Loading...
HomeMy WebLinkAboutContracts & Agreements_32-2003_CCv0001.pdf AGREEMENT TO FURNISH PROFESSIONAL SERVICES FOR HAZARDOUS MATERIALS BUSINESS PLANS AND RISK MANAGEMENT PLAN AUDITS FOR WATER PRODUCTION FACILITIES This Agreement is made and entered into this 4th day of March 2003, by and between the City of Redlands, a municipal corporation (hereinafter "City") and Resource Management Services, Inc., hereinafter("Consultant"). In consideration of the mutual promises, covenants and conditions hereinafter set forth, City and Consultant hereby agree as follows: ARTICLE I - ENGAGEMENT OF CONSULTANT 1.1 City hereby engages Consultant, and Consultant hereby accepts the engagement,to perform professional environmental services ("Services") for preparation of Hazardous Materials Business Plans and RMP Compliance Audits at and for various facilities (See Attachment "A")within the City of Redlands, California("Project"). 1.2 The Services shall be performed by Consultant in a professional manner, and Consultant represents that it has the skill and the professional expertise necessary to provide high quality Services for the Project at the level of competency presently maintained by other practicing professional engineers in the industry providing like and similar types of services. ARTICLE 2 - SERVICES OF CONSULTANT 2,1 The specific Services which Consultant shall perform are more particularly described in Attachment"A,"entitled"Scope of Work,"which is attached hereto and incorporated herein by this reference. ARTICLE 3 - RESPONSIBILITIES OF CITY 3.1 City shall make available to Consultant information in its possession that is pertinent to the performance of Consultant's Services. 12 City will provide access to and make provisions for Consultant to enter upon City-owned property or right-of-way as required by Consultant to perform the Services. 33 City designates Greg Gage, Project Manager, to act as its representative with respect to the Z=1 Services to be performed under this Agreement. ARTICLE 4 - PERIOD OF SERVICE 4.1 Consultant shall perform the Services in a prompt and diligent manner and in accordance I with the schedule set forth in Attachment"B", entitled "Project Schedule". ARTICLE 5 - PAYMENTS TO THE CONSULTANT AND NOTICE 5.1 The total compensation for Consultant's performance of the Services shall not exceed the amount of$74,600. City shall pay Consultant on a fixed fee basis up to the not to exceed amount,in accordance with Attachment"C",entitled"Project Fee"based on the hourly rates shown in Attachment "D", entitled "Schedule of Fees". 5.2 Consultant shall bill City for services by submitting an invoice indicating the Services performed,who performed the Services, indirect costs, and the detailed cost of all Services including backup documentation. Payments by City to Consultant shall be made within 30 days after receipt and approval of Consultant's invoice, by warrant payable to Consultant. 5.3 All contractual notices, bills and payments shall be made in writing and may be given by personal delivery or by mail. Notices,bills and payments sent by mail shall be addressed as follows: Cily Consultant Greg Gage Pankaj Garg Municipal Utilities Department Resource Management Services, Inc. 35 Cajon Street 7304 Celata Lane P. O. Box 3005 San Diego, CA 92129 Redlands, CA 92373 When so addressed, such notices shall be deemed given upon deposit in the United States Mail. In all other instances, notices,bill and payments shall be deemed given at the time of actual delivery. Changes may be made in the names and addresses of the person to whom notices,bills, and payments are to be given by giving notice pursuant to this paragraph. ARTICLE 6 - INSURANCE AND INDEMNIFICATION 6.1 Consultant's Insurance to be�Prnmar7 All insurance required by this Agi-eerrient,is to be maintained by Consultant for the duration of this Project and shall be primary With respect to City and non-contributing to any insurance or sell' -insurance maintained by the City. Consultant shall not perform any services pursuant to this Agreement unless and until all required insurance listed below is obtained by Consultant. Consultant shall provide City with Certificates of'Insurance and endorsements evidencing such insurance prior to conirrienceirient of work. All insurance policies shall include a provision prohibiting cancellation of the policy except upon thirty (30) days prior written notice to City. 6.2 Workers' Compensation and f�m lover's Liability A. Consultant shall secure and maintain Worker Compensation and Employer's Liability 2 insurance throughout the duration of this Agreement in amounts which meet statutory requirements with an insurance carrier acceptable to the City. B. Consultant expressly waives all rights to subrogation against the City, its officers, employees and volunteers for losses arising from work performed by Consultant for City by expressly waiving Consultant's immunity for injuries to Consultant's employees and agrees that the obligation to indemnify,defend and hold harmless provided for in this Agreement extends to any claim brought by or on behalf of any employee of Consultant. This waiver is mutually negotiated by the parties. This shall not apply to any damage resulting from the sole negligence of City, its agents and employees. To the extent any of the damages referenced herein were caused by or resulted from the concurrent negligence of City,its agents or employees,the obligations provided herein to indemnify,defend and hold harmless is valid and enforceable only to the extent of the negligence of Consultant, its officers, agents and employees. 6.3 Comprehensive General Liability Insurance. Consultant shall secure and maintain in force throughout the duration of the Agreement comprehensive general liability insurance with carriers acceptable to City. Minimum coverage of one million dollars ($1,000,000) per occurrence and two million dollars ($2,000,000) aggregate for public liability,property damage and personal injury is required. Consultant shall obtain an endorsement that City shall be named as an additional insured. 6.4 Professional Liability Insurance. Consultant shall secure and maintain professional liability insurance throughout the duration of this Agreement in the amount of one million dollars 01,000,000) per claim made. 6.5 Business Auto Liability Insurance. Consultant shall have business auto liability coverage,with minimum limits of one million 01,000,000)per occurrence,combined single limit for bodily injury liability and property damage liability. This coverage shall include all consultant owned vehicles used on the project, hired and non-owned vehicles, and employee non-o-Vvilership vehicles. Consultant shall obtain an endorsement that the City shall be named as an additional insured. 6.6 A-ssiggment,and Insurance Requirements. Consultant is expressly prohibited from subletting or assigning any of the services covered by this Agreement without the express written consent of City. In the event of mutual agreement between parties to sublet a portion of the Services, the Consultant will add the subcontractor as an additional insured and provide the City with the insurance endorsements prior to any work being performed by the subcontractor. Assignment does not include printing or other customary reimbursable expenses that may be provided in this Agreement. 6.7 Hold Harmless and Indemnification. Consultant shall defend,indemnify,and hold harmless City and its elected officials,employees and agents from and against any and all actions,claims, demands,lawsuits,losses and liability for damages to persons or property,including costs and attorney fees,that may be asserted or claimed by any person,firm,entity,corporation,political 3 subdivision or other organization arising out of or in connection with Consultant's negligent and/or intentionally wrongful acts or omissions under this Agreement; but excluding such actions, claims, demands, lawsuits and liability for damages to persons or property arising f'rorn the sole negligence or intentionally w-rongful acts ol'City,its officers,employees or agents. ARTICLE 7 - GENERAL CONSIDERATIONS 7.1 In the event any action is commenced to enforce or interpret any of the terms or conditions of this Agreement the prevailing party shall,in addition to any costs and other relief,be entitled to the recovery of its reasonable attorneys' fees. 7.2 Consultant shall not assign any of the Services required by this Agreement,except with the prior written approval of City and in strict compliance with the terms, provisions and conditions of this Agreement. 7.3 Consultant's key personnel for the Project are: Project Manager: Pankaj Garg Consultant agrees that the key personnel shall be made available and assigned to the Project, and that they shall not be replaced without concurrence from City. 7.4 All documents, records, drawings, designs, costs estimates, electronic data files and databases and other Project documents developed by the Consultant pursuant to this Agreement shall become the property of City and shall be delivered to City upon completion of the Services or upon the request of City. Any reuse of such documents for other projects and any use of incomplete documents will be at City's sole risk. 7.5 Consultant is for all purposes an independent contractor. All personnel employed by Consultant are for its account only, and in no event shall Consultant or any personnel retained by it be deemed to have been employed by City or engaged by City for the account of or on behalf of City, 7.6 Unless earlier terminated, as provided for below, this Agreement shall terminate upon completion and acceptance by City of the Services. 7.7 This Agreement may be terminated by the City, without cause, by providing ten (10) days prior written notice to the Consultant(delivered by certified mail,return receipt requested)of intent to terminate. 7.8 Upon receipt of a termination notice, Consultant shall(1)promptly discontinue all services affected, and(2) deliver or otherwise make available to City, copies(in both hard copy and electronic form,where applicable)of any data,design calculations,drawings,specifications, reports, estimates, summaries and such other information and materials as may have been 4 accumulated by Consultant in performing the Services required by this Agreement. 7.9 This Agreement, including the attachments incorporated herein by reference,represents the entire agreement and understanding between the parties and any prior negotiations,proposals or oral agreements are superseded by this written Agreement. Any amendment to this Agreement,to be effective, shall be in writing and approved by the City Council of City and signed by City and Consultant. 7.10 This Agreement shall be governed by and construed in accordance with the laws of the State of California. 5 IN WITNESS WHEREOF,duly authorized representatives of the City and Consultant have signed in confirmation of this Agreement. City of Redlands Resource Management Services, Inc. ("City") ("Consultant") By: KARL N. HAWS PANKAJ GARG � Mayor Director ATTEST: Citi Clerk, City � elands 6 AGREEMENT TO FURNISH ENGINEERING SERVICES FOR THE PREPARATION OF HAZARDOUS MATERIALS BUSINESS PLANS AND RISK MANAGEMENT PLAIN AUDITS FOR WATER PRODUCTION FACILITIES ATTACHMENT A SCOPE OF WORK Scope of Work Item A: Preparation of Hazardous Materials Business Plans (HMBPs) and HMBP Support Services: The City of Redlands,Water Utilities Department owns and operates the following sites: 1. Henry Tate Water Treatment Plant; 2. Horace Hinckley Water Treatment Plant; 3. Highland Avenue Reservoir(Boosters 2174,2176, 2177, 1720, 1721, and 1722); 4, Yucaipa Blvd. Booster 2330; 5. Agate Well No. 2; 6. Airport Well No. 1; 7. Airport Well No. 2; 8. Church Street Well; 9. East Lugonia Well No. 3; 10. East Lugonia Well No. 4; 11. East Lugonia Well No. 6; 12. Madeira Well; 13. Magnet Well No. 2; 14- Mentone Acres Well; 15, Orange Street Well; 16. Orange Well Field(New Project,begins operating June 2003); 17. Rees Well; 18. Well No. 31-A; 19. Well No. 38; and 20. Well No. 39. Each of these sites is required to prepare a Hazardous Materials Business Plan(HMBP)under the chemical inventorying requirements set forth in the state of California Health and Safety Code,Division 20, Chapter 6.95, Sections 25500-25520; the California Code of Regulations, Title 19, Chapter 2, Subchapter 3,Article 4, Sections 2729-2734; and Title 40 of the Code of Federal Regulations. The Hazardous Materials Division of the San Bernardino County Fire Department administers these regulations. The definition of hazardous substance set forth in the cited regulations is fairly broad and includes any material for which the manufacturer has developed a material safety data sheet(MSDS). For the above-listed sites 1, 2 and 3 (i.e., the Henry Tate WTP Horace Hinckley'VVTP and the Highland Avenue Water CorMlex)the Scope of Work will consist of the following,,: A.Ll. Resource Management Services (RMS) will provide the City of Redlands Project Manager (Project Manager) with a preliminary listing of all administrative information that will be required for each of the three sites. A.1.2. The Project Manager will provide RMS with a preliminary listing identifying all hazardous substances(including wastes)believed to be present at each of the three facilities. A.1.3. The Project Manager will provide RMS with the Administrative information identified under Item A.I above, A-] A.1.4. The Project Manager(through the City's GIS Department) will provide RMS with base-maps of each of the three sites. At least three separate base-maps will be provided as follows: a. An area map (usually with a USGS Topographic Series Map) indicating the location of the site in relation to major highways, etc..- b. An aerial view of the site indicating the facility's boundary or fence-line and the layout of buildings,tanks etc. (i.e., a plot plan);and c. An overhead drawing of each building and each floor on each building at the site. Please Note: A more detailed description of the mapping requirements is provided under Item A,10 below. RIMS will work with the GIS Department to provide clear direction on the mapping requirements. Z� A.1.5. RMS will conduct site visits of each of the three facilities with the information from Items A.1 thru A.4 in hand to make a preliminary determination of the hazardous substances stored, handled or used at each site. A.1.6. Review purchasing records of ALL "hazardous substances" identified (for the latest 12 months)to identify hazardous substances and hazardous wastes that may not be present onsite when RSM personnel conduct site surveys. RMS will work with City personnel to clearly delineate the type of information necessary(presently the IT and MIS capabilities of the City are not well known to RMS personnel). A.1.7. City personnel will then be asked to provide material safety data sheets (MSDSs) to RSM personnel for each identified hazardous substance. If MSDSs are not available for any of the identified hazardous substances, RSM will obtain them through the City's vendor(s) or other sources A.1.8. A second set of site visits will then be conducted to identify potential hazardous substances not present at the sites during the initial site visits and to confirm average quantities of hazardous substances and hazardous wastes present. A.1.9. RMS will then utilize the base-maps provided under Item A.4 above to layout the locations of hazardous materials and hazardous wastes at each site (i.e., RMS will "redline" the maps as appropriate). This information will be provided to the Project Manager and the GIS Department. A.1.10. The GIS Department will incorporate the provided information onto the appropriate maps as instructed by RMS. The mapping requirements for each of the sites is as follows: a. An Area Map showing the entire area around the site. The primary purpose of the Area Map is to identify primary and alternate routes to the site and to show where in the community a site is located. The Map should be provided on an 8 V_, x I I sheet of paper and should call out the facility location. i. Site orientation(i.e., indicate north); ii. Map Scale; and iii. Site location and address. b. A map showing an aerial overview of the site. The purpose of the Site Map is to provide the geographic context of the buildings. access points, and surrounding properties and streets around the site. The Map should be provided on an 8 V2 x 11 sheet of paper. The Scale of the Map should be one inch equals 100 feet The Site Map for each site should indicate the following: i. Site orientation(i.e,, indicate north); A-2 ii. Map Scale, iii. Site location and address; iv. The names of ALL roads on ALL sides of the site; v. The site address; vi. Property lines and adjacent property names on all sides of each site(property); vii. Exit/Entry points(i.e., gates,driveways, etc.); viii. Schools, hospitals and extended care facilities within 1000 feet of the site; ix. Fences and/or barriers on the site; and x. Location of any rail transportation sites (i.e., railroad tracks or spurs in close proximity). c. A Map providing a floor plan of the site, The Map should be provided on an 8 V2 x I I sheet of paper. The Scale of the Map should be one inch equals 100 feet. i. Site orientation(i.e., indicate north); ii. Map Scale; iii. Identify the location of all emergency response equipment such as fire suppression equipment,ppe, etc.; iv. Identify exits,evacuation routes,doors, and wall separations; v. Identify interior and exterior electrical, gas, water and other emergency shut-off valves; vi. Identify emergency alarm locations and first aid equipment locations; vii. Identify location of floor drains; viii. Identify location of sewer and storm drains on or around facility site; ix. Identify location of parking and/or loading areas; x. Identify location of evacuation staging areas; xi. Identify location of above-and belowground storage tanks. d. The GIS Department will provide RMS with three copies of each map. A.1.11. The Project Manager (through the GIS Department) will then provide RMS with the revised base maps for each site. RMS will review, "redline" again, if necessary, and resubmit to the Project Manager. The Project Manager will provide RMS with the finalized maps for each of the three sites. A.1.12. Based on the identification of"hazardous materials"stored and handled,the MSDSs collected and the storage locations of the materials, RMS will complete Hazardous Materials and Hazardous Waste Inventory Sheets for each"hazardous substance"as appropriate. A.1.13. Based on information provided by the Project Manager, RMS will complete other sections of the HMBP package and assemble for review and signature by appropriate City personnel. RMS will utilize the most recent version of the County of San Bernardino Fire Department, Hazardous Materials Division HMBP Forms. A.1.14. RMS personnel will then sign as appropriate each of the three HMBP Packages developed. A,1.15. RIMS will then arrange for reproduction of the packages. A.1.16. RMS will then submit two copies of each HMBP package to the San Bernardino County Fire Department for review and acceptance and obtain receipts for the submittal. A,1.171. RMS will provide the receipts and one copy of each HMBP package to the Project Manager. For the above listed sites -in A-3 A.2.1. The City of Redlands Project Manager (Project Manager) will gather all of the necessary information to complete the HMBP Packages for each of the remaining 17 sites (i.e., sites 4 through 20 as identified above). This includes all storage locations and quantities, all administrative information,all response information, all mapping requirements,etc. A.12. The Project Manager will provide the Draft Completed HMBP Packages for each of the 17 sites to RMS. A.2.3. RMS will then review the content and accuracy of each HMBP Package. As part of the review process, RIMS will visit an appropriate number of the 17 sites (as determined to be appropriate by RMIS), A.2.4, It will be the responsibility of City Staff to obtain material safety data sheets (MSDSs) for each identified hazardous substance, If MSDSs are not available for any of the identified hazardous substances, it will be RMIS's responsibility to obtain them via alternate sources (i.e.,the City's vendors, etc,). A.2.5. RMS will provide the City's Project Manager with any comments/suggestions for revisions/modifications to each of the 17 HMBP Packages (i.e., RMS will "redline" the HMBP Packages as appropriate). A.2.6. City Staff will then incorporate the revisions(as appropriate)into each Package and assemble for signature by appropriate Staff and forward the Packages to RMS. A.2.7. RMS will then arrange for reproduction of the packages. A2.8. RMS will then submit two copies of each HMBP package to the San Bernardino County Fire Department for review and acceptance and obtain receipts for the submittal. A.23. RMS will provide the receipts and one copy of each HMBP package to the Project Manager. Scope of Work Item B : Conduct of Three Year Risk Management Plan Audits at the Henry Tate and Horace Hinckley Water Treatment Plants: in 1999,two of the facilities owned and operated by the City of Redlands, Water Utilities Department were subject to the federal Risk Management Program (40 CFR Part 68), the California Accidental Release Prevention Program(California Code of Regulations, Title 19, Division 2, Chapter 4-5,Articles I through 11) and the federal OSHA Process Safety Management Program(29 CFR Part 1910.119). These facilities were the Henry Tate and Horace Hinckley Water Treatment Plants. As part of its compliance program with the above-specified regulations, in 1999 the City prepared the following documents: 1. Risk Management Plan Executive Summary and Data Elements Package; 2. Volume I-Federal RMP, CalARP&OSHA PSM-Prevention Program;and 3. Volume 11 - Federal RMP, CalARP & OSHA PSM - Technical Studies and Supporting Documents. These documents and the implementation of the Prevention Program must be audited at least every three- years. The regulatory requirements for the conduct of these audits and the associated documentation (for the conduct of the audit, the documentation of the findings and corrective actions taken to address the deficiencies) is set forth under the federal Risk Management Program (40 CFR Part 68), the California Accidental Release Prevention Program(California Code of Regulations, Title 19, Division 2,Chapter 4.5, Articles I through 11) and the federal OSHA Process Safety Management Program (29 CFR Part 1910.119). More specifically, three-year audit requirements are set forth under 40 CFR Part 68.58-, California Code of Regulations, Title 19, Division 2, Chapter 4.5, Article 6 Section 2760.8; and 29CFR Part 119 Subpart(o). The required Audits were to be completed and documented by the City by June 2002 A-4 Furthermore, the above-referenced documents prepared by the City(i.e., the federal RMP/CaIARP/OSHA PSM Program Documents) specify that the City will perform the required Audits in compliance with the applicable regulations. As part of the federal RMPI/CalARP compliance audit to be performed, Resource Management Services,Inc.(RMS)will perform a thorough and detailed audit of the two water treatment plants subject to the federal RMP regulations, the Cal ARP regulations and the federal OSHA Process Safety Management Regulations (Henry Tate and Horace Hinckley Water Treatment Plants). The purpose of the audit will be to determine the level of compliance with the regulatory requirements and the level of implementation of the City's RMP Program (i.e., federal RMP, CalARP Program and federal OSHA PSM Program) by collecting and evaluating objective evidence. The scope of work will consist of a documentation audit of the existing federal RMP/CalARP/OSHA PSM Program developed for the Henry Tate and Horace Hinckley Water Treatment Plants and a field audit of the status of implementation of the Program. Specific tasks to be completed will include the following: B.1. Determination of whether all recommended actions resulting from the hazard and operability studies conducted have been satisfactorily completed and implemented. B.2. Evaluation of the level of implementation of all administrative procedures via the objective evaluation of records. B.3. Evaluation of the level of implementation of all operating procedures via the objective evaluation of records. B.4. Evaluation of the accuracy and completeness of the required process safety information. B.5. Evaluation of training programs and implementation thereof and supporting training records. B.6. Evaluation of the technical studies performed and the adequacy and completeness of the documentation (including the hazard and operability study, the offsite consequence analysis, any seismic evaluations performed, etc.). B.7. Evaluation of the adequacy and completeness of the Public Review Notice and Meeting conducted and the required subsequent follow-up documentation to appropriate federal agencies. BX Preparation of a detailed standard operating procedure (SOP) for RMP, CaIARP, and OSHA PSM audits. The SOP will utilize the USEPA's Audit Protocols. The SOP will be in conformance with the SOP format and contain the level of detail consistent with the City's current SOPS(as presented in the federal RMP/CalARP/OSHA PSM Programs). 13,9. R?VIS will prepare a summary report documenting the findings and recommending corrective ve actions. A-5 AGREEMENT TO FURNISH ENGINEERING SERVICES FOR THE PREPARATION OF HAZARDOUS MATERIALS BUSINESS PLANS AND RISK MANAGEMENT PLAN AUDITS FOR WATER PRODUCTION FACILITIES ATTACHMENT B PROJECT SCHEDULE Work under this Contract initiates on March 10, 2003 and will be completed by September 30, 2003, Provided below are the Key Project Milestones: Scope of Work Item A—Hazardous Materials Business Plan Preparation and Support Services: March 10,2003 Project Kickoff Meeting. RMS to provide the City's Project Manager with a preliminary listing of required information. RMS to meet with GIS to discuss mapping requirements and provide GIS with directions. March 17,2003 Meeting Project Manager and Henry Tate and Horace Hinckley Operations Staff to discuss listing of actions recommended in 1999 to reduce the likelihood of accidental chlorine releases and determine the status of the actions. March 21,2003 Project Manager to provide RMS with previously existing documents and preliminary listing of Hazardous Substances stored, handled or used at Henry Tate WTP,Horace Hinckley WTP and the Highland Avenue Water Complex. Project Manager to provide RMS with Administrative Information requested at Project Kickoff. GIS to provide RMS with initial base-maps. March 24-28,2003 Completion of Henry Tate WTP Site Visits and initial data gathering. Initial data gathering for RMP Audits April 1 -4,2003 Completion of Highland Avenue Water Complex Site Visits and initial data gathering. April 14- 18,2003 Completion of Horace Hinckley WTP Site Visits and initial data gathering. Initial data gathering for RMP Audits April 28,2003 Delivery to GIS of"redlined"site maps. May 26,2003 GIS to complete"redlined"revisions. May 30,2003 RMS to complete review of"redlined"revisions Delivery to Project Manager of Initial Drafts of Horace Hinckley WTP,Henry Tate WTP,Highland Avenue Water Complex HMBPs Delivery to RMS by Project Manager of Draft HMBPs for other sites for review June 7 - 18,2003 Site visits of All 20 HMBP sites B-I June 15,2003 Project Manager to provide comments on three HMBPs June 21,2003 RMS to provide comments on 17 HMBPs prepared by City Staff July 14, 2003 All HMBPs to be submitted to County Fire Department July 21,2003 Draft RMP Audit Report to be submitted to Project Manager August 4,2003 Project Manager to provide comments on Draft RMP Audit Report August 11,2003 Final RMP Audit Report to be provided to Project Manager B-2 AGREEMENT TO FURNISH ENGINEERING SERVICES FOR THE PREPARATION OF HAZARDOUS MATERIALS BUSINESS PLANS AND RISK MANAGEMENT PLAN AUDITS FOR WATER PRODUCTION FACILITIES ATTACHMENT C PROJECT FEE Resource Management Services, Inc. (RSM) proposes to perform the Scope of Services specified in Attachment A on a fixed cost basis for a total price of$74,600. Our fee includes all technical and clerical labor charges and other direct expenses as well as all travel and per them expenses associated with perforniing the Scope of Services specified. Our project fee is payable to be payable per the following schedule: After the Project Kickoff Meeting $3,000.00 After the Meeting with Tate and Hinckley Operations Staff to go over the RMP Actions Recommended in 1999 for the RIMP $2,000.00 After Completion of Initial Data Gathering Site Visits at Tate,Hinckley and Highland Avenue $13,866.67 After Providing City GIS Department with Redlined Maps $3,000.00 After Submittal of Draft HMBPs for Tate,Hinckley and Highland Avenue sites to the Project Manager $17,866.67 After Completion of Second set of Site Visits at Tate, Hinckley and Highland Avenue Sites and Other 7 Sites $4,000.00 After Review and Comment on 17 HMl3Ps prepared by City Staff $7,000.00 After Submittal of ALL 20 HM13Ps to County Fire Department $4,000.00 After Submittal of Draft RMP Audit Report to Project Manager $16,866.66 After Submittal of Final RMP Audit Report $3,000.00 C-1 AGREEMENT TO FURNISH ENGINEERING SERVICES FOR THE PREPARATION OF HAZARDOUS MATERIALS BUSINESS PLANS AND RISK MANAGEMENT PLAN AUDITS FOR WATER PRODUCTION FACILITIES ATTACHMENT D SCHEDULE OF FEES PROFESSIONAL SERVICES HOURLY RATE Professional Level 1 45.00 Professional Level 11 50.00 Professional Level III 55.00 Professional Level IV 60.00 Professional Level V 65.00 Professional Level VI 75.00 Professional Level VII 85.00 Professional Level VIII 95.00 Professional Level IX 100.00 Professional Level X 105.00 Professional Level XI 115.00 Principal 125.00 TECHNICIAN SERVICES Technician 1 25.00 Technician 11 35.00 Technician 111 45.00 Technician IV 55.00 SUPPORT SERVICES Clerical 25.00 Technical Editor 35.00 Word Processing 35.00 Graphics 45.00 D-1