Loading...
HomeMy WebLinkAbout8045RESOLUTION NO 8045 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS ESTABLISHING A FEE AND SERVICE CHARGE REVENUE/COST COMPARISON SYSTEM AND THE AMOUNTS OF FEES LEVIED IN CONNECTION WITH THE CITY'S PROVISION OF SERVICES, AND RESCINDING RESOLUTION NO 7892 BE IT RESOLVED by the City Council of the City of Redlands as follows Section 1. Intent. Pursuant to article XIIIB of the California Constitution, it is the intent of the City Council of the City of Redlands to require the ascertainment of recovery of costs reasonably borne from fees levied therefor m providing the services hereinafter enumerated in the exhibits to this Resolution. The fee and service charge revenue/cost comparison system established within this Resolution provides a mechanism to ensure that, pursuant to this Resolution, the fees adopted by the City for services rendered do not exceed the reasonable estimated costs for providing the services for which the fees are charged. Accordingly, the City Council, by adoption of this Resolution, adopts the fees described in the attached Exhibit "A" which have been adjusted by CPI in accordance with Section 2, except where the fee has been set by statute or where otherwise determined that no CPI increase is in the best interests of the City for the efficient payment and collection of fees, or in case of recreation fees, participation m the programs. Section 2. CPI Adjustment. The fees referenced within this Resolution shall be increased annually by the City's Finance Director, in July of each fiscal year, by an amount reasonably equal to the percent change m the Consumer Price Index — All Urban Users (Riverside — San Bernardino — Ontario) over the prior year In making such adjustments, the Finance Director may round the amount of the increased fee to the nearest dollar for purposes of facilitating efficient payment and collection. Further, the City Manager, or his or her designee, shall undertake periodic reviews of the fees established by this Resolution and provide a written report to the City Council recommending whether such fees should be adjusted to reflect increased costs or efficiencies in the City's provision of services Section 3. Authority for Administrative Orders. The City Manager is hereby delegated the authority to issue administrative orders establishing fee collection and financial procedures for implementation of this Resolution. All such administrative orders shall be signed by any affected department directors and the Finance Director Section 4. Costs Reasonably Borne. The phrase "costs reasonably borne," as used in this Resolution, consists of: A. All applicable direct costs including, but not limited to, salaries, wages, frmge benefits, services and supplies, operation expenses, contracted services, special supplies and any other direct expense incurred. -1- I.\Resolutions\Res 8000-8099\8045 Fee Resolution Dec. 2019.docx B All applicable indirect costs including, but not limited to, building maintenance and operations, equipment maintenance, conuilunication, printing and reproduction, and like expenses, when distributed on a rational proration system. C Fixed asset recovery expenses, consisting of depreciation of fixed assets and additional fixed asset expense recovery charges calculated on the current estimated cost of replacement, divided by the approximate life expectancy of the fixed asset. A further additional charge to make up the depreciation not previously recovered and reserved in cash also shall be calculated and considered a cost so as to recover such unrecovered depreciation over the remaining life of the asset. D General overhead, expressed as a percentage, distributing and charging the expenses of the City Council, City Manager, Finance Department, City Clerk, City Treasurer, City Attorney, Human Resources Department and all other staff and support service provided to the entire City organization. E. Departmental overhead, expressed as a percentage, distributing and charging the cost of each department director and his or her supporting expenses as enumerated in the above subsections of this section. F Debt service costs, consisting of repayment of principal, payment of interest, and trustee fees and administrative expenses for all applicable bonds, certificates of participation, securities issues or loans. Any required coverage factors of added reserves beyond basic debt service costs shall also be considered a cost if required by covenant within any securities, ordinance, resolution, indenture or general law applicable to the City Section 5. Public Hearing. Pursuant to California Government Code sections 66016 and 66018, and other applicable statutory requirements, the City Clerk has caused public notice to be provided as set out in Government Code sections 66016, 66018 and 6062a, and the City Council has received, at a regularly scheduled meetmg, oral and written testunony from staff and members of the public concerning the new or increased fees proposed to be established by this Resolution. The notice, oral and written presentations and public meeting were provided prior to the City Council taking any action on the new or increased fees established by this Resolution. Section 6. Public Data. At least ten (10) days prior to the required public hearing described herein, the City Clerk made available to the public data indicating the cost or estimated cost required to support the fee for which the charge is proposed to be made The data demonstrates that the new or increased fees established by this Resolution is not a tax, that the amount of the fee is necessary to cover the reasonable costs of the City for the Service for which it is imposed, and the manner in which the costs are allocated to a payor bear a fair and reasonable relationship to the payor's burden on, or benefit received from, the City's governmental activities. Section 7. Public Notice. Notice of the time and place of the public hearing, including a general explanation of the matter to be considered, has been mailed by the City Clerk at least -2- I.\Resolutions\Res 8000-8099\8045 Fee Resolution Dec. 2019.docx fourteen (14) days prior to the public hearing to all interested parties who have filed written requests with the City for mailed notice of meetings relating to new or increased fees. Section 8. Actual Costs/Deposits. The actual cost for a service or project is determined by the affected City department directors. Initial deposits are determined by the amount of time historically spent by City staff on similar projects. Whenever seventy five percent (75%) of a deposit has been expended and the department director determines that the estimated actual cost of the project or service will exceed the amount deposited, an additional deposit of such estimated excess amounts may be required. When an additional deposit has been requested, work may be suspended on the project or service when eighty percent (80%) of the deposit previously received has been expended. Section 9. Proposition 26 Determination. The City Council hereby finds and determines that the fees referenced within this Resolution are not taxes as defined in Article XIII C Section 1(e) of the California Constitution because the fees are either A. Imposed for a specific benefit conferred or privilege granted directly to the payors, that is not provided to those not charged, and which do not exceed the reasonable costs m the City of conferring the benefit or granting the privilege, B Imposed for a specific government service or product provided directly to the payor that is not provided to those charged, and which do not exceed the reasonable costs to the City of providing the service or product, C Imposed for the reasonable regulatory costs to the City for issuing licenses and permits, performing investigations, inspections, or audits, and the administrative enforcement and adjudication thereof; D Imposed for entrance to, or use of, City property; or the purchase, rental or lease of City property; or E Charges imposed as a condition of property development. Section 10. Prior Resolutions Rescinded. Resolution No 7892 of the City Council of the City of Redlands relating to fees is hereby rescinded on the effective date of this Resolution, except for the fees referenced therein and which are identified in this Resolution as becoming effective sixty (60) days after December 3, 2019 For the fees identified in this Resolution No 8045 as becoming effective sixty (60) days after December 3, 2019, such portions of Resolution No 7892 shall not be rescinded until sixty (60) days after December 3, 2019 Section 11. CEQA Exemption. The City Council hereby finds and determines that the adoption of this Resolution is exempt from review under the California Environmental Quality Act ("CEQA") pursuant to Public Resources Code Section 21080(b)(8)(1) and CEQA Guidelines Section 15273 because this Resolution relates to fees and charges for the purpose of meeting the operating expenses of the City -3- I.\Resolutions\Res 8000-8099\8045 Fee Resolution Dec. 2019.docx Section 12 Severabihty. Should any part or portion of this Resolution be rendered or declared invalid by a court of competent jurisdiction, including any of the fees identified m the Exhibit to this Resolution, such invalidation of such part or portion of tlus Resolution, or of any fee, shall not invalidate the remaining portions hereof, of the remaining fees, and they shall remain in full force and effect Section 13 Effective Date This Resolution and the fees established by this Resolution shall become effective on December 3, 2019 except for new or modified fees which apply to the "filing, accepting, reviewing, approving, or issuance of an apphcation, permit or entitlement to use" for a development project, as defined m Government Code section 66000, which shall become effective sixty (60) days after December 3, 2019 ADOPTED, SIGNED AND APPROVED this 3rd day of December 2019 ATTEST Donaldson, City Clerk aul W Foster, Mayor -4- I \Resolutions\Res 8000 8099\8045 Fee Resolution Dec 2019 docx I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certify that the foregomg Resolution was duly adopted by the City Council at a regular ineetmg thereof, held on the 3rd day of December, 2019, by the followmg vote AYES Councilmembers Barich, Tejeda, Momberger, Davis, Mayor Foster NOES None ABSTAIN None ABSENT None Donaldson, City Clerk -5- I \Resolutions\Res 8000 8099\8045 Fee Resolution Dec 2019 docx EXHIBIT "A" [Attached] -6- I.\Resolutions\Res 8000-8099\8045 Fee Resolution Dec. 2019.docx Fees as of 7/17/2018 Fees as of 7/16/2019 LEGEND adjusted for 1 9% CPI increase adjusted for 2.8% CPI increase Fee Added Resolution No 7892 Resolution No xxxx No Change in Fee Service Name % Recovery Fee Year 6 Fee Year 7 Fee Deleted PLANNING DIVISION 1 Concept plan 100% 10 122 10,405 2 Concept plan amendment 100% 4 120 4,235 3 Specific plan 100% 9,460 9,725 4 Specific plan amendment 100% 4,306 4,427 5 CUP new construction 100% 6,529 6,712 6 CUP no new construction 100% 2 173 2,234 7 CUP time extension 100% 359 369 8 RevisedCUP- construction 100% 3,066 3152 9 Revised CUP no construction 100% 1,547 1,590 10 CUP daycare home (13 + clients) 100% 2,359 2,425 11 Variance fence committee 100% 615 632 12 Variance - SFR 100% 2,699 2,775 13 Variance comm, multi family 100% 3,014 3,098 14 Variance parking modification 100% 2,215 2,277 15 Building moving main structure 100% 1,795 1,845 16 Building moving garage/secondary structure 100% 1 701 1,749 17 CRA major>1 acre 100% 7358 7,564 18 CRA - minor 1 acre or less 100% 5,622 5 779 19 CRA time extension 100% 296 304 20 Minor commission review 100% 1,928 1 982 21 CRA revised major 100% 5,886 6,051 22 CRA- revised minor 100% 5,075 5,217 23 Parcel map 100% 4,908 5,045 24 Revised parcel map 100% 3,871 3,979 25 Reversion to acreage/merger 100% 2,737 2,814 26 Tentative tract map 100% 12 153 12,493 27 Revised tentative tract map 100% 8 108 8,335 28 Subdivision time extension 100% 384 395 29 Lot line adjustment 100% 687 706 30 Certificate of compliance 100% 730 750 31 Negative declaration (by staff) 100% 5,545 5,700 32 Negative declaration (by consultant) 100% Contract plus 10% administrative fee Contract plus 10% administrative fee 33 Environmental Impact Report (by consultant) 100% Contract plus 10% administrative fee Contract plus 10% administrative fee 34 Environmental project assessment 100% 786 808 35 Residential Development Allocation (RDA) 100% 3,752 3,857 36 Residential Development Allocation (RDA) alteration of approved project 100% 592 609 37 Residential Development Allocation (RDA) transfer of development allocation 100% 579 595 38 Home occupation permit - review 100% 49 50 39 Temporary Events 100% 170 175 40 Zone Change commission determination 100% 2,281 2,345 41 Zone Change - ordinance text amendment 100% 2,872 2,952 42 Zone Change 100% 3,694 3,797 43 One sign review 100% 662 681 44 Sign program 100% 1,500 1,542 PLANNING DIVISION Continued 1 Exhibit A of Resolution No. 8045 Fee Schedule.xlsx Fees as of 7/17/2018 Fees as of 7/16/2019 LEGEND adjusted for 1 9% CPI increase adjusted for 2.8% CPI increase Fee Added Resolution No 7892 Resolution No xxxx No Change in Fee Service Name % Recovery Fee Year 6 Fee Year 7 Fee Deleted 45 Flag test 100% 1,439 1,479 46 Sign review by staff 100% 135 139 47 Sign program amendment 100% 807 830 48 Annual banner permit 100% 130 134 49 Additional banner display 100% 66 68 50 Searchlights 100% 130 134 51 CUP signs >120 SF 100% 2,594 2,667 52 Demolition > 50 yr old - Historic Designated SFR 100% 931 r 957 53 Demolition > 50 yr old Histonc Designated MF, Comm, Indstrl 100% 931 957 54 Demolition > 50 yr old Historic Designated Accessory Building 100% 649 667 55 Demolition > 50 yr old Single Family Zones 100% 628 646 56 Demolition > 50 yr old Multi Family Commercial & Industrial 100% 664 683 57 Demolition > 50 yr old Accessory Building 100% 549 564 58 Annexation 100% 6,877 7,070 59 Service plan for annexation 100% 1,334 1,371 60 Pre annexation agreement 100% 2,495 2,565 61 Agriculture preserve removal 100% 2,455 2,524 62 General plan amendment 100% 5,903 6,068 63 Street vacation 100% 2,531 2,602 64 Appeal - Various Fees Paid 100% 2,193 2,254 65 Addendum to planning commission 100% 1,156 1 188 66 Continued item by applicant 100% 360 370 67 Verification letter- basic 100% 374 384 68 Verification letter research 100% 663 682 69 Temporary occupancy 100% 195 200 70 News rack impound fee 100% 366 376 71 Development agreement 100% 5,942 6,108 72 Williamson Act contract removal 100% 2 724 2,800 73 Socio Economic Study 100% 3,176 3,265 74 Preliminary Review -over one acre 100% 418 430 75 Preliminary Review -one acre or less 100% 323 332 76 Minor Certificate of Appropnateness 100% 346 356 77 Certificate of Appropriateness 100% 598 615 78 Demolition Permit < 50 yr. old Single Family Zones 100% 376 387 79 Demolition Permit < 50 yr old - Multi Family Commercial & Industrial 100% 391 402 80 Demolition Permit < 50 yr old Accessory Building 100% 418 430 81 Mills Act 100% 467 480 82 Administrative Use Permit 100% 773 795 83 Zoning Clearance Form 100% 45 46 MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT 84 Environmental Impact Review 100% 381 392 85 Environmental Impact Report Review 100% 1,807 1,858 86 Tentative Tract Map 100% 1,429 1,469 87 Revised Tract Map 100% 1,429 1,469 88 Final Tract Map 100% 2,497 2,567 89 Tentative Parcel Map 100% 1,429 1,469 2 Exhibit A of Resolution No. 8045 Fee Schedule.xlsx Fees as of 7/17/2018 Fees as of 7/16/2019 LEGEND adjusted for 1 9% CPI increase adjusted for 2.8% CPI increase Fee Added Resolution No 7892 Resolution No xxxx No Change in Fee Service Name % Recovery Fee Year 6 Fee Year 7 Fee Deleted 90 Revised Parcel Map 100% 1,836 1 887 91 Final Parcel Map 100% 2,245 2,308 92 Easement/Dedication Review 100% 719 739 93 Conditional Use Permit 100% 1,037 1 066 94 Commission Review and Approval 100% 1,037 1,066 95 Building Moving Permit 100% 233 240 96 Lot Line Adjustment 100% 671 690 97 Certificate of Compliance 100% 298 306 98 Street Vacation 100% 1,093 1,124 99 Subordination Agreement/Lien Release 100% 696 715 100 Building Permit Residential 100% 716 736 101 Building Permit Commercial/Industrial 100% 1,037 1 066 102 Building Permit Room Addition 100% 133 137 103 Building Permit - Commercial TI 100% 133 137 104 Plan Check Grading Base Fee/ 0 500 c.y 100% 492 506 105 Plan Check Grading, each addtl 500 cy or fraction thereof 501 5,000 c.y 100% 68 70 106 Plan Check - Grading each addtl 5,000 cy or fraction thereof, 5,001 50,000 c.y 100% 78 80 107 Plan Check Grading each addtl 10,000 cy or fraction thereof, 50,001-100,000 c.y 100% 88 90 108 Plan Check -Grading, each addtl 10,000 cy or fraction thereof, 100,001-200,000 c.y. 100% 10 10 109 Plan Check -Grading, >200,001 c.y. each addtl 10,000 cy or fraction thereof 100% 6 6 110 Plan Check Erosion Control SFR 100% 566 582 111 Plan Check Erosion Control Project Base Fee 100% 1,072 1,102 112 Plan Check SWPPP SFR 100% 1,047 1 076 113 Plan Check SWPPP Project Base Fee 100% 1,383 1 422 114 Plan Check SWPPP Subdivision Lot Fee 100% 145 149 /lot 115 Plan Check SWPPP Subdivision Acre Fee 100% 145 149 /acre 116 WQMP BMP Inspection Complex Projects 100% 743 764 117 WQMP BMP Inspection Standard Projects 100% 575 591 118 WQMP BMP Inspection Basic Project 100% 406 417 119 Plan Check Preliminary WQMP SFR 100% 722 742 120 Plan Check Preliminary WQMP - Project Base Fee 100% 806 829 121 Plan Check Preliminary WQMP Subdivision Lot Fee 100% 199 205 /lot 122 Plan Check Preliminary WQMP Subdivision Acre Fee 100% 199 205 /acre 123 Plan Check Final WQMP SFR 100% 1 047 1,076 124 Plan Check Final WQMP - Project Base Fee 100% 1,383 1,422 125 Plan Check Final WQMP Subdivision Lot Fee 100% 145 149 /lot 126 Plan Check Final WQMP - Subdivision Acre Fee 100% 145 149 /acre MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT Continued 127 Plan Check Parcel Map Base Fee 100% 3,478 3,575 128 Plan Check - Parcel Map Lot Fee 100% 167 172 /lot 129 Plan Check Parcel Map Acre Fee 100% 29 30 /acre 130 Plan Check Tract Map Base Fee 100% 3,982 4,093 131 Plan Check Tract Map Lot Fee 100% 100 103 /lot 132 Plan Check - Tract Map - Acre Fee 100% 29 30 /acre 133 Plan Check - Street Construction Base fee 100% 1 391 1,430 134 Plan Check Street Construction per sheet 100% 555 571 /sheet 3 ExhibitA of Resolution No 8045 Fee Schedule.xlsx Fees as of 7/17/2018 Fees as of 7/16/2019 LEGEND adjusted for 1 9% CPI increase adjusted for 2.8% CPI increase Fee Added Resolution No 7892 Resolution No xxxx No Change in Fee S Service Name % Recovery Fee Year 6 Fee Year 7 Fee Deleted 135 Plan Check Storm Drains Base fee 100% 803 825 136 Plan Check - Storm Drains per sheet 100% 321 330 /sheet 137 Plan Check Hydrology Study 100% 1,437 1,477 138 Plan Check Street Lights Base fee 100% 646 664 139 Plan Check Street Lights per sheet 100% 366 376 /sheet 140 Plan Check - Sewer Construction Base fee 100% 803 825 141 Plan Check Sewer Construction per sheet 100% 321 330 /sheet 142 Plan Check Water Construction Base fee 100% 803 825 143 Plan Check Water Construction - per sheet 100% 321 330 /sheet 144 Plan Check Traffic Signals - New Installations 100% 1,643 1 689 145 Plan Check - Traffic Signals Modifications 100% 1,121 1 152 146 Plan Check Street Trees Base fee 100% 536 551 147 Plan Check Street Trees per sheet 100% 267 274 /sheet 148 Plan Check - Signs and Striping Base fee 100% 803 825 149 Plan Check Signs and Striping per sheet 100% 321 330 /sheet 150 Encroachment Permit Driveway Approach base 100% 84 86 151 Encroachment Permit Driveway Approach each 100% 42 43 /each 152 Encroachment Permit Sidewalk base 100% 84 86 153 Encroachment Permit Sidewalk - per sq foot up to 300 SF 100% 0.43 0.44 /sq if 154 Encroachment Permit - Sidewalk each additonal sq foot over 300 SF 100% 0.10 0 11 /sq ft. 155 Encroachment Permit Cross Gutter/Spandrel base 100% 84 86 /each 156 Encroachment Permit Cross Gutter/Spandrel per sq foot 100% 0.84 0.87 /sq ft. 157 Encroachment Permit Curb and Gutter - base 100% 84 86 158 Encroachment Permit Curb and Gutter per linear foot up to 50 LF 100% 3 19 3.28 /lin ft 159 Encroachment Permit - Curb and Gutter each additional LF up to 200 LF 100% 1.60 1 64 /Iin ft 160 Encroachment Permit Curb and Gutter each additional LF over 200 LF 100% 0.80 0.82 /Iin. ft. 161 Encroachment Permit Curb / Berm - base 100% 84 86 163 Encroachment Permit Curb / Berm - per linear foot up to 50 LF 100% 2 13 2 19 /lin ft. 164 Encroachment Permit Curb / Berm each additional LF up to 200 LF 100% 1 06 1 09 /lin ft. 165 Encroachment Permit Curb / Berm each additional LF over 200 LF 100% 0.53 0.55 /Iin ft. 166 Encroachment Permit Crushed Aggregate Base base 100% 84 86 167 Encroachment Permit - Crushed Aggregate Base - per sq. foot 100% 0.09 0.09 /sq ft. 168 Encroachment Permit - Asphalt Pavement - base 100% 10 10 169 Encroachment Permit- Asphalt Pavement persq Foot 100% 0.08 0.09 /sq ft. 170 Encroachment Permit Street Light base 100% 84 86 MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT Continued 171 Encroachment Permit- Street Light -each 100% 42 43 /each 172 Encroachment Permit Traffic Signal - New base 100% 84 86 173 Encroachment Permit Traffic Signal New -each 100% 2,498 2,568 /each 174 Encroachment Permit Traffic Signal Modification - base 100% 84 86 175 Encroachment Permit Traffic Signal - Modification - each 100% 1 956 2,011 /each 176 Encroachment Permit Reinforced Concrete base 100% 84 86 177 Encroachment Permit - Reinforced Concrete - per cubic yd 100% 126 130 /cubic yd 178 Encroachment Permit Storm Drain Pipe base 100% 84 86 179 Encroachment Permit Storm Drain Pipe per linear foot up to 100 LF 100% 5.07 5.21 /Iin ft 180 [Encroachment Permit Storm Drain Pipe each additional LF 100% 0.80 0.82 /lin ft. 4 Exhibit A of Resolution No 8045 Fee Schedule.xlsx Fees as of 7/17/2018 Fees as of 7/16/2019 JLEGEND Fee Added adjusted for 1 9% CPI increase adjusted for 2.8% CPI increase Resolution No 7892 Resolution No xxxx No Change in Fee Service Name % Recovery Fee Year 6 Fee Year 7 Fee Deleted 181 Encroachment Permit - Curb Inlet/Outlet Structures base 100% 84 86 182 Encroachment Permit Curb Inlet/Outlet Structures -each 100% 42 43 /each 183 Encroachment Permit Storm Drain Manhole/Junction Box- base 100% 84 86 184 Encroachment Permit Storm Drain Manhole/Junction Box each 100% 42 43 /each 185 Encroachment Permit - Curb Core - base 100% 84 86 186 Encroachment Permit Curb Core each 100% 42 43 /each 187 Encroachment Permit Sewer Main base 100% 84 86 188 Encroachment Permit Sewer Main - per linear foot up to 50 LF 100% 1.68 1 73 /lin ft 189 Encroachment Permit Sewer Main each additional LF 100% 0.26 0.27 /lin ft. 190 Encroachment Permit Sewer Manhole base 100% 84 86 191 Encroachment Permit Sewer Manhole each 100% 42 43 /each 192 Encroachment Permit - Sewer Cleanout base 100% 84 86 193 Encroachment Permit Sewer Cleanout each 100% 42 43 /each 194 Encroachment Permit Sewer Lateral base 100% 84 86 195 Encroachment Permit Sewer Lateral - each 100% 42 43 /each 196 Encroachment Permit Water Main Potable- base 100% 84 86 197 Encroachment Permit Water Main Potable per linear foot up to 50 LF 100% 1.68 1 73 /lin. ft. 198 Encroachment Permit Water Main Potable -each additional LF over 50 LF 100% 0.26 0.27 /lin ft. 199 Encroachment Permit Water Main Non -Potable - base 100% 84 86 200 Encroachment Permit Water Main Non Potable per linear foot up to 50 LF 100% 1.68 1 73 /lin ft. 201 Encroachment Permit Water Main Non Potable each additional LF over 50 LF 100% 0.26 0.27 /lin ft. 202 Encroachment Permit Water Service Lateral base 100% 84 86 203 Encroachment Permit Water Service Lateral each 100% 42 43 /each 204 Encroachment Permit Fire Hydrant Assembly base 100% 84 86 205 Encroachment Permit Fire Hydrant Assembly each 100% 42 43 /each 206 Encroachment Permit Water Shutdown base 100% 84 86 207 Encroachment Permit Water Shutdown - each 100% 42 43 /each 208 Encroachment Permit Fire Service base 100% 84 86 209 Encroachment Permit Fire Service each 100% 42 43 /each 210 Encroachment Permit - Excavation Trench Street Cut - base 100% 84 86 211 Encroachment Permit Excavation Trench Street Cut per linear foot up to 50 LF 100% 1.68 1 73 /lin ft. 212 Encroachment Permit Excavation Trench, Street Cut each additional LF over 50 LF 100% 0.26 0.27 /lin. ft 213 Encroachment Permit Street Patch base 100% 84 86 MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT Continued 214 Encroachment Permit Street Patch per sq ft up to 200 SF 100% 0 17 0 18 /sq ft. 215 Encroachment Permit Street Patch each additional SF over 200 SF 100% 0 12 0 13 /sq ft 216 Encroachment Permit Processing Fee 100% 330 339 217 Encroachment Permit SIA/PIA Projects 100% 1% of bond amount 1% of bond amount 218 Grading Permit, Base Fee/ 0-500 c.y 100% 567 583 219 Grading Permit, each addtl 2,000 cy or fraction thereof 501 10,000 c.y 100% 68 70 220 Grading Permit, each addtl 5,000 cy or fraction thereof, 10,001 100,000 c.y 100% 82 10 7 72 72 84 10 7 221 Grading Permit, each addtl 10,000 cy or fraction thereof, 100,001 200,000 c.y Grading Permit, >200,001 c.y. each add0 10,000 c.y. or fraction thereof 100% 222 100% 223 Permit Truck Route (up to 5 days) 100% 74 224 Permit Wide Load 100% 225 Permit Wide Load Single Trip Statute 16 5 Exhibit A of Resolution No 8045 Fee Schedule.xlsx Fees as of 7/17/2018 Fees as of 7/16/2019 LEGEND adjusted for 1 9% CPI increase adjusted for 2.8% CPI increase Fee Added Resolution No 7892 Resolution No xxxx No Change in Fee Service Name % Recovery Fee Year 6 Fee Year 7 Fee Deleted 226 Permit - Wide Load - Annual Statute 90 227 Permit Outdoor Dining New 100% 297 305 228 Permit Outdoor Dining Annual Renewal 100% 161 166 229 Permit Outdoor Display New 100% 297 305 230 Permit - Outdoor Display Annual Renewal 100% 161 166 231 Permit Parklet 100% 288 296 232 NPDES Program Fee, Industrial High 100% 167 172 233 NPDES Program Fee, Industrial - Medium 100% 83 85 234 NPDES Program Fee Industrial Low 100% 35 36 235 NPDES Program Fee, Commercial High 100% 167 172 236 NPDES Program Fee, Commercial Medium 100% 83 85 237 NPDES Program Fee, Commercial Low 100% 35 36 238 SWPPP preliminary check 100% 2,415 2,483 239 SWPPP final check erosion control plan 100% 2 415 2,483 240 WQMP preliminary check 100% 2,415 241 WQMP final check erosion plan 100% 2,415 242 WQMP preliminary Single Family Residence 100% 1,226 243 WQMP preliminary Base Fee 100% 1,795 244 WQMP preliminary -Acreage 100% - 65 /acre 245 WQMP final Single Family Residence 100% 1 136 246 WQMP final - Base Fee 100% 1 715 247 WQMP final Acreage 100% 65 /acre 248 NPDES Inspection Construction - High - Non rainy season pnority once 100% 515 529 249 NPDES Inspection Construction High Rainy season, priority monthly 100% 515 529 250 NPDES Inspection, Construction Medium Non -rainy season priority once 100% 257 264 251 NPDES Inspection, Construction - Medium- Rainy season priority monthly 100% 257 264 252 NPDES Inspection Construction Low Non rainy season, priority once 100% 257 264 253 NPDES Inspection, Construction Low- Rainy season, priority monthly 100% 257 264 254 NPDES Inspection, Construction Out of Compliance Site weekly 100% 515 529 255 NPDES Testing - Chlorination Removal Discharge Testing per pipeline 100% 129 133 256 NPDES Testing - pH testing per discharge per pipeline 100% 130 134 257 Public Improvement Agreement 100% 1 020 1,049 258 Landscape Covenant 100% 894 919 259 Landscape Covenant w/ Caltrans Agreement 100% 1 147 1,179 260 Water Efficient Landscape Plan 100% 811 834 261 Plan research records request, per hour 100% 111 114 262 Street Name Sign Installation 100% 576 592 263 Stop Sign Installation 100% 700 720 POLICE DEPARTMENT 264 Background Checks 100% 21 22 265 False alarm response 100% 206 212 266 Bicycle license 47% 5 5 267 CCW permit Statute 100 100 NO CPI 268 CCW permit renewal Statute 25 25 NO CPI 269 CCW Modification Fee Statute 10 10 NO CPI 270 Fingerprint - rolling 100% 25 I 26 6 Exhibit A of Resolution No. 8045 Fee Schedule.xlsx Fees as of 7/17/2018 Fees as of 7/16/2019 LEGEND adjusted for 1 9% CPI increase adjusted for 2.8% CPI increase Fee Added Resolution No 7892 Resolution No xxxx No Change in Fee S Service Name % Recovery Fee Year 6 Fee Year 7 Fee Deleted 271 Miscellaneous permits 100% 110 113 272 Miscellaneous photos 100% 65 67 273 Repossession 100% 19 20 274 Vehicle impound all others 100% 251 258 275 Vehicle impound DUI 100% 251 258 276 Tow Services Agreement 100% 78 80 277 Visa Clearance 100% 11 11 278 Film Permits 100% 434 446 279 Film Permits locally owned and operated video production companies 50% 217 223 280 Massage therapist permit 100% 110 113 281 Massage Therapy Business Owner permit initial 100% 406 417 282 Massage Therapy Business Owner permit renewal 100% 208 214 283 Solicitor permit 100% 110 113 284 Taxi Driver permit (3 yr permit) 100% 307 316 285 Tow Truck Driver permit 100% 78 80 286 Adult Oriented Business permit 100% 362 372 287 Adult Entertainer permit 100% 110 113 288 Remote Bingo 100% 583 599 289 Cost Recovery - Delinquent Parking Citations 100% 15% of citation + $5.00 15% of citation + $5.00 Animal Shelter 290 Animal boarding 16% 10 10 291 Trap rentals 100% 60 - 292 Shelter apprehension livestock - large 76% 43 50 293 Shelter apprehension livestock medium 57% 33 50 294 Shelter apprehension, livestock small 38% 20 50 Cat 295 Cat adoption 6% 7 10 296 Cat release owner 50% 20 30 297 Cat release owner, < 4 months 16% 10 POLICE DEPARTMENT Continued 298 Shelter apprehension cat 19% 10 15 299 Cat Vaccine 65% 15 15 300 Cat Spay 57% 28 50 301 Cat Neuter 85% 28 50 Dog 302 Dog adoption 10% 12 15 303 Dog release owner 50% 33 50 304 Dog release owner, < 4 months 32% 20 305 Shelter apprehension, unaltered - 1st Statute 35 35 306 Shelter apprehension unaltered 2nd Statute 50 50 307 Shelter apprehension unaltered 3rd Statute 100 100 308 Dog Vaccine 100% 23 25 309 Dog Spay (up to 30 lbs) 78% 54 75 310 Dog - Spay (31 - 50 lbs) 56% 54 75 311 Dog Spay (51 to75lbs) 51% 54 75 312 Dog Spay (76 100 lbs) 37% 54 75 7 Exhibit A of Resolution No 8045 Fee Schedule.xlsx Fees as of 7/17/2018 Fees as of 7/16/2019 LEGEND adjusted for 1 9% CPI increase adjusted for 2.8% CPI increase Fee Added Resolution No. 7892 Resolution No xxxx No Change in Fee Service Name % Recovery Fee Year 6 Fee Year 7 Fee Deleted 313 Dog - Neuter (up to 30 lbs) 93% 54 75 314 Dog Neuter (31 50 Ibs) 63% 54 75 315 Dog - Neuter (51 to 75 Ibs) 56% 54 75 316 Dog Neuter (76 100 Ibs) 44% 54 75 Small -Native -Exotic Animals 317 Small animals - Rabbit, Guinea Pig, Hamster 50% 10 318 Native birds parakeets, finch, lovebirds, canaries, etc 50% 10 319 Exotic birds parrots, macaws toucans, etc. 50% 75 320 Turtle red razor 50% 10 321 Turtle snapping 50% 30 322 Tortoise 50% - 50 323 Snakes 100% Market Rate FIRE DEPARTMENT 324 False alarm residential 100% 154 177 325 False alarm commercial 100% 275 299 326 Plan review commercial 100% - 404 327 Plan review multi -family 100% 324 328 Plan review - other (access, grading, house moving) 100% 243 329 Plan review residential tract 100% - 324 330 Plan review single family 100% - 163 331 Plan review - commercial fire pump 100% 208 332 Plan review high -piled storage 100% 324 333 Plan review consultations (hourly fee) 100% 175 484 334 Plan review - prevention engineering 100% 293 335 Plan review fuel dispensing 100% 318 163 336 Plan review hood & duct 100% 279 163 337 Plan review medical gas 100% 279 243 338 Plan review portables 100% 318 163 339 Plan review spray booths 100% 279 243 STATE MANDATED FIRE MARSHAL INSPS 340 Insp care facilities / churches 100% 246 341 Insp pre school / school / day care 100% 208 FIRE DEPARTMENT continued 100% 342 Insp high rise 100% 423 632 343 Insp daycare / foster care (6 or less) 100% 170 344 Inspection In -home, 6 or less to include care facilities 100% - 258 345 Inspections In -home 7 or more to include care facilities 100% - 311 346 Inspection Facility Pre -Inspection 100% 40 347 Inspection -Annual Clearance 100% - 80 348 Inspection - Hospital - I 100% 912 349 Inspection - Schools E 100% 552 350 Inspection Preschools/Day Care 100% 271 351 Inspection Commercial home- 24 hour care 100% - 298 352 Inspection Churches A 100% - 80 353 Inspection - Jail lock up detention facilities 100% 258 354 Failure to Keep Scheduled Appointment for Inspection 100% - 160 8 Exhibit A of Resolution No 8045 Fee Schedule.xlsx Fees as of 7/17/2018 Fees as of 7/16/2019 LEGEND adjusted for 1 9% CPI increase adjusted for 2.8% CPI increase Fee Added Resolution No. 7892 Resolution No xxxx No Change in Fee Service Name % Recovery Fee Year 6 Fee Year 7 Fee Deleted 355 Inspection - After hours inspection 100% - 160 P PREVENTION INSPECTIONS 356 Insp aprtmnt/condo 1 10 units 100% 196 191 357 Insp aprtmnt/condo 11-30 units 100% 234 204 358 Insp - aprtmnt/condo 31 50 units 100% 242 218 359 Insp aprtmnt/condo 57 75 units 100% 318 258 360 Insp aprtmnt/condo 76-100 units 100% 318 338 361 Insp aprtmnt/condo 101 + units 100% 396 351 362 Insp cert of occupancy ordinary hazard 100% 178 218 363 Insp cert of occupancy high hazard 100% 216 231 364 Insp commercial B-2 100% 156 365 Insp commercial Xmas tree 100% 156 366 Insp commercial high hazard 100% 216 271 367 Insp motels 1 20 units 100% 165 231 368 Insp motels 21-40 units 100% 203 231 369 Insp motels 41 50 units 100% 203 271 370 Insp motels 51+ units 100% 242 311 371 Insp- commercial occupancy re -inspection 100% 47 372 Group F Fabrication Finishing Manufacturing) 100% 458 373 Group L Labortory 100% 338 374 Group S - Storage 100% 258 375 Group U Utility 100% - 191 376 Large Warehouse inspections (B M F and S) 100% 632 377 Fire Prevention Inspector Inspection -Ordinary Hazard 100% 80 378 Fire Prevention Inspector Re -Inspection -Ordinary Hazard 100% 80 ENGINE COMPANY INSPECTIONS 379 Engine company insp ordinary hazard 75% 144 150 380 Engine company insp high hazard 100% 180 PERMITS 100% 381 Aircraft repair hangar permit 100% 242 271 382 Aircraft refueling vehicle permit 100% 255 271 383 Aerosol products 100% 258 384 Amusement buildings 100% 258 385 Bowling pin/Alley refurbish 100% 40 386 Carbon Dioxide System (at/over 100 lbs.) - Beverage Systems 100% 218 387 Cellulose Nitrate Film/Storage 100% 218 388 Cryogenic Fluids 100% 258 389 Fire Hydrants & Valves 100% - 218 390 Floor Finishing 100% 258 391 Fumigation or Thermal Insecticidal Fogging 100% 191 392 HPM Facilities 100% 231 393 Hood and Duct Permit 100% 271 394 Hot -work operations 100% - 231 395 Industrial Ovens 100% 231 396 Liquid or gas fueled vehicles or equipment in assembly buildings 100% 231 397 Miscellaneous Combustible Storage (over 2500 cubic feet) 100% 271 9 Exhibit A of Resolution No 8045 Fee Schedule.xlsx Fees as of 7/17/2018 Fees as of 7/16/2019 LEGEND adjusted for 1 9% CPI increase adjusted for 2.8% CPI increase Fee Added Resolution No 7892 Resolution No xxxx No Change in Fee Service Name % Recovery Fee Year 6 Fee Year 7 Fee Deleted 398 Open Buming (bonfire, rubbish, BBQ, recreational or ceremonial Fire,etc.) 100% - 231 399 Organic Coatings 100% 231 400 Private Hydrant Removal 100% 204 401 Prytechnics special effects Fireworks permit -small show 100% - 321 402 Prytechnics special effects - Fireworks permit- large show (can include engine crew) 100% - 1,218 403 Proxylin Plastics 100% 218 404 Rocket launching (model rockets) 100% 244 Special Activities (Production Facilities Live Audience Tradeshows, Exhibits Special Events) seasonal eventshaunted houses/mazes, pumpkin patches christmas tree 405 lots etc.) 100% 258 406 Spraying/Dipping 100% 218 407 Tire storage/recapping/rebuilding 100% 218 408 Waste handling 100% 218 _ 409_ Wood Products (over 200 cubic feet) 100% - 218 I 410 Compressed gas/LPG permit 100% 255 271 411 Covered mall permit 100% 318 552 412 Dry cleaning permit 100% 242 311 413 Combustible Fiber Storage or Dust Producing 100% 279 258 414 Explosives permit 100% 345 258 415 Fruit ripening permit 100% 318 218 416 Flammable/combustible liquid permit 100% 267 231 417 Hazardous / toxic / corrosive permit 100% 267 231 418 High piled combustible permit 100% 306 512 419 Junk yard permit 100% 423 271 420 Lumber yard permit 100% 345 218 421 Medical gas system permit 100% 279 218 422 Pesticides permit 100% 191 271 423 Pipeline excavation / operation permit 100% 267 271 424 Poison gas permit 100% 267 271 425 Radioactive matenal permit 100% 267 271 426 Refrigeration equipt permit 100% 267 351 427 Repair garage permit 100% 267 231 FIRE DEPARTMENT continued 100% 428 Spray booth permit 100% 267 271 429 Tanks permit 100% 267 231 430 Welding / cutting permit 100% 267 231 431 Bonfire permit 100% 191 432 Carnival / fair permit 100% 267 231 433 Fireworks permit* 100% 796 434 Open flame permit 100% I 242 231 10 Exhibit A of Resolution No 8045 Fee Schedule.xlsx Fees as of 7/17/2018 Fees as of 7/16/2019 LEGEND adjusted for 1 9% CPI increase adjusted for 2.8% CPI increase Fee Added Resolution No 7892 Resolution No xxxx No Change in Fee Service Name % Recovery Fee Year 6 Fee Year 7 Fee Deleted 435 Parade float permit 100% 165 271 436 Assembly 1000+ persons w/ stage 100% 345 351 437 Assembly 501 999 persons w/ stage 100% 345 311 438 Assembly 300 500 persons 100% 345 271 439 Assembly 50-299 persons 100% 242 271 440 Tents/Canopy 100% 242 231 WEED ABATEMENT 100% 441 Weed abatement adman 100% 239 416 442 Weed abatement disking (Admin Fee Only) 100% 21 83 443 Weed abatement mowing lot (Admin Fee Only) 100% 21 83 444 Weed abatement hand work (Adman Fee Only) 100% 21 83 445 Weed abatement re -inspection 100% 43 190 446 LandscapeNegetation Management 100% - 258 HYDRANT/HYDRO FLOW TEST 100% 447 Hydrant/Hydro Flow Test - Install 1 tank 100% 332 218 448 Hydrant/Hydro Flow Test - Install 2 tanks 100% 411 231 449 Hydrant/Hydro Flow Test Install 3 tanks 100% 487 271 450 Hydrant/Hydro Flow Test Removal 1 tanks 100% 332 218 451 Hydrant/Hydro Flow Test Removal 2 tanks 100% 411 231 452 Hydrant/Hydro Flow Test Removal 3 tanks 100% 487 271 453 Admin fee cost recovery (Community Risk Reduction) 100% 101 249 454 Flow Test Fire Flow 100% 255 231 455 Miscellaneous Inspection/Permit Hourly 100% 146 351 Permit fees includes 2 inspections For businesses with multiple permits the highest permitted fee will be charged first and then each additional permit fee will be reduced by 50% 100% 456 Alarm System Plan Review,Spnnkler monitoring only 100% 154 123 457 Alarm System Plan Review 10 or less initiating devices 100% 309 203 458 Alarm System Plan Review 11 20 initiating device 100% 463 203 459 Alarm System Plan Review 20 or more devices 100% 619 268 460 Sprinkler System Plan Review 25 heads or less 100% 309 461 Sprinkler System Plan Review 26 99 heads 100% 463 462 Sprinkler System Plan Review 100 heads or more 100% 619 463 Sprinkler System Plan Review, 1-99 heads 100% 120 464 Sprinkler System Plan Review 100-499 heads 100% 243 465 Sprinkler System Plan Review, 500 or more heads 100% 292 466 Fire Sprinkler Modification 1-100 heads 100% 123 467 Fire Sprinkler Modification- 101-700 heads 100% 163 468 Fire Sprinkler modification- 701 1250 heads 100% 203 469 Fire Sprinkler modification- 1251 heads and over 100% - 243 11 Exhibit A of Resolution No 8045 Fee Schedule.xlsx Fees as of 7/17/2018 Fees as of 7/16/2019 LEGEND adjusted for 1 9% CPI increase adjusted for 2.8% CPI increase Fee Added Resolution No 7892 Resolution No xxxx No Change in Fee Service Name % Recovery Fee Year 6 Fee Year 7 Fee Deleted 470 In -rack sprinklers (plan review permit, & 2 inspections) 1 10,000 square feet 100% - 191 471 In -rack sprinklers (plan review permit, & 2 inspections) 10,001-50,000 square feet 100% - 271 472 In -rack sprinklers (plan review permit, & 2 inspections) 50,001-100,000 square feet 100% - 351 In rack sprinklers (plan review permit, & 2 inspections) each additional 1-50,000 square 473 feet over 100,000 square feet 100% 431 474 Plan Review -Private underground Fire Line 1-10 appliances per building 100% - 163 475 Plan Review -Private Underground Fire Line 11-20 appliances per building 100% - 203 476 Plan Review -Private Underground Fire Line 21-30 appliances per building 100% - 203 477 Plan Review-Pnvate Underground Fire Line 31-40 appliances per building 100% 243 478 Plan Review- each additional appliance over 40 100% 123 479 Plan Review- Aboveground and Underground Storage tank -first tank at location 100% 123 480 Plan Review- Aboveground and Underground storage tank -each tank after first 100% - 163 481 Plan Review-LandscapeNegetation Management 100% 163 482 Plan Review Resubmittal/Revision of previously reviewed plan (after 2nd sub) 100% 123 Plan Review -where no permit or inspection is required, i.e solar 483 (commercial/residential TI) 100% 123 FIRE DEPARTMENT continued 484 Commercial Fire Alarm Modification- 1 50 devices 100% - 123 485 Commercial Fire Alarm Modification- 51 devices and over 100% - 163 486 Smoke Control System Plan Review review of rational analysis 100% 1,236 364 487 Smoke Control System Plan Review Design Testing 100% 1,236 444 488 Inspection 100,000 sq ft or less 100% 154 391 489 Inspection 100,000 500,000 sq ft 100% 232 472 490 Inspection 500,001 sq ft and above 100% 309 552 491 Const - Automatic fire -extinguishing system 25 heads or less 100% 309 191 492 Const - Automatic fire -extinguishing system 26 99 heads 100% 463 231 493 Const - Automatic fire -extinguishing system 100 heads or more 100% 619 114 494 Const - Kitchen Hood and Duct 100% 309 191 495 Const Clean Agent System 100% 309 191 496 Const Battery Systems 100% 309 231 497 Const Compressed Gases 100% 309 231 498 Const Cryogenic fluids 100% 309 231 499 Const - Alarm and detection systems/equip sprinklers monitoring only 100% 154 191 500 Const - Alarm and detection systems/equip 10 or less initiating devices 100% 309 191 501 Const - Alarm and detection systems/equip 11-20 initiating devices 100% 619 231 502 Const Alarm and detection systems/equip 20 or more devices 100% 927 311 503 Const Fire pumps and related equipment 100% 619 311 504 Const Flammable and combustible liquids 100% 309 231 505 Const Hazardous Materials 100% 619 311 506 Const - Industrial ovens 100% 309 191 12 Exhibit A of Resolution No 8045 Fee Schedule.xlsx Fees as of 7/17/2018 Fees as of 7/16/2019 LEGEND adjusted for 1 9% CPI increase adjusted for 2.8% CPI increase Fee Added Resolution No 7892 Resolution No xxxx No Change in Fee Service Name % Recovery Fee Year 6 Fee Year 7 Fee Deleted 507 Const LP gas 100% 309 191 508 Const Pnvate fire hydrants 100% 463 191 509 Const Spraying or dipping 100% 463 231 510 Const - Standpipe systems 100% 463 191 511 Const - Temporary membrane structures and tents 100% 154 183 512 High Fire Hazard Area Landscaping 100% 125 271 513 First Responder Fee (Engine/Truck) (non-residents only) 100% - 514 514 First Responder Fee (Paramedic Squad) (non-residents only) 100% - 380 515 Const- Emergency responder radio coverage systems 100% 203 516 Const Gates/Barricades 100% 191 517 Const Smoke Control/Exhaust 100% 391 518 Const - Solar- Photovoltaic 100% 40 519 Building Occupant Safety Survey (BOSS) 100% - 111 FACILITIES & COMMUNITY SERVICES DEPARTMENT 520 Small Cell Site Applications (pass -through costs) 100% - Contract Cost 519 Annual License Fee for Use of City Facilities Statute 270 per year 520 Vacant, abandoned property registration 100% 90 93 521 Street Tree Permit Street Tree Removal 50% 83 85 522 Street Tree Permit Street Tree Trimming 50% 69 71 523 Street Tree Permit Street Tree Planting 50% 79 81 524 Street Tree Permit Street Tree Relocation 50% 137 141 525 Street Tree Permit Processing Fee 50% 39 40 526 Rental Dwelling Permit < 1 acre 100% 82 80 527 Rental Dwelling Permit 1 3 acres 100% 96 94 528 Rental Dwelling Permit , 3.01 5 acres 100% 108 106 529 Rental Dwelling Permit , > 5.01 acres 100% 118 116 530 Rental Dwelling Permit Reinspection 100% 42 40 531 Street Banner Permit 100% - 25 PARKS DIVISION PARK RESERVATION RATES 532 Park Reservation Rates Prospect Park Sign 61 63 Redlands Bowl 118 121 Stage (outdoor area of Posellis only) - 20 /hour Prosellis (includes stage area) - 25 /hour Bowl - 25 /hour Mandatory Park Attendant - 50 /hour IAvice Meeker Sewall Theatre 1 1 118 I 121 Apron (full stage not available) - 20 /hour Mandatory Park Attendant 50 /hour !Sylvan Park 1 118 121 Section A (Group Picnic) Tables 1 through 8 (seats 128) - 30 Section A (Group Picnic) Tables 9 through 17 (seats 64) - 30 13 Exhibit A of Resolution No 8045 Fee Schedule.xlsx Fees as of 7/17/2018 Fees as of 7/16/2019 LEGEND adjusted for 1 9% CPI increase adjusted for 2.8% CPI increase Fee Added Resolution No. 7892 Resolution No xxxx No Change in Fee Service Name % Recovery Fee Year 6 Fee Year 7 Fee Deleted Section A (Group Picnic) Tables 17 through 25 (seats 64) - 30 , Section C (Group Picnic) Tables 1 through 7 (seats 65) - 30 , Rose Garden 25 Covered Picnic Area (Shelter Area) - 40 Gazebo - 40 All Other Parks 91 94 -, 533 Clean up deposit (refundable) up to 50 persons - 100 50 to 150 persons - 200 150 or more persons 300 , RECREATION DIVISION F FIELD RENTAL RATES Rental Fields. Texonia Park (Texas Street and Lugonia Ave.) Community Park (Church Street and San Bemardino Ave.) Brookside Park (Brookside Avenue) Crofton Park nde endence Avenue ■ Clement School Ball Fields and Tennis Courts *(Pennsylvania Avenue) Orangewood School ( Stuart Avenue) Joint Use Agreement with Redlands Unified School District cUser Creaps zed - Rental Rates ■ GROUP 2 Field Use $ 10 /hour per field /hour per field Field Lighting $ 4hour /hour 534 GROUP 3 ALL GROUPS Field Use $20 / hour per field 21 /hour per field Field Lighting $ 30 / hour 32 /hour * Field Lighting at Crafton Park and Community Park is paid directly to utility provider by user 535 Miscellaneous Staff Call Out fee shall be assessed when city staff is called to a field for any of the following reasons. confirm field reservations tum lighting on/off clean garbage /debris left by users resolve complaints and/make repairs resulting from abuse by user $ 40 per hour 43 /hour RECREATION DIVISION Continued FACILITY RENTAL RATES Facilities Redlands Community Center (111 W Lugonia Avenue) Redlands Senior Center (111 W Lugonia Avenue) 14 Exhibit A of Resolution No 8045 Fee Schedule.xlsx Fees as of 7/17/2018 Fees as of 7/16/2019 LEGEND adjusted for 1 9% CPI increase adjusted for 2.8% CPI increase Fee Added Resolution No 7892 Resolution No. xxxx No Change in Fee Service Name Y. Recovery Fee Year 6 Fee Year 7 Fee Deleted Joslyn Senior Center (21 Grant Avenue) 536 2 ALL GROUPS Facility / Room Rates $200 deposit required Gym $ 61 / hour 65 /hour Racquetball Court $ 20 / hour 21 /hour Multipurpose Rooms $ 25 / hour 27 /hour Kitchens $ 51 flat fee 54 Computer Class Room $ 30 / hour 32 /hour Conference Room $ 15 hour 16 /hour Game Room (CC) $ 25 hour 27 /hour Building (1-4 hours) $ 707 1-4 hours * 752 Building (each additional hour) * $51 each additional hr 54 /hour 537 Tennis Court Lighting 2.50 2.50 /hour 538 Tennis Machine Rental 10 10 /hour 539 Miscellaneous Charges for All Groups Refundable Cleaning Deposit 200 200 Attendant / Staff Supervision Fee 20 20 /hour per attendant Fees shall be prepaid to guarantee reservation Refunds will be issued less a 10% administrative fee. A processing fee of $10 shall be assessed when applicants and/or participants request deviation from the standard processing time of five business days All user groups shall comply with the City's established field and facility rental policies Rental agreements may be negotiated for continuous use of the fields and/or facilities The rates contained in these agreements may vary from the structure presented above, and shall be approved by City Council RECREATION DIVISION continued ADULT SERVICES, PROGRAMS AND ACTIVITIES (18 and over) 540 Adult Open gym - resident 1 1 /person per day Adult Open gym - non-resident 2 2 /person per day 541 Adult Open Racquetball - resident 1 1 / hour per person Adult Open Racquetball - non-resident 2 2 / hour per person Adult Open Racquetball -Annual Pass - resident 25 25 Adult Open Racquetball - Annual Pass - non-resident 35 35 542 Adult Classes Fee Set By Independent Contractor Fee Set By Independent Contractor 543 Adult Family Trips 100% Cost of Trip 100% Cost of Trip 15 Exhibit A of Resolution No 8045 Fee Schedule.xlsx Fees as of 7/17/2018 Fees as of 7/16/2019 LEGEND adjusted for 1 9% CPI increase adjusted for 2.8% CPI increase Fee Added Resolution No 7892 Resolution No xxxx No Change in Fee S Service Name % Recovery Fee Year 6 Fee Year 7 Fee Deleted 544 Annual Pass - resdident I.D. Game Room, Gym Usage, Racquetball and Tennis Courts 25 25 /person Annual Pass non resdident I.D., Game Room, Gym Usage Racquetball and Tennis Courts 35 35 /person Annual Pass adult group homes I.D., Game Room, Gym Usage, Racquetball and Tennis Courts 50 50 /group home S SENIOR SERVICES, -PROGRAMS AND ACTIVITIES 545 I Bingo 0.50 0.50 /card 546 Bingo Tournaments Per Person 20 20 /person per toumament Per Team 100 100 /person per team 547 Senior Classes Fee Set By Independent Contractor Fee Set By Independent Contractor 548 Trips 100% cost of trip 100% cost of trip 549 Senior Transportation Program :Bus Pass $ 1 75 / person each way $ 1 75 / person each way $17 50 for 10 one-way trips $17.50 for 10 one-way trips Senior Patron - A Patron is any senior making a voluntary donation in excess of $ 20 per senior center Patrons shall receive identification cards and shall save $ 5 on senior services and activities. year to either programs YOUTH SERVICES, PROGRAMS AND ACTIVITIES Scholarships are available for all youth services programs and activities. To qualify scholarship recipients shall meet income requirements as established Urban Development for San Bemardino County Not applicable with any other discounts by the Department of Housing and 550 Youth Annual Pass for use at Community Center No Charge No Charge 551 Annual Pass - group homes 50 I.D. Game Room Gym Usage Racquetball and Tennis Courts 50 /group home 552 Teen Dances $ 3 / person $ 3 / person 553 i Teen Trips 100% cost of trip 100% cost of trip RECREATION DIVISION Continued MISCELLANEOUS 554 Contract Classes Fee Set By Independent Contractor Fee Set By Independent Contractor 555 Special Events 100% cost of event 100% cost of event 556 $10 / day per space without table $10 / day per space without table Boutique Spaces $20/ day per space with table $20/ day per space with table 557 Smiley Gardens $20/ year per plot Smiley Gardens $20/ year per plot Garden Plot Spaces Clement Gardens $30/ year per plot Clement Gardens $30/ year per plot Lugonia Gardens $35/ year per plot Lugonia Gardens $35/ year per plot 558 Program Attendant Fee $20 / hour per employee $20 / hour per employee 559 10% discount for individuals and teams registering a minimum of 30 days prior to the close of registration (applies to all Youth Early Registration" Adult, or Senior classes or pgrograms requiring registration.) 16 Exhibit A of Resolution No 8045 Fee Schedule.xlsx Fees as of 7/17/2018 Fees as of 7/16/2019 LEGEND adjusted for 1 9% CPI increase adjusted for 2.8% CPI increase Fee Added Resolution No 7892 Resolution No xxxx No Change in Fee Service Name % Recovery Fee Year 6 Fee Year 7 Fee Deleted 560 Multiple Registration" 10% discount for multiple family members or pgrograms requiring registration.) registering in the same class or program (applies to all Youth, Adult, or Senior classes FINANCE DEPARTMENT 561 Business License - new 100% 71 46 562 Business License - renewal 100% 23 20 563 Yard Sale Permit 100% 4 4 564 Retumed Check 100% 42 43 565 Dog licensing 100% 23 24 566 Dog licensing -spay/neutered 50% 12 12 567 Dog licensing - replacement tag 100% 17 17 568 State CASp Svc Fee* Statute 4 4 * Effective 1/1/2018, SB 1186 Disability Access Legislation (Chpt 383, Statutes of 2012) was revised by AB 1379 (Chpt. 667 Statutes 2017) to increase the $1 00 State fee on applicants for new and renewal business licenses to $4, with 70% retained by the City and 30% remitted to the State LIBRARY SERVICES 569 Reservation of library materials 26% 0.75 0.75 /item 570 Non-resident fee 96% 30 30 annually I OFFICE OF THE CITY CLERK 571 Passport Execution Fee (Set by State Department) 100% 25 25 572 Passport Photo Fee 100% 15 15 17 Exhibit A of Resolution No 8045 Fee Schedule.xlsx 57 57 57 575 1 575.2 CITY OF REDLANDS Building Department Schedule of New Construction Fees PLAN CHECK & INSPECTION FEES COMBINED Kesolution No 8045- 2 8% CPI Adjustment Construction Type IA, IB Construction Type IIA, IIB, II A, IIIB, IV Construction Type VA, VB IBC Class IBC Occupancy Type Project Size Threshold Base Cost @ Threshold Size Cost for Each Additional 100 sf * Base Cost @ Threshold Size Cost for Each Additional 100 sf * Base Cost @ Threshold Size Cost for Each Additional 100 sf * 3 A-1 Assembly uses, usually with fixed seating, 2,000 $7,433 $5 44 $6,319 $4 97 $5,206 $4 51 Greater intended for the production and 10,000 $7,867 $13 11 $6,717 $11 07 $5,566 $9 02 Than 50 viewing of the performing arts or 20,000 $9,179 $4 27 $7,823 $3 63 $6,469 $2 98 Occupant motion pictures 40,000 $10,033 $4 67 $8,548 $3 93 $7,065 $3 19 - - - 100,000 $12 832 $1 62 $10 907 $1 38 $8 981 $1 14 - 200,000 $14 457 $7 03 $12 287 $5 94 $10,117 $4 86 i A-2 Assembly uses intended for food and/or 1,000 $10 634 $15 31 $9,012 $14 06 $7,389 $12 81 - drink consumption 5,000 $11,248 $34 70 $9,574 $29 25 $7,901 $23 81 - - 10,000 $12,982 $12 25 $11,037 $10 35 $9,092 $8.46 - Restaurant 20 000 $14,207 $13 06 $12,072 $11 01 $9 937 $8 95 - - 50,000 $18,125 $4.42 $15 373 $3 75 $12 623 $3 09 - - 100,000 $20,336 $19 93 $17,251 $16 84 $14,166 $13 76 i A-3 A-4 __ . _._._.__.............. - Assembly uses intended for worship 1,000 $10 157 $14 50 $8 609 $13 31 $7,061 $12 11 Assembly uses intended for viewing 5,000 $10 737 $33 19 $9,141 $27 99 $7,546 $22.79 - of outdoor sporting events and activities with 10,000 $12 397 $11 72 $10,541 $9 91 $8,685 $8 10 - spectator seating 20,000 $13,568 $12 45 $11,532 $10 49 $9,495 $8 52 - - 50,000 $17,302 $4 23 $14,677 $3 59 $12 052 $2 96 - - 100 000 $19,416 $19 01 $16 474 $16 07 $13,532 $13 12 A-4 See Above 500 $8,206 $23 17 $6,968 $21 25 $5,730 $19 34 - - 2,500 $8 670 $53 16 $7,393 $44 84 $6,117 $36 53 - - 5,000 $9,999 $18 73 $8,514 $15 84 $7 030 $12 94 - - 10,000 $10,936 $19 94 $9,307 $16 80 $7 677 $13 67 - - 25 000 $13,926 $6 75 $11 826 $5 73 $9,728 $4 72 - - 50,000 $15,614 $30 42 $13,261 $25 71 $10,907 $21 00 A-5 Assembly -Outdoor Activities 1,500 $10,470 $9 99 $8,870 $9 14 $7,269 $8.28 - Amusement Park, Bleacher Stadium 7,500 $11 069 $23 79 $9,418 $20 05 $7,766 $16 31 - - 15 000 $12,853 $8 04 $10 922 $6 79 $8,990 $5.55 - - 30,000 $14 059 $8 74 $11,940 $7 36 $9,822 $5 98 - - 75,000 $17,992 $2 92 $15,253 $2 47 $12 514 $2 03 18 Exhibit A of Resolution No 8045 Fee Schedule.xlsx 575. 57 57 57 57 580 Resolution No 8045- 2 8% CPI Adjustment Construction Type IA, IB Construction Type IIA, JIB, II A, IIIB, IV Construction Type VA, VB IBC Class IBC Occupancy Type Project Size Threshold Base Cost @ Threshold Size Cost for Each Additional 100 sf * Base Cost @ Threshold Size Cost for Each Additional 100 sf * Base Cost @ Threshold Size Cost for Each Additional 100 sf * - - 150,000 $20 182 $13 18 $17,109 $11 13 $14 034 $9 09 3 A A Occupancy Tenant Improvements 1,000 $8,394 $8 79 $7,100 $7 82 $5 807 $6 84 - - 5,000 $8,745 $26 90 $7,413 $22.68 $6,082 $18 45 - - 10,000 $10,090 $9.86 $8,547 $8 35 $7,004 $6.84 - - 20 000 $11,077 $9 99 $9,382 $8 38 $7,688 $6 76 - - 50 000 $14,075 $3.42 $11,895 $2 90 $9,715 $2 38 - - 100,000 $15 785 $15 38 $13,345 $12 94 $10,907 $10 50 3 B Business -Professional Office 1 000 $8,999 $13 95 $7,651 $12 93 $6,304 $11 91 - Buildings or spaces for office professional 5,000 $9,558 $28 61 $8,169 $24 21 $6,781 $19 81 - or service type transactions including 10,000 $10 987 $10 41 $9,379 $8 83 $7 771 $7 26 - storage of records and accounts, 20 000 $12,029 $10 85 $10,262 $9 17 $8,497 $7 49 - Restaurants w/ less than 50 occupants 50,000 $15,285 $3.74 $13 014 $3 20 $10,742 $2 65 - - 100,000 $17,157 $16 75 $14,613 $14 21 $12,068 $11 66 ' B B Occupancy Tenant Improvements 1,000 $7 539 $8 17 $6,388 $7 30 $5 238 $6 43 - Buildings or spaces for office professional 5,000 $7,866 $24.29 $6,681 $20 50 $5,495 $16 71 - or service type transactions including 10,000 $9,080 $8.86 $7 705 $7 51 $6,330 $6 17 - storage of records and accounts, 20,000 $9 966 $8 93 $8,457 $7 49 $6,948 $6 05 - Restaurants w/ less than 50 occupants 50 000 $12,646 $3 11 $10,704 $2 65 $8 763 $2 18 - - 100,000 $14,204 $13 80 $12 028 $11 62 $9,852 $9 45 E Educational 500 $8,324 $22 87 $7 067 $20 96 $5,809 $19 05 - Buildings or rooms used by more than 6 2 500 $8 782 $52 37 $7,486 $44 09 $6,190 $35 81 - persons for educational purposes up to the 5,000 $10,091 $18 74 $8,588 $15 80 $7 085 $12 86 - 12th grade 10,000 $11,027 $20 01 $9 378 $16 86 $7,729 $13 70 - Day care for 6 or more children older than 25,000 $14,029 $6 75 $11 906 $5 73 $9,783 $4 71 - 2 5 years of age 50 000 $15 716 $30 58 $13,338 $25 82 $10,960 $21 07 E E Occupancy Tenant Improvements 1,000 $7,643 $8 02 $6,479 $7 17 $5 313 $6 32 - Buildings or rooms used by more than 6 5,000 $7,964 $23 35 $6,765 $19 72 $5 566 $16 08 - persons for educational purposes up to the 10,000 $9,132 $8 99 $7 751 $7 62 $6,371 $6.26 - 12th grade 20 000 $10 030 $8 84 $8,513 $7 41 $6,996 $5 99 - - Day care for 6 or more children older than 2 5 years of age 50,000 $12,682 $3 05 $10,737 $2 59 $8 793 $2 14 100,000 $14 206 $13 78 $12,033 $11 61 $9,860 $9.43 F-1 Factory Industrial -Moderate Hazard 20,000 $8,407 $3 85 $7,190 $3 32 $5 973 $2 79 - Factory and industrial uses that include the 50,000 $9,562 $3.41 $8,186 $2 91 $6 810 $2 41 - fabrication or manufacturing of Moderate 100,000 $11,266 $1 21 $9 639 $1 02 $8,013 $0 84 - and Low Hazard materials 250,000 $13 080 $1 10 $11,176 $0 93 $9,271 $0.75 - - 500 000 $15 823 $0 93 $13,489 $0 78 $11,154 $0 63 19 Exhibit A of Resolution No 8045 Fee Schedule.xlsx Resolution No 8045- 2 8% CPI Adjustment Construction Type IA, IB Construction Type IIA, IIB, II A, IIIB, IV Construction Type VA, VB IBC Class IBC Occupancy Type Project Size Threshold Base Cost @ Threshold Size Cost for Each Additional 100 sf * Base Cost @ Threshold Size Cost for Each Additional 100 sf * Base Cost @ Threshold Size Cost for Each Additional 100 sf * - - 1 000 000 $20,471 $2 01 $17 394 $1 71 $14,317 $1 40 1 F F Occupancy Tenant Improvements 2,000 $4,918 $5 34 $4,226 $5 02 $3 535 $4 69 - Factory and industrial uses that include the 10,000 $5,346 $9 86 $4,627 $8 39 $3,910 $6 92 - fabrication or manufacturing of Moderate 20,000 $6,331 $2 89 $5,466 $2 49 $4,601 $2 09 - and Low Hazard materials 40,000 $6,910 $3 26 $5 965 $2 77 $5,020 $2.28 - - 100,000 $8,865 $1.20 $7,625 $1 03 $6,386 $0 86 - - 200,000 $10 065 $4 87 $8,658 $4 16 $7,251 $3.46 2 H-1, H-2 High Hazard Detonation Hazard, 1,000 $5,124 $10 00 $4 383 $9 25 $3,641 $8 51 H-3, H-4 Deflagration hazard or hazard from 5,000 $5 524 $21 88 $4,753 $18.47 $3 982 $15 06 H-5 accelerated burning Materials that readily 10,000 $6 618 $5 68 $5,676 $4 83 $4,735 $3 98 - support combustion, Materials that are 20 000 $7,186 $7 11 $6,159 $6 01 $5,133 $4 91 - health hazards 50,000 $9,320 $2.57 $7 962 $2 19 $6,606 $1 82 - - 100,000 $10 605 $10 27 $9,059 $8.73 $7 515 $7 18 3 H - See Above - 1,000 $5,231 $11 00 $4,483 $10 27 $3,735 $9 54 5,000 $5,671 $21.61 $4 894 $18 29 $4,116 $14.97 - - 10,000 $6 751 $5 85 $5,808 $4 99 $4 865 $4 13 - - 20 000 $7,336 $7 14 $6,308 $6.05 $5,278 $4 96 - - 50,000 $9,478 $2 59 $8,122 $2.22 $6,767 $1 85 - - 100,000 $10,775 $10 44 $9 235 $8 90 $7,694 $7.36 1-1 Housing of clients on a 24-hour basis in a 1,000 $6,730 $12 25 $5,732 $11 32 $4,735 $10 38 - supervised residential environment providing 5 000 $7 221 $27 18 $6,185 $22 93 $5 150 $18 68 - personal care services 10,000 $8,580 $7 60 $7 332 $6 45 $6,084 $5 30 - - 20,000 $9,339 $9 13 $7,977 $7 71 $6,614 $6.29 - - 50 000 $12 079 $3 25 $10,290 $2 77 $8,501 $2.29 - - 100,000 $13,706 $13 37 $11,677 $11.35 $9 648 $9 32 1-2, 1-3 Medical, surgical, psychiatric, nursing or 1,000 $8,330 $15 32 $7,083 $14 15 $5,835 $12 97 - custodial care on a 24-hour basis for more 5,000 $8,943 $33 97 $7 649 $28 66 $6,355 $23.35 - than 6 persons, facilities where persons are 10,000 $10 641 $9 50 $9,082 $8 07 $7,522 $6.63 - restrained 20,000 $11,592 $11 41 $9,888 $9.64 $8 185 $7 86 - - 50,000 $15,016 $4 07 $12 780 $3 47 $10,543 $2 87 - - 100 000 $17 050 $16 72 $14,513 $14 18 $11,977 $11 65 1-4 Day care operations of more than 6 people 1,000 $7,837 $14 63 $6,672 $13 57 $5 507 $12 52 - of any age where the care is for less than 5,000 $8,423 $30.66 $7 214 $25 90 $6,007 $21 15 - 24 hours a day 10,000 $9 956 $8 94 $8 510 $7 60 $7,065 $6.25 - - 20 000 $10,850 $10 53 $9,269 $8 90 $7 690 $7 27 - - 50,000 $14,007 $3 73 $11,939 $3 18 $9,871 $2 64 20 Exhibit A of Resolution No 8045 Fee Schedule.xlsx Resolution No 8045- 2 8% CPI Adjustment Construction Type IA, IB Construction Type IIA, IIB, II A, IIIB, IV Construction Type VA, VB IBC Class IBC Occupancy Type Project Size Threshold Base Cost @ Threshold Size Cost for Each Additional 100 sf * Base Cost @ Threshold Size Cost for Each Additional 100 sf * Base Cost @ Threshold Size Cost for Each Additional 100 sf * - - 100,000 $15,872 $15 54 $13,532 $13 20 $11 192 $10 86 7 I I Occupancy Tenant Improvements 1,000 $4 851 $10 40 $4,166 $9 77 $3,481 $9 14 - - 5 000 $5,266 $18 72 $4 557 $15.88 $3,847 $13.04 - - 10 000 $6,202 $5.45 $5 351 $4 66 $4 499 $3 86 - - 20,000 $6,748 $6 37 $5,817 $5 41 $4,885 $4.45 - - 50,000 $8,658 $2 32 $7 439 $2 00 $6,220 $1 67 - - 100,000 $9,820 $9 49 $8 439 $8 11 $7,057 $6 73 3 M Display and sale of merchandise accessible 1,000 $7 214 $14 09 $6,154 $13 12 $5,092 $12 16 - to the public 5,000 $7 778 $28 24 $6,679 $23 89 $5,578 $19 53 - - 10 000 $9,191 $8 23 $7 873 $7 00 $6,555 $5 78 - - 20,000 $10,014 $9 66 $8,573 $8 17 $7 133 $6 69 - - 50,000 $12 910 $3 44 $11,025 $2 94 $9,139 $2.45 - - 100,000 $14,629 $14 30 $12,496 $12 16 $10,363 $10 03 M - M Occupancy Tenant Improvements - 1,000 $6,836 $13 79 $5,837 $12.88 $4,839 $11 96 5,000 $7,388 $26 90 $6,353 $22 77 $5 318 $18 64 - - 10,000 $8 732 $7 78 $7,491 $6 63 $6,249 $5.48 - - 20 000 $9,510 $9 18 $8 154 $7 78 $6,797 $6 37 - - 50,000 $12,264 $3.28 $10,487 $2 81 $8,709 $2 34 - - 100,000 $13 903 $13 57 $11,891 $11 56 $9 879 $9 55 I R-1, R-2 Transient and nontransient lodging including 2 000 $9,994 $0 64 $8,508 $0 53 $7,021 $0.42 - hotels, motels, apartments and boarding 10,000 $10,046 $15 93 $8 551 $13 27 $7,055 $10.62 - houses 20,000 $11 638 $3 76 $9,878 $3 13 $8 117 $2 51 - - 40 000 $12,390 $3 71 $10,504 $3 09 $8,618 $2.47 - - 100,000 $14,614 $1 92 $12,358 $1 60 $10,101 $1 28 - - 200,000 $16,534 $7 73 $13,958 $6 44 $11,381 $5 15 R-3, R-3 One and two-family homes Residentially 1,000 $6,618 $5 10 $5,648 $4.25 $4,679 $3.40 R-4 based 24-hour facility for 6 or fewer clients 2 000 $6 669 $71 78 $5,691 $59 82 $4,713 $47 85 - of any age, Residential care/assisted living 3,000 $7,387 $42 09 $6,289 $35 07 $5,192 $28.06 - for more than 6 ambulatory clients 4,000 $7,807 $112 80 $6 640 $94 00 $5,472 $75.20 - - 5,000 $8,936 $16 62 $7,580 $13 85 $6,224 $11 08 - - 10 000 $9,766 $89 66 $8,272 $74.72 $6,778 $59 77 R-3 REPEAT OF MODEL 1,000 $4,906 $3 91 $4 221 $3 25 $3,537 $2 60 - One and two family homes 2,000 $4,944 $44 67 $4,254 $37 22 $3,563 $29 78 - Repeat plan check set at 50% of initial plan 3 000 $5,391 $28 43 $4,626 $23 69 $3,861 $18 96 - check, per current Master Fee Schedule 4,000 $5,676 $73 54 $4 863 $61 28 $4,050 $49 02 - - 5,000 $6,411 $10 15 $5 476 $8 46 $4,541 $6 77 21 Exhibit A of Resolution No 8045 Fee Schedule.xlsx Resolution No 8045- 2 8% CPI Adjustment Construction Type IA, IB Construction Type IIA, IIB, II A, IIIB, IV Construction Type VA, VB IBC Class IBC Occupancy Type Project Size Threshold Base Cost @ Threshold Size Cost for Each Additional 100 sf * Base Cost @ Threshold Size Cost for Each Additional 100 sf * Base Cost @ Threshold Size Cost for Each Additional 100 sf * - - 10,000 $6,919 $61 18 $5,899 $50 98 $4,879 $40 78 3 S-1 Storage -Moderate Hazard, Repair Garage 500 $4 701 $14 16 $4,011 $12 93 $3,319 $11 70 - Motor Vehicles (not High Hazard) 2 500 $4,985 $35 00 $4,269 $29.49 $3 552 $23 98 - - 5,000 $5,860 $10 42 $5,006 $8 82 $4,152 $7 22 - - 10,000 $6 381 $12 08 $5,447 $10 18 $4,513 $8.28 - - 25 000 $8,193 $4.26 $6 973 $3 63 $5,755 $2 99 - - 50 000 $9,258 $17 85 $7,880 $15 10 $6 502 $12.34 1. S-2 Storage -Low Hazard Storage 500 $5,770 $17 55 $4,909 $16 04 $4,049 $14 53 - - 2 500 $6,120 $42 93 $5 230 $36 17 $4,340 $29 42 - - 5 000 $7,194 $12 99 $6 134 $11 00 $5 075 $9 00 - - 10,000 $7,843 $14 93 $6,684 $12 58 $5,525 $10 23 - - 25,000 $10 083 $5 24 $8,571 $4 46 $7,060 $3 68 - - 50 000 $11,393 $22 12 $9 687 $18 71 $7,980 $15 30 5 S S Occupancy Tenant Improvements 1,000 $4,856 $8.23 $4,148 $7 57 $3,439 $6 90 - - 5,000 $5 185 $19 27 $4,451 $16.26 $3,716 $13.25 - - 10 000 $6,148 $5.44 $5,264 $4 62 $4,379 $3 81 - - 20,000 $6,693 $6 44 $5,725 $5 43 $4 759 $4.43 - - 50,000 $8,626 $2 36 $7,356 $2.02 $6,087 $1 68 - - 100,000 $9,804 $9 47 $8,364 $8 03 $6,926 $6.59 U Accessory and miscellaneous structure not 1 000 $4,948 $7 89 $4 230 $7 31 $3,511 $6 72 - specifically classified 5,000 $5,264 $17 02 $4,522 $14.47 $3 780 $11 91 - - 10,000 $6,115 $5 84 $5,246 $5 01 $4,376 $4 17 - - 20,000 $6,699 $6 02 $5 746 $5 08 $4,794 $4 15 - - 50,000 $8,504 $2 18 $7,271 $1 87 $6 039 $1 57 - - 100,000 $9 594 $9 26 $8,208 $7 88 $6 824 $6 49 SHELL BUILDINGS B, M, S All Shell Buildings 5,000 $5,432 $2 20 $4,659 $2 07 $3,887 $1 93 - - 25,000 $5,873 $4.22 $5 072 $3 60 $4,273 $2.97 - - 50,000 $6,928 $1 29 $5,972 $1 11 $5 015 $0 93 - - 100 000 $7,574 $1 41 $6,528 $1.20 $5,482 $0 98 - - 250,000 $9,691 $0 57 $8 325 $0 49 $6,958 $0.42 - - 500,000 $11,111 $2 16 $9,562 $1 85 $8 013 $1 54 Each additional 100 square feet or portion thereof up to the next highest project size threshold 22 Exhibit A of Resolution No 8045 Fee Schedule.xlsx 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 CITY OF REDLANDS - Building & Safety MISCELLANEOUS ITEMS PERMIT FEES Resolution No 8045 - 2.8% CPI Adjustment Work Item Unit Fee Adopted 7/16/2019 Standard Hourly Rate $ 12770 k 1 _0,-.,,- .._y„i. .a.�.-�nk- 'Aa,!_..__�..:i�.:_., ..h._•_P { ',).-%i. �.-_ .,.`�:+�_',t-. �:r, -_",+:,.+"�'.[�."„.�'tf �:.fid. ?'�, ti5'r:�isr+-h'.*fi :..'I SvH.i���.-si' _ •:,sY..,.. i .-, _.FY•'[e.,.> ..%vt .. �+ch�� t., #,•.i� ...,fl�.i..�"...3--'.' Equipment Container any size each _v'��._. $ 383.10 Cellular/Mobile Phone, free-standing each $ 446.95 Cellular/Mobile Phone, co -location each $ 383.10 Balcony addition each $ 510.80 Carport MINOR (< or = 200 sq ft.) each $ 319.25 Carport MAJOR (> 200 sq ft,) each $ 446.95 Change of Occupancy each 7%4:'u,e.,i'�r:•''�e�,;=+:-v.Y\-<- e�f,r , u.. ...... -r . .,. .,r.. - i � �{ h�... � '.v .,� T Q;;1�.S`,:'%rei�: t,.Z7:=Ql ..-, �;�.,. �yry , .. �.. >,1 r-s��,c_,..yn,�:'i,; � 55 Interior wall each $ 255.40 Exterior wall each $ 383.10 Commercial Coach (per unit) each unit $ Compliance Inspections/Reinspections each $ 510.80 Deck (wood) up to 200 sq ft. each $ 319.25 Each additional 100 sq ft. each 100 sf $ 255.40 Deck (wood) (with calcs) - up to 200 sq ft. each $ 383.10 Over 200 sq ft. each $ 446.95 Demolition Single Family Dwelling each $ 255.40 Demolition Multi Family/ Commercial each $ 383.10 ..°r,' ';e,.- �„ s, ... ,>�• ��y :, .,':,:v r�I�yPd:^ ._T'v x - ,,, ,,., `-x! t-,.M�r,_.............t4P:�,nt,._Mw?S.•a ......r....; .st.,• ,. :v .. ' off',',`,,"},3:a '.� �,., ..m.w ., ., _,....7�Maci,•;.k,_Sr,..,trr..,.,,-a'k._,..,,�2�.,.,i'16!3d�:5u,,,..A.:1s>, ....,. _..,.. _ ,:_.� - y,ri' ,-gyp • -'r '. �a,ae+;'-�•.;�;s,.e�- �3�;;� Psi` New door (residential) .ewez each tJ9 $ 319.25 New door (Commercial/ Industrial) .'.�.. ':Y;map•, each $ ,jG.,,}+, v,; 2�", k,�, t ;:$ ' • ,'flv MSS- i^ 2a'� _ el- 1onma.§, 'GPe _ - ':t `h'`� •v;;i: i Any Size _!_ r _ - a - rY.2"a pWy��y j �y w �.,t; .; .ti ; :. '��:*rjCi.1.1V �,Q �I Si6.,.lP �I A;. ry� ,�5„� y�� ''.l', 'jai`„�,.i• ;M1•11.m,�� <.._�.�-., x, n x ¢¢, r� aa.��aru�.. t7 �. i:IJ - - 'L- ' � � �, �o- S�<� ,�,i �t�! 1 ._...__..<.?x't -.;i'>;'.,,,..� nr..'c.�.... ,. �_..-... ..-__,,.-.�.,,:�it ='v...,- .-.. L� v, y .�.,'.''i`�'€: .,e, ,_ �R.,.. 3l ,''K" ........,-:.;5i:�'s5�. �'�'Ja�-•:*;:§;. ,.v..1. ,C c - F ..>.k3 <:.. .i;�-YR_, T: Yf,. „��'..-�u`.',��d;`-�� tHe�'» 2zr... Masonry, (6-8 feet high) pre-engineered .. up to 100 If $ 383.10 Each additional 100 If each 100 If $ 63.85 Masonry Special Design (6-10' high) up to 100 If $ 574.65 Each additional 100 If each 100 If $ 191.55 Masonry Special Design (over 10' high) up to 100 If $ 574.65 Each additional 100 If each 100 If $ 191.55 -.,_ =.v. _...-,,; �s,,: ,,..,. .. ...... .. ..:.._.... _:..-..,..,.�.. _.-._-._.,. , ::,... _�.• e.z�fiv,...._t_..., Pre -Fabricated / Metal __: each $ 255.40 Flag pole (over 30 feet in height) each iiir)g-(Cti tfid;, il1): ram.. " ._ai;,._ .r-. , ;a 0-100 Cubic Yards (Cut and Fill) each $ 191.55 101-1 000 CY each 255.40 1 000 10 000 CY each $ 383.10 10,001 - 100 000 CY each $ 446.95 100 001 200,000 CY each $ 638.50 Each Add' 10,000 CY or portion thereof each $ 76.62 Lighting Pole each $ 255.40 23 Exhibit A of Resolution No. 8045 Fee Schedule.xlsx 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 Resolution No. 8045 2.8% CPI Adjustment Work Item Unit Fee Adopted 7/16/2019 � .,:•'�-.,::rs. ....:s..`..-.-.�'` .:.,.i• '�'; y_a y �*,' `"�z �" -�<e�,se- "' �. ::.i'.: tc{,. A -=.;yam .�„-�;�'s3Yo:'"`-�[�✓+;, iti h; 'Come ,E . L; _ ;? , ` k._ _ : .: ., _ ; xN Y � �-. - � .��,.. ��s , .r::,�,:�'`� N__...t�- � .;� r �r� .r. » � . }_'sx''r..� - .u. -.. _.. .,, .5s; _ate='Na„t•{.:r�•,3er-• fit.. ' ' �`%�i 35 Yr .x ?�s. t. r8g+v $,���.- Yam, v�i-=c*, L^',' S':cCJ='�li,o y.�i-,,'s, Interior (up to 30 I.f) up to 30 I.f .';;�•�'�;3;t $ 255.40 Additional partition 127 70 f: �.t;4z�.��tcrr 0 io CoverAwning, C0 '0 ,1 ', h p..; r x .,....r-,_ .� .... el sand Ar o `s ' ", , „ Y ° • � � 4 r : Wood frame (City Standard) up to 300 s.f $ 255.40 Wood frame (with calcs) up to 300 s.f $ 319.25 Other frame up to 300 s.f $ 319.25 Additional Patio up to 300 s.f $ 127 70 Enclosure each $ 319.25 t�;<°,.„,. ''.i 7,v yyy�,� ...,. s. .....8 . _ ",, =;?"' •mot? '� i e':: ,Ys , `Sx`:+.G. .. ,,.•, .- . . r......,,,i:.....,,...,a.,.. ,.., `.,,......,.,- n-,,._,.n...,.- „-,...0 _...,.G,..,_U,.,....,. i .,..-...<.s�Y'.., �,....2...w °i:;€ ya:,., 5,..,,'.s i ,,,, Residential 0-10 kW ., .., d,,�s` .etas,., $ 446.9500 Residential each additional kW> 10kW 12.7700 Non -Residential 0-50 kW 1,000.00 Non -Residential 51-250 kW** Ea KW $ 7.00 Non -Residential >250kW** Ea KW $ 5.00 Stucco Applications up to 400 s.f $ 191.55 Additional Stucco Application each 400 s.f $ 127 70 a � � � ., ,n ep}}�, g £.- ,. is F•, r,t, .ue .t , ,er ,,. ,a--,, s. m. .. :.N u,_ .. , ,r „ .i , - n- ., ,,. M � �° ,:¢., 'F. •.a ...v`v. udi. r: ? , aT , .; 7" `;�`. .�y� tz��,�,`'`,sdF��a�„ a °h G, .',`i¢ry For Fire, Water Decay & Pests .a;tY,..�;� <$10 000 .-�4;.,• ti, $ 766.20 For Fire, Water Decay & Pests $10 000 - 25 000 $ 766.20 For Fire, Water Decay & Pests $25,001 - 100,000 $ 1,021.60 For Fire, Water Decay & Pests > $100 000 1 149.30 u, , ., ., % .,,- :lame?: -..: � ., ,,:? ._. , ...--.Cti�' - _ �:a?���Y-'- - $. in ;Wall concr.-a#e or_mas.o *`3'31�'yvStr �r. t..e'-.,�., �s = - .r a^,,.ne_.'+�_t�.;�.rttis,:�,,,.�a First 50 If up to 50 I.f $ 383.10 Additional retaining wall each 50 I.f $ 63.85 Special Design 3-10' high (up to 50 If) up to 50 I.f $ 446.95 Additional retaining wall each 50 I.f $ 63.85 Special Design over 10' high (up to 50 If) up to 50 I.f $ 702.35 Additional retaining wall each 50 I.f. $ 63.85 r- o�rtb Resfdehtfal, „ < ;":s3 500 s.f Single Story up to 500 s.f $ 638.50 501 1 000 s.f 501 to 1 000 s.f $ 702.35 Additional remodel (each add'I 500 sq ft) „n... each 500 s.f $ 255.40 yy pV d ,o f. I 0 amr 'Dw 1 .. ; , .M TA' .4, .� £ .. ?.C._ ... �:, ,Y,_, g.11n.9_/ pip 9ASc _ ..,.._.. ,. ,>r =. .' :..�.-.r t'-_.,..:: •+3.:? rs.-_�:a.+ - ,... i:�'i� ?'"_.. :-R ..... ... Any Size .......`_ ,n. .. up to 200 s.f. $ 383.10 -roof:Mult'-F.=.a _ i y/,Gornm:/lnctj.• ,,, ,;t, zYs .= . •3 „, Minor Repair < 500 sq ft up to 500 s.f $ 191.55 501 3,000 sq ft 501 to 3,000 s f $ 319.25 3,001 10 000 sq ft 3,001 to 10k s.f $ 446.95 > 10 001 sq ft Each 1,000 sq ft $ 63.85 Roof Structure Replacement up to 500 s.f $ 638.50 Additional roof structure replacement each 500 s.f. es de t IAd itiotis' r_ g h,,, ..f,� ...sue; One Story up to 500 s.f $ 574.65 One Story 501 1,000 s.f $ 766.20 One Story > 1,000 s.f each 500 sqft $ 95.78 24 Exhibit A of Resolution No. 8045 Fee Schedule.xlsx 665 666 670 671 672 673 678 679 60 681 682 683 684 685 686 687 688 689 690 Resolution No. 8O45'2.8%CPI Adjustment Work Item Unit Fee Adopted 7n6m09 RwKt fi Stone and Brick Veneer (interior orexterior) upto4OOa.f $ 255.40 Additional siding Each add 4OOu.f $ 9578 M. Monument each $ 510.80 VVa||'mnuntedFhxtupu each $ 255.40 Free-standing each * 319.25 �m�,-��.~.-~�� Any Size each $ 255.40 -��-��----`*'n�--- —� AW'"2�w�.��<��a�J������ each $ 319.25 In -ground Private gh '�'~-~~�~~~`^�-�-�����-^~'��«'-^~^��^'—~'^^��'���_.����°�~.-ji�~������~�� first 1UO|[ Any Height (up 0m 10010 $ 383.10 each additional 100|f each 100|f $ 31.93 - - VW! _--__ Private <8OOo.f $ 838.60 Private >8OUo.f $ 766.20 Heater $ 95.m Temporary OU| Occupancy $ 1e770 e8 _0eWIPW`"2­­,������"--��'����-'�ao��"��^�'��k�./��'._�_���� , Residential Replacement qty14 $ 191.55 Residential Replacement qty 5ormore ea add $ 31.83 New Window (non structural) each $ 255.40 Service Required inExcess ofStandard per hour $ 12770 Re -inspection porhour $ 12770 P|unRa'Chonk per hour $ 12770 Research perhour $ 12/70 Residential Building Reports each * n».00 Off -hours inspection (min 3hours) First hour orportion $ 383.10 Off -hours inspection (min 3hours) EaAdd Hour $ 191a5 Landscaping $ onoao Strong -Motion Instrumentation and Seismic Hazards Mapping Feel Group ROccupancies: one bnthree stories excluding hotels/motels valuation ^X *00001 All other buildings *000021 A||000uponoioo-minimumfeu $050 California Health & Safety Code Section 18O810building permit fee vu|uotion2X $000004 Minimum fee $1 General Plan Maintenance Fee $010u.f of new construction or additions ^50%nf existing floor area 25 Exhibit Aof Resolution No. o04oFee Schodule.xlm Resolution No 8045 - 2.8% CPI Adjustment Work Item Unit Fee Adopted 7/16/2019 Microfilm/Scanning $10 + $2/page 1 Pursuant to Californa Public Resources Code Section 2705 2 In accordance with the January 1, 1996 Valuation Data *Effective 1/1/2018, Solar Energy System permit fee maximums were established by AB 1414 **Indicates these fees have reach maximum threshold as of 1/1/2018 checksums $ 32,100 57 26 Exhibit A of Resolution No. 8045 Fee Schedule.xlsx 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 CITY OF REDLANDS - Building & Safety MECHANICAL, ELECTRICAL & PLUMBING PERMIT FEES Resolution No. 8045 2.8% CPI Adjustment FEE TYPES FEE DESCRIPTION !ADMINISTRATIVE AND MISC. FEES Permit Issuance Permit Issuance MECHANICAL PERMIT FEES Fee Adopted 7/16/2019 63,85 Stand Alone Mechanical Plan Check (hourly rate) Stand Alone Mechanical Plan Check (hourly rate) $ 127 70 UNIT FEES: NC, Residential (each) Install/Relocate forced air or gravity -type furnace or burner (including attached ducts and vents) up to and including 100,000 Btu/h (each) $ 191.55 Heater (Wall) Install/Relocate floor furnace, including vent (each) $ 191.55 Appliance Vent/Chimney (only) Install/Relocate suspended heater recessed wall heater or floor mounted unit heater (each) $ 191.55 Boiler Repair/Alter/Add heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls (each) $ 191.55 Chiller Install/Relocate boiler or compressor up to and including 3HP or absorption system up to and Including 100,000 Btu/h (each) $ 510.80 Evaporative Cooler Air -handling unit, including attached ducts. (Note: this fee shall not apply to an air -handling unit that is a portion of a factory -assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit Is required elsewhere) (each) $ 191.55 Moisture Exhaust Duct (Clothes Dryer) Evaporative cooler other than portable type (each) $ 191.55 Vent Fan, Single Duct (each) Ventilation fan connected to a single duct (each) $ 191.55 Vent System Ventilation system that is not a portion of any heating or air-conditioning system authorized by a permit (each) $ 383.10 Exhaust Hood and Duct (Residential) Hood installation that is served by mechanical exhaust, including the ducts for such hood (each) $ 383.10 Non -Residential Incinerator Install/Relocate commercial or industrial -type incinerator (each) $ 255.40 Appliance or piece of equipment not classed in other appliance categories, or for which no other fee is listed (each) $ 191.55 OTHER FEES: OTHER FEES: Installation or relocation of any duct system $ 191.55 For Each Process Piping System of 1 to 2 Outlets $ 127 70 Other Mechanical Inspections (per half hour) For each additional process piping outlet $ 63.85 Other Mechanical Inspections (per hour) $ 127 70 PLUMBING/GAS PERMIT FEES Permit Issuance ( one time fee for each plumbing permit issued) Stand Alone Plumbing Plan Check (hourly rate) Stand Alone Plumbing Plan Check (hourly rate) UNIT FEES: UNIT FEES: Plumbing fixture or trap or set of fixtures on one trap, including water drainage piping, and backflow protection (each) PLUMBING/GAS PERMIT FEES Continued Building or trailer park sewer (each) Rainwater system inside building (per drain) Private sewage disposal system (each xhihit A of Re olution No 80 63.85 $ 127 70 $ 191.55 $ 191.55 $ 191.55 5 $ 191.55 27 71 717 718 719 720 721 722 723 724 725 726 727 728 72 73 731 73 73 734 735 736 737 738 739 FEE TYPES FEE DESCRIPTION Fee Adopted 7/16/2019 Water Heater (no issuance fee assessed) $ 191.55 Industrial waste pretreatment interceptor including its trap and vent, excepting kitchen -type grease interceptors functioning as fixture traps (each) $ 574.65 Underground utilities (sewer storm, water) Exception: Single Family Dwellings $ 191.55 OTHER FEES: OTHER FEES: Install/Alter/Repair water piping and/or water treating equipment (each) $ 191.55 For repair or alteration of drainage or vent piping, each fixture $ 191.55 For each lawn sprinkler system on any one meter including backflow protection devices therefor $ 191.55 For atmospheric -type vacuum breakers $ 191.55 1 1 to 5 $ 63.85 over 5 (each) $ 38.31 For each backflow protective device other than atmospheric -type vacuum breakers: $ 191.55 For each gas piping system of one to four outlets $ 191.55 For each gas piping system of five or more outlets $ 191.55 Other Plumbing and Gas Inspections (per half hour) Other Plumbing and Gas Inspections (per hour) $ 127 70 ELECTRICAL PERMIT FEES Stand Alone Electrical Plan Check (hourly rate) Permit Issuance (one time fee for each electrical permit issued) Stand Alone Electrical Plan Check Swimming pools, therapeutic whirlpools, spas and alterations to existing swimming pools. Use unit fee schedule for itemized work. Temporary power (ea); Temporary power to a permanent location (ea); Temporary service power pole or pedestal including all pole or pedestal - mounted receptacle outlets and appurtenances (ea) For a temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative light, Christmas tree lots, firework stands, etc. UNIT FEES: Receptacle, Switch, and Light Outlets Receptacle, switch, lighting or other outlets at which current is used or controlled, except services, feeders and meters: First 20 Each Additional 20 Outlets Lighting Fixtures For lighting fixtures, sockets or other lamp -holding devices First 20 Each Additional Outlet For pole or platform -mounted lighting fixtures For theatrical -type lighting fixtures or assemblies $ 63.85 127 70 $ 191.55 $ 191.55 191.55 $ 191.55 $ 63.85 191.55 63.85 63.85 127 70 ELECTRICAL PERMIT FEES Continued Residential Appliances 28 Exhibit A of Resolution No. 8045 Fee Schedule.xlsx 74 741 74 74 74 74 74 747 748 749 750 751 752 753 FEE TYPES FEE DESCRIPTION Fee Adopted 7/16/2019 For fixed residential appliances or receptacle outlets for same, Including wall -mounted electric ovens; counter -mounted cooking tops; electrical ranges, self-contained room, console, or through -wall air conditioners; space heaters, food waste grinders, dishwashers; washing machines; water heaters; clothes dryers or other motor -operated appliances not exceeding 1 horsepower (HP) in rating each. For other types of air conditioners and other motor -driven appliances having large electrical rating, see POWER APPARATUS. $ 191.55 Non -Residential Appliances For residential appliances and self-contained factory -wired, non- residential appliances not exceeding 1 horsepower (HP), kilowatt (KW), or kilovolt -ampere (KVA), in rating including medical and dental devices; food, beverage, and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines, or other similar types of equipment, each. For other types of air conditioners and other motor -driven appliances having large electrical rating, see POWER APPARATUS $ Power Apparatus For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment and other apparatus, as follows: Rating in horsepower (HP), kilowatts (KW), kilovolt- amperes (KVA), or kilovolt - amperes -reactive (KVAR): Up to and including 1 $ 191.55 Over 1 and not over 10 $ 191.55 Over 10 and not over 50 $ 255.40 Over 50 and not over 100 $ 383.10 Over 100, each $ 446.95 P Paneiboards Installation or relocation of panelboard (ea) $ 191.55 Busways For trolley and plug -in -type busways, each 100 feet or fraction thereof An additional fee will be required for lighting fixtures, motors and other appliances that are connected to trolley and plug -in -type busways. No fee is required for portable tools $ 191.55 Signs, Outline Lighting, and Marquees For signs, outline lighting systems or marquees supplies from one branch circuit, each $ 191.55 Electrical Services For services of 600 volts or less, up to 1,000amperes in rating, each $ 191.55 For services over 600 volts or over 1,000 amperes in rating, each $ 510.80 OTHER FEES: For electrical apparatus, conduits and conductors for which a permit is required but for which no fee is herein set forth. This fee is not applicable when a fee is paid for one or more services, outlets, fixtures, appliances, power apparatus, busways, signs or other equipment. $ 191.55 Other Electrical Inspections (per hour) $ 127 70 Note: This table would be used if, for example, someone wants a permit for just a water heater or electrical panel. 29 $ 11,978.26 Exhibit A of Resolution No 8045 Fee Schedule.xlsx