HomeMy WebLinkAboutOrdinances_2307_CCv0001.pdf ORDINANCE NO. 23017
AN ORDINANCE OF TIME CITY OF REDLANDS AMENDING CHAPTER 15.52 OF THE
REDLANDS MUNICIPAL CODE RELATING TO THE ADOPTION OF THE UNIFORM CODE
FOR BUILDING CONSERVATION, 1994 EDITION AND MAKING AMENDMENTS
THERETO
The City Council of the City of Redlands does ordain as follows
Section I. The text of Chapter 15.52 of the Redlands Municipal Code is hereby deleted
in its entirety and rewritten to read as follows;
"Chapter 15.52
UNIFORM CODE FOR BUILDING CONSERVATION'
Section 15.52.010 Effective date ofsections--Statefunding;:
Section 15.52.02 1 Hazardous buildings--Inventory,
Section 15,52.030 Documents adopted by reference--Copies on file.
Section 15.52,040 UCBC Appendix Chapter 1 amended- Section Al 2 Scope.
Section 1' .52.050 UCBC Appendix Chapter I amended--Section 103"Definitions.
15.52.010 Effective date of sections--State funding,
The sections contained in this Chapter, excepting Section 15.52.02.0, shall take effect upon
the State of California or other governmental agency adopting a Handing program which adequately
assists the City and private individuals in financing the retrofitting of potentially hazardous buildings
that have historically exhibited little:resistance to earthquake motion;.
15.52,020 Hazardous buildings--Inventory:
The Chief Building Official shall establish an inventory identifying all potentially hazardous
buildings within the City, including, each building's use and daily occupancy load, The inventory
listing should be Dept on file in the City's Community Development Department. For purposes of
this Chapter, the term "hazardous building" means a building which has historically exhibited little;
resistance to earthquake motion.
15.5 ..030 Documents adopted by reference--Copies on file.
That certain document, at least one copy of which is on file in the Office of the City Clerk'
of the City, and is marked and designated as the "Uniform Code for Building Conservation"" CBC
1994 Edition, Chapters 1,2,3,4,5,6 and 7, and Appendix Chapters 1,3 and 4 (as ended) and the
"State Historical Building Code" (SHBC , Title 24, Part 8, State Building Standards, is adopted and
made part of this Chapter, including all of the regulations, provisions, conditions and tens of such
codes. The SHBC shall apply to all qualified historical buildings covered by this Chapter.
15:51040 UCBC Appendix Chapter I amended--Section A10 Scope:
Chapter I of the Appendix to the Uniform Code for Building Conservation Is amended by
adding Section A 102.2-1 to read as follows:
102.2.I Additional Code Requirements
Z&O
1, Automatic Fire Extinguishing Systems as required by Section 15.20,025 of the Redlands
Municipal Code shall not apply to any work required by this Chapter, However, any additional
improvements, upgrading, remodeling, increase of floor space or change of occupancy done
concurrently with the requirements of this Chapter shall cause such work to be subject to the
requirements of Section 15.20,025,
2. This Chapter does not require alteration of existing clectricaL plumbing, mechanical or
fire safety systems unless a health or safety hazard exists. Any new or repaired electrical,
mechanical, plumbing or fie safety systems shall be required to comply with current building and
fire codes.
3. The State Accessibility Code, Title 24, shall, not apply to an existing structure undergoing
repairs pursuant to this Chapter, New construction shall comply with current State Accessibility
Code regulations.
4. All other Chapters of the UCBC as adopted shall apply to any repairs mandated by this
Chapter,
15.52.050 UCBC Appendix Chapter I amended--Section A103 Definitions.
Chapter I of the Appendix to the Uniform Code for Building Conservation is amended by
rewriting Section A103 to read as follows-,
Section A103, (a) Definitions. For purposes of this Chapter, the meaning of certain terms
shall be as set forth below, and the applicable definitions in the Building Code shall also apply,
"High-Risk Building" is any building, other than an essential or hazardous building, having
an occupant load of 100 occupants or more a s determined by Section 3 3 02(a) of the Building Code.
EXCEPTION-. A high-risk building shall not include the following,
I. Any building having exterior walls braced with masonry crosswalls or wood frame
crosswalls spaced less than 40 feet apart in each story, Crosswalls shall be full-story height with
a minimum length of 1 1/2 times the story height,
2. Any building used for its intended purpose, as determined by the Chief Building
Official, for less than 20 hours per week.
"Low-Risk Building" is any building, other than an essential or hazardous building, having
an occupant load of less than 20 occupants as determined by Section 3302 (a) of the Building Code.
DIMS22LE 2
"Medium-Risk Building" is any building, not classified as a high-risk building or an essential
or hazardous building, having an occupant load of 20 occupants or more as determined by Section
3302 a) of the Building Code:
"Deputy Inspector" is a trade certified technician qualified for the type of construction or
work to be inspected. The technician shall demonstrate competence to the satisfaction of the
building official for inspections of the particular type of construction or operation requiring special
inspections..
"Qualified Historical Building" is any structure, collection of structures and associated sites,
deemed ofimportance to the history, architecture, or culture of an area by an appropriate focal, state,
or federal governmental jurisdiction. This shall include designated structures declared eligible or
listed on official national, state, or local historic registers or official inventories such as the National
Register of Historic Places, Mate Historic Landmarks, Mate Points of Historical Interest, and offr-
cially adopted City or County registers or inventories of historical or architecturally significant sites,
places, or landmarks. Structures included in inventories submitted to the State Office of Historical
Preservation shall be considered qualified ifthey have been evaluated by such office and given any
rating other than ineligible.
"Special Inspector" i a licensed civil or structural engineer or architect for inspections of
the particular type of construction or operation requiring special inspections,
(b) Administration 1. Order- ,Service:-
A. The Chief Building Official shall, in accordance with the priorities set forth in Table
No. A.-1-Hand incorporated at the end of this Chapter, issue an order as provided in this section to
the owner of each building within the scope of this Chapter;
B: Prior to the service of an order as set forth in Table No. A-1-H, a bulletin may be
issued to the owner as shown upon the last equalized assessment roll or to the person in apparent
charge or control of building considered by the Chief Building Official to be within the scope of
this Chapter. The bulletin may contain information the building official deems appropriate; The
bulletin may be issued by mail or personally served.
Order-Priority of Service. Priorities for the service of the order for buildings within
the scope of this Chapter shall be in accordance with the rating classification as shown in Table No,
A-1-H. Within each separate rating classification, the priority of the order shall normally be based
upon the occupant load of the building. The owners of the buildings housing the largest occupant
loads shall be served first. The minimum time period prior to the service ofthe order as shown on
Table No. A-I-H shall be measured from the effective date of this Chapter, The Chief Building
Official may, upon receipt of a written request from the owner, order such owner to bring his
building into compliance with this Chapter prior to the normal service date for such building set
forth in this Chapter.
3, Order-Contents, The order shall be in writing and shall be served either personally
or by certified or registered in"upon the owner as shown on the last equalized assessment roll, and
upon the person, if any, in apparent charge or control of the building. Tice order shall specify that
the building has been determined by the Chief Building Official to be within the scope of this
Chapter and, therefore, is required to meet the minimum seismic standards of this Chapter. The
order shall specify the rating classification of the building and shall be accompanied by a copy of
Section Al 11(d), which sets forth the owner's alternatives and time limits for compliance,
4. Appeal from order. The owner of the building may appeal the Chief Building
Official's initial determination that the building is within the scope of this Chapter to the Board of
Appeals established by Section 15,04,(120 of the Redlands Municipal Code. Such appeal shall be
filed with the Board within 60 days from the service date of the order described in Section A 111(b)
3, The appeal shall be submitted in writing and the grounds thereof shall be stated clearly and
concisely. Any such appeal shall be decided by the Board no later than 90 days from date of receipt
of the appeal by the Board. Appeals or requests for modifications from any other determinations,
orders or actions by the building official pursuant to the Chapter shall be made in accordance with
the procedures established in Sections 107 and 108 of the Uniform Admiruistrative Code,
5. Recordation, At the time that the building official serves the aforementioned order,
the Chief Building Official shall also file with the office of the county recorder a certificate stating
that the subject building is within the scope of this Chapter and is a potentially earthquake hazardous
building. The certificate shall also state that the owner thereof has been ordered to structurally
analyze the building and to structurally alter or demolish it where compliance with this Chapter has
not been demonstrated:
Ifthe building is either demolished, found not to be within the scope of this Chapter, or is
structurally capable of resisting minimum seismic forces required by this Chapter as a result of
structural alterations or an analysis, the Chief Building Official shall file with the office of the
county recorder'a form terminating the status of the subject building as being classified within the
scope of this Chapter.
6. Enforcement. If the owner in charge or control of the subject building fails to comply
with any order issued by the Chief Building Official pursuant to this Chapter within any of the time
limits set forth in Section Al I l(d), the Chief Building Official shall verify that the record owner
of this building has been properly served If the order has been served on the record owner, then the
building official shall order that the entire building be vacated and that the building remain vacated
until such order has been complied with. If compliance with such order has not been accomplished
within 90 days after the date the building has been ordered vacated or such additional time as may
have been granted by the Board of Appeals, the building official may order its demolition in
accordance with the provisions of Section 203 of the Uniform Building Code,
It shall be unlawful for any person, firm or corporation to fail to make the necessary repairs
required by this Chapter, Violation of this Chapter shall be a misdemeanor unless, at the discretion
of the City Attorney, it is charged as an infraction.
4
(c) Rating Classifications. The rating classifications identified in Table No. A-I-E are
hereby established, and each building within the scope of this Chapter shall be placed in one such
rating classification by the building official. The total occupant load of the entire building as
determined by Section 3302 (a) of the Building Code shall be> used to determine the rating
classification.
EXCEPTIOM For purposes of this Chapter, portions of buildings constructed to act
independently when resisting seismic, forces, and having required exits with independent travel
paths, may be placed in separate rating classifications.
(d) Compliance Requirements.
1, The owner of each building within the scope of this Chapter shall, upon service of an
order and within the time limits set forth in this Chapter, cause a structural analysis to be made of
the building by an engineer or architect licensed by the state to practice as such and, if the building
does not comply with earthquake standards specified in this Chapter, the owner shall cause it to be
structurally altered to conform to such standards or shall cause the building to be demolished.
A building subject to this Chapter may remain occupied while structural improvements
required by this Chapter are being made, provided that such construction occurs during the time
limits specified in Table A-l-G as incorporated at the end of this Chapter. The Chief Building
Official may, however, order a building vacated during the period of construction if he finds that
continued occupation of the building would endanger the safety of the occupants,
The structural improvements required by this Chapter may be completed in separate
construction phases if approved or required by the building official. Phased construction shall only
be approved by the Chief Building Official after his review of a complete structural analysis of the
entire building, and upon his determination that the phased construction can be completed without
endangering the safety and structural integrity of the remaining portions of the building which may
remain occupied,
' An owner may vacate a building subject to this Chapter at any time. During a one time
continuous vacancy, the time limits for compliance with this Chapter as set forth in Table A-1-G
shall be stayed up to a maximum of two years. When a vacated building is reoccupied the time
limits set forth in Table A-I-G shall continue to run,
2. The owner of a building within the scope of this Chapter shall comply with the
requirements set forth above by submitting to the building official for review within the following
stated time limit alternatives,
A. ALTERNATIVE 1. Within 360 days after service of the order, a structural analysis,
which is subject to approval by the Chief Building Official, and which shall demonstrate that the
building meets the minimum requirements of this Chapter, or
DA4822LE
B. ALTERNATIVE 2. Within 360 days after service of the order, the structural analysis
and plans for structural alterations of the building to comply with this Chapter, or
C. ALTERNATIVE 3. Within 180 days after service of the order, plans for the installation
of parapet bracing and wall anchors in accordance with the requirements specified in this Chapter-,
or
D, ALTERNATIVE 4, Within 360 days after service of the order, plans for the demolition
of the building.
E. ALTERNATIVE 5. Applications for demolition of qualified historical buildings or
buildings over 50 years old shall be reviewed and acted upon by the Historic and Scenic
Preservation Com mission-
F Notwithstanding the provisions of this Chapter, all buildings shall have all parapets
braced and wall anchors installed within three (3) years from the effective date of this Chapter.
I After plans are submitted and approved by the building official, the owner shall obtain
a building permit and then commence and complete the required construction or demolition within
the time limits set forth.in Table No. A-1- . These time limits shall begin to run from the date the
order is served in accordance with Section Al I I(b) 2, except that the time limit to commence
structural alteration or demolition shall begin to run from the date the building permit is issued,
4. Owners complying with ALTERNATIVES 3 or 5 of this subsection are also required
to comply with ALTERNATIVES 2 or 4 of this subsection provided, however, that the 360 day
period provided for in ALTERNATIVES 2 or 4 and the time limits for obtaining a building permit
and to complete structural alterations or building demolition set forth in Table A-l-G shall be
extended in accordance with Table No. A-1-H. Each such extended time limit shall begin to run
from the date the order is served in accordance with Section Al I I(b), except that the time limit to
commence structural alterations or demolition shall begin to run from the date the building permit
is issued.
Owners not complying with ALTERNATIVE 3 or 5 of this subsection shall comply with
ALTERNATIVE 2 or 4 within the time limits shown in Table A-l-G.
5. Hardship Cases. The Chief Building Official may grant extensions of the time pefiods
specified in Table A-I-G of up to a total of 3 additional years to a building owner who demonstrates
substantial hardship in complying with the provisions of this Chapter, including but not limited to
financial, medical or personal hardships, This time extension shall not apply to the parapet bracing
and wall anchor requirements of Section Al 11(d) (F),
(e) Special Requirements for Historic Buildings
I A qualified historical building or structure may comply with the special provisions set
DJM8221,F 6
forth in this Chapter and Chapter 6 of the UCB ,
Unburned Clay Masonry or Adobe. Existing or re-erected walls of adobe construction shall
conform to the following-
A.. Exterior bearing walls of aznreinf rced adobe masonry shall not exceed a height or
length to thickness ratio of 5 in Seismic Zone No- 4, 6 in Seismic;done No. 3 or 8 in Seismic Zone
No 1 or 2, Such walls shall be provided with a reinforced bondbeamat the top which interconnects
all walls. The band beam shall have a minimum depth of 6 inches, The bond beam may have a
width equal to the width of wall less 8 inches. Minimum wall thickness shall,be 18 inches for
exterior bearing walls and 10 inches for adobe partitions. adobe structures shall not exceed one
story in height unless the historic evidence satisfactory to the Chief Building Oficial indicates
two-story height;is justified, In such cases, the height-to-thickness ratio for the second story shall,
not exceed that stated above. The height-to-thickness ratio for the first story shall not exceed that
permitted for the ,second story by more than 20 percent. Bond beams shall be provided at the roof
and second floor level.
B. Foundation footings shall be reinforced concrete under newly reconstructed walls and
shall be 50 percent wither than the wall above, soil conditions permitting, except that the foundation
wall may be 4 inches less in width than the wall if a rock, burned brick or stabilized adobe facing
is necessary to provide:authenticity.
C. New or existing unstabilized brick and adobe brick masonry shall fest to 75 percent
of the compressive strength required by the Uniform Building Code for new material. Unstabilized
brick maybe used where existing bricks are unsta.bilized and where the buildings not susceptible
to flooding conditions or direct exposure. .Adobe may be allowed a maximum value of 3 pounds per
square inch for shear with no increase for lateral forces:
D. Mortar may be of the same soil composition and stabilization as the brick in lieu of
cement mortar:
E= Nominal tension stresses due to seismic forces normal to the wall may be neglected
if the wall meets thickness requirements and shear values allowed by this subsection.
2. Allowable stresses for archaic materials not specified in this code shall be based on
substantiating research data or engineering judgment with the approval of the Chief Building
Official.
3. Flans for seismic upgrading of qualified historical buildings shall be reviewed by the
Historic Preservation Commission. The basis of review shall be the Design Guidelines and the
Secretary of the Interior's Standards subject to the following requirements:
A; Features of architectural or historic significance shall be retained and reattached,
braced, or stabilized, as required.
BIn-wall anchors shall be used on historic buildings instead of through-wall anchors,
especially on the principal facade. Through-wall anchors on other facades may be permitted,
provided that their locations and treatment are approved by the Director of Community
Development.
CClosure of historic openings on the principal facade shall not be permitted and shall
be discouraged on secondary facades. If closure of such openings on secondary facades is
unavoidable, the materials used shall be compatible with the existing exterior materials of the
secondary facade wall,
D_ Historic parapets shall be braced rather than removed,
I" Historic architectural veneer posing a safety hazard shall be stabilized and
re-anchored to the building.
4. The purpose and intent of the plan review and guidelines shall be to minimize the effects
of seismic strengthening on the exterior appearance of the building.
5. In the case of a qualified historical building, plans showing proposed test and core
locations shall be submitted for review and approval by the Director of Community Development
in order to minimize the effect on the exterior appearance of the building. Repairs after testing shall
match the original adjacent existing wall.
TABLE NO: A-I-G TIME LIMITS FOR COMPLIANCE
OBTAIN BUILDING COMMENCE COMPLETE
REQUIRED ACTION BY OWNER PERMIT CONSTRUCTION CONSTRUCTION
WITHIN WITHIN WITHIN
Structural ALterations One Year,,
180 Days' 3 Years
or Demolition
Parapet Bracing 180 Days` 1 year 2 1
and Wal,I Anchors
"Measured from date of building permit issuance.
'Measured from date of service of order.
DJVM8221,F 8
TABLE NO. A-1-H EXTENSIONS OF TIME AND SERVICE PRIORITIES
RATING CLASSIFICATION OCCUPANT LOAD EXTENSION OF TIME IF MINIMUM TIME PERIODS
PARAPETS & WALL FOR SERVICE OF ORDER
ANCHORS INSTALLED
N/A A N/A
II 300 or more ------ 360 Days
II 100 or more 1 Year 540 Days
III-A 100 or more 1 Year 2 Years
111-8 51 to 99 1 Year 3 Years
III-C 20 to 50 1 Year 4 Years
IV Less Than 20 1 Year
5 Years
Section 2, The Mayor shall sign this ordinance and the City Clerk shall certify to the
adoption of this ordinance and shall cause it, or a summary of it, to be published once in the
Redlands Daily Facts, a newspaper of general circulation within the City and thereafter this
ordinance shall take effect as provided by law,
"01
ayor of the City of Redlands
Attest-
it lerk V�
1,Lorne Poyzer, City Clerk of the City of Redlands, hereby certify that the foregoing ordinance was
duly adopted by the City Council at a regular meeting thereof held on the Sth day of March, 1996,
by the following vote:
AYES: Councilmembers Gilbreath, Cunningham, Gil, Banda; Mayor Larson
NOES,- None
ABSTATNT: None
ABSENT- None
CqityC ryk of—th twv f-Redlands
r')AJ92ZL'P' 9