Loading...
HomeMy WebLinkAbout8127RESOLUTION NO 8127 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS ADOPTING THE MEASURE I FIVE-YEAR CAPITAL PROJECT NEEDS ANALYSIS FOR FISCAL YEARS 2021/2022 THROUGH 2025/2026 WHEREAS, San Bernardino County voters approved passage of Measure I in November 2004, authorizing the San Bernardino County Transportation Authority to impose a one-half of one percent retail transactions and use tax applicable in the incorporated and unincorporated territory of the County of San Bernardino, and WHEREAS, revenue from the tax can only be used for transportation improvement and traffic management programs authorized in the Expenditure Plans set forth in Ordinance No 04-1 of the Authority, and WHEREAS, the Strategic Plan requires each local jurisdiction applying for revenue from certain Measure I Programs to annually adopt and update a Five -Year Capital Project Needs Analysis, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Redlands, as follows Section 1 That approval of this Resolution is exempt from review under the California Environmental Quality Act ("CEQA") pursuant to CEQA Guidelines section 15061 (b)(3) as it can be seen with certainty be this City Council that the approval of this Resolution establishing a Five -Year Capital Project Needs Analysis will have no physical effect on the environment Section 2 That the Measure I Five -Year Capital Project Needs Analysis, attached to this Resolution as Exhibit "A," is hereby adopted ADOPTED, SIGNED AND APPROVED this 20th day of October, 2020 ATTEST Donaldson, City Clerk 1 I \Resolutions\Res 8100 8199\8127 Measure I CPNA.docx co 44Af Paul W Foster, Mayor I, Jeanne Donaldson, City Clerk of the City of Redlands, do hereby certify that the foregoing Resolution was duly adopted by the City Council at a regular meeting thereof held on the 20th day of October, 2020 by the following vote AYES NOES ABSENT ABSTAINED Councilmembers Banch, Tejeda, Davis, Mayor Foster Councilmember Momberger None None 2 I \Resolutions\Res 8100 8199\8127 Measure I CPNA.docx Donaldson, City Clerk EXHIBIT "A" Measure I Five -Year Capital Project Needs Analysis 3 I.\Resolutions\Res 8100-8199\8127 Measure I CPNA.docx Capital Project Needs Analysis Agency- Redlands Program. Valley Arterial Sub -Program Project Name Construct a Traffic Signal at the Intersection of Ford St and 1-10 WB Agency Project Name Agency reported Total Project Cost: $442,000 Escalation Factor-% Actual Prior Year Dollars and escalated costs in subsequent years (not in 1,000s) Public Share 76.90% [ Dev Share 23.10% Exhibit A to Resolution No 8127 Funding Prior FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 Future Total Nexus Total Project Cost (All phases) 441,660 PA&ED MI ART 7 690 0 0 0 0 0 0 7,690 DEV FEE 2,310 0 0 0 0 0 0 2,31Q Total 1.0, 0.00 0 0 0 0' 0 0 Total Presented Funding (Prior - FY25/26) 442,000 PS&E MI ART 76,900 78,438 0 0 0 0 0 155;338 DEV FEE 23,100 23 562 0 0 0 0 0 46,662 Total 100,000, 102,000 0 0 0. 0 0 202,000 Total Measure I Request (Prior - FY25/26) 339,898 ROW Total CONST DEV FEE 0 0 53 130 0 0 0 0 53,130 MI ART 0 0 176,870 0 0 0 0 1:76,870 Total. 0 0 230,000 0 0 0 0 Total 110;000 102,000 230,000 0 0 0 0 *Prior should identify any expenses incurred in prior years that have not yet been reimbursed by SBCTA including FY 20/21 expenses. Project Comments Project Comments Last Update 8/3/2020 7:57:27 AM Page 1 of 9 Reference Measure I Policy 40006 Capital Project Needs Analysis Agency Redlands Program Valley Arterial Sub -Program Project Name Construct a Traffic Signal at the Intersection of Ford St and 1-10 Agency Project Name Agency reported Total Project Cost: $442,000 Escalation Factor% Actual Prior Year Dollars and escalated costs in subsequent years (not in 1,000s) Public Share 76.90% I Dev Share 23.10% Funding Prior FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 Future Total Nexus Total Project Cost (All phases) 441,660 PA&ED DEV FEE 2,310 0 0 0 0 0 0 2,3.10 MI ART 7,690 0 0 0 0 0 0 7,690 Total 1:0,o0o 0 0 0' 0, 0 0 Total Presented Funding (Prior - FY25/26) 442,000 PS&E MI ART 76,900 78 438 0 0 0 0 0 1;55-,338 DEV FEE 23 100 23,562 0 0 0 0 0 46,662. Total -10.0;000, 102,000; 0 0 0 0 Total Measure I Request (Prior - FY25/26) 339,898 ROW Total CONST MI ART 0 0 176 870 0 0 0 0 176,870 DEV FEE 0 0 53,130 0 0 0 0 53,130 Total 0 0 230,000 0 0 0 0 Total 110,000. 102,000 2303000 0 0 0 0 000; *Prior should identify any expenses incurred in prior years that have not yet been reimbursed by SBCTA including FY 20/21 expenses. Project Comments Project Comments Last Update 8/3/2020 9:00:23 AM Page 2 of 9 Reference Measure I Policy 40006 Capital Project Needs Analysis Agency. Redlands Program Valley Freeway Interchange Program Project Name I-10 & University Ave Agency Project Name Agency reported Total Project Cost: $940 000 Escalation Factor•% Actual Prior Year Dollars and escalated costs in subsequent years (not in 1,000s) Public Share 76.90% f Dev Share 23.10% Funding Prior FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 Future Total Nexus Total Project Cost (All phases) 940,000 PA&ED MI VFI 318,772 0 0 0 0 0 0 318,772 DEV LOAN 116 688 0 0 0 0 0 0 116;688 Total 435,460 0 0 0 0 0 0 60 Total Presented Funding (Prior - FY25/26) 5,231,422 PS&E MI VFI 508 862 0 0 0 0 0 0 508,862 DEV FEE 133 926 0 0 0 0 0 0 133,926 Total 642,788 0: 0 0 0. 0 0 Total Measure I Request (Prior - FY25/26) 4,218,522 ROW Total, CONST MI VFI 0 3,390,888 0 0 0 0 0 3,390,,88.8 DEV FEE 0 87 019 0 0 0 0 0 87,019 DEV LOAN 0 675,267 0 0 0 0 0 675,267 Total, 0 4,153,174 0 0 0 0.' 0 Total 1,,078,248 4,153,174 0 0 0 0 0. *Prior should identify any expenses incurred in prior years that have not yet been reimbursed by SBCTA including FY 20/21 expenses. Project Comments Project Comments Last Update 8/3/2020 7:57 17 AM Page 3 of 9 Reference Measure I Policy 40006 Capital Project Needs Analysis Agency. Redlands Program Valley Arterial Sub -Program Project Name Intersection Improvements at University and Colton Agency Project Name University Street and Colton Avenue Traffic Signal Agency reported Total Project Cost: $500 000 Escalation Factor% Actual Prior Year Dollars and escalated costs in subsequent years (not in 1,000s) Public Share 76.90% Dev Share 23.10% Funding Prior FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 Future Total Nexus Total Project Cost (All phases) 500,000 PA&ED MI ART 38,450 0 0 0 0 0 0 38,450 DEV FEE 11,550 0 0 0 0 0 0 11,550 Total 50,000 0 0 0 0 0 0 50000 Total Presented Funding (Prior - FY25/26) 500,000 PS&E MI ART 0 76 900 0 0 0 0 0 76,900 DEV FEE 0 23,100 0 0 0 0 0 23,100 Total 0 100 000 0 0 0 0 0 Total Measure I Request (Prior - FY25/26) 384,500 ROW Total 0 CONST MI ART 0 0 269 150 0 0 0 0 269,150 DEV FEE 0 0 80,850 0 0 0 0 80,850 Total 0 0 350,000 0 0 0 0 Total 50,000 100,000 350,000 0 0 0 *Prior should identify any expenses incurred in prior years that have not yet been reimbursed by SBCTA including FY 20/21 expenses. Project Comments Installation of a traffic signal at the intersection of University Street and Colton Avenue Last Update 8/3/2020 7:57.03 AM Page 4 of 9 Reference Measure I Policy 40006 Capital Project Needs Analysis Agency' Redlands Program Valley Arterial Sub -Program Project Name Widen Citrus Ave from Dearborn St to Wabash Ave from 2 to 4 lanes Agency Project Name Agency reported Total Project Cost: $1,584 000 Escalation Factor% Actual Prior Year Dollars and escalated costs in subsequent years (not in 1,000s) Public Share 76.90% I Dev Share 23.10% Funding Prior FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 Future Total Nexus Total Project Cost (All phases) 1,583,891 PA&ED MI ART 0 0 0 38,450 0 0 0 38,450 DEV FEE 0 0 0 11,550 0 0 0 11,5.50. Total 0 0 0 50,000 0 0 0' 5;0000 Total Presented Funding (Prior - FY25/26) 316,800 PS&E MI ART 0 0 0 0 205 169 0 0 205,1169 DEV FEE 0 0 0 0 61 631 0 0 61,631 Total. 0 0 0. 0 266;800 0 0 '266 $'00 Total Measure I Request (Prior - FY25/26) 243,619 ROW Total : O. CONST Total 0 Total 0 0 0 50;000 266,800 0 0. ` 3.1'6,80.0 *Prior should identify any expenses incurred in prior years that have not yet been reimbursed by SBCTA including FY 20/21 expenses. Project Comments Project Comments Last Update 8/3/2020 7:56:55 AM Page 5of9 Reference Measure I Policy 40006 Capital Project Needs Analysis Agency Redlands Program Valley Arterial Sub -Program Project Name Widening Pioneer Ave from Furlow Dr to Texas St from 2 to 4 lanes (to be added) Agency Project Name Agency reported Total Project Cost: $1,500 000 Escalation Factor•% Actual Prior Year Dollars and escalated costs in subsequent years (not in 1,000s) Public Share 76.90% I Dev Share 23.10% Funding Prior FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 Future Total Nexus Total Project Cost (All phases) 1,500,000 PA&ED MI ART 0 115 350 0 0 0 0 0 115,350 DEV FEE 0 34 650 0 0 0 0 0 34,6.50, Total 0 150,000 0 0 0' 0 0 Total Presented Funding (Prior - FY25/26) 1,500,000 PS&E MI ART 0 0 173 025 0 0 0 0 173;025 DEV FEE 0 0 51,975 0 0 0 0 51,975 Total, 0 0 225,000 0 0 0 Total Measure I Request (Prior - FY25/26) 1,153,500 ROW MI ART 0 0 0 115,350 0 0 0 115,350. DEV FEE 0 0 0 34 650 0 0 0 :34 '650 Total 0 0. 0 150,000 0 0 0 0000 CONST MI ART 0 0 0 0 749 775 0 0 749,775 DEV FEE 0 0 0 0 225,225 0 0 225,225 Total 0 0 0 0 975,000 0 0 Total 0 150,000 225,000 150,000 975,000 0 0 0000 *Prior should identify any expenses incurred in prior years that have not yet been reimbursed by SBCTA including FY 20/21 expenses. Project Comments Project Comments Last Update 8/3/2020 9:01.01 AM Page 6 of 9 Reference Measure I Policy 40006 Capital Project Needs Analysis Agency' Redlands Program Valley Arterial Sub -Program Project Name Widen San Bernardino Ave from Church St to Wabash Ave from 2 to 4 lanes Agency Project Name Agency reported Total Project Cost: $3,565 000 Escalation Factor•% Actual Prior Year Dollars and escalated costs in subsequent years (not in 1,000s) Public Share 76.90% I Dev Share 23.10% Funding Prior FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 Future Total Nexus Total Project Cost (All phases) 3,565,000 PA&ED MI VFI 0 0 0 76,900 0 0 0 76,900 DEV FEE 0 0 0 23 100 0 0 0 23,100 Total 0 0. 0 1.00,000 0 0 0 ' 1.000.00. Total Presented Funding (Prior - FY25/26) 641,700 PS&E MI ART 0 0 0 0 416 567 0 0 41'6,567 DEV FEE 0 0 0 0 125 133 0 0 125,133 Total 0 0 0 0 541,700 0 0 54:1',:700 Total Measure I Request (Prior - FY25/26) 493,467 ROW Total 43; CONST Total ':0, Total 0 0 0 100,000 541,700 0 0 641,700 *Prior should identify any expenses incurred in prior years that have not yet been reimbursed by SBCTA including FY 20/21 expenses. Project Comments Project Comments Last Update 8/3/2020 7:56 46 AM Page 7of9 Reference Measure I Policy 40006 Measure I Valley Major Street/Arterial Sub -Program Allocations, Reimbursements and Loans Jurisdiction Equitable Share Allocation FY20/21 Allocations FY10/il thru FY20/21, Reimbursements FY10/11 thru FY20/21 Allocations - Reimbursements Arterial Loans Chino 7.591% $ 1,790,193.26 $10,530,932.02 $ 298,945.94 $10,231,986.08 Chino Hills 2.194% $ 517,413.25 $3,043,718.20 $ - $3,043,718.20 Colton 2.534% $ 597,595.80 $3,515,397.41 $ 374,399.91 $3,140,997.50 Fontana 19 400% $ 4,575,121.75 $26,913,460.81 $ 4,440,957.57 $22,472,503.24 Grand Terrace 1.389% $ 327,569.28 $1,926,948.31 $ 151,461.76 $1,775,486.55 Highland 6.777% $ 1,598,226.81 $9,401,676.49 $ - $9,401,676.49 $ 1,462,417.00 Loma Linda 4 074% $ 960,775.57 $5,651,826.77 $ 2,591,018.56 $3,060,808.21 Montclair 0.597% $ 140,791.12 $828,213.20 $ 6,308.40 $821,904.80 $ 3,897,666.73 Ontario 12.272% $ 2,894,118.25 $17,024,844.89 $ 1,116,351.46 $15,908,493.43 $ 6,383,764.00 Rancho Cucamonga 5 044% $ 1,189,531.65 $7,027,499.80 $ 5,429,606.70 $1,597,893.10 Redlands 4.854% $ 1,144,723.76 $6,733,914.37 $ 2,112,512.00 $4,621,402.37 $ 603,973.63 Rialto 3.831% $ 903,468.63 $5,314,714.86 $ 4,411,246.23 $903,468.63 San Bernardino 7.857% $ 1,852,924.31 $10,899,951.63 $ 1,176,417.55 $9,723,534.08 Upland 2.743% $ 646,884.48 $3,805,341.40 $ 2,590,093.12 $1,215,248.28 $ 2,029,872.20 Yucaipa 5.965% $ 1,406,732.02 $8,275,195.56 $ 4,960,130.03 $3,315,065.53 County 12.878% $ 3,037,031.85 $17,865,543.73 $ 5,983,366.00 $11,882,177 73 Arterial Allocation 100.000% $23,583,101.80 $138,759,179.43 $35,642,815.23 $103,116,364.20 514,377,693.56' Page 8 of 9 MEASURE I VALLEY MAJOR STREET ARTERIAL SUBPROGRAM ALLOCATION ADJUSTMENT SCHEDULE FY2021/2022 THRU FY2025/2026 (SBCTA Board Approval April 1,2020) Jurisdictionunadjusted Estimated FY21/22 Allocation Annual Allocation Adjustment over 15 Years Estimated adjusted FY21/22 allocation FY18/19 Remaining Equitable Share to be Reconciled Chino $1,433,474.24 $132,649.02 $1,566,123.27 $1,913,269.53 Chino Hills $414,312.01 $414,312.01 $0.00 $6,640,616.47 Colton $478,51716 $77,232.68 $555,749.84 $1 113,969.25 Fontana $3,663,469.94 -81,366,276.83 $2,297,193.12 $19,127,875.57 Grand Terrace $262,296.89 $42,334.72 $304,631.62 $610,616.92 Highland $1 279 759.58 $201,608.50 $1,481,368.08 $2,907,909.83 Loma Linda $769,328.69 $124,169.67 $893,498.36 $1,790,96714 Montclair $112,736.68 $18 195 70 $130,932.38 $262,446.59 Ontario $2,317,428.00 $374,032.93 $2,691,460.93 $5,394,881.87 Rancho Cucamonga $952,502.19 $203,244 11 $749,258.08 -$2,845,417 51 Redlands $916,622.84 $147,942.95 $1,064,565.79 52133,86217 Rialto $723,440.89 $79,906.94 $803,347.84 $1,152,541 61 San Bernardino $1,483,705.33 $239,470.07 $1 723 175.40 $3,454,008.05 Upland $517 984.44 $83,602.70 $601,587 13 $1,205,84753 Yucaipa $1,126,422.59 $70,18413 $1,196,606.72 $1,012,30413 County : $2,431 864.22 $392,502.94 $2,824,36716 $5,661,284.93 TOTALS I $18,883,865.69 $0.00 $18,883,865.69 $0.00 Jurisdiction Estimated unadjusted FY24/25 Allocation Annual Allocation Adjustment over 15 Years Estimated adjusted FY24/25 allocation FY18/19 Remaining Equitable Share to be Reconciled Chino $1,463,773.70 $133,234.58 $1,597 008.29 $1,516,056.98 Chino Hills $423,069.36 $423,069.36 50.00 -$5,408,665.52 Colton $488,631 61 $77 573.61 $566,205.22 $882,698.87 Fontana $3740,905.00 -81,366,276.83 $2,374,62818 $15,029,045.09 Grand Terrace $267,841 08 $42,521 60 $310,362.69 $483,847 17 Highland $1,306,809.96 $202,498.47 $1,509,308.43 $2,304,200 70 Loma Linda $785,590.05 $124 717.80 $910,307.85 $1,419,145.70 Montclair $115,119.60 $18,276.02 $133,395.63 $207 960.23 Ontario $2,366,411 66 $375,684.04 $2,742,095.70 $4,274,854.22 Rancho Cucamonga $972,635.30 $203,244 11 $769,391 19 -$2,235,685.19 Redlands $935,997.57 $148,596.02 $1,084,593.59 $1,690,852.54 Rialto $738,732.32 $80,259.68 $818,992.00 $913,263.25 San Bemardino $1,515,066.53 $240,52718 $1 755,593.70 $2,736,923.86 Upland $528,933 11 $83,971 75 $612,904.87 $955,502.37 Yucaipa $1,150,231.87 $70,493.95 $1,220,725.82 $802 140.37 County $2,483,266 73 $394,235.59 $2,877,502.32 $4,485,949.52 TOTALS $19,283,015.48 $0.00 $19,283,015.48 $0.00 Estimated unadjusted FY22/23 Allocation Annual Allocation Adjustment over 15 Years Estimated adjusted FY22/23 allocation FY18/19 Remaining Equitable Share to be Reconciled $1,378,715.55 $131,59077 $1,510,306.32 $1,781,678.77 $398,485.30 -8398,485.30 $0.00 $6,242 131 17 $460,237 81 $76,616.53 $536,854.34 $1,037,352.72 $3,523,525.45 -81,366,276.83 $2,157,248.63 -817,761,598.74 $252,277 16 $41,996.98 $294,27414 $568,619.94 $1,230,872.78 $200,000 10 $1,430,872.88 $2,707,909.73 $739,940.35 $123,179.06 $863,119.41 $1,667,788.08 $108,430 14 $18,050.54 $126,480.68 $244,396.05 $2,228,902.29 $371,048.95 $2,599,951 24 $5,023,832.92 $916 116.62 -$203,24411 5712,872.51 -$2,642173.41 $881,607.86 $146,762.68 $1,028,370.54 51,987099.49 $695,805.46 $79,269.46 $775,074.92 $1,073,272.15 $1,427,027.81 $237 559.62 $1,664,587 43 $3,216,448.43 $498197.44 $82,935.73 $581 133 17 81122,91180 $1,083,393.26 $69,624.21 $1,153,017.47 $942,679.92 $2,338,967.05 $389,371.61 $2,728,338.66 $5,271,913.32 $18,162,502.34 $0.00 $18,162,502.34 $0.00 Estimated unadjusted FY25/26 Allocation Annual Allocation Adjustment over 15 Years Estimated adjusted FY25/26 allocation FY18/19 Remaining Equitable Share to be Reconciled $1,509,983.37 $134 127.62 $1,644 110.99 $1,381,929.37 $436,42518 -$436,425 18 $0.00 $4,972,240.35 $504,057 15 $78,093.57 $582 150.72 $804 605.31 $3,859,001 10 -81,366,276.83 $2,492 724.27 $13,662,768.26 $276,296.52 $42,806.62 $319,103.14 $441,040.55 $1,348,064.46 $203,855.76 $1,551,920.22 $2 100,344.94 $810,390.23 $125,553.75 $935,943.98 $1,293,591 96 $118,753.80 $18,398.52 $137,152.32 $189,561 71 $2,441116.57 $378,20216 $2,819,318.73 $3,896,652.06 81,003,340.29 -$203,244 11 $800,096 18 $2,032,441 08 $965,545.94 $149,592.02 $1,115,137.96 $1,541,260.52 $762,053.26 $80,797.64 $842,850.90 $832,465.61 $1,562,895.44 $242,139.37 $1 805,034.81 $2,494,784.49 $545,630.93 $84,534.59 $630,165.52 $870,967 78 $1186,543.38 $70,966.45 $1,257,509.83 $731 173.93 $2,561,660.63 $396,878.04 $2,958,538.67 $4,089,071.48 $19,891,758.24 $0.00 $19,891 758.24 $0.00 Estimated unadjusted FY23/24 Allocation Annual Allocation Adjustment over 15 Years Estimated adjusted FY23/24 allocation FY18/19 Remaining Equitable Share to be Reconciled $1,419,926.25 $132,387.20 $1,552,313.45 $1,649,291.57 $410,396.28 -8410,396.28 $0.00 $5,831 734.88 $473,994.61 $77,080.24 $551 074.85 $960,272.49 $3,628,845.91 -81,366,276.83 52,262,569.08 -$16,395,32192 $259,817.88 $42,251 16 _ $302,069.05 $526,368.78 $1,267 664.37 $201,210.56 $1,468,874.93 $2,506,699 17 $762,057.64 $123,924.58 $885,982.22 $1,543,863.50 $111,671 19 $18 159 79 $129,830.97 $226,236.26 $2,295,525.62 $373,294.66 $2,668,820.27 $4,650,538.26 8943,499.94 -$203,244 11 $740,255.83 $2,438,929.30 $907,959.69 $147 650.93 $1 055,610.63 $1,839,448.56 $716,603.54 $79,749.22 $796,352.76 $993,522.93 $1 469,682.59 $238,997.40 $1 708,679.99 $2,977 451.03 $513,088.88 $83,437 68 $596,526.56 $1 039,474 12 $1,115,776.59 $70,045.60 $1,185,82219 $872,634.32 $2,408,880.29 $391 728.21 $2,800,608.50 $4,880 185.11 $18,705,391.27 $0.00 $18,705,391.27 $0.00 Page 9 of 9