Loading...
HomeMy WebLinkAboutContracts & Agreements_16-1983_CCv0001.pdf FOR DISTRICT USE ONLY F1C�j San Bernardino County Flood Control Di str Contract Number , oD CONTROL DEPT,.' OF TRANSPORTATION/F� — Flood Control District Contract Representative Contractor's license Number: Anthony J. Cray Ph.Ext.3771 CAtIFOP.NNA Budget Unit No. Sub-Object No. Fund No. Job No. Amount of Contract SAN BERNARDINO COUNTY 010 ------- 693 19F00972 NA If contract has more than one payment or receipt, FLOOD CONTROL DISTRICT Project Name: complete the following: STANDARD CONTRACT Payments Estimate: Approximate Amount Each: THIS CONTRACT is entered into in the State of California by and between the San Bernardino County Flood Control District, hereafter called the District, and Name CITY OF REDLANDS hereafter called CITY Add rens Phone Birth Date Federal 10 .o.or Soclai Sacur Ety No. IT IS HEREBY AGREED AS FOLLOWS: (Use space below and additional bond sheets. Set forth service to be rendered,amount to be paid,manner of payment, time for performance or completion, determination of satisfactory performance and cause for termination, other terms and conditions,and attach plans,specifications,and addenda,if any.) City of Redlands, hereinafter called CITY. ZEAS, severe flooding has occurred in the City of Redlands on Redlands Boulevard at the outlet of Reservoir Canyon Storm Drain; and WHEREAS, County and CITY desire to cooperate and jointly participate in the improvement of Reservoir Canyon Storm Drain from Fern Avenue to Zanja Channel, herein referred to as PROJECT; and WHEREAS, PROJECT will consist of constructing approximately a double 10 x 5 reinforced concrete box culvert and appurtenant structures; and WHEREAS, the CITY has sent out proposals to consultant engineers to provide a cost estimate of various alignments and design the PROJECT; and WHEREAS, PROJECT is proposed to be constructed utilizing CITY's funds; and WHEREAS, COUNTY and CITY desire to set forth the responsibility and oblig- ations of each as pertains to participation of design, construction, and future maintenance of the PROJECT. NOW, THEREFORE, IT IS MUTUALLY AGREED AS FOLLOWS: 1 .0 CITY shall: 1 .1 Act as lead agency and advertize and award the PROJECT. 02-12459-697 Rev. 11/80 Page 1 of p, k k r� 6 00 1 .2 Accept responsibility for hiring and paying all costs of a consultant civil engineer to report on the hydrology and hydraulics of the PROJECT; provide cost estimates on various economical alignments; prepare final contract plans and specifications. 1 .3 Accept responsibility for completing the environmental clearance for the PROJECT. 1 .4 Fund the total cost of the construction of the PROJECT and pay the construction contractor. 1 .5 Provide a source of funds to pay for any unforeseen capital costs not constructed as a part of the PROJECT that become evident within three years after the construction completion of the PROJECT. 1 .6 Accept responsibility for the cost of relocating all utilities which interfere with the construction of the PROJY, ,'T. 1 .7 Transmit preliminary and final plans and specifications of the PROJECT to the COUNTY for review, comment and written approval of acceptance prior to advertising the PROJECT. 2.0 COUNTY shall: 2.1 Accept responsibility and all costs to administer, inspect and provide construction survey for the construction of the PROJECT at its own expense. 2.2 Accept responsibility for the future maintenance of the PROJECT at the completion of construction except as set forth in Section 1 .5. THIS CONTRACT, shall inure to the benefit of and be binding upon the successors and assigns of both parties. IN WITNESS WHEREOF, the parties hereto have caused this contract to be executed by their respective officials thereunto duly authorized. SAN BER RDINO COUNTY F L00 O � L DIST a City of Redlands -(State i€co orat,on,eompany,etc.) Ch'arrmafi, Beard of SiupdTtsors CA _SWAN" By s Dated JUN 0 J 1983 (AuthorizedS;gr ure) Dated April 124 1983 ATTESTED: • Title Mayor Af-be Secretary e ood Control 13 ict Deputy Address 3O QajQn Street-, R�ri1 axir1s Approved as to Legal Form Reviewed as to Affirmative Action Reviewed for Processing �- 4-� __._.. .. Agen d torlCAL7 County Counsel <" .) Date � � Date Date 02-12459-697 Rev.1it$¢ Page 2 of 2 MINUTES UTES OF THE BOARD OF SUPERVISORS F SAN BER ARDI 1O COUNTYAWLIFORNIA JUNE 6, 1983 FROM: B. L. INGRAM Flood Control Engineer SUBJECT: AGREEMENT BETWEEN FLOOD CONTROL DISTRICT AND CITY OF REDLANDS FOR RESERVOIR CANYON STORM DRAIN F00972 RECOMMENDATION: Approve agreement between San Bernardino Flood Control District and the City of Redlands regarding the design, construction and administration of Reservoir Canyon Storm Drain in the City of Redlands. BACKGROUND INFORMATION: Severe flooding has occurred in the City of Redlands on Redlands Boulevard at the outlet of the existing Reservoir Canyon Storm Drain. This project would extend the storm drain to tie into Zanja Channel and sets forth that the City will be responsible for all costs for design and construction of this facility. The agreement further sets forth that the District will accept responsibility for all costs to administer, inspect and provide construction survey for this construction project and be responsible for future maintenance. REVIEW BY OTHER DEPARTMENTS: Deputy County Counsel E. H. Robinson has reviewed and approved this agreement as to legal form on May 25, 1983. FINANCIAL DATA: This agreement sets forth that the Flood Control District would be responsible for the cost to administer, inspect and provide const- ruction surveying. Funds to provide these services are incorporated in the 1983/84 District fiscal year budget. Action of the Board of Supervisors c: Flood Control w/afire L AGREEMENT ` O. 83-358 Ci coo' Recilarlds w/a e�s�.L Floc ' ro Auditor w/a et B�}A�fl {)F SUPERVISORS Works-Shone COUNTY OF SAN BERNARDIN J EPWA MOTIONL __2L_ `X _._ Motion X File w/agre nL 1 2 3 4 ANDRE 1 RARflC} LERK O�THIE�OAR�D -�. BY 14-9507-000 DATED: 6 1983 Rev. 10181 ITEM