HomeMy WebLinkAboutContracts & Agreements_210-2003_CCv0001.pdf Southern California Edison Company 14.25.51
NOVf 26103 11-j-,Revision 13/1195
Reissued,, 1111198
Revision:4110101
SOUTHERN CALIFORNIA EDISON COMPANY
ATTACHMENT AGREEMENT FOR ILLUMINATED
DECORATIONS ON ORNAMENTAL
STREET LIGHT POLES
THIS AGREEMENT,made and entered into this 4th day of November __01 by
and between Southern California Edison Company, a subsidiary of Edison International, a corporation,
hereinafter called"Utility"and the City of _ R,91 a n A G
a political
subdivision of the State of California,hereinafter called"City."City and Utility are sometimes,hereinafter
referred to individually as"Party"and collectively as"Parties."
WHEREAS,Utility has installed Utility—owned ornamental marbelite and steel street light poles
at various locations within said City at request of City:and
WHEREAS, City desires to periodic temporary service to electrify decorative attachments and
appurtenances,hereinafter called"decorations,"on said street light poles:and
WHEREAS, Utility is agreeable to allow City to install Utility-approved decorations on said
street light poles.
NOW, THEREFORE, in consideration of the premises and the mutual understandings and
obligations of the parties, as hereinafter set forth, subject to the terms and conditions provided in this
Agreement,Utility shall hereby permit City or its authorized agent for City to install,maintain,use,repair,
renew, and remove certain Utility-approved hangers and decorations on Utility-owned ornamental
marbelite and steel street light poles in accordance with the following:
1. City,for itself and its contractors, agents,and/or employees indemnifies and holds harmless Utility,its
officers and employees from and against all losses,expenses,claims,actions,causes of action,damages,
costs or liabilities,including court costs and attorney fees, for injuries to or death of persons including
employees,agents or contractors of Utility,regardless of cause,arising out of or resulting in any manner
whatsoever from the installation, maintenance, decoration hardware failure, and/or removal of the
decorations and hanger assemblies on or from Utility-owned omamental street lighting poles.
L Prior to attachment of said hanger and decorations,City shall furnish to Utility a sample decoration with
its hanger assembly, with decoration & hanger drawings, with detailed specifications and proposed
mounting height, signed and sealed by a structural engineer in good standing and prof ionally
registered in the State of California, for Utility to examine and approve design. Said essDrawings
submitted to Utility shall include the physical size and weight of the proposed decorations, the
proposed hardware assemblies for hanging the decorations, and the necessary calculations for the
effects winds may have on the decorations and the Utdity-owned ornamental street lighting poles
Said total surface area of the decoration shall not exceed 18 square feet Variance from the total
surface area ojthe decoration requires Street Light Committee approval prior to attachment
3. At no time shall the electrical load exceed 300 watts per device.All conductors shall be UL-approved
and contain a minimum of No. 14-gauge copper with 600-volt insulation The conductor shall be
Page I of 3
Figure 1.Attachment Agreement for Illuminated Decorations on Ornamental Street Light Poles
(Front)
14.25.51
y r i� i !i / � ^�.'/l�' �sr'^���f�fir",,��' �� ��.����� /� �✓ / y j �/ r/ /y yil x:7r�!'��,�
/ 4
Southern California Edison Company
I4.25.5I
M-ior Revision 11/1/95
Reissued.11/1/98
Revision:4/10/02
secured to the mast arm and will not be farther than 12 inches from the connection point at the
luminaire.
4 Prior to any subsequent attachment that may involve a City desired modification Or change to an
approved decoration and hanger, City shall furnish another set of above said sample and submittals
to Utility for review and approval
5. Included in the decoration and drawing submittal and prior to any such attachment,City shall submit
to Utility the phy ieel size and
capacity required so that the Utility may study the effects the specific and detailed electric
and cnflicts, if y, with
system operation. At its sole discretion, Utility reservers thet s
decorations. re{llseoattachmentmof any
6. It is agreed that said approved type of decorations and hanger assemblies shall be installed and
maintained by the City in good, safe, and workmanlike manner and in compliance withlicab
d le
taws, codes, standards, regulations, ordinances, and decrees of all lawfully constitutefall appederal, state,
county,or city legislative bodies, administrative agencies or tribunals pertaining thereto, including but
not limited to General Order No. 95 of the Public Utilities Commission of the State of California
Occupational Safety and Health Act.
7. Utility shall not,by taking action pursuant to its tariffs,be liable for any loss,damage,decoration size,
or injury established or alleged,which may be the result,therefrom.
8. At the sole discretion of Utility,service shall not be furnished where locations,mounting height,voltage
drop to streetlights,and/or other considerations are unacceptable to Utility.
9. This Agreement for electrical decorations is intended to solely pen-nit their installation€ef*jefied
eneeed-90- ays per event and time period as per attached form 14.25.51 "Timed Auxiliary power
(TAP)Adaptor,Billing Calculation worksheet"No permanent decorations installations are permitted
on Fusee.Utility ornamental street lighting poles under this Agreement.
10. Utility reserves the right to remove Utility-owned adaptor devices and any decorations at any time for its
operating needs,requirements,and convenience.In the event of removal by Utility,because i damage
and replacement of poles,when circumstances permit,the City will be notified and will be responsible
for the removal and reattachment and/or repair of decorations.
H. It is understood and agreed that should a street light pole be affected or damaged in any way by the
attachment of such decorations,City willtY reimburse Utility for any material and labor cosrs/expenses
for the repairs including,but not limited to,the replacement of the street light pole,at City's expense.
12. Should Utility determine that it is necessary to relocate or replace a street light pole on which a
decoration is in place, and where time and circumstance permit, Utility will notify City and City, or
agent ofCity,shall promptly remove,afid relocate,or transfer said decoration ta substitute street light
pole as required by Utility. o
13. The failure of Utility to enforce any provision of this Agreement or the waiver thereof in any instance
shall not be construed as a general waiver or relinquishment on its part of any such provisions
same shall nevertheless be and remain in full force and effect. ,but the
141 This Agreement shall continue in effect unless terminated by written notice Unless sooner terminated
by mutual written notice,this Agreement shall continue in effect for a term of one hundred and twenty
(120)days from the date hereof.Either party may terminate this Agreement '
by written notice of not less than ten (10) days, is the event of such
termination, City shall remove ail of said decorations from Utility's street light poles prior to the
termination of the Agreement Any/or all annual charges are not refundable in the event the City
discontinues the service.
15. The provisions hereof shah inure to the benefit of and bind the respective successor in interest,
representatives, or assigns of the parties hereto; provided, however, that no assignment may be made
without the prior written consent of the other party hereto.
Page 2 of 3
EFigure .Attachment,4greement for Illuminated Decorations on Ornamental Street Light Poles
(Front)
Id.25SI
r% r.� l r r r�r� ��aa''i'r�rJr/.�'3�x5p 'J�✓l ,�,.y v�'� r � � r / � .s*n �^.-�""�
e
Southern California Edison Company
14.25.51
Major Revision 12/119.1
Reissued.- 1111198
Revision:4110102
16• Where Utility experiences excessive maintenance costs resulting , but not limited to, vandalism,
Utility may require City to pay for all repairs and maintenance to the devi
attached ce or luminaire to which it is
17. City agrees to pay Utility for the calculated energy,per event charges,and annual charges,within thirty
(30)days after bill has been submitted to City.
((( annus/!y for these charges in the 1"quarter of the year for the recedln Uri'shall bill City
upon calculation jos the annual bill is attached in the Tinned Auxiliary power(TAP)chaqAdaptor Billingagreed
Calculation Worksheet This will be the annual bill to City unless the number of event days or
quantity of devices is revised, as mutually agreed by the parties. 1n the event of any changes, the
Worksheet will be updated 4:461` ivt44 a Aete�
fe—amity; and re-acknowledged, by Utility and City, noting whether TAP devices are added or
reproved,decorations will be installed for additional events,or the nu
increased/decreased mber Of identified event days are
18. City shall notify Utility of any desired changes that will affect the billing calculation by written notice
Of not less than ten(10)days prior to the event
19. City shall be responsible for removal of all decorations. However, should City fail to remove such
decorations ninety 1901 days after insrait tion at MH
remove such material and a City hereby authorizes Utility to
agrees to reimburse Utility for such removal and storage costs.
This Agreement is granted to attach illuminated decorations on a periodic basis during this event
to Utility-owned ornamental street light poles upon receipt by Utility of two(2) copies of this Agreement
signed by a duly authorized official of the City of Redlands
This Agreement shall at all times be subject to such changes or modifications by the Public
Utilities Commission of the State of California as said Commission may, from time to time, direction the
exercise of its jurisdiction.
Approval For
Approval For
The Cityof Redlands
Southern California Edison Company�
By: Bob Siegal
ga 1
Title: Karl N. Haws Mayor Title: Service Planner
Date: November 4 2003 Date:__Qctohpr 07 003
Attest:
Lor ie Poyz tyClerk
Page 3 of 3
Figure 1.Attachment Agreement for Illuminated Decorations on Ornamental Street Light Poler
(Front)
14.25.51
nn
>>p �
Southern California Edison Company
14.25.51
Major Revision 12/1/95
Reissued- 11/1/98
4
Revision. 3/15/02
SOUTHERN CALIFORNIA EDISON COMPANY
Timed Auxiliary Power (TAP)Adapter
Billing Calculation Worksheet
Section#1 —Annual Events&
Number of Installed TAP Devices
Customer City of Redlands
Date: October 7 , 2003
Customer Accnt#:_ 01-19 5—7 8 5 o Service Accnt#:
Annual Events— Winter Holidays
#of Days_—n---____—
#of Days
#of Days
Total number of days = 6 0
In
a itial tallarion• �
• Number of Devices installed:
6 (b)
• Date devices installed:
Additional Devices Installed
• Number of Existing Devices:
• Number of Devices installed:
• Revised Total of Devices installed:
• Date devices installed: �)
1 /
Partial or Full removal of Devices
• TotaI Number of Devices removed:
• Date devices removed:
• Total Number of Devices after removal:
• Account Closed? YIN @�
Remarks
Page I of 2
Figure 3. Timed Auxiliary Power(TAP)Adaptor
Billing[ Calcul
ksheet
Attach to the `Attachment Agreeme t For lluminated Decorations ions on Ornamental Street Light Poles"
14.25.51
r
z� zR
l
R
Southern California Edison Company
14._x.51
i
AWajor Revision 12/1/95
Reissued.• 11/1/98
Revision:3115102
Section#2- Billing Calculation
Customer City of Redlands Date: November 4 , 2003
Customer Accnt#: 01-1.95-7859 Service Accnt#: 001-3763-68
Formula
Number of Devices Used in the Events(b) 6 X 300 Watts= 18 0 0 divided by
1,000= 1 . 8 kWh,X 6 hours= 10 . 8 kWh X Total Number of Event days
in Billing(a) 6 0 = 648 Total kWhs(c).
Bill Calculation
TAP Annual Charge of 521.09 X Number of Devices(b) =5 12 6
Energy Charge at LS-I Midnight Rate(.05371 cents(3)) 1
The Total KWh X Midnight Rate(c).
.00020 State Tax X Total kWh Charge =5 +
565.00 Account set up(or Device quantity adjustment)Fee(l) =5 65 .
Total Annual Bill(4) _$ 226
Notes:
I. If new Devices are added to an existing account or there is a partial removal of devices on an
existing account,a 565.00 fee is added,set up in event billing.
2. Utility Special Billing verifies current charges and rates in the tariffs before calculating billing.
3. Annual bill may adjust due to the addition of event days,or the addition or removal of devices.
The Customer is responsible for advising the LS-I-TAP single point of contact of any desired
changes.
Billing Calculation Worksheet Acknowledgment
Approval For Approval For
The Cityof Redlands Southern Califor 'a Edison Comp y
By: By: Bob Siegal
Title: Karl N. Haws Mavor Title:SPr�ri nP pl arena,
Date: Novemb 4 2003 Date: October 7, 2003
Attest:Qy Page 2 of 2
Ftgure 3. Timed Auxiliary Power(TAP)Adaptor
Billing Calculation Worksheet
Attach to the "Attachment Agreement For Illuminated Decorations on Ornamental Street Light Poles-
14.25.51
oles"14.25.51
a