemsvx xH>sxnw>rc.V.c cemwa> thern California Edison Original Cal. PUC Sheet No. 27957-E z Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 35 GENERATING FACILITY INTERCONNECTIONS ( 1 (Continued) I J. Generating Unit Testing And Certification Criteria 3. Type Testing a. Inverters Static power inverters shall meet all of the Type Tests and requirements appropriate for a utility interactive inverter as specified in UL 1741 Static Inverters and Charge Controllers for Use in Photovoltaic Power Systems, and listed in Table 1 below. These requirements may be applied to inverters used with electric energy sources other than photovoltaic ("PV") systems. The specific section number from the May 1999 version of UL1741 is provided for each test and requirement. Section titles were added for clarity. These section numbers are subject to change by UL. A revised version of 1741 is expected to be published around November, 2000. The utility interconnection- related procedures and requirements of that version will need to be reviewed to determine if they should be adopted into these testing and certification rules. The requirements described below cover only issues related to Interconnection and are not intended to address device safety or other issues outside the needs of the relationship between SCE and a Producer operating a Generating Facility. Table 1_UL1741 (May 1999 Version) Tyne Tests and Requirements Appropriate for Utility Interactive Inverter Systems Section Number Section Title 39.1 Utility Disconnect Switch 39.2 Field Adjustable Trip-points 39.3 Field Adjustable Trip-points 39.4 Field Adjustable Trip-points 39.5 Field Adjustable Trip-points.Marking 40.1 DC isolation 41.2 Simulated PV Array (input Source) requirements 44 Dielectric Voltage Withstand Test 45.2.2 Power Factor 45.4 Harmonic Distortion 45.5 DC Injection 46.2 Utility Voltage and Frequency Variation Test (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 35c900-12-037 Resolution E�DISON ,�aW.hrF�M�n�u�—,�, Southern California Edison Original Cal. PUC Sheet No. 27958-E* Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 36 , GENERATING FACILITY INTERCONNECTIONS (Continued) J. Generating Unit Testing And Certification Criteria 1 Type Testing (Continued) a. Inverters (Continued) Table 1. UL1741 (May 1999 Version) Continued Type Tests and Requirements Appropriate for Utility Interactive inverter Systems Section Number Section Title 46.2.3 Reset Delay 46.4 Loss of Control circuit 47.3 Short Circuit Test 47.7 Load Transfer Test A description of key aspects of these procedures is provided in the testing procedures section of this Section. Separate test procedures are provided to certify Non-Islanding functions (Section J.3.d.) and Non-Exporting functions (Section 13.e.), to determine the In-rush Current tolerance of the Distribution System (Section J.3.f.), to subject the device to voltage surge conditions (Section J.3.g.), and to verify the inverter's ability to synchronize with the Distribution System (Section J.3.h.). b. Synchronous Generators Until a standardized test procedure, written specifically for synchronous generators, is identified, SCE or an NRTL shall determine which of the tests described in this Appendix are appropriate and necessary to certify the performance of the control and protection system functions of the synchronous machine, and how to perform them. The following tests listed in Table 2 and defined in UL 1741, shall be performed as applicable to a synchronous generator. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-081 Senior Vice President Effective Jan 9, 2001 sscrr 00-12-037 Resolution EDISON ��� ^����,�^~��� SouthernCo|U�rnimEdiaon Original Cal' PUC Sheet No. 27959-E° Rosemead, California Cancelling Cal' PUC Sheet No. Rule 21 Sheet37 GENERATING FACILITY INTERCONNECTIONS J. Generating Unit Testing And Certification Criteria 3. Type Testing (Continued) b. Synchronous Generators Table 2, UL1741 (May 1999 Version) Type Tests and Requirements Appropriate for Synchronous Generators Section Number Section Title 39.1 Utility Disconnect Switch 39.2 Field Adjustable Trip-points 39.3 Field Adjustable Trip-points 39.4 Field Adjustable Trip-points 39.5 Field Adjustable Trip-points, Marking 44 Dielectric Voltage Withstand Test 45.2.2 Power Factor 45.4 Harmonic Distortion 46.2 Utility Voltage and Frequency Variation Test 462.3 Reset Delay 46,4 Loss of Control circuit 47.3 Short Circuit Test A description of key aspects of these procedures is provided in the testing procedures section of this Section. Separate test procedures are provided to certify Non-Islanding functions (Section J.3,d.) and Non-Exporting functions (Section J.3.e.), to determine the In-rush Current tolerance of the Distribution System (Section J.3.f.), to subject the device to voltage surge conditions (Section J.3.g.), and to verify the inverters ability to synchronize with the Distribution System (Section J.3.h.). C. Induction Generators Until a standardized test procedure, written specifically for induction generators is identified, SCE or an NRTL shall determine which of the tests described in this Appendix are appropriate and necessary to certify the performance of the control and protection system functions of the induction generator, and how to perform them. The following tests listed in Table 3 and defined in LIL 1741, shall be performed as applicable to a induction generator. (To be inserted by utility) Issued by (TV be inserted byCal. PUC) Adv/cm 1490-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 ,ro,, 00-12'087 Resolution . . .` E ��� ��� EDISON Sou�em���aU�mioEdi so n DhAine| Cal. PUC Sheet No. 27060'E^ Rosemead,California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 38 GENERATING FACILITY INTERCONNECTIONS JGenerating Unit Testing And Certification Criteria 3. Type Testing (Continued) C. Induction Generators Table 3, UL1741 (May 1999 Version) Type Tests and Rec juirements Appropriate for Induction Generators Section Number Section Title 39.1 Utility Disconnect Switch 392 Field Adjustable Trip-points 39.3 Field Adjustable Trip-points 39.4 Field Adjustable Trip-points 39.5 Field Adjustable Trip-points, Marking 44 Dielectric Voltage Withstand Test 4522 Power Factor 45A Harmonic Distortion 46.2 Utility Voltage and Frequency Variation Test 4623 Reset Delay 46.4 Loss of Control circuit 47.3 Short Circuit Test 47.7 Load Transfer Test A description of key aspects of these procedures is provided in the testing procedures section of this Section. Separate test procedures are provided to certify Non-Islanding functions (Section J.3.d.) and Non-Exporting functions (Section J,3.e.), to determine the I n-rush Current tolerance of the Distribution System (Section J,3.f.), to subject the device to voltage surge conditions(Section J.3,g.). d. Anti-Islanding Test In addition to the above Type Tests, devices that pass the Anti-Islanding test procedure described in Section J.5.a.(2) will be considered Non-Islanding for the purposes of SCE's interconnection requirements. e. Non-Exporting Test In addition to the above Type Tests, devices that pass the Non-Exporting test procedure described in Section J.7.a. will be considered Non-Exporting for the purposes of SCE's interconnection requirements. (To beinserted byutility) issued by (To be^ inserted byCal. PUC) Advioa8-E-4 John R. Fielder Date Filed Jan 9, 2001 ---�� Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 ` � .. EDISON ~~~. Bouthern California Edison Original Cal. PUC Sheet No. 27861-E Rosemead, California Cancelling Ca/' PUC Sheet No. Rule 21 Sheet 39 GENERATING FACILITY INTERCONNECTIONS J. Generating Unit Testing And Certification Criteria 3. Type Testing (Continued) f. In-rush Current Test Generation equipment that utilizes SCE power to motor up to speed will be tested using the procedure defined in Section J.7.b- to determine the maximum current drawn during this startup process. The resulting In-rush Current is used to estimate the starting voltage drop. 9- Surge Withstand Capability Test Interconnection equipment shall be tested for surge withstand capability (SWC), both oscillatory and fast transient, in accordance with the test procedure defined in IEEE/ANSI C62.45 using the peak values defined in IEEE/ANSI C62.41 Tables 1 and 2 for location category B3. An acceptable result occurs even if the device is damaged by the surge, but is unable to operate or energize SCE's Distribution System. If the device remains operable after being subject to the surge conditions, previous type tests related to SCE's protection and power quality will need to be repeated to ensure the unit will still pass those tests following the surge test h. Synchronization Test This test verifies that the unit synchronizes within the specified voltage/frequency/phase angle requirements. It is applied to synchronous generators and inverters capable of operating as voltage-source while connected to the SCE. This test is not necessary for induction generators or current-source inverters. The test will start with only one of the three parameters: 1) voltage difference between Generating Facility and SCE's Distribution System, 2) frequency difference, or 3) phase angle outside of the synchronization specification. Initiate the synchronization routine and verify that the Generating Facility is brought within specification prior to synchronization. Repeat the test five times for each of the three parameters. For manual synchronization with synch check or manual control with auto synchronization, the test must verify that paralleling does not occur until the parameters are brought within specifications. 4. Production Testing As a minimum, the Utility Voltage and Frequency Variation Test procedure described in UL1741 under Manufacturing and Production Tests, Section 68 shall be performed as part of routine production (100 percent) on all equipment used to interconnect Generating Facilities to SCE's Distribution System. This testing may be performed in the factory or as part of a Commissioning Test (Section J.5.). (To beinserted byutility) Issued by (To beinserted byCal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision Effective Jan 9, 2081 x000 00-12-037 Resolution | EDISON Southern California Edison Original Cal- PUC Sheet No. 27962-E Rosemead, California Cancelling Cal. PUC Sheet No, Rule 21 Sheet 40 GENERATING FACILITY INTERCONNECTIONS (Continued) J. Generating Unit Testing And Certification Criteria 5. Commissioning Testing Commissioning Testing, where required, will be performed on-site to verify protective settings and functionality. Upon initial Parallel Operation of a Generating Facility, or any time interface hardware or software is changed that may affect the functions listed below, a Commissioning Test must be performed. An individual qualified in testing protective equipment (professional engineer, factory-certified technician, or licensed electrician with experience in testing protective equipment) must perform Commissioning Testing in accordance with the manufacturer's recommended test procedure to prove the settings and requirements of this Rule. SCE has the right to witness Commissioning Tests as described below, or to require written certification by the installer describing which tests were performed and their results. Functions to be tested during commissioning, particularly with respect to non-certified equipment, may consist of the following: a. Over and under-voltage b. Over and under-frequency C. Anti-Islanding function(if applicable) d. Non-Exporting function(if applicable) e. Inability to energize dead line f. Time delay on restart after utility source is stable 9- Utility system fault detection (if used) h. Synchronizing controls (if applicable) i. Other interconnection protective functions that may be required as part of the Generating Facility Interconnection Agreement Other checks and tests that may need to be performed include: a. Verifying final protective settings b. Trip test C. In-service test (Continued) (To be inserted by utility) Issued by (To be inserted by Cal, PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 40C9 00-12-037 Resolution souxx�n a-.u,r<mnu EDISQN cif .^iNTEAxAYidY.iz Campay *3 SRlSiI Southem California Edison Original Cal. PUC Sheet No. 27963-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 41 GENERATING FACILITY INTERCONNECTIONS (Continued) J. Generating Unit Testing And Certification Criteria 5. Commissioning Testing (Continued) a. Certified Equipment Generating Facilities qualifying for Simplified Interconnection incorporate Certified Equipment that have, at a minimum, passed the Type Test and Production Tests described in this document and are judged to have little or no potential impact on SCE's Distribution System. For such Generating Facilities, it is necessary to perform only the following tests: (1) Protection settings that have been changed after factory testing will require field verification. Tests will be performed using injected secondary quantities, applied waveforms, a test connection using a generator to simulate abnormal utility voltage or frequency, or varying the set points to show that the device trips at the measured (actual) utility voltage or frequency. (2) The Non-Islanding function will be checked by operating a load break disconnect switch to verify the interconnection equipment ceases to energize the line and does not re-energize for the required time delay after the switch is closed. (3) The Non-Exporting function will be checked using secondary injection techniques. This function may also be tested by adjusting the Generating Facility output and local loads to verify that the applicable Non-Exporting criteria(i.e., reverse power or under power)are met. The supplemental review or an Interconnection Study may impose additional components or additional testing. b. Non-Certified Equipment Non-certified equipment shall be subjected to the appropriate tests described in Type Testing (Section J.3.) as well as those described in Certified Equipment Commissioning Test (Section J.S.a.). With SCE's approval, these tests may be performed in the factory, in the field as part of commissioning, or a combination of both. SCE, at its discretion, may also approve a reduced set of tests for a particular application or, for example, if it determines it has sufficient experience with the equipment. (Continued) (To be inserted by utility) issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 _ 41c9 00-12-037 Resolution �����`�~�'���� �ou�henn�aUh�nmim Edison Original Cal. PUC Sheet No. 27864'E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 42 GENERATING FACILITY INTERCONNECTIONS JGENERATING UNIT TESTING AND CERTIFICATION CRITERIA 5Commissioning Testing (Continued) C. Verification of Settings Verifying final protective settings If the testing is part of the commissioning process, then, at the completion of such testing, the Producer shall confirm all devices are set to SCE-approved settings . This step shall be documented in the Commissioning Test Certification. d. Trip Tests Interconnection protective devices (e.g. reverse power relays) that have not previously been tested as part of the interconnection system with their associated interrupting devices (e.g. contactor or circuit breaker)shall be trip tested during commissioning. The trip test shall be adequate to prove that the associated interrupting devices open when the protective devices operate. Interlocking circuits between protective devices or between interrupting devices shall be similarly tested unless they are part of a system that has been tested and approved during manufacture. e. In-service tests Interconnection protective devices that have not previously been tested as part of the interconnection system with their associated instrument transformers or that are wired in the field shall be given an in-service test during commissioning. This test will verify proper wiring, polarity, CT/PT ratios, and proper operation of the measuring circuits. The in-service test shall be made with the power system energized and carrying a known level of current. A measurement shall be made of the magnitude and phase angle of each ac voltage and current connected to the protective device and the results compared to expected values. For protective devices with built-in metering functions that report current and voltage magnitudes and phase angles, or magnitudes of current, voltage, and real and reactive power, the metered values may be used for in-service testing. Otherwise, portable ammeters, voltmeters, and phase-angle meters shall be used. (To beinserted byutility) Issued by (To beinserted byCal. PUC) Advice 1408-E-A John R. Fielder Dab* Fi|ed Jan02001 Decision 00-11-001 Senior Vice President Effective Jan 92OO1 0 42C9 00-12-037 Resolution m _ . . - , M1111 Southern California Edison Original Cal. PUC Sheet No. 27965'E \ Rosemead, California Cancelling Cal. PUC Sheet No. GENERATING FACILITY INTERCONNECTIONS � Rule 21 Sheet 43 J. Generating Unit Testing And Certification Criteria 6. Periodic Testing Periodic Testing of Interconnection-related Protective Functions shall be performed as specified by the manufacturer, or at least every four years. All periodic tests prescribed by the manufacturer shall be performed. The Producer shall maintain periodic test reports or a log for inspection by SCE. Periodic Testing conforming to SCE test intervals for the particular line section may be specified by SCE under special circumstances, such as high fire hazard areas. A system that depends upon a battery for trip power shall be checked and logged once per month for proper voltage. Once every four years, the battery must be either replaced or a discharge test performed. 7. Supplemental Testing Procedures This section describes the additional Type Tests necessary to qualify a device as Certified for use on SCE and other California Electric Corporation's Distribution Systems. These Type Tests are not contained in Underwriters Laboratories UL 1741 Standard Inverters, Converters and Controllers for Use in Independent Power Systems, or other referenced standards, but are considered necessary for Certification by SCE and the other Electrical Corporations. a. Non-Exporting Test Procedures The Non-Exporting test is intended to verify the operation of relays, controllers and inverters designed to limit the export of power and certify the equipment as meeting the requirements of Step 2, Options 1 and 2, of the Initial Review Process. Tests are provided for discrete relay packages and for controllers and inverters that include the intended function. (1) Reverse Power Relay Test This version of the Non-Exporting test procedure is intended for stand-alone reverse power and under power relay packages provided to meet the requirements of Options I and 2 of the Non-Exporting Screen. It should be understood that in the reverse power application, the relay will provide a trip output with power in the export (toward the SCE Distribution System) direction. � (Tobe inserted by utility) Issued by (To be inserted by Cal, PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11'001 Senior Vice President Effective Jan 9, 2001 43C9 _u_0-1 2-037 Resolution � ' SOUINERN G4ffORNb EDISON CtlISaN I.Nx'E.a NATlON�Y.ComB+uY Southern California Edison Original Cal. PUC Sheet No. 27966-E Rosemead,California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 44 GENERATING FACILITY INTERCONNECTIONS (Continued) J. Generating Unit Testing And Certification Criteria 7. Supplemental Testing Procedures (Continued) a. Non-Exporting Test Procedures (Continued) (1) Reverse Power Relay Test (Continued) Step 1: Power Flow Test at Minimum, Midpoint and Maximum Pickup Level Settings Determine the appropriate secondary pickup current for the desired export power flow of 0.5 secondary watts(the agreed- upon minimum pickup setting, assumes 5 Amp and 120V CT/PT secondary). Apply nominal voltage with minimum current setting at zero (0) degrees in the trip direction. Increase the current to pickup level. Observe the relay's (LCD or computer display) indication of power values. Note the indicated power level at which the relay trips. The power indication should be within 2 percent of the expected power. For relays with adjustable settings, repeat this test at the midpoint, and maximum settings. Repeat at phase angles of 90, 180 and 270 degrees and verify that the relay does not operate (measured watts will be zero or negative). Step 2: Leading Power Factor Test Apply rated voltage with a minimum pickup current setting (calculated value for system application) and apply a leading power factor load current in the non-trip direction (current lagging voltage by 135 degrees). Increase the current to relay rated current and verify that the relay does not operate. For relay's with adjustable settings, this test should be repeated at the minimum, midpoint, and maximum settings. Step 3 Minimum Power Factor Test At nominal voltage and with the minimum pickup(or ranges) determined in Step 1, adjust the current phase angle to 84 or 276 degrees. Increase the current level to pickup (about 10 times higher than at 0 degrees) and verify that the relay operates. Repeat for phase angles of 90. 180 and 270 degrees and verify that the relay does not operate. ) (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9, 2001 Decision 00-11-001 Senior Vice President Effective Jan 9, 2001 _ 44c9 00-12-037 Resolution ' . ' E..'_~. ' ~~~�~~~~."~~~.- So��ernCa|h�mioEdi son Original Cal. PUC Sheet No. 2067E Rosemead, California Cancelling Cal. PUC Sheet No. � Rule 21 Sheet45 GENERATING FACILITY INTERCONNECTIONS J. Generating Unit Testing And Certification Criteria 7Supplemental Testing Procedures (Continued) a. Non-Exporting Test Procedures (Continued) (1) Reverse Power Relay Test (Continued) Step 4 Negative Sequence Voltage Test Using the pickup settings determined in Step 1, apply rated relay voltage and current at 180 degrees from tripping direction, to simulate normal load conditions (for 3-phase relays, use 1,at 180, That 60 and 1,at 300 degrees). Remove Phase-1 voltage and observe that the relay does not operate. Repeat for phase-2 and 3. Step 5 Load Current Test Using the pickup settings determined in Step 1, apply rated voltage and current at 180 degrees from the tripping direction, to simulate normal load conditions (use 1. at 180, lb at 300 and 1, at 60 degrees). Observe that the relay does not Step 6: Unbalanced Fault Test Using the pickup settings determined in Step 1, apply rated voltage and 2 times rated current, to simulate an unbalanced fault in the non-trip direction (use V. at 0 degrees, Vb and V, at 180 degrees, 1, at 180 degrees, lb at 0 degrees, and 1, at 180 degrees). Observe that the relay, especially single phase, does not mis-operate. Step 7: Time Delay Settings Test Apply Step 1 settings and set time delay to minimum setting. Adjust the current source to the appropriate level to determine operating time, and compare against calculated values. Verify that the timer stops when the relay trips. Repeat at midpoint and maximum delay settings. ` ! ( \ ` ! ^ \ ' (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-Ef\ John R. Fielder Date Filed Jan Q , 2001 Decision 00-11-001 Senior Vice President Effective Jan0 2O01 � � 45Co 00'12-037 Resolution = ____ EDISON u.CD{$!'.1.V INTExuwTfftN,�L a:amp�n> - } Southern California Edison Original Cal. PUC Sheet No. 27968-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 46 GENERATING FACILITY INTERCONNECTIONS (Continued) J. Generating Unit Testing And Certification Criteria 7. Supplemental Testing Procedures (Continued) a. Non-Exporting Test Procedures (Continued) (1) Reverse Power Relay Test (Continued) Step 8: Dielectric Test Perform the test described in IEC 414 using 2 kV RMS for 1 minute. Step 9: Surge withstand Perform the surge withstand test described in IEEE C37.90.1.1989 or the surge withstand test described in J.3.g. (2) Under Power Relay Test In the underpower application, the relay will provide a trip output when import power (toward the Producer's Generating Facility)drops below the specified power level. Note: For an underpower relay, pickup is defined as the highest power level at which the relay indicates that the power is less than the set setting. Step 1: Power Flow Test at Minimum, Midpoint and Maximum Pickup Level Settings Determine the appropriate secondary pickup current for the desired power flow pickup level of 5% of peak load (the agreed-upon minimum pickup setting). Apply rated voltage and current setting at 0 degrees in the direction of normal load current. Decrease the current to pickup level. Observe the relay's (LCD or computer display) indication of power values. Note the indicated power level at which the relay trips. The power indication should be within 2 percent of the expected power. For relays with adjustable settings, repeat the test at the midpoint, and maximum settings. Repeat at phase angles of 90, 180 and 270 degrees and verify that the relay operates (measured watts will be zero or negative). I0 (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) y Advice 1498-E-A John R. Fielder Date Filed Jan 9,2001 Decision 00-11-001 Senior Vice President Effective Jan 9,2001 4808 00-12-037 Resolution ` ED SON ~��~^�~~~~~�— ie Edison Original Cal. PUCSheetNo. 27969'E .� Rosemead, California Cancelling Cai, PUC Sheet No. ' Rule 21 Sheet 47 GENERATING FACILITY INTERCONNECTIONS J. GENERATING UNIT TESTING AND CERTIFICATION CRITERIA 7. Supplemental Testing Procedures (Continued) a. Non-Exporting Test Procedures (Continued) (2) Under Power Relay Test (Continued) Step 2: Leading Power Factor Test Using the pickup current setting determined in step 1, apply rated voltage and rated leading power factor load current in the normal load direction (current leading voltage by 45 degrees). Decrease the current to 145% of the pickup level determined in Step 1 and verify that the relay does not operate, For relays with adjustable settings, repeat the test at the minimum, midpoint, and maximum settings, Step 3: Minimum Power Factor Test At nominal voltage and with the minimum pickup (or ranges) determined in Step 1, adjust the current phase angle to 84 or 276 degrees. Decrease the current level to pickup (about 10% of the value at 0 degrees) and verify that the relay operates. Repeat for angles 90, 180 and 270 degrees and verify that the relay operates for any current less than rated Step 4: Negative Sequence Voltage Test Using the pickup settings determined in Step 1, apply rated relay voltage and 25% of rated current in the normal load direction, to simulate light load conditions. Remove Phase-1 voltage and observe that the relay does not operate, repeat for phase-2 and 3. Step 5: Unbalanced Fault Test Using the pickup settings determined in Step 1, apply rated voltage and 2 times rated current, to simulate an unbalanced fault in the normal load direction (use V, at 0 degrees, Vt, and V,at 180 degrees, 1, at 0 degrees, lb at 180 degrees,and 1,at 0 degrees). Observe that the relay, especially single phase, operates property. � / (To beinserted byutility) Issued by (To be inserted by Cal. PUC) Advice 1498'E-A John R. Fielder Dote Filed Jan 9, 2001 Decision Effective Jan 9, 2001 4nn 00'12-037 Resolution � ell50W1}ifRN Gi1F01WM �. EDISON Southern'Ca lifomia Edison Original Cal. PUC Sheet No. 27970-E Rosemead, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 48 GENERATING FACILITY INTERCONNECTIONS (Continued) J. Generating Unit Testing And Certification Criteria 7. Supplemental Testing Procedures (Continued) a. Non-Exporting Test Procedures (Continued) (2) Under Power Relay Test (Continued) Stern 6: Time Delay Settings Test Apply Step 1 settings and set time delay to minimum setting. Adjust the current source to the appropriate level to determine operating time, and compare against calculated values. Verify that the timer stops when the relay trips. Repeat at midpoint and maximum delay settings. Step 7: Dielectric Test Perform the test described in IEC 414 using 2 kV RMS for 1 minute. Step 8: Surge withstand Perform the surge withstand test described in IEEE C37.90.1.1989 or the surge withstand test described in Section J.3.g. (3) Functional Tests for Inverters and Controllers Inverters and controllers designed to provide reverse or under power functions shalt be tested to certify the intended operation of this function. Two methods are provided: Method 1: If the controller utilizes external current/voltage measurement to determine the reverse or underpower condition, then the controller shall be functionally tested by application of appropriate secondary currents and potentials as described in the Reverse Power Relay Test, Section J.7.a.(1) of this Rule. Method 2: If external secondary current or potential signals are not used, then unit-specific tests must be conducted to verify that power i cannot be exported across the PCC for a period exceeding two seconds. These tests may be factory tests, if the measurement and control points are part of a single unit, or may be provided for in the field. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1498-E-A John R. Fielder Date Filed Jan 9,2001 Decision 00-11-001 Senior Vice President Effective Jan 9„2001 4808 00-12-037 Resolution � Southern California Edison Original Cal. PUC Sheet No. 27971-E Rusornood, California Cancelling Cal. PUC Sheet No. Rule 21 Sheet 49 GENERATING FACILITY INTERCONNECTIONS J. Generating Unit Testing And Certification Criteria 7, Supplemental Testing Procedures (Continued) b. In-rush Current Tests This test will determine the maximum In-rush Current drawn by the unit. (1) Locked-Rotor Method Use the test procedure defined in NEMA MG-1 (manufacturer's data is acceptable if available). (2) Start-up Method Install and setup the Generating Facility equipment as specified by the manufacturer. Using a calibrated oscilloscope or data acquisition equipment with appropriate speed and accuracy, measure the current draw at the Point of Interconnection as the Generating Facility starts up and parallels with SCE's Distribution System. Startup shall follow the normal, manufacturer-specified procedure. Sufficient time and current resolution and accuracy shall be used to capture the maximum current draw within five percent. In-rush Current is defined as the maximum current draw from SCE during the startup process, using a 10-cycle moving average. During the test, the utility source, real or simulated, must be capable of maintaining voltage within +/ five percent of rated at the connection to the unit under test. Repeat this test five times. Report the highest 10-cycle current as the In-rush Current. A graphical representation of the time-current characteristic along with the certified In-rush Current must be included in the test report and made available to SCE. (To beinserted byutility) Issued by (To bainserted byCal. PUC) Advice 1498-E,A John R. Fielder Date Filed Jan 9, 2001 Decision OO-11'O01 Senior Vice President Effective Jan 9, 2001 49m8 00-12-037 Resolution � http://www.sce.coin/005_regu1_info/005a4_rules.shtml GENERATING FACILITY INTERCONNECTION AGREEMENT SOUTHERN CALIFORNIA EDISON CITY OF REDLANDS GFID 2630 APPENDIX B RULES: "T and "21 (and any other tariffs pertinent to the situation) (Provided by SCE) (Note: SCE's tariffs are included for reference only and shall at all times be subject to such changes or modifications by the Commission as the Commission may, from time to time, direct in the exercise of its jurisdiction.) January 3,2002(Form 14-731) VM � � . � ������.���> ( ���������t � � �> . . .» ..». ., ., ��, . « <����__�������. . : GENERATING FACILITY INTERCONNECTION AGREEMENT SOUTHERN CALIFORNIA EDISON CITY OF REDLANDS GFID 2630 APPENDIX C INTERCONNECTION FACILITIES FINANCING AND OWNERSHIP AGREEMENT January 3,2002(Form 14-731) A3 APPENDIX C CITY OF REDLANDS Interconnection Facilities Financing and Ownership Agreernent (GFID 2530) 1. PARTIES: The Parties to this Interconnection Facilities Financing and Ownership Agreement (IFFOA) are, City of Redlands (Producer), and Southern California Edison Company, (SCE). Producer and SCE are sometimes referred to herein individually as"Party,"and collectively as"Parties." 2. RECITALS: 2.1 Producer has applied to to aquire, operate, and control a 1213 kW(gross nameplate capacity) Generating Facility that will be operated in parallel with SCE's Distribution System. Said Generating Facility is described in Section I of the Generating Facility Interconnection Agreement ("GFIA" between the Parties to which this IFFOA is attached. SCE has assigned the Generating Facility identification number"GFID 2530"to this facility. 2.2 The electrical facilities described in Exhibit A, attached hereto, are required to connect Producers Generating Facility to the SCE Distribution System pursuant to SCE's Tariff Rule No. 21. Such electrical facilities are hereinafter referred to as "Interconnection Facilities"or"Added Facilities"depending on the financing and ownership arrangements selected by the Parties. 2.3 Pursuant to SCE's Tariff Rule No. 21 all or a portion of the Interconnection Facilities may be provided by SCE as"Added Facilities"as defined in SCE's Tariff Rule No. 2.1-1. 2.4 The Parties' respective scopes of work, costs and ownership responsibilities for the Interconnection Facilities are identified in Exhibit A, attached hereto. 3. AGREEMENT: The Parties agree as follows: 3.1 Unless otherwise defined herein, initially capitalized terms shall have the same meanings as defined in the GFIA. 3.2 The Parties agree to one or more of the arrangements as indicated in this Section 3.2 for the financing, design, installation, operation, maintenance, and ownership of the Interconnection Facilities described in Exhibit A, attached hereto. SCE-Financedl NO 3.2.1 SCE, at Producer's expense, shall finance, install, own, operate, and maintain all or a portion of the Interconnection Facilities described as"SCE-Financed Added Facilities" in Exhibit A, attached hereto; and/or Producer-Financed. B YES 3.2.2 SCE, at Producer's expense, shall install, own,operate, and maintain all or a portion of the Interconnection Facilities described as"Producer-Financed Added Facilities"in Exhibit A, attached hereto; and/or (NOTE: Pursuant to Edison's tariffs,SCE may only finance"removable"facilities. Additionally,SCE-Financed Added Facilities are availble to SCE's customers at SCE's sole discretion. January 3,2002 C-1 APPENDIX C CITY OF REDLANDS Interconnection Facilities Financing and Ownership Agreement (GFID 2630) Producer-Constructed and Conveyed NO 3.2.3 Producer shall finance, install, and transfer ownership of all or a portion of the Interconnection Facilities described as"Producer Constructed and Conveyed Interconnection Facilities"in Exhibit A attached hereto, to SCE for SCE to own, operate, and maintain at Producer's expense as"Producer-Financed Added Facilities"; and/or Producer-Constructed and Owned 0 YES 3.2.4 Producer shall finance, install, own, operate, and maintain all or a portion of the Interconnection Facilities described as"Producer- Constructed and Owned Interconnection Facilities" in Exhibit A, attached hereto. 4. TERM AND TERMINATION: 4.1 This IFFOA shall be binding upon execution by the Parties and shall remain in effect until terminated by(1) either Party on at least thirty (30)days advance written notice or(2)the end of the 20 year term provided under Sections 6.2 and/or 7.3 herein or (3)termination of the GFIA to which this IFFOA is attached. Upon termination, Producer shall pay all costs and charges incurred to the date of termination pursuant to Section 10.10 herein, including but not limited to charges for engineering, surveying, right-of-way and easement acquisition expenses or any other expense incurred by SCE for the Producer, even if the Interconnection Facilities have not been installed. 4.2 Producer agrees to utilize all Added Facilities described in Exhibit A, attached hereto, in accordance with good operating practice. If Producer fails to so utilize said Interconnection Facilities, SCE may terminate this IFFOA, remove the Added Facilities, and Producer shall be subject to the Termination Charge pursuant to Section 10.10 herein. S. PROJECT DEVELOPMENT MILESTONES: [This section is not applicable to this Agreement and has been intentionally omitted.] 6. INTERCONNECTION FACILITIES PROVIDED AS SCE-FINANCED ADDED FACILITIES: [This Section is not applicable to this Agreement and has been intentionally omitted.] 7. INTERCONNECTION FACILITIES PROVIDED AS PRODUCER-FINANCED ADDED FACILITIES: If the Parties have agreed to provide all or a portion of the Interconnection Facilities pursuant to the provisions of Section 3.2.2 herein, the following shall apply for that portion of the Interconnection Facilities specified in Exhibit A, attached hereto, as"Producer-Financed Added Facilities." 7.1 SCE shall, pursuant to SCE's Tariff Rule No. 21, engineer,design, procure equipment and materials, construct, install, own, operate, and maintain the Producer-Financed Added Facilities. 7.2 Producer shall pay to SCE in advance of construction,the estimated Total Installed Cost of said Producer-Financed Added Facilities, as set forth in Exhibit A, attached hereto, as may be revised pursuant to Sections 10.2 and/or 10.3, herein. If applicable, said cost shall include the estimated Income Tax Component of Contributions (ITCC), pursuant to SCE's Preliminary Statement as filed with the Commission and as may be revised from time to time. January 3,2002 C-2 APPENDIX C CITY OF REDLANDS Interconnection Facilities Financing and Ownership Agreement (GFID 2630) 7.3 In addition to the payment required under Section 7.2 herein, Producer shall pay a charge based on (1)the Added Facilities Investment in Producer-Financed Added Facilities as set forth in Exhibit A, attached hereto, as may be revised pursuant to Sections 10.2 and/or 10.3 herein, and (2)the monthly rate established for the replacement coverage option for"Customer-Financed Added Facilities"selected in this Section 7.3 as set forth in SCE's Rule No. 2.1-1 as filed with the Commission and as may be revised from time to time. Whenever Added Facilities are replaced, the Added Facilities Investment amount used as the basis for determining the charge Producer pays SCE shall be subject to the conditions set forth in Section 10.6 or 10.7 herein. Producer hereby selects a replacement coverage option for Producer- Financed Added Facilities as follows: NO (a) Replacement Coverage into Perpetuity Under this option, Producer shall pay to SCE, at SCE's sole option, either(SCE to select one): N/A (1) A Monthly Charge determined by SCE based upon an initial monthly rate of 0.43%times the Added Facilities Investment amount; or, N/A (2) A One-Time Payment determined by SCE representing the present value of the sum of the Monthly Charges ($-NLA-per month)for the Added Facilities Investment amount. 0 YES (b) Replacement Coverage with 20-Year Term Under this Option, for a term of 20 years beginning with the date said Added Facilities are first made available for Producer's use, Producer shall pay to SCE a Monthly Charge determined by SCE based upon an initial monthly rate of 0.37%times the Added Facilities Investment amount. At the end of the 20-year term, this IFFOA shall terminate. If the Parties elect to continue to utilize the Added Facilities past the term of this IFFOA, Producer and SCE may execute a new Added Facilities Agreement. If such an agreement is formed, a revised Added Facilities investment amount shall be determined by SCE on a RCNLD basis. NO (c) Without Replacement Coverage Under this option, Producer shall pay SCE a Monthly Charge determined by SCE based upon an initial monthly rate of 0.36 %times the Added Facilities Investment amount. 8. INTERCONNECTION FACILITIES PROVIDED AS PRODUCER-CONSTRUCTED AND CONVEYED INTERCONNECTION FACILITIES: [This Section is not applicable to this Agreement and has been intentionally omitted.] 9. INTERCONNECTION FACILITIES PROVIDED AS PRODUCER-CONSTRUCTED AND OWNED INTERCONNECTION FACILITIES: If the Parties have agreed to provide all or a portion of the Interconnection Facilities pursuant to the provisions of Section 3.2.4 herein, Producer is subject to the following for that portion of the Interconnection Facilities specified in Exhibit A, attached hereto, as "Producer-Constructed and Owned Interconnection Facilities:" January 3,2002 C-3 APPENDIX C CITY OF REDLANDS Interconnection Facilities Financing and Ownership Agreement (GFID 2530 9.1 At Producer's expense, Producer shall finance, engineer, design, acquire equipment and materials, construct, obtain rights-of-way as necessary, install, own, lease or rent, operate, and maintain the Producer-Constructed and Owned Interconnection Facilities. Said Interconnection Facilities shall be engineered,designed and constructed to be compatible with SCE's Distribution System and in accordance with SCE's Tariff Rule No. 21, as applicable. 9.2 SCE shall, at Producers expense, review Producers design and require modifications that SCE reasonably determines necessary to assure compatibility with SCE's electrical system and assure SCE system integrity. 9.3 Producer shall notify SCE at least thirty(30) days prior to the parallel operation of Producer's Generating Facility and SCE shall have the right to inspect the Producer- Constructed and Owned Interconnection Facilities and shall notify Producer of any deficiencies within five days after inspection. Producer must correct any deficiencies prior to parallel operation of the Generating Facility. 10. INTERCONNECTION FACILITIES BILLING: 10.1 Producer shall pay to SCE in advance of any construction by SCE, any one-time costs (including, when applicable, the Income Tax Component of Contribution (ITCC), pursuant to SCE's Preliminary Statement as filed with the Commission and as may be changed from time to time)to rearrange existing facilities and/or to provide facilities normally installed by the Producer as set forth in Exhibit A, attached hereto, as"One-Time Costs for Equipment or Services Provided by SCE for Producer." 10.2 Unless otherwise agreed in writing, the costs and charges paid by Producer pursuant to Sections 6.2, 7.2, 7.3, 8.2, 8.4, 8.7, 9.2, 10.1, and 14.14 herein shall Initially be based upon estimated costs. When the recorded book costs have been determined by SCE, the costs and charges paid by Producer under this IFFOA shall be revised to be based upon such recorded costs and adjusted retroactively to the date when service was first available by means of such Added Facilities. By executing this IFFOA, Producer has been informed and understands SCE's determination of recorded book cost is often delayed and that unless otherwise agreed, retroactive adjustments resulting from such determination may occur at anytime during the term of this IFFOA. All amounts billed under this IFFOA, unless other terms are mutually agreed upon, shall be payable to SCE within thirty(30)days from the date of presentation of a bill. Any credits resulting from such adjustments will, unless other terms are mutually agreed upon, be refunded to Producer. 10.3 SCE shall have the right to revise the initial estimated costs and bill Producer using such revised estimated costs during the period preceding determination of the recorded book costs. SCE shall indicate such revisions on Exhibit A,attached hereto, or a superseding Exhibit A and provide a copy to Producer. SCE shall commence billing the costs and charges paid by Producer pursuant to this IFFOA using such revised estimate not earlier than 30 days from the date the revised estimate is provided to Producer. 10.4 Pursuant to SCE's Tariff Rule No. 21, as an alternative to the estimated basis described in Sections 10.2, and 10.3 herein, SCE shall provide, at Producer's written request, a binding estimate of the Added Facilities Investment values which shall be used to determine Producer's payments under this IFFOA, except as such payments may be adjusted pursuant to Section 10.6 herein. Said binding estimate shall be valid for a period of one year from the date such estimate is provided to Producer. January 3,2002 C-4 APPENDIX C CITY OF REDLANDS Interconnection Facilities Financing and Ownership Agreement (GFID 2630) 10.5 The Monthly Charge to be paid by Producer pursuant to Sections 6.2 and 7.3 herein, shall automatically increase or decrease without formal amendment to this IFFOA if the Commission subsequently authorizes a higher or lower percentage rate in the calculation of the costs of ownership for Added Facilities as stated in Rule No. 2.H, effective with the date of such authorization. Further,the revised costs of ownership shall also be used to determine the unamortized balance of the One-Time Payment described in Sections 6.2(a) and 7.3(a) and owed to SCE due to termination of service, termination of this IFFOA, or otherwise. 10.6 If it becomes necessary for SCE to alter or rearrange the Added Facilities including, but not limited to,the conversion of overhead facilities to underground, Producer shall be notified of such necessity and shall be given the option to either terminate this IFFOA in accordance with Sections 4 and 10.9 herein, or to pay to SCE additional amounts consisting of: (a) Revised costs and charges based on the total net additional installed cost of all new and remaining Added Facilities. Such revised costs and charges shall be determined, as applicable, in the same manner as described in Sections 6.2 and 7.3 herein; plus (b) An additional payment of ITCC, and/or one-time cost, if any, for any new Added Facilities which shall be determined in the same manner as described in Sections 7.2 and 10.1 herein; plus (c) The cost to remove any portion of the Added Facilities that are no longer necessary because of alteration or rearrangement, such charge is to be determined by SCE in the same manner as described in Section 10.9 herein. 10.7 Whenever Added Facilities are replaced due to damage(caused by other than the Producer's intentional or negligent conduct) or equipment failure and Producer has selected replacement coverage pursuant to Sections 6.2(a)or(b)and/or Sections 7.3(a) or(b) herein, such replacement will be at SCE's expense with no change in the Added Facilities Investment amount. 10.8 Whenever Added Facilities are replaced (1) due to damage or equipment failure and Producer has selected the'Without Replacement Coverage"option pursuant to Sections 6.2(c) and/or 7.3(c) herein, or(2)due to Producer's increased load or generation levels, as determined by SCE, or(3) Producer's intentional or negligent conduct, such replacement will be made by SCE at the Producer's expense, including any applicable ITCC. Any additional amounts due to SCE as a result of such replacement shall be payable by the Producer to SCE within thirty (30)days from the date of presentation of a bill. If such replacement results in a change in the Added Facilities Investment, the Monthly Charges will be adjusted based on the revised added investment amount effective with the date the replaced Added Facilities are first available for Producers use. Except that,where the replacement of Added Facilities is solely required for SCE's operating convenience or necessity or because of damage caused by the sole negligence or willful act of SCE, no increase shall be made in the Added Facilities Investment amount or the Monthly Charge. 10.9 Except as otherwise provided in this IFFOA, SCE shall have the right to charge Producer under the terms and conditions of this IFFOA commencing with the date SCE, in its sole opinion, determines the Added Facilities are available for Producers use. January 3,2002 C-5 APPENDIX C CITY OF REDLANDS Interconnection Facilities Financing and Ownership Agreement (GFID 2530) 10.10 Upon discontinuance of the use of any Added Facilities due to termination of service, termination of this IFFOA, or otherwise: (a) Producer shall pay to SCE on demand (in addition to all other moneys to which SCE may be legally entitled by virtue of such termination) a Termination Charge defined as the costs estimated, subject to Sections 10.2 and 10.3, herein, by SCE to install and/or remove said facilities, less the estimated salvage value of the Added Facilities to be removed. Commencing in the sixteenth (16) year after the date service is first rendered by means of said Added Facilities, the Termination Charge shall be reduced by 20 percent each year until the total Termination Charge is zero. (b) SCE shall be entitled to remove and shall have a reasonable time in which to remove any portion of the Added Facilities located on the Producer's property. (c) SCE may, at its option, alter, rearrange, convey, or retain in place any portion of the Added Facilities located on property other than Producers property. Where all or any portion of the Added Facilities located on property other than Producers property are retained in place and used by SCE to provide permanent service to other customers,the facility Termination Charge described in Section 10.1 0(a), herein, shall be reduced by the recorded installed cost of the retained facilities. 10.11 SCE may, at its sole discretion at any time during the term of this IFFOA, require Producer to provide and maintain a performance bond, a letter of credit, an escrow account, or other security,to SCE's satisfaction, securing to SCE the payment of the Facility Termination Charge described in Section 10.10, herein. Producer's Failure to provide such security to SCE's satisfaction shall result in termination of this IFFOA. 10.12 Producer shall not be required to pay the Termination Charge specified in Section 10.10, herein if termination of the use of the Interconnection Facilities is caused solely by SCE. Termination pursuant to Section 4.2 herein or Section 4.1 of the GFIA shall be deemed not to have been caused solely by SCE. 10.13 Should any amount billed pursuant to this IFFOA not be paid by Producer, SCE shall at any time be entitled to collect such amounts through an offset against any amount SCE may owe to Producer. 11. GENERAL PROVISIONS: 11.1 Producers option to construct and own all of the Interconnection Facilities as "Producer-Constructed and Owned Interconnection Facilities"is limited to Interconnection Facilities that will interconnect with the SCE Distribution System at voltages of 35 kV and below. For interconnections at voltages above 35 kV, SCE shall, at its option, own and operate the last interfacing protection devices separating Producer's facilities from SCE's Distribution System. However, in such case, Producer shall have the option to provide and transfer ownership of such interfacing facilities to SCE, pursuant to Section 8 herein. 11.2 SCE shall not be obligated to begin construction of Added Facilities prior to Producers payment of all moneys due as described in Sections 6.2(a)(2), 7.2, 7.3(a)(2), 10.1, and 10.10 herein. January 3,2002 C-6 APPENDIX C CITY OF REDLANDS Interconnection Facilities Financing and Ownership Agreement (GFID 2530) 11.3 Where it is necessary to install Added Facilities on Producer's property, Producer hereby grants to SCE (a) the right to make such installation on Producer's property including installation of a line extension along the shortest practical route thereon and (b)the right of ingress to and egress from Producer's property as determined by SCE in its sole discretion for any purpose connected with the operation and maintenance of the Added Facilities. Producer shall provide rights-of-way or easements of sufficient space to provide legal clearance from all structures now or hereafter erected on Producer's property for any facilities of SCE. 11.5 Where formal rights-of-way or easements are required in, on, under, or over Producers property or the property of others for the installation of the Added Facilities, SCE shall not be obligated to install the Added Facilities unless and until any necessary permanent rights-of-way or easements, satisfactory to SCE, are granted without cost to SCE. Upon termination of this IFFOA in accordance with Section 4, SCE shall quitclaim all easements and rights of way in, on, under, and over Producer's property,which are, as determined by SCE in its sole discretion, no longer required by SCE due to the removal of its Added Facilities. 11.6 SCE shall not be responsible for any delay in completion of the installation of the Added Facilities including, but not limited to, delays resulting from shortage or labor or materials, strike, labor disturbances, war, riot,weather conditions, governmental rule, regulation, or order, including orders or judgments of any court or commission, delay in obtaining necessary rights-of-way and easements, act of God, or any other cause or condition beyond control of SCE. SCE shall have the right in the event it is unable to obtain materials or labor for all of its construction requirements, to allocate materials and labor to construction projects which it deems, in its sole discretion, most important to serve the needs of its customers, and any delay in construction hereunder resulting from such allocation shall be deemed to be a cause beyond SCE's control. 11.7 Added Facilities provided hereunder shall at all times remain the property of SCE. 11.8 This IFFOA supplements the appropriate application and contract(s)for electric service presently in effect between the Parties. 11.9 Producer may assign this IFFOA only with SCE's written consent. Such consent shall not be unreasonably withheld. Such assignment shall be deemed to include, unless otherwise specified therein, all of Producer's rights to any refunds,which might become due upon discontinuance of the use of any Added Facilities. H January 3,2002 C-7 APPENDIX C CITY OF REDLANDS Interconnection Facilities Financing and ownership Agreement (GFID 2530) 12. GOVERNING LAW This IFFOA shall be interpreted, governed, and construed under the laws of the State of California as if executed and to be performed wholly within the State of California and shall, to the extent provided by law, at all times be subject to applicable tariff rules and modification of such rules as directed by the California Public Utilities Commission in the exercise of its jurisdiction. 13. SIGNATURES IN WITNESS WHEREOF,the Parties hereto have caused two originals of this IFFOA to be executed by their duly authorized representatives. This IFFOA is effective as of the last date set forth below. CITY OF REDLANDS SOUTHERN CALIFORNIA EDISON COMPANY By: By: Name: Karl N. "Kaley"Haws Name: Lars E. Bergmann Title: Mayor Title: Director, QF Resources Date: February 5, 2002 Date: February 13 , 2002 Attest: By: orrio Poyzer�, i y Clerk January 3,2402 C-8 EXHIBIT A to APPENOM C CITY OF REDLANDS Interconnection Facilities Financing and Ownership Agreement (GFID 2530) Summary of Ownership and Cost Responsibilities 1. Added Facilities Investment for Producer-Financed Facilities(Provided per section 3,2.2) Interconnection Facilities Firm Component Original Revised Recorded Price Estimate Estimate Cost (per 10.4) Extend 12kv Neutral $198,069.00 Conductor to Site of Generating Facility DWO 6031-8402:1-8401 Extend 12kv Neutral $25,986.00 Conductor on Site of Generating Facility DWO 6031-8403:1-8402 Construct Ground Bank $30,875.00 DWO 6431-8401:1-8403 Total Added Facilities $254,930.00 Investment Income Tax Component of $86,676.20 Contribution QTCC) (34%) Total Amount to be $3411606.20 Advanced by Producer SCE Service Account#For New Monthly Billing 019-7275-18 2. Estimated Termination Charge Applicable to Producer-Financed Facilities Original Revised Estimate Estimate Removal Costs $75,000 Note: While there are no Security Deposit Requirements for the potential cost of removing Producer-Financed Facilities, Producer is responsible for such costs, subject to the reductions which occur during the 16th through 20th years. January 3,2002 C-A-1 EXHIBIT A to APPENDIX C CITY OF REDLANDS Interconnection Facilities Financing and Ownership Agreement (GFID 2530) Summary of Ownership and Cost Responsibilities 3. One-Time Cost For Equipment or Services Provided by SCE for Producer Provided per Sections 7.2,8.1,8.2,8.4 9.2,and 10.1 Interconnection Facilities Original Revised Recorded Firm Component Estimate Estimate Cost Price Per 10.1 Temporary Service DWO 6431-8808:1-8854 New Business Service $589.60 DWO 6531-2053:1-2242 Total Amount To Be $19,180.76 Advanced By Provider 4. Description of Producer-Constructed and Owned Facilities(Provided per Section 3.2.4) Interconnection Facilities Component a. All generating unit protective relays, controls and switchgear. b. All ducts, conduits and structures used in conjunction with the interconnection facilities. Note: Cost information need not be provided for Producer-Constructed and Owned Facilities. Service Date Information Original Date Requested by Producer June 1,2002 Date Partial Service Available Date Full Service Available Note: If partial service is provided, only those costs associated with the facilities actually available to the Producer are to be included in the Added Facility Investment Amount until full service is made available. Documentation shall be made available showing the dates and details of such phased service arrangements. Preparation and Revision Log for Exhibit A Prepared/ Prepared/ Revised by: Date Reason Revised b . Date Reason 1 T.Gabih/T,Dossey 113/02 initial Estimate 3 January 3,2DO2 C-A-2 ­��V .j EDISON ^.°~�~~_"~~ ~~�, So�bemCsd�omkaEdiaon Revised Cal. PUC Sheet No. 24131'E Rosemead, California Cancelling Original Cal. PUC Sheet No. 22049-E SCHEDULE DL-NBC Sheet 1 of 2 DEPARTING LOAD NONBYPASSABLE CHARGES APPLICABILITY Applicable to Departing Load Customers. This Schedule provides for determination of the monthly amount of Competition Transition Charge (CTC), Nuclear Decommissioning Charge (NDC), Public Purpose Programs Charge (PPPC), and Fixed Transition Amount Charge (FTAC) for Departing Load Customers who are not exempt from such charges as set forth in the Special Conditions below. TERRITORY Within the entire territory served. RATES The Departing Load Customer's bill shall be an amount equal to the sum of the customer's CTC, NDC, PPPC, and FTAC obligations for the billing period. The CTCis the surn [oilowing rates tinder the Otherwise Applicable Tariff (OAT) multiplied by the Customer's billing determinants: a. The Generation portion of the Customer Charge for the OAT as set forth in the Rate Components Section of such tariff, if applicable; b. The Generat"on portion of th,,:� p=-r kW monthly Demand Charges for the OAT as set forth i� the, Rate Components Sc!f:.tion of such tariff, if applicable-, C. The CTC portion of the per kWh Energy Charge which is calculated by subtracting the average Power Exchange (PX) Energy Cost determined in accordance with Schedule PX, from the Generation portion of the per kWh Energy Charge for the OAT as set forth in the Rate Components Section of such tariff, for each Time-of-Use period. if applicable. clThe Generation portion of all other charges for the OAT as set forth in the Rate Components Section of such tariff, if app�licable, (To beinserted byutility) |oeuedby (To beinserted byCal. PUC) Advice 1245-E-B John Fielder Date Filed Decision 97-08-056 Effective {|E148'12.[)[)C Vice President Resolution -- AEDISON 10"I", � o­'u­t'h`e`r,n_-C-a I-if_o_m,i a Edison Revised Cal. PUC Sheet No. 24132-E Rosemead, California Cancelling Original Cal. PUC Sheet No. 22050-E SCHEDULE DL-NBC Sheet 2 of 2 DEPARTING LOAD NONBYPASSABLE CHARGES (Continued) RATES (Continued) 2. The NDC is calculated by multiplying the kWh for the billing period by the NDC rate set forth in the Rate Components Section for the OAT. 3. The PPPC is calculated by multiplying the kWh for the billing period by the PPPC rate set forth in the Rate Components Section for the OAT, 4. The FTAC is calculated by multiplying the kWh for the billing period by the FTAC rate set forth in the Rate Components Section for the OAT, if applicable. For customers served on Schedule S, Standby, the CTC obligation as set forth above will be reduced by the CTC billed under Schedule S, Standby, which will be the generation portion of all charges applicable under Schedule S, Standby, as set forth in the Rate Components Section of Schedule S. When the Departing Load is a result of an event that also reduces the amount of transition costs incurred by Edison, the amount of the CTC will be adjusted by a credit in the amount of the transition costs avoided. The amount of the credit will be equal to the difference between the amount of transition costs before the occurrences of the specific event and the amount of transition costs after the event has occurred. SPECIAL CONDITIONS 1. Departing Load: Departing Load is that portion of Edison's customer's electric load for which the customer, on or after December 20, 1995: (a) discontinues or reduces its purchases of electricity supply and delivery services from Edison; (b) purchases or consumes electricity supplied and delivered by sources other than Edison to replace such Edison purchases-, and (c) remains physically located at the same location or within Edison's service area as it existed on December 20, 1995. Reduction in load qualifies as Departing Load only to the extent that such load is subsequently served with electricity from a source other than Edison and is not residential load served by a solar electrical generating facility with a capacity of not more than 10 kilowatts. 2. Bill Calculation: The Departing Load Customer's CTC, NDC, PPPC, and FTAC obligations will be based on metered consumption. If reliable metered consumption information is not made available to Edison, Edison will estimate the consumption based on that customer's historical load at the time the customer discontinues or reduces retail service with Edison. Further, when Departing Load previously served by Edison is served by another entity whose charges include the PPPC, such Departing Load Customer will not be billed the PPPC by Edison. rise Applicable Tariff -dUle under which service 01herA The customer's regu�ar�v filed rate sche was rendered. (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1245-E-B John Fielder Date Filed Decision 97-08-056 Effective CE148-12.DOC Vice President Resolution FDISON Southam Galifomia Edison Revised Cal.PLIC Sheet No. 26534-E Rosemead, California Cancelling Revised Cal. PLC Sheet No. 24761-E Schedule S Sheet 1 of 5 STAN7BY _AEPLICABILITY Applicable to customers taking service under a regular service rate schedule and where a part or all of the electrical requirements of the customer can be supplied from a generating facility as defined, interconnected, and operated in accordance with Rule 21. A generating facility may be connected for: (1) parallel operation with the service of the Company; or (2) isolated operation with standby or breakdown service provided by the Company by means of a double throw switch. TERRITORY Within the entire territory served. RATES Per Meter Standby Charge: Service Voltage Per Mont All kW of Standby Demand, per kW. ............. Below 2 kV $6.40 All kW of Standby Demand, per kW.................... 2 kV to 50 kV $6.60 All kW of Standby Demand, per kW.................... Above 50 kV $0.65 Generation Reservation Charge (to be added to Standby Charge) Applicable to customers newly taking service under this schedule as of May 1, 1996: All kW of Standby Demand, per kW.................... Below 2 kV $0.37 All kW of Standby Demand, per kW.................... 2kVto50kV $0.36 All kW of Standby Demand, per kW.................... Above 50 kV $0.35 Applicable Schedule Charges (to be added to Standby Charge and Generation Reservation Charge): The Facilities Related Component of the Demand Charges designated in the applicable regular service rate schedule shall be applied to all kW of Facilities Related Billing Demand in the current month less Standby Demand but in no case applied to a difference less than zero. All other charges including any minimum charges and provisions of the applicable regular service rate schedule designated in the Generation Agreement or the Contract for Electric Service shall apply. For customers served under this schedule whose regular service rate is Schedule TOU-8, the Standby and Generation Reservation Charges are excluded from the Peak Period and Average Rate Limiter calculation provided in Schedule TOU-8. The rate components used for customer billing are determined using the components shown in the Rate Components Section following the Special Conditions Section. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1410-E-A John Fielder Date Filed F .-e,b 14, 2000 Decision Effective Feb 14, "000 C79-12.doc Vice President Resolution E-3652 FIDISON Southern Gaii-o­m'i a Edison Revised Cal. PUC Sheet No. 24762-E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 24140-E Schedule S Sheet 2 of 5 STANDBY (Continued) SPECIAL CONDITIONS 1. Contract: A Contract is required for service under this schedule. 2. Generation Agreement: A Generation Agreement with the customer shall be required for service under this schedule where the cogeneration or small power production source is connected for parallel operation with the service of the Company. 3. Standby Demand: The level of standby demand shall be set forth in the Generation Agreement or Contract for Electric Service. The level of standby demand shall be determined by the Company and shall be the lower of (a) the nameplate capacity of the customer's generating facility;or(b)the Company's estimate of the customer's peak demand. The Company reserves the right to install, at the customer's expense, a demand meter to measure the customers demand. The highest recorded demand shall be used to determine the customer's level of standby demand, 4. Allowance for Maintenance: After a customer has received service under this schedule for a period of six months, the added demand created by scheduled maintenance outages of the generating facility will be ignored for purposes of determining the Time Related Component of the demand charges under the applicable regular service rate schedule in months acceptable to the Company upon advance notice and subject to prevailing system peak conditions, subject to the conditions stated herein. Such conditions are that customer schedule and perform maintenance in accordance with the advance notice, outage duration, and outage frequency requirements set forth in the Generation Agreement, and following the period of scheduled maintenance,customer shows, to the satisfaction of the Company, what part of the recorded maximum demand utilized for billing in any of the months was added demand due to outage for such scheduled maintenance. This condition is applicable for one continuous outage per year of up to 30 consecutive days. The Company may, at its option, require that the customer defer scheduled maintenance. If scheduled maintenance is deferred, the Company will allow an outage for maintenance at a later date with allowance for maintenance in accordance herewith. Notice of such deferral,if required, shall be provided to the customer not less than 60 days prior to customer's scheduled outage date, except in the event of emergency. The Allowance for Maintenance applies only to customers served on a rate schedule which has a Time Related Component within the demand charge. 5. Excess Energy: For parallel connections, the customer may sell power to the Company under the terms of the Generation Agreement. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1312-E Jghn Fielder Date Filed May 05199§ Decision Effective Jun 14, 1998 CE79-12.doc Vice Presidgnt Resolution F1131SON Southern California Edison Revised Cal. PUC Sheet No. 26297-E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 24763-E Schedule S Sheet 3 of 5 STANDBY (Continued) SPECIAL CONDITIONS & Billing: A Customer's bill is first calculated according to the total rates and conditions above. The following adjustments are made depending on the option applicable to the customer. a. Bundled Service Customers receive supply and delivery services solely from Edison. The Customer's bill is based on the total rates set forth above. The Power Exchange (supply) component is equal to the Averaged Power Exchange (PX) Energy Charge as set forth in Schedule PX b. Direct Access Customers purchase energy from an Energy Service Provider and continue receiving delivery services from Edison. The Averaged PX Energy Charge is determined as specified for a Bundled Service Customer. The customer's bill will be calculated as for a Bundled Service Customer, but the Customer will receive a credit for the Averaged PX Energy Charge. C. Hourly PX Pricing Option Customers receive supply and delivery services solely from Edison. A Customer taking Hourly PX Pricing Option service must have an interval meter installed at its premise to record hourly usage, since PX Energy Costs change hourly. If such metering is not currently installed, it shall be installed at the customer's expense before Hourly PX Pricing can be provided. Edison's charges for such metering are determined as set forth in Rule 2. The bill for a Hourly PX Pricing Option Customer is determined by calculating the bill as if it were for a Bundled Service Customer, then crediting the bill by the amount of the Averaged PX Energy Charge, as determined for Bundled Service and Direct Access Customers, then adding the hourly PX Energy Cost amount which is determined by multiplying the hourly energy used in the billing period by the hourly PX Energy Cost determined as set forth in Section 1 of Schedule PX, and the appropriate hourly Line Loss Adjustment Factors as set forth in Section 3 of Schedule PX, and the Uncollectibles expense factor of 1.00313. 7. Generation Charge: The generation charge is calculated based on the total rate less the sum of. Distribution, Transmission, Public Purpose Programs, Nuclear Decommissioning, and Fixed Transition Amount (where applicable) charges, the Transmission Revenue Balancing Account Adjustment (TRBAA), and the Public Utilities Commission Reimbursement Fee. The Competition Transition Charge (CTC) is calculated residually by subtracting the Averaged PX Energy Charge calculated as set forth in Schedule PX from the generation charge (See Rate Components Table). & Negotiating of CTC Payment Method: Nothing in this rate schedule prohibits a marketer or broker from negotiating with Customers the method by which their Customer will pay the CTC. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1403-E Jahn Fielder Date Filed Sec 15. 1229 Decision 99-06-058 Effective Jun 10. 1229 CE79-12.doc Senior 1/.ice President Resolution ------------- 3 IFF)ISON Southern California Edison Original Cal. PUC Sheet No. 24764-E Rosemead, California Cancelling Cal. PUC Sheet No. -E Schedule S Sheet 4 of 5 STANDBY (Continued) SPECIAL CONDITIONS (Continued) 9. Exemptions under Public Utilities Code, Section 380: "Eligible customers", as defined in Public Utilities(P.U.)Code Section 380, who operate a microgeneration facility are exempt from paying standby charges under this Schedule. An "eligible customer" is defined in P.U. Code Section 380 as a customer who has installed a microgeneration facility as defined in P.U. Code Section 331(f)on or after March 31, 1998 if that facility meets all of the following requirements: a. Is operated in parallel with SCE's transmission and distribution system, b. Is subject to SCE's Schedule S, Standby, and C. Is in full compliance with the best available control technology(SACT}. A microgeneration facility is defined in P.U. Code Section 331(f) as "a cogeneration facility of less than one megawatt." Such exemptions shall not exceed a cumulative load of one megawatt (1 MW) and shall expire on June 30,2000. (Continued) (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 1312-E John Fielder Date Filed May 05, 1998 Decision Effective Jun 14, 1228 CE79-12.doc Vice President Resolution ~ ` . E0»0SOPN ~~~~~.�~~~~.�� 8o�bemCmUfomkaEdison Revised Cal. PUC Sheet No. 24785-E Rosemead, California Cancelling Original Cal.PUC Sheet No. 24142-E Schedule S Sheet 5 STANDBY RATE COMPONENTS Rate Cononents Table Rate Schedule Summary Trans' Distrbtn� Genl4 I NDC5 I PPPC' I TRBAA71 PUCRF' Total Above 50 kV 0-15 014 016 0 Generation Reservation Charge-S,'kW Above 50 kV 0.00 0.00 0.35 035 Trans=Transmission Gen=Generation Competition Transition Charge(CTC)=Total Generation charge mmus Averaged Power Exchange(PX)Energy Charge as set forth in Schedule PX.. NDC Nuclear Decommissioning Charge PPPC Public Purpose Programs Charge(includes California Aftemate Rates for Energy Surcharge and Discount where applicable.) TRBAA=Transmission Revenue Balancing Account Adjustment PUTCRF=The PUC Reimbursement Fee is described in Schedule RF-E, FTAC=The Fixed Transition Amount Charge is described in Schedule PRB, (To beinsetted byutility) Issued by (To beinserted byCal. PUC) Advice 1312'E John R. Fielder Date Filed May G 18&8 Decision Senior Vice President Effective Jun 14, 1998 ,c, Resolution