Loading...
HomeMy WebLinkAbout8214RESOLUTION NO 8214 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS ADOPTING A ROAD REPAIR AND ACCOUNTABILITY ACT PROJECT LIST FOR THE 2021 2022 FISCALYEAR WHEREAS, Senate Bill 1 ("SB1 '), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017), was passed by the Legislature and signed into law by the Governor in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of City of Redlands ("City") are aware of the projects proposed for funding in our community andwhichprojects have been completed each fiscal year; and WHEREAS, the City must include a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account ("RMRA '), created by SB1 by resolution, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City will receive an estimated one million four hundred four thousand seventy one dollars ($1 404,071) in RMRA funding in Fiscal Year 2021 22 from SB1 and WHEREAS, this is the fifth year in which the City is receiving SB1 funding which will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1 and WHEREAS, the City used the Pavement Management Program ("PMP") to determine the SB1 project list and ensure revenues are being used on the most high-priority and cost-effective projects that also meet the communities priorities for transportation investment; and WHEREAS, the funding from SB1 will supplement other funding to rehabilitate approximately 50 lane miles throughout the City in the PMP 2021 Street Resurfacing Project; and WHEREAS, the SB1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety investing in complete streets infrastructure, and using cutting-edge technology materials and practices, will assist the City in continuing to fund the City's PMP program; NOW THEREFORE, be it resolved by the City Council of the City of Redlands, as follows: Section 1. The foregoing recitals are true and correct. 1 I:\Resolutions\Rcs 8200-8299\8214 FY 21-22 SBI Project List.DOCX Section 2 The following previously proposed and adopted project list attached hereto as Exhibit "A" may utilize fiscal year 2021-22 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City is reaffirming to the public and the State its intent to fund these projects with Road Maintenance and Rehabilitation Account Revenues PMP 2021 Street Resurfacing Project will rehabilitate approximately 50 lane miles on vanous streets in the City of Redlands The project is anticipated to begin construction in Fall 2021, with an estimated construction timeline of 6 months, and an estimated project life of at least 20 years Section 3 Adoption of this Resolution has no environmental impact and therefore such action is exempt from review under the California Environmental Quality Act ("CEQA") in accordance with State CEQA guidelines section 15061(b)(3) ADOPTED, SIGNED AND APPROVED this 1st day of June, 2021 Paul T Banch, Mayor ATTEST e Donaldson, City Clerk 2 1.1Resolutions\Res 8200-8299\8214 FY 21-22 SBI Project List.DOCX I, Jeanne Donaldson, City Clerk, City of Redlands, hereby certify that the foregoing Resolution was duly adopted by the City Council at the regular meeting thereof, held on the 1St day of June, 2021, by the following vote AYES Councilmembers Davis, Foster, Guzman -Lowery, Tejeda, Mayor Barich NOES None ABSENT None ABSTAINED None 3 I 1Resolutions\Res 8200-8299\8214 FY 21 22 SB1 Project List.DOCX e Donaldson, City Clerk EXHIBIT A PAVEMENT MANAGEMENT PROGRAM 2021 RESURFACING PROJECT 4 1: \ Resolutions \ Res 8200-8299\8214 FY 21-22 SBI Project List.DOCX PMP 2021 RESURFACING PROJECT STREET SEGMENTS Exhibit 'A' No. Street Name From Street To Street 1 16TH ST FLORIDA ST CITY LIMITS 2 17TH ST CITY LIMITS FLORIDA ST 3 18TH ST CITY LIMITS FLORIDA ST 4 ACACIA CT CYPRESS AVE ACACIA KNUCKLE 5 AFTON CT CRESTVIEW RD END 6 ALABAMA ST COUNTY LIMIT CITY LIMIT 7 ARIZONA ST COULSTON AVE END 8 ASHFORTH DR CLUB DR SOUTH LN 9 ASHLEY WAY KARON ST ELISE DR 10 AVENUE N HIGHVIEW DR FLORIDA ST 11 AVIATION DR END SESSUMS DR 12 BALBOA CT PACIFIC ST END 13 BLACK HAWK CT VALLEY FALLS AVE END 14 BLUE WING CT REVELATION WAY END 15 BOW B SUMMIT AVE SUMMIT AVE 16 BRADBURY DR CRESTVIEW RD END 17 BRIGHTON CT CRESTVIEW RD END 18 BROOKSIDE AVE LAKESIDE AVE S EUREKA ST 19 CALHOUN ST PENNSYLVANIA AVE LUGONIA AVE 20 CALLE DE ACACIA EDGEHILL LN END 21 CALLE DE BARRANCA SMILEY HEIGHTS DR END 22 CALLE DE LAS PALMAS EDGEHILL LN SMILEY HEIGHTS DR 23 CALLE OCOTILLO SMILEY HEIGHTS DR END 24 CAMBRIA CT VALLEY FALLS AVE END 25 CAMEO DR KINCAID ST SUNSET DR 26 CAMPBELL AVE SUMMIT AVE OAK ST 27 CANYON RD SARRITA DR END 28 CAPRI AVE END OF REPAVING WABASH AVE 29 CARDINAL LN CAMBRIDGE AVE END 30 CARLSON AVE SUN AVE BROCKTON AVE 31 CARMEL CT CAPRI AVE END 32 CAROB ST ALESSANDRO RD PACIFIC ST 33 CENTER ST BROOKSIDE AVE W CRESENT AVE 34 CHAUCER CT HAMPTON RD END 35 CLOCK AVE FALCON LN DEARBORN ST 36 CLUB DR E SUNSET DRS ASHFORTH DR 37 COLUMBIA ST LUGONIA AVE PENNSYLVANIA AVE 38 COULSTON AVE ALABAMA ST ARIZONA ST 39 CRESTVIEW RD FORD ST DEVONSHIRE DR 40 CRESTWOOD FRANKLIN AVE E HILTON AVE 41 CROWN ST SUNSET DR MIRA VISTA DR 42 DANELAW AVE ASHFORTH DR END 43 DEXTER WAY LINCOLN ST END 44 DRAKE RIDGE CREST SMILEY HEIGHTS DR END 45 EDGEHILL LN WEST END EAST END 1 of 3 PMP 2021 RESURFACING PROJECT STREET SEGMENTS Exhibit 'A' 46 ELISE DR KARON ST TEXAS ST 47 ELM ST SUMMIT AVE CAMPBELL AVE 48 EMERALD AVE !COLUMBIA ST OHIO ST 49 EMERY CT SOUTH LN END 50 ENDYMION WAY SOUTH LN END 51 ESCONDIDO RD SIERRA VISTA DR END 52 EUREKA CT EUREKA ST DEAD END 53 EUREKA ST PALM AVE CYPRESS AVE 54 FALCON LN CAMPUS AVE END 55 FLORIDA ST 16TH ST 18TH ST 56 FOOTHILL WAY DEARBORN ST DEARBORN ST 57 FOX CT CRESTVIEW RD END 58 FREYA DR _ SOUTH LN END 59 GLENN CT BROCKTON AVE END 60 GOLD BUCKLE CT VALLEY FALLS AVE END 61 GOLD CUP CT END FOOTHILL WAY 62 GRANADA CT CARLSON AVE END 63 HAMPTON RD CRESTVIEW RD BRADBURY DR 64 HELEN CT HELEN DR END 65 HIGHVIEW DR FLORIDA ST END 66 HIGHVIEW DR ALTA VISTA DR END 67 IMPERIAL CT END FOOTHILL WAY 68 JONI LN CAMBRIDGE AVE END 69 KARON ST END PENNSYLVANIA AVE 70 KINCAID ST CAROB ST SUNSET DR 71 LA ARRIBA DR LA CRESTA DR LA FLORA DR 72 LA CRESTA DR ALESSANDRO RD MONTEREY ST 73 LA FELIZ DR LA LOMA DR CAROB ST 74 LA FLORA DR LA LOMA DR MONTEREY ST 75 LA HERMOSA DR ALESSANDRO RD LA ARRIBA DR 76 LA LOMA DR LA HERMOSA DR MONTEREY ST 77 LARAMIE AVE LINCOLN ST DEARBORN ST 78 LARAMIE CT LARAMIE AVE END 79 LEMONWOOD AVE COLUMBIA ST WEBSTER ST 80 LIVE OAK CT DEAD END LEMONWOOD AVE 81 LOS ROBLES CREST OAK ST END 82 MARSHALL ST PARKFORD DR END 83 MITCHELL WAY LARAMIE AVE END 84 MONTEREY ST CRESCENT AVE CAROB ST 85 NAPLES AVE WABASH AVE JASPER AVE 86 NARANJO CT REVELATION WAY END 87 NEVADA ST BARTON RD PVMTCHNGE 88 NICE AVE WABASH AVE CITY LIMITS (200' E/ JASPER AVE) 89 OAK ST _ FRANKLIN AVE FORD ST 90 OHIO ST EMERALD AVE END 91 PACIFIC ST CRESCENT AVE BURKE ST 92 PACIFIC ST PACIFIC ST END 2 of 3 PMP 2021 RESURFACING PROJECT STREET SEGMENTS Exhibit 'A' 93 PAIGE LN CAMPBELL AVE FRANKLIN AVE 94 PAIGE LN PAIGE LN END 95 PALA BELLS CT END FOOTHILL WAY 96 PARKFORD DR MARSHALL ST FORD ST 97 PIEDMONT LN WEST END EAST END 98 PINE KNOLL CREST SERPENTINE DR END 99 PIONEER AVE JUDSON ST N DEARBORN ST 100 POWELL LN LARAMIE AVE LINCOLN ST 101 PROSPECT DR CAJON ST FOUNTAIN AVE 102 RED BIRD CT VALLEY FALLS AVE END 103 REVELATION WAY VALLEY FALLS AVE LUGONIA AVE 104 RHONDA LN CAMPBELL AVE FRANKLIN AVE 105 RUBY AVE COLUMBIA ST OHIO ST 106 SARRITA DR ROSSMONT DR CANYON RD 107 SERPENTINE DR MIRA MONTE DR SUNSET DR 108 SESSUMS DR N DEARBORN ST WABASH AVE 109 SIERRA CREST VALLEY FALLS AVE END 110 SIERRA VISTA DR CANYON RD ELDER RD 111 SILVER CUP CT END FOOTHILL WAY 112 SILVER CUP CT FOOT HILL WAY END 113 SMILEY HEIGHTS CYPRESS AVE SERPENTINE DR 114 SOUTH LN ALTA VISTA DR FREYA DR 115 SUMMIT AVE CAJON ST CAMPBELL AVE 116 SUMMIT B SUMMMITAVE FRANKLIN AVE 117 SUN AVE TEXAS ST CARLSON AVE 118 SUNDOWN CT FOOT HILL WAY END 119 SUNNYSIDE AVE EDGEHILL LN END 120 VALLE VISTA DR ROSSMONT DR SUNSET DR 121 VALLEY FALLS AVE END WABASH AVE 122 VENICE COVE CT END REVELATION WAY 3 of 3