HomeMy WebLinkAboutContracts & Agreements_113-2003_CCv0001.pdf DOCUMENT 00520
PROCUREMENT CONTRACT
THIS PROCUREMENT CONTRACT(herein called Contract) is by and between City of Redlands,
California, USA(herein called OWNER)and ZENON Environmental Corporation,5051Commercial Circle,
Suite B. Concord,California, USA 94520(herein called SUPPLIER).
OWNER and SUPPLIER, in consideration of the mutual covenants herein set forth,agree as follows:
ARTICLE I - GOODS AND SERVICES
1.1 SUPPLIER shall provide Goods and Services as specified or indicated in the
Procurement Documents based on the acceptance by OWNER of SUPPLIER's Bid.
1.2 The Goods to be furnished are generally described as follows: Membrane
Filtration System that includes six (6) trains with 15 cassettes for a total of 90 cassettes,
membrane support frames, membranes, permeate collection piping, permeate pumps, air
scour distribution piping, air scour blowers, vacuum pumps, membrane chemical cleaning
feed pumps, process instrumentation, valves, side stream rotary drum screen with
compactor and PLC control system designed to provide 6.0 mgd recycled water. Process
equipment, piping, and valves to be shipped loose and installed by the Contractor. Design
and equipment shall be provided as indicated in Zenon proposal dated March 15, 2002
1.3 The following Services are required: Zenon shall provide complete technical
support service through all phases of the project, from receipt of purchase order,
submittals, equipment shipment, commissioning and performance testing, and plant
operation. Field Service, Installation Assistance, Commissioning, and Operator Training shall
be as presented in SUPPLIER's proposal.
1.4 The agreed upon Goods and Services shall be provided after written notification
from Contractor within the number of days established by the following schedule:
ITEM
Initial receipt by ENGINEER of Shop Drawings, data and 45 days
samples
Delivery of equipment to the Point of Delivery:
Earliest acceptable delivery 140 days
Completion of delivery 220 days
1.5 The places where Goods are to be delivered (Point of Delivery) is designated as:
City of Redlands Wastewater Treatment and Disposal Facilities, Nevada Street, Redlands,
California.
April 2002 00520-1 6192A 10
Cl)OCTIMENTSAND SETTINGS,,RFLISJ,OCAL SETTINGS,TEMPORARY INTERNET FILESOLKCIREVISED ZENON PROCUREMENT-DOC
1.6 For purposes of Article 1, Contractor's Notice shall be as set forth in 15.01,
Document 00700- Procurement General Conditions.
ARTICLE 2- ENGINEER
2.1 The Project has been designed by Carollo Engineers, P.C. who is referred to in
the Procurement Documents as ENGINEER. ENGINEER, and its duly authorized agents, are
to act as OWNER's representatives and assume all duties and responsibilities and have the
rights and authority assigned to ENGINEER in the General Conditions.
ARTICLE 3- PAYMENT AND PROCEDURES
3.1 Progress Payments. SUPPLIER shall submit an Application for Payment to OWNER,
claiming the amount due in accordance with the schedule of payments and the
Procurement Documents.
3.2 Schedule of Payments. SUPPLIER shall be entitled to claim payments for Goods
and Services in accordance with the following schedule:
Payment(Cumulative
Goods and Services Provided
Percentaae of Contract Price)
Final approval of Shop drawings,data and samples 10
Receipt and acceptance of all equipment in 85
acceptable condition and preliminary O&M
Manual,partial shipments and invoicing for partial
shipments is permitted
Completion of installation by CONTRACTOR. 95
including field testing and installation check
Final acceptance of Performance Test by OWNER 100
3.3 Retainage. Per the Construction Contract Documents.
3.4 Final Payment. Upon completion of installation and final acceptance by OWNER
of all Goods and Services of the SUPPLIER such acceptance to not be unreasonably
withheld, final payment may be claimed by SUPPLIER.
Applications for Payment will be processed by ENGINEER as provided in the General Conditions.
April 2002 0052-0-2- 6192A 10
CDOCUMENTS AND SETTINGS-RFLISIOCAL SETTINGS'JEMPORARY INTERNET FILESiOLKCREVISED ZENON PROCUREWNIf-DOC
ARTICLE 4- LIQUIDATED DAMAGES
4.1 OWNER and SUPPLIER recognize that time is of the essence of this Contract and
that OWNER will suffer financial loss if the Goods and Services are not furnished within the
times specified in Article 1, plus any extensions thereof allowed in accordance with the
General Conditions. They also recognize the delays, expense, and difficulties involved in
proving in a legal or arbitration proceeding the actual loss suffered by OWNER if the Goods
and Services are not furnished on time. Accordingly, instead of requiring any such proof,
OWNER and SUPPLIER agree that as liquidated damages for delay (but not as a penalty)
SUPPLIER shall pay OWNER the following sums for each day that expires after the times
indicated:
Liquidated Damages,
Item Days From NTP 1) per day
Equipment delivery to jobsite as follows:
Appurtenances to be installed by 140 $1,000
Contractor
Membrane Cassettes 220 $3,000
Acceptable Performance Test(2) 60 days after start of $3,000
performance test Not to exceed 175 days
(1) Notice To Proceed from Contractor to SUPPLIER or date ENGINEER provides approval of
shop drawings, whichever date is latest.
(2) Performance Test shall not begin until ENGINEER advises SUPPLIER in writing that the
Contractor has completed installation of the equipment supplied by SUPPLIER and that the
Contractor has completed the installation checklists provided to the Contractor by
SUPPLIER. Contractor is to be responsible for any delays in satisfactorily completing the
Performance Test due to faulty installation of equipment or materials.
OWNER shall have the right to deduct the liquidated damages from any money in its hands,
otherwise due,or to become due,to SUPPLIER, or to initiate applicable dispute resolution procedures and
recover liquidated damages for nonperformance of this Contract within the time stipulated.
ARTICLE 5- PROCUREMENT DOCUMENTS
5.1 The Procurement Documents which comprise the entire agreement between
OWNER and SUPPLIER consist of the following:
1. This Contract, Document 00520;
2. Assignment of Contract Document 00608;
3. Surety's Agreement to Assignment Document 00610;
April 21002 00520-3 6192A 10
C'DOCUMENTS AND SETrINGSAFLISTOCAL SETTINGSJENVORARY INTERNET FILES'IOLKCREVISED ZENON PROCUTREMENT.DOC
4. Warranty Bonds 00618;
5. Exhibits to this Contract;
6. Notice to Proceed;
7. General Conditions, Document 00700;
8. Specifications, Membrane Bioreactor System, Document 11240;
9. Engineering Agreement between OWNER and SUPPLIER dated May 15,
2001,
10. Proposal for a Membrane Bioreactor System for the City of Redlands dated
March 15, 2002.This includes the main equipment as listed in the proposal and as shown on
the P&ID drawings contained in the appendices, and recommended storage procedures
for the membrane equipment,
11. Service Agreement between OWNER and SUPPLIER dated February 22, 2002,
5.2 There are no Procurement Documents other than those listed in this article. The
Procurement Documents may be amended, modified, or supplemented only as provided
in the General Conditions.
ARTICLE 6- ASSIGNMENT OF PROCUREMENT CONTRACT
6.1 This Contract will be assigned by OWNER to CONTRACTOR, and SUPPLIER will
accept such assignment, pursuant to the Procurement Documents. In the application of
the terms and conditions of the Procurement Documents after said assignment, SUPPLIER
will function as a subcontractor to the CONTRACTOR, and all obligations of SUPPLIER to
OWNER will become obligations of SUPPLIER to the CONTRACTOR. Notwithstanding this
assignment, the guarantees and warranties specified in the Procurement Documents are
intended for the benefit of OWNER and the CONTRACTOR, and may be enforced by either
party.
6.2 Assignment of the Procurement Contract shall be accomplished on
Document 00608 and Document 00610, a copy of which is attached to this Procurement
Contract.
ARTICLE 7- MISCELLANEOUS
7.1 Terms used in this Contract, which are defined in Article I of the General
Conditions,will have the meanings indicated in the General Conditions.
April 2002 00520-4 6192A 10
C DOCUMENTS AND SETTrNGS�RFLIS\LOCAL SETTINGS',TEMPORARY PNTERNET FTLES'OLKOREVISED ZENON PROCUREMENT-DOC
7.2 No assignment by a party hereto of any rights under or interests in the Contract
Documents will be binding on another party hereto without the written consent of the
party sought to be bound; and specifically but without limitation moneys that may
become due and moneys that are due may not be assigned without such consent
(except to the extent that the effect of this restriction may be limited by law); and unless
specifically stated to the contrary in any written consent to an assignment, no assignment
will release or discharge the assignor from any duty or responsibility under the Procurement
Documents.
7.3 OWNER and SUPPLIER each binds itself, its partners, successors, assigns, and legal
representatives to the other party hereto, its partners, successors, assigns, and legal
representatives in respect of all covenants, agreements, and obligations contained in the
Procurement Documents.
7.4 The business address of SUPPLIER given herein is hereby designated as the place
to which all notices, letters, and other communication to SUPPLIER will be mailed or
delivered.The address of OWNER appearing herein is hereby designated as the place to
which all notices, letters, and other communication to OWNER shall be mailed or delivered.
Either party may change its address at any time by an instrument in writing delivered to
ENGINEER and to the other party.
7.5 Where SUPPLIER has procured the equipment, including membranes, in
accordance with the OWNER's purchase order and the equipment is ready for shipment to
the project site, and where the OWNER is not ready to receive the equipment, the OWNER
shall be responsible for the sourcing and cost associated with providing a local bonded
warehouse (location selected by OWNER in California) for the storage of equipment
received from SUPPLIER. CONTRACTOR will be responsible for unloading the equipment at
the warehouse as well as reloading of equipment for delivery to site. Freight cost from
warehouse to site shall also be the responsibility of the CONTRACTOR. At the
CONTRACTOR's expense, inspect the equipment with SUPPLIER's representative and to
certify that the materials have been received. Delivery of equipment to the local bonded
warehouse will permit SUPPLIER to invoice as though equipment has been received onsite.
7.6 Contract person assigned by SUPPLIER for this project is Robert Flis, Oakville,
Ontario, Canada, phone (905) 465-3030, extension #3286.
7.7 Contact person assigned to represent OWNER for this project is Todd Henderson ,
Carollo Engineers, (Santa Ana Office), phone (714) 540-4300.
April 2002 00520-5 6192A10
C`DOCUNIENTS AND SETrENGS",RFLISLOCAL SETTINGS'TEMPORARY INTERNET FILES',OI,KC REVISED ZENON PROCLREMENT.130C
IN WITNESS WHEREOF,OWNER and SUPPLIER have signed this Contract. Two counterparts have been
delivered to OWNER,and one counterpart each has been delivered to SUPPLIER, Surety,and ENGINEER.
This Contract will be effective on
OWNER: SUPPLIER:
City of Redlands Zeno�nE;,-nviron ental Corporati
By Karl N. Haws, Mayor By:
Title: Title:
Address for giving notices: Address for giving notices:
P. O. Box 3005 c/o ZENON Environmental Inc.
Redlands.CA 92373
3239 Dundas Street West
Attest: Oakville,Ontario, Canada L6M 4132
Lorri: ' Poyzer66ky Clerk
END OF DOCUMENT
April 2002 00520-6 6192A 10
CADOCUTIMENTS AND SET TINGS'RIFLI&LOCAL SETTINGS1EIMPORARY INTERNET FILES',0LICCNEVISED ZENON PROCUREMENT.130C
DOCUMENT 00608
ASSIGNMENT OF CONTRACT
The Contract between City of Redlands, California (OWNER)and Zenon Environmental Corporation(SUPPLIER)for the
procurement of Membrane Bioreactor System under the Procurement Documents entitled Proposal for a Zenon
Zenogem°(Zeeweed@ Membrane Bioreactor System for the City of Redlands Wastewater Treatment Plant,California, is
hereby assigned,transferred, and set over to J R Filanc Construction Company, inc. ,
the CONTRACTOR for the General Construction Work,who shall be totally responsible for all work performed by the
assigned and for the OWNER's obligations and rights contained in the Procurement Documents.
SUPPLIER shall provide written consent to OWNER prior to assignment of the Contract to CONTRACTOR.
This assignment will be effective on the Effective Date of the Contract between the OWNER and the CONTRACTOR for
the General Construction Work.
ASSIGNMENT DIRECTED BY: City of Redlands California
Date: June 3, 2003 For OWNER
Karl N. Haws
Attest: �� , � - �.,�' By:
Mayor
Loril Poyze �Yity Clerk (Signature) (Title)
ASSIGNMENT CONSENTED TO BY: Zenon Environmental Corporation
SUPPLI
d
( ignature) (Title)
ASSIGNMENT ACCEPTED BY: FI
J-A. ANC CONSTRUCTION COP Y, INC.
CONTRACTOR
t
PETER r L s _u
By:
(Signature) (Title)
PETER J. FILAINC
PUSEDENT
END OF DOCUMENT