HomeMy WebLinkAbout8045RESOLUTION NO 8045
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDLANDS
ESTABLISHING A FEE AND SERVICE CHARGE REVENUE/COST
COMPARISON SYSTEM AND THE AMOUNTS OF FEES LEVIED IN
CONNECTION WITH THE CITY'S PROVISION OF SERVICES, AND
RESCINDING RESOLUTION NO 7892
BE IT RESOLVED by the City Council of the City of Redlands as follows
Section 1. Intent. Pursuant to article XIIIB of the California Constitution, it is the intent
of the City Council of the City of Redlands to require the ascertainment of recovery of costs
reasonably borne from fees levied therefor m providing the services hereinafter enumerated in
the exhibits to this Resolution. The fee and service charge revenue/cost comparison system
established within this Resolution provides a mechanism to ensure that, pursuant to this
Resolution, the fees adopted by the City for services rendered do not exceed the reasonable
estimated costs for providing the services for which the fees are charged. Accordingly, the City
Council, by adoption of this Resolution, adopts the fees described in the attached Exhibit "A"
which have been adjusted by CPI in accordance with Section 2, except where the fee has been set
by statute or where otherwise determined that no CPI increase is in the best interests of the City
for the efficient payment and collection of fees, or in case of recreation fees, participation m the
programs.
Section 2. CPI Adjustment. The fees referenced within this Resolution shall be
increased annually by the City's Finance Director, in July of each fiscal year, by an amount
reasonably equal to the percent change m the Consumer Price Index — All Urban Users
(Riverside — San Bernardino — Ontario) over the prior year In making such adjustments, the
Finance Director may round the amount of the increased fee to the nearest dollar for purposes of
facilitating efficient payment and collection. Further, the City Manager, or his or her designee,
shall undertake periodic reviews of the fees established by this Resolution and provide a written
report to the City Council recommending whether such fees should be adjusted to reflect
increased costs or efficiencies in the City's provision of services
Section 3. Authority for Administrative Orders. The City Manager is hereby delegated
the authority to issue administrative orders establishing fee collection and financial procedures
for implementation of this Resolution. All such administrative orders shall be signed by any
affected department directors and the Finance Director
Section 4. Costs Reasonably Borne. The phrase "costs reasonably borne," as used in this
Resolution, consists of:
A. All applicable direct costs including, but not limited to, salaries, wages, frmge
benefits, services and supplies, operation expenses, contracted services, special
supplies and any other direct expense incurred.
-1-
I.\Resolutions\Res 8000-8099\8045 Fee Resolution Dec. 2019.docx
B All applicable indirect costs including, but not limited to, building maintenance and
operations, equipment maintenance, conuilunication, printing and reproduction, and
like expenses, when distributed on a rational proration system.
C Fixed asset recovery expenses, consisting of depreciation of fixed assets and
additional fixed asset expense recovery charges calculated on the current estimated
cost of replacement, divided by the approximate life expectancy of the fixed asset.
A further additional charge to make up the depreciation not previously recovered
and reserved in cash also shall be calculated and considered a cost so as to recover
such unrecovered depreciation over the remaining life of the asset.
D General overhead, expressed as a percentage, distributing and charging the
expenses of the City Council, City Manager, Finance Department, City Clerk, City
Treasurer, City Attorney, Human Resources Department and all other staff and
support service provided to the entire City organization.
E. Departmental overhead, expressed as a percentage, distributing and charging the
cost of each department director and his or her supporting expenses as enumerated
in the above subsections of this section.
F Debt service costs, consisting of repayment of principal, payment of interest, and
trustee fees and administrative expenses for all applicable bonds, certificates of
participation, securities issues or loans. Any required coverage factors of added
reserves beyond basic debt service costs shall also be considered a cost if required
by covenant within any securities, ordinance, resolution, indenture or general law
applicable to the City
Section 5. Public Hearing. Pursuant to California Government Code sections 66016 and
66018, and other applicable statutory requirements, the City Clerk has caused public notice to be
provided as set out in Government Code sections 66016, 66018 and 6062a, and the City Council
has received, at a regularly scheduled meetmg, oral and written testunony from staff and
members of the public concerning the new or increased fees proposed to be established by this
Resolution. The notice, oral and written presentations and public meeting were provided prior to
the City Council taking any action on the new or increased fees established by this Resolution.
Section 6. Public Data. At least ten (10) days prior to the required public hearing
described herein, the City Clerk made available to the public data indicating the cost or estimated
cost required to support the fee for which the charge is proposed to be made The data
demonstrates that the new or increased fees established by this Resolution is not a tax, that the
amount of the fee is necessary to cover the reasonable costs of the City for the Service for which
it is imposed, and the manner in which the costs are allocated to a payor bear a fair and
reasonable relationship to the payor's burden on, or benefit received from, the City's
governmental activities.
Section 7. Public Notice. Notice of the time and place of the public hearing, including a
general explanation of the matter to be considered, has been mailed by the City Clerk at least
-2-
I.\Resolutions\Res 8000-8099\8045 Fee Resolution Dec. 2019.docx
fourteen (14) days prior to the public hearing to all interested parties who have filed written
requests with the City for mailed notice of meetings relating to new or increased fees.
Section 8. Actual Costs/Deposits. The actual cost for a service or project is determined
by the affected City department directors. Initial deposits are determined by the amount of time
historically spent by City staff on similar projects. Whenever seventy five percent (75%) of a
deposit has been expended and the department director determines that the estimated actual cost
of the project or service will exceed the amount deposited, an additional deposit of such
estimated excess amounts may be required. When an additional deposit has been requested, work
may be suspended on the project or service when eighty percent (80%) of the deposit previously
received has been expended.
Section 9. Proposition 26 Determination. The City Council hereby finds and determines
that the fees referenced within this Resolution are not taxes as defined in Article XIII C Section
1(e) of the California Constitution because the fees are either
A. Imposed for a specific benefit conferred or privilege granted directly to the payors,
that is not provided to those not charged, and which do not exceed the reasonable
costs m the City of conferring the benefit or granting the privilege,
B Imposed for a specific government service or product provided directly to the payor
that is not provided to those charged, and which do not exceed the reasonable costs
to the City of providing the service or product,
C Imposed for the reasonable regulatory costs to the City for issuing licenses and
permits, performing investigations, inspections, or audits, and the administrative
enforcement and adjudication thereof;
D Imposed for entrance to, or use of, City property; or the purchase, rental or lease of
City property; or
E Charges imposed as a condition of property development.
Section 10. Prior Resolutions Rescinded. Resolution No 7892 of the City Council of the
City of Redlands relating to fees is hereby rescinded on the effective date of this Resolution,
except for the fees referenced therein and which are identified in this Resolution as becoming
effective sixty (60) days after December 3, 2019 For the fees identified in this Resolution No
8045 as becoming effective sixty (60) days after December 3, 2019, such portions of Resolution
No 7892 shall not be rescinded until sixty (60) days after December 3, 2019
Section 11. CEQA Exemption. The City Council hereby finds and determines that the
adoption of this Resolution is exempt from review under the California Environmental Quality
Act ("CEQA") pursuant to Public Resources Code Section 21080(b)(8)(1) and CEQA Guidelines
Section 15273 because this Resolution relates to fees and charges for the purpose of meeting the
operating expenses of the City
-3-
I.\Resolutions\Res 8000-8099\8045 Fee Resolution Dec. 2019.docx
Section 12 Severabihty. Should any part or portion of this Resolution be rendered or
declared invalid by a court of competent jurisdiction, including any of the fees identified m the
Exhibit to this Resolution, such invalidation of such part or portion of tlus Resolution, or of any
fee, shall not invalidate the remaining portions hereof, of the remaining fees, and they shall
remain in full force and effect
Section 13 Effective Date This Resolution and the fees established by this Resolution
shall become effective on December 3, 2019 except for new or modified fees which apply to the
"filing, accepting, reviewing, approving, or issuance of an apphcation, permit or entitlement to
use" for a development project, as defined m Government Code section 66000, which shall
become effective sixty (60) days after December 3, 2019
ADOPTED, SIGNED AND APPROVED this 3rd day of December 2019
ATTEST
Donaldson, City Clerk
aul W Foster, Mayor
-4-
I \Resolutions\Res 8000 8099\8045 Fee Resolution Dec 2019 docx
I, Jeanne Donaldson, City Clerk of the City of Redlands, hereby certify that the foregomg
Resolution was duly adopted by the City Council at a regular ineetmg thereof, held on the 3rd
day of December, 2019, by the followmg vote
AYES Councilmembers Barich, Tejeda, Momberger, Davis, Mayor Foster
NOES None
ABSTAIN None
ABSENT None
Donaldson, City Clerk
-5-
I \Resolutions\Res 8000 8099\8045 Fee Resolution Dec 2019 docx
EXHIBIT "A"
[Attached]
-6-
I.\Resolutions\Res 8000-8099\8045 Fee Resolution Dec. 2019.docx
Fees as of 7/17/2018
Fees as of 7/16/2019
LEGEND
adjusted for 1 9% CPI increase
adjusted for 2.8% CPI increase
Fee Added
Resolution No 7892
Resolution No xxxx
No Change in Fee
Service Name
% Recovery
Fee Year 6
Fee Year 7
Fee Deleted
PLANNING DIVISION
1
Concept plan
100%
10 122
10,405
2
Concept plan amendment
100%
4 120
4,235
3
Specific plan
100%
9,460
9,725
4
Specific plan amendment
100%
4,306
4,427
5
CUP new construction
100%
6,529
6,712
6
CUP no new construction
100%
2 173
2,234
7
CUP time extension
100%
359
369
8
RevisedCUP- construction
100%
3,066
3152
9
Revised CUP no construction
100%
1,547
1,590
10
CUP daycare home (13 + clients)
100%
2,359
2,425
11
Variance fence committee
100%
615
632
12
Variance - SFR
100%
2,699
2,775
13
Variance comm, multi family
100%
3,014
3,098
14
Variance parking modification
100%
2,215
2,277
15
Building moving main structure
100%
1,795
1,845
16
Building moving garage/secondary structure
100%
1 701
1,749
17
CRA major>1 acre
100%
7358
7,564
18
CRA - minor 1 acre or less
100%
5,622
5 779
19
CRA time extension
100%
296
304
20
Minor commission review
100%
1,928
1 982
21
CRA revised major
100%
5,886
6,051
22
CRA- revised minor
100%
5,075
5,217
23
Parcel map
100%
4,908
5,045
24
Revised parcel map
100%
3,871
3,979
25
Reversion to acreage/merger
100%
2,737
2,814
26
Tentative tract map
100%
12 153
12,493
27
Revised tentative tract map
100%
8 108
8,335
28
Subdivision time extension
100%
384
395
29
Lot line adjustment
100%
687
706
30
Certificate of compliance
100%
730
750
31
Negative declaration (by staff)
100%
5,545
5,700
32
Negative declaration (by consultant)
100%
Contract plus 10% administrative fee
Contract plus 10% administrative fee
33
Environmental Impact Report (by consultant)
100%
Contract plus 10% administrative fee
Contract plus 10% administrative fee
34
Environmental project assessment
100%
786
808
35
Residential Development Allocation (RDA)
100%
3,752
3,857
36
Residential Development Allocation (RDA) alteration of approved project
100%
592
609
37
Residential Development Allocation (RDA) transfer of development allocation
100%
579
595
38
Home occupation permit - review
100%
49
50
39
Temporary Events
100%
170
175
40
Zone Change commission determination
100%
2,281
2,345
41
Zone Change - ordinance text amendment
100%
2,872
2,952
42
Zone Change
100%
3,694
3,797
43
One sign review
100%
662
681
44
Sign program
100%
1,500
1,542
PLANNING DIVISION Continued
1
Exhibit A of Resolution No. 8045 Fee Schedule.xlsx
Fees as of 7/17/2018
Fees as of 7/16/2019
LEGEND
adjusted for 1 9% CPI increase
adjusted for 2.8% CPI increase
Fee Added
Resolution No 7892
Resolution No xxxx
No Change in Fee
Service Name
% Recovery
Fee Year 6
Fee Year 7
Fee Deleted
45
Flag test
100%
1,439
1,479
46
Sign review by staff
100%
135
139
47
Sign program amendment
100%
807
830
48
Annual banner permit
100%
130
134
49
Additional banner display
100%
66
68
50
Searchlights
100%
130
134
51
CUP signs >120 SF
100%
2,594
2,667
52
Demolition > 50 yr old - Historic Designated SFR
100%
931
r 957
53
Demolition > 50 yr old Histonc Designated MF, Comm, Indstrl
100%
931
957
54
Demolition > 50 yr old Historic Designated Accessory Building
100%
649
667
55
Demolition > 50 yr old Single Family Zones
100%
628
646
56
Demolition > 50 yr old Multi Family Commercial & Industrial
100%
664
683
57
Demolition > 50 yr old Accessory Building
100%
549
564
58
Annexation
100%
6,877
7,070
59
Service plan for annexation
100%
1,334
1,371
60
Pre annexation agreement
100%
2,495
2,565
61
Agriculture preserve removal
100%
2,455
2,524
62
General plan amendment
100%
5,903
6,068
63
Street vacation
100%
2,531
2,602
64
Appeal - Various Fees Paid
100%
2,193
2,254
65
Addendum to planning commission
100%
1,156
1 188
66
Continued item by applicant
100%
360
370
67
Verification letter- basic
100%
374
384
68
Verification letter research
100%
663
682
69
Temporary occupancy
100%
195
200
70
News rack impound fee
100%
366
376
71
Development agreement
100%
5,942
6,108
72
Williamson Act contract removal
100%
2 724
2,800
73
Socio Economic Study
100%
3,176
3,265
74
Preliminary Review -over one acre
100%
418
430
75
Preliminary Review -one acre or less
100%
323
332
76
Minor Certificate of Appropnateness
100%
346
356
77
Certificate of Appropriateness
100%
598
615
78
Demolition Permit < 50 yr. old Single Family Zones
100%
376
387
79
Demolition Permit < 50 yr old - Multi Family Commercial & Industrial
100%
391
402
80
Demolition Permit < 50 yr old Accessory Building
100%
418
430
81
Mills Act
100%
467
480
82
Administrative Use Permit
100%
773
795
83
Zoning Clearance Form
100%
45
46
MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT
84
Environmental Impact Review
100%
381
392
85
Environmental Impact Report Review
100%
1,807
1,858
86
Tentative Tract Map
100%
1,429
1,469
87
Revised Tract Map
100%
1,429
1,469
88
Final Tract Map
100%
2,497
2,567
89
Tentative Parcel Map
100%
1,429
1,469
2
Exhibit A of Resolution No. 8045 Fee Schedule.xlsx
Fees as of 7/17/2018
Fees as of 7/16/2019
LEGEND
adjusted for 1 9% CPI increase
adjusted for 2.8% CPI increase
Fee Added
Resolution No 7892
Resolution No xxxx
No Change in Fee
Service Name
% Recovery
Fee Year 6
Fee Year 7
Fee Deleted
90
Revised Parcel Map
100%
1,836
1 887
91
Final Parcel Map
100%
2,245
2,308
92
Easement/Dedication Review
100%
719
739
93
Conditional Use Permit
100%
1,037
1 066
94
Commission Review and Approval
100%
1,037
1,066
95
Building Moving Permit
100%
233
240
96
Lot Line Adjustment
100%
671
690
97
Certificate of Compliance
100%
298
306
98
Street Vacation
100%
1,093
1,124
99
Subordination Agreement/Lien Release
100%
696
715
100
Building Permit Residential
100%
716
736
101
Building Permit Commercial/Industrial
100%
1,037
1 066
102
Building Permit Room Addition
100%
133
137
103
Building Permit - Commercial TI
100%
133
137
104
Plan Check Grading Base Fee/ 0 500 c.y
100%
492
506
105
Plan Check Grading, each addtl 500 cy or fraction thereof 501 5,000 c.y
100%
68
70
106
Plan Check - Grading each addtl 5,000 cy or fraction thereof, 5,001 50,000 c.y
100%
78
80
107
Plan Check Grading each addtl 10,000 cy or fraction thereof, 50,001-100,000 c.y
100%
88
90
108 Plan Check -Grading, each addtl 10,000 cy or fraction thereof, 100,001-200,000 c.y.
100%
10 10
109 Plan Check -Grading, >200,001 c.y. each addtl 10,000 cy or fraction thereof
100%
6 6
110
Plan Check Erosion Control SFR
100%
566
582
111
Plan Check Erosion Control Project Base Fee
100%
1,072
1,102
112
Plan Check SWPPP SFR
100%
1,047
1 076
113
Plan Check SWPPP Project Base Fee
100%
1,383
1 422
114
Plan Check SWPPP Subdivision Lot Fee
100%
145
149
/lot
115
Plan Check SWPPP Subdivision Acre Fee
100%
145
149
/acre
116
WQMP BMP Inspection Complex Projects
100%
743
764
117
WQMP BMP Inspection Standard Projects
100%
575
591
118
WQMP BMP Inspection Basic Project
100%
406
417
119
Plan Check Preliminary WQMP SFR
100%
722
742
120
Plan Check Preliminary WQMP - Project Base Fee
100%
806
829
121
Plan Check Preliminary WQMP Subdivision Lot Fee
100%
199
205
/lot
122
Plan Check Preliminary WQMP Subdivision Acre Fee
100%
199
205
/acre
123
Plan Check Final WQMP SFR
100%
1 047
1,076
124
Plan Check Final WQMP - Project Base Fee
100%
1,383
1,422
125
Plan Check Final WQMP Subdivision Lot Fee
100%
145
149
/lot
126
Plan Check Final WQMP - Subdivision Acre Fee
100%
145
149
/acre
MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT Continued
127
Plan Check Parcel Map Base Fee
100%
3,478
3,575
128
Plan Check - Parcel Map Lot Fee
100%
167
172
/lot
129
Plan Check Parcel Map Acre Fee
100%
29
30
/acre
130
Plan Check Tract Map Base Fee
100%
3,982
4,093
131
Plan Check Tract Map Lot Fee
100%
100
103
/lot
132
Plan Check - Tract Map - Acre Fee
100%
29
30
/acre
133
Plan Check - Street Construction Base fee
100%
1 391
1,430
134
Plan Check Street Construction per sheet
100%
555
571
/sheet
3
ExhibitA of Resolution No 8045 Fee Schedule.xlsx
Fees as of 7/17/2018
Fees as of 7/16/2019
LEGEND
adjusted for 1 9% CPI increase
adjusted for 2.8% CPI increase
Fee Added
Resolution No 7892
Resolution No xxxx
No Change in Fee
S
Service Name
% Recovery
Fee Year 6
Fee Year 7
Fee Deleted
135
Plan Check Storm Drains Base fee
100%
803
825
136
Plan Check - Storm Drains per sheet
100%
321
330
/sheet
137
Plan Check Hydrology Study
100%
1,437
1,477
138
Plan Check Street Lights Base fee
100%
646
664
139
Plan Check Street Lights per sheet
100%
366
376
/sheet
140
Plan Check - Sewer Construction Base fee
100%
803
825
141
Plan Check Sewer Construction per sheet
100%
321
330
/sheet
142
Plan Check Water Construction Base fee
100%
803
825
143
Plan Check Water Construction - per sheet
100%
321
330
/sheet
144
Plan Check Traffic Signals - New Installations
100%
1,643
1 689
145
Plan Check - Traffic Signals Modifications
100%
1,121
1 152
146
Plan Check Street Trees Base fee
100%
536
551
147
Plan Check Street Trees per sheet
100%
267
274
/sheet
148
Plan Check - Signs and Striping Base fee
100%
803
825
149
Plan Check Signs and Striping per sheet
100%
321
330
/sheet
150
Encroachment Permit Driveway Approach base
100%
84
86
151
Encroachment Permit Driveway Approach each
100%
42
43
/each
152
Encroachment Permit Sidewalk base
100%
84
86
153
Encroachment Permit Sidewalk - per sq foot up to 300 SF
100%
0.43
0.44
/sq if
154
Encroachment Permit - Sidewalk each additonal sq foot over 300 SF
100%
0.10
0 11
/sq ft.
155
Encroachment Permit Cross Gutter/Spandrel base
100%
84
86
/each
156
Encroachment Permit Cross Gutter/Spandrel per sq foot
100%
0.84
0.87
/sq ft.
157
Encroachment Permit Curb and Gutter - base
100%
84
86
158
Encroachment Permit Curb and Gutter per linear foot up to 50 LF
100%
3 19
3.28
/lin ft
159
Encroachment Permit - Curb and Gutter each additional LF up to 200 LF
100%
1.60
1 64
/Iin ft
160
Encroachment Permit Curb and Gutter each additional LF over 200 LF
100%
0.80
0.82
/Iin. ft.
161
Encroachment Permit Curb / Berm - base
100%
84
86
163
Encroachment Permit Curb / Berm - per linear foot up to 50 LF
100%
2 13
2 19
/lin ft.
164
Encroachment Permit Curb / Berm each additional LF up to 200 LF
100%
1 06
1 09
/lin ft.
165
Encroachment Permit Curb / Berm each additional LF over 200 LF
100%
0.53
0.55
/Iin ft.
166
Encroachment Permit Crushed Aggregate Base base
100%
84
86
167 Encroachment Permit - Crushed Aggregate Base - per sq. foot
100%
0.09 0.09 /sq ft.
168 Encroachment Permit - Asphalt Pavement - base
100%
10 10
169
Encroachment Permit- Asphalt Pavement persq Foot
100%
0.08
0.09
/sq ft.
170
Encroachment Permit Street Light base
100%
84
86
MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT Continued
171
Encroachment Permit- Street Light -each
100%
42
43
/each
172
Encroachment Permit Traffic Signal - New base
100%
84
86
173
Encroachment Permit Traffic Signal New -each
100%
2,498
2,568
/each
174
Encroachment Permit Traffic Signal Modification - base
100%
84
86
175
Encroachment Permit Traffic Signal - Modification - each
100%
1 956
2,011
/each
176
Encroachment Permit Reinforced Concrete base
100%
84
86
177
Encroachment Permit - Reinforced Concrete - per cubic yd
100%
126
130
/cubic yd
178
Encroachment Permit Storm Drain Pipe base
100%
84
86
179
Encroachment Permit Storm Drain Pipe per linear foot up to 100 LF
100%
5.07
5.21
/Iin ft
180
[Encroachment Permit Storm Drain Pipe each additional LF
100%
0.80
0.82
/lin ft.
4
Exhibit A of Resolution No 8045 Fee Schedule.xlsx
Fees as of 7/17/2018
Fees as of 7/16/2019
JLEGEND
Fee Added
adjusted for 1 9% CPI increase
adjusted for 2.8% CPI increase
Resolution No 7892
Resolution No xxxx
No Change in Fee
Service Name
% Recovery
Fee Year 6
Fee Year 7
Fee Deleted
181
Encroachment Permit - Curb Inlet/Outlet Structures base
100%
84
86
182
Encroachment Permit Curb Inlet/Outlet Structures -each
100%
42
43
/each
183
Encroachment Permit Storm Drain Manhole/Junction Box- base
100%
84
86
184
Encroachment Permit Storm Drain Manhole/Junction Box each
100%
42
43
/each
185
Encroachment Permit - Curb Core - base
100%
84
86
186
Encroachment Permit Curb Core each
100%
42
43
/each
187
Encroachment Permit Sewer Main base
100%
84
86
188
Encroachment Permit Sewer Main - per linear foot up to 50 LF
100%
1.68
1 73
/lin ft
189
Encroachment Permit Sewer Main each additional LF
100%
0.26
0.27
/lin ft.
190
Encroachment Permit Sewer Manhole base
100%
84
86
191
Encroachment Permit Sewer Manhole each
100%
42
43
/each
192
Encroachment Permit - Sewer Cleanout base
100%
84
86
193
Encroachment Permit Sewer Cleanout each
100%
42
43
/each
194
Encroachment Permit Sewer Lateral base
100%
84
86
195
Encroachment Permit Sewer Lateral - each
100%
42
43
/each
196
Encroachment Permit Water Main Potable- base
100%
84
86
197
Encroachment Permit Water Main Potable per linear foot up to 50 LF
100%
1.68
1 73
/lin. ft.
198
Encroachment Permit Water Main Potable -each additional LF over 50 LF
100%
0.26
0.27
/lin ft.
199
Encroachment Permit Water Main Non -Potable - base
100%
84
86
200
Encroachment Permit Water Main Non Potable per linear foot up to 50 LF
100%
1.68
1 73
/lin ft.
201
Encroachment Permit Water Main Non Potable each additional LF over 50 LF
100%
0.26
0.27
/lin ft.
202
Encroachment Permit Water Service Lateral base
100%
84
86
203
Encroachment Permit Water Service Lateral each
100%
42
43
/each
204
Encroachment Permit Fire Hydrant Assembly base
100%
84
86
205
Encroachment Permit Fire Hydrant Assembly each
100%
42
43
/each
206
Encroachment Permit Water Shutdown base
100%
84
86
207
Encroachment Permit Water Shutdown - each
100%
42
43
/each
208
Encroachment Permit Fire Service base
100%
84
86
209
Encroachment Permit Fire Service each
100%
42
43
/each
210
Encroachment Permit - Excavation Trench Street Cut - base
100%
84
86
211
Encroachment Permit Excavation Trench Street Cut per linear foot up to 50 LF
100%
1.68
1 73
/lin ft.
212
Encroachment Permit Excavation Trench, Street Cut each additional LF over 50 LF
100%
0.26
0.27
/lin. ft
213
Encroachment Permit Street Patch base
100%
84
86
MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT Continued
214
Encroachment Permit Street Patch per sq ft up to 200 SF
100%
0 17
0 18
/sq ft.
215
Encroachment Permit Street Patch each additional SF over 200 SF
100%
0 12
0 13
/sq ft
216
Encroachment Permit Processing Fee
100%
330
339
217
Encroachment Permit SIA/PIA Projects
100%
1% of bond amount
1% of bond amount
218
Grading Permit, Base Fee/ 0-500 c.y
100%
567
583
219
Grading Permit, each addtl 2,000 cy or fraction thereof 501 10,000 c.y
100%
68
70
220
Grading Permit, each addtl 5,000 cy or fraction thereof, 10,001 100,000 c.y
100%
82
10
7
72
72
84
10
7
221
Grading Permit, each addtl 10,000 cy or fraction thereof, 100,001 200,000 c.y
Grading Permit, >200,001 c.y. each add0 10,000 c.y. or fraction thereof
100%
222
100%
223 Permit Truck Route (up to 5 days)
100%
74
224 Permit Wide Load
100%
225 Permit Wide Load Single Trip
Statute
16
5
Exhibit A of Resolution No 8045 Fee Schedule.xlsx
Fees as of 7/17/2018
Fees as of 7/16/2019
LEGEND
adjusted for 1 9% CPI increase
adjusted for 2.8% CPI increase
Fee Added
Resolution No 7892
Resolution No xxxx
No Change in Fee
Service Name
% Recovery
Fee Year 6
Fee Year 7
Fee Deleted
226 Permit - Wide Load - Annual
Statute
90
227
Permit Outdoor Dining New
100%
297
305
228
Permit Outdoor Dining Annual Renewal
100%
161
166
229
Permit Outdoor Display New
100%
297
305
230
Permit - Outdoor Display Annual Renewal
100%
161
166
231
Permit Parklet
100%
288
296
232
NPDES Program Fee, Industrial High
100%
167
172
233
NPDES Program Fee, Industrial - Medium
100%
83
85
234
NPDES Program Fee Industrial Low
100%
35
36
235
NPDES Program Fee, Commercial High
100%
167
172
236
NPDES Program Fee, Commercial Medium
100%
83
85
237
NPDES Program Fee, Commercial Low
100%
35
36
238
SWPPP preliminary check
100%
2,415
2,483
239
SWPPP final check erosion control plan
100%
2 415
2,483
240 WQMP preliminary check
100%
2,415
241 WQMP final check erosion plan
100%
2,415
242 WQMP preliminary Single Family Residence
100%
1,226
243 WQMP preliminary Base Fee
100%
1,795
244 WQMP preliminary -Acreage
100%
- 65
/acre
245 WQMP final Single Family Residence
100%
1 136
246 WQMP final - Base Fee
100%
1 715
247 WQMP final Acreage
100%
65
/acre
248
NPDES Inspection Construction - High - Non rainy season pnority once
100%
515
529
249
NPDES Inspection Construction High Rainy season, priority monthly
100%
515
529
250
NPDES Inspection, Construction Medium Non -rainy season priority once
100%
257
264
251
NPDES Inspection, Construction - Medium- Rainy season priority monthly
100%
257
264
252
NPDES Inspection Construction Low Non rainy season, priority once
100%
257
264
253
NPDES Inspection, Construction Low- Rainy season, priority monthly
100%
257
264
254
NPDES Inspection, Construction Out of Compliance Site weekly
100%
515
529
255
NPDES Testing - Chlorination Removal Discharge Testing per pipeline
100%
129
133
256
NPDES Testing - pH testing per discharge per pipeline
100%
130
134
257
Public Improvement Agreement
100%
1 020
1,049
258
Landscape Covenant
100%
894
919
259
Landscape Covenant w/ Caltrans Agreement
100%
1 147
1,179
260
Water Efficient Landscape Plan
100%
811
834
261
Plan research records request, per hour
100%
111
114
262
Street Name Sign Installation
100%
576
592
263
Stop Sign Installation
100%
700
720
POLICE
DEPARTMENT
264
Background Checks
100%
21
22
265
False alarm response
100%
206
212
266 Bicycle license
47%
5 5
267
CCW permit
Statute
100
100
NO CPI
268
CCW permit renewal
Statute
25
25
NO CPI
269 CCW Modification Fee
Statute
10 10
NO CPI
270 Fingerprint - rolling
100%
25 I 26
6
Exhibit A of Resolution No. 8045 Fee Schedule.xlsx
Fees as of 7/17/2018
Fees as of 7/16/2019
LEGEND
adjusted for 1 9% CPI increase
adjusted for 2.8% CPI increase
Fee Added
Resolution No 7892
Resolution No xxxx
No Change in Fee
S
Service Name
% Recovery
Fee Year 6
Fee Year 7
Fee Deleted
271
Miscellaneous permits
100%
110
113
272
Miscellaneous photos
100%
65
67
273
Repossession
100%
19
20
274
Vehicle impound all others
100%
251
258
275
Vehicle impound DUI
100%
251
258
276
Tow Services Agreement
100%
78
80
277
Visa Clearance
100%
11
11
278
Film Permits
100%
434
446
279
Film Permits locally owned and operated video production companies
50%
217
223
280
Massage therapist permit
100%
110
113
281
Massage Therapy Business Owner permit initial
100%
406
417
282
Massage Therapy Business Owner permit renewal
100%
208
214
283
Solicitor permit
100%
110
113
284
Taxi Driver permit (3 yr permit)
100%
307
316
285
Tow Truck Driver permit
100%
78
80
286
Adult Oriented Business permit
100%
362
372
287
Adult Entertainer permit
100%
110
113
288
Remote Bingo
100%
583
599
289
Cost Recovery - Delinquent Parking Citations
100%
15% of citation + $5.00
15% of citation + $5.00
Animal Shelter
290
Animal boarding
16%
10
10
291
Trap rentals
100%
60
-
292
Shelter apprehension livestock - large
76%
43
50
293
Shelter apprehension livestock medium
57%
33
50
294
Shelter apprehension, livestock small
38%
20
50
Cat
295
Cat adoption
6%
7
10
296
Cat release owner
50%
20
30
297
Cat release owner, < 4 months 16%
10
POLICE
DEPARTMENT Continued
298
Shelter apprehension cat
19%
10
15
299
Cat Vaccine
65%
15
15
300
Cat Spay
57%
28
50
301
Cat Neuter
85%
28
50
Dog
302
Dog adoption
10%
12
15
303
Dog release owner
50%
33
50
304 Dog release owner, < 4 months
32%
20
305
Shelter apprehension, unaltered - 1st
Statute
35
35
306
Shelter apprehension unaltered 2nd
Statute
50
50
307
Shelter apprehension unaltered 3rd
Statute
100
100
308
Dog Vaccine
100%
23
25
309
Dog Spay (up to 30 lbs)
78%
54
75
310
Dog - Spay (31 - 50 lbs)
56%
54
75
311
Dog Spay (51 to75lbs)
51%
54
75
312
Dog Spay (76 100 lbs)
37%
54
75
7
Exhibit A of Resolution No 8045 Fee Schedule.xlsx
Fees as of 7/17/2018
Fees as of 7/16/2019
LEGEND
adjusted for 1 9% CPI increase
adjusted for 2.8% CPI increase
Fee Added
Resolution No. 7892
Resolution No xxxx
No Change in Fee
Service Name
% Recovery
Fee Year 6
Fee Year 7
Fee Deleted
313
Dog - Neuter (up to 30 lbs)
93%
54
75
314
Dog Neuter (31 50 Ibs)
63%
54
75
315
Dog - Neuter (51 to 75 Ibs)
56%
54
75
316
Dog Neuter (76 100 Ibs)
44%
54
75
Small -Native -Exotic Animals
317
Small animals - Rabbit, Guinea Pig, Hamster
50%
10
318
Native birds parakeets, finch, lovebirds, canaries, etc
50%
10
319
Exotic birds parrots, macaws toucans, etc.
50%
75
320
Turtle red razor
50%
10
321
Turtle snapping
50%
30
322
Tortoise
50%
-
50
323
Snakes
100%
Market Rate
FIRE
DEPARTMENT
324
False alarm residential
100%
154
177
325
False alarm commercial
100%
275
299
326 Plan review commercial
100%
-
404
327 Plan review multi -family
100%
324
328 Plan review - other (access, grading, house moving)
100%
243
329 Plan review residential tract
100%
-
324
330 Plan review single family
100%
-
163
331 Plan review - commercial fire pump
100%
208
332 Plan review high -piled storage
100%
324
333 Plan review consultations (hourly fee)
100%
175
484
334 Plan review - prevention engineering
100%
293
335
Plan review fuel dispensing
100%
318
163
336
Plan review hood & duct
100%
279
163
337
Plan review medical gas
100%
279
243
338
Plan review portables
100%
318
163
339
Plan review spray booths
100%
279
243
STATE MANDATED FIRE MARSHAL INSPS
340 Insp care facilities / churches
100%
246
341 Insp pre school / school / day care
100%
208
FIRE DEPARTMENT continued
100%
342 Insp high rise
100%
423
632
343 Insp daycare / foster
care (6 or less)
100%
170
344
Inspection In -home, 6 or less to include care facilities
100%
- 258
345
Inspections In -home 7 or more to include care facilities
100%
- 311
346
Inspection Facility Pre -Inspection
100%
40
347
Inspection -Annual Clearance
100%
- 80
348
Inspection - Hospital - I
100%
912
349
Inspection - Schools E
100%
552
350
Inspection Preschools/Day Care
100%
271
351
Inspection Commercial home- 24 hour care
100%
- 298
352
Inspection Churches A
100%
- 80
353
Inspection - Jail lock up detention facilities
100%
258
354
Failure to Keep Scheduled Appointment for Inspection
100%
- 160
8
Exhibit A of Resolution No 8045 Fee Schedule.xlsx
Fees as of 7/17/2018
Fees as of 7/16/2019
LEGEND
adjusted for 1 9% CPI increase
adjusted for 2.8% CPI increase
Fee Added
Resolution No. 7892
Resolution No xxxx
No Change in Fee
Service Name
% Recovery
Fee Year 6
Fee Year 7
Fee Deleted
355
Inspection - After hours inspection
100%
-
160
P
PREVENTION INSPECTIONS
356
Insp aprtmnt/condo 1 10 units
100%
196
191
357
Insp aprtmnt/condo 11-30 units
100%
234
204
358
Insp - aprtmnt/condo 31 50 units
100%
242
218
359
Insp aprtmnt/condo 57 75 units
100%
318
258
360
Insp aprtmnt/condo 76-100 units
100%
318
338
361
Insp aprtmnt/condo 101 + units
100%
396
351
362
Insp cert of occupancy ordinary hazard
100%
178
218
363
Insp cert of occupancy high hazard
100%
216
231
364
Insp commercial B-2
100%
156
365
Insp commercial Xmas tree
100%
156
366
Insp commercial high hazard
100%
216
271
367
Insp motels 1 20 units
100%
165
231
368
Insp motels 21-40 units
100%
203
231
369
Insp motels 41 50 units
100%
203
271
370
Insp motels 51+ units
100%
242
311
371
Insp- commercial occupancy re -inspection
100%
47
372
Group F Fabrication Finishing Manufacturing)
100%
458
373
Group L Labortory
100%
338
374
Group S - Storage
100%
258
375
Group U Utility
100%
- 191
376
Large Warehouse inspections (B M F and S)
100%
632
377
Fire Prevention Inspector Inspection -Ordinary Hazard
100%
80
378
Fire Prevention Inspector Re -Inspection -Ordinary Hazard
100%
80
ENGINE COMPANY INSPECTIONS
379
Engine company insp ordinary hazard
75%
144
150
380 Engine company insp high hazard
100%
180
PERMITS
100%
381
Aircraft repair hangar permit
100%
242
271
382
Aircraft refueling vehicle permit
100%
255
271
383
Aerosol products
100%
258
384
Amusement buildings
100%
258
385
Bowling pin/Alley refurbish
100%
40
386
Carbon Dioxide System (at/over 100 lbs.) - Beverage Systems
100%
218
387
Cellulose Nitrate Film/Storage
100%
218
388
Cryogenic Fluids
100%
258
389
Fire Hydrants & Valves
100%
- 218
390
Floor Finishing
100%
258
391
Fumigation or Thermal Insecticidal Fogging
100%
191
392
HPM Facilities
100%
231
393
Hood and Duct Permit
100%
271
394
Hot -work operations
100%
- 231
395
Industrial Ovens
100%
231
396
Liquid or gas fueled vehicles or equipment in assembly buildings
100%
231
397
Miscellaneous Combustible Storage (over 2500 cubic feet)
100%
271
9
Exhibit A of Resolution No 8045 Fee Schedule.xlsx
Fees as of 7/17/2018
Fees as of 7/16/2019
LEGEND
adjusted for 1 9% CPI increase
adjusted for 2.8% CPI increase
Fee Added
Resolution No 7892
Resolution No xxxx
No Change in Fee
Service Name
% Recovery
Fee Year 6
Fee Year 7
Fee Deleted
398 Open Buming (bonfire, rubbish, BBQ, recreational or ceremonial Fire,etc.)
100%
- 231
399 Organic Coatings
100%
231
400 Private Hydrant Removal
100%
204
401 Prytechnics special effects Fireworks permit -small show
100%
- 321
402 Prytechnics special effects - Fireworks permit- large show (can include engine crew)
100%
- 1,218
403 Proxylin Plastics
100%
218
404 Rocket launching (model rockets)
100%
244
Special Activities (Production Facilities Live Audience Tradeshows, Exhibits Special
Events) seasonal eventshaunted houses/mazes, pumpkin patches christmas tree
405 lots etc.)
100%
258
406 Spraying/Dipping
100%
218
407 Tire storage/recapping/rebuilding
100%
218
408 Waste handling
100%
218
_ 409_ Wood Products (over 200 cubic feet)
100%
- 218
I
410
Compressed gas/LPG permit
100%
255
271
411
Covered mall permit
100%
318
552
412
Dry cleaning permit
100%
242
311
413
Combustible Fiber Storage or Dust Producing
100%
279
258
414
Explosives permit
100%
345
258
415
Fruit ripening permit
100%
318
218
416
Flammable/combustible liquid permit
100%
267
231
417
Hazardous / toxic / corrosive permit
100%
267
231
418
High piled combustible permit
100%
306
512
419
Junk yard permit
100%
423
271
420
Lumber yard permit
100%
345
218
421
Medical gas system permit
100%
279
218
422
Pesticides permit
100%
191
271
423
Pipeline excavation / operation permit
100%
267
271
424
Poison gas permit
100%
267
271
425
Radioactive matenal permit
100%
267
271
426
Refrigeration equipt permit
100%
267
351
427
Repair garage permit
100%
267
231
FIRE
DEPARTMENT continued
100%
428
Spray booth permit
100%
267
271
429
Tanks permit
100%
267
231
430
Welding / cutting permit
100%
267
231
431
Bonfire permit
100%
191
432
Carnival / fair permit
100%
267
231
433 Fireworks permit*
100%
796
434
Open flame permit
100%
I 242
231
10
Exhibit A of Resolution No 8045 Fee Schedule.xlsx
Fees as of 7/17/2018
Fees as of 7/16/2019
LEGEND
adjusted for 1 9% CPI increase
adjusted for 2.8% CPI increase
Fee Added
Resolution No 7892
Resolution No xxxx
No Change in Fee
Service Name
% Recovery
Fee Year 6
Fee Year 7
Fee Deleted
435
Parade float permit
100%
165
271
436
Assembly 1000+ persons w/ stage
100%
345
351
437
Assembly 501 999 persons w/ stage
100%
345
311
438
Assembly 300 500 persons
100%
345
271
439
Assembly 50-299 persons
100%
242
271
440
Tents/Canopy
100%
242
231
WEED ABATEMENT
100%
441
Weed abatement adman
100%
239
416
442
Weed abatement disking (Admin Fee Only)
100%
21
83
443
Weed abatement mowing lot (Admin Fee Only)
100%
21
83
444
Weed abatement hand work (Adman Fee Only)
100%
21
83
445
Weed abatement re -inspection
100%
43
190
446 LandscapeNegetation Management 100% - 258
HYDRANT/HYDRO FLOW TEST
100%
447
Hydrant/Hydro Flow Test - Install 1 tank
100%
332
218
448
Hydrant/Hydro Flow Test - Install 2 tanks
100%
411
231
449
Hydrant/Hydro Flow Test Install 3 tanks
100%
487
271
450
Hydrant/Hydro Flow Test Removal 1 tanks
100%
332
218
451
Hydrant/Hydro Flow Test Removal 2 tanks
100%
411
231
452
Hydrant/Hydro Flow Test Removal 3 tanks
100%
487
271
453
Admin fee cost recovery (Community Risk Reduction)
100%
101
249
454
Flow Test Fire Flow
100%
255
231
455
Miscellaneous Inspection/Permit Hourly
100%
146
351
Permit fees includes 2 inspections For businesses with multiple permits the highest
permitted fee will be charged first and then each additional permit fee will be reduced by
50%
100%
456
Alarm System Plan Review,Spnnkler monitoring only
100%
154
123
457
Alarm System Plan Review 10 or less initiating devices
100%
309
203
458
Alarm System Plan Review 11 20 initiating device
100%
463
203
459
Alarm System Plan Review 20 or more devices
100%
619
268
460 Sprinkler System Plan Review 25 heads or less
100%
309
461 Sprinkler System Plan Review 26 99 heads
100%
463
462 Sprinkler System Plan Review 100 heads or more
100%
619
463 Sprinkler System Plan Review, 1-99 heads
100%
120
464 Sprinkler System Plan Review 100-499 heads
100%
243
465 Sprinkler System Plan Review, 500 or more heads
100%
292
466 Fire Sprinkler Modification 1-100 heads
100%
123
467 Fire Sprinkler Modification- 101-700 heads
100%
163
468 Fire Sprinkler modification- 701 1250 heads
100%
203
469 Fire Sprinkler modification- 1251 heads and over
100%
- 243
11
Exhibit A of Resolution No 8045 Fee Schedule.xlsx
Fees as of 7/17/2018
Fees as of 7/16/2019
LEGEND
adjusted for 1 9% CPI increase
adjusted for 2.8% CPI increase
Fee Added
Resolution No 7892
Resolution No xxxx
No Change in Fee
Service Name
% Recovery
Fee Year 6
Fee Year 7
Fee Deleted
470 In -rack sprinklers (plan review permit, & 2 inspections) 1 10,000 square feet
100%
- 191
471 In -rack sprinklers (plan review permit, & 2 inspections) 10,001-50,000 square feet
100%
- 271
472 In -rack sprinklers (plan review permit, & 2 inspections) 50,001-100,000 square feet
100%
- 351
In rack sprinklers (plan review permit, & 2 inspections) each additional 1-50,000 square
473 feet over 100,000 square feet
100%
431
474 Plan Review -Private underground Fire Line 1-10 appliances per building
100%
- 163
475 Plan Review -Private Underground Fire Line 11-20 appliances per building
100%
- 203
476 Plan Review -Private Underground Fire Line 21-30 appliances per building
100%
- 203
477 Plan Review-Pnvate Underground Fire Line 31-40 appliances per building
100%
243
478 Plan Review- each additional appliance over 40
100%
123
479 Plan Review- Aboveground and Underground Storage tank -first tank at location
100%
123
480 Plan Review- Aboveground and Underground storage tank -each tank after first
100%
- 163
481 Plan Review-LandscapeNegetation Management
100%
163
482 Plan Review Resubmittal/Revision of previously reviewed plan (after 2nd sub)
100%
123
Plan Review -where no permit or inspection is required, i.e solar
483 (commercial/residential TI)
100%
123
FIRE DEPARTMENT continued
484 Commercial Fire Alarm Modification- 1 50 devices
100%
- 123
485 Commercial Fire Alarm Modification- 51 devices and over
100%
- 163
486
Smoke Control System Plan Review review of rational analysis
100%
1,236
364
487
Smoke Control System Plan Review Design Testing
100%
1,236
444
488
Inspection 100,000 sq ft or less
100%
154
391
489
Inspection 100,000 500,000 sq ft
100%
232
472
490
Inspection 500,001 sq ft and above
100%
309
552
491
Const - Automatic fire -extinguishing system 25 heads or less
100%
309
191
492
Const - Automatic fire -extinguishing system 26 99 heads
100%
463
231
493
Const - Automatic fire -extinguishing system 100 heads or more
100%
619
114
494
Const - Kitchen Hood and Duct
100%
309
191
495
Const Clean Agent System
100%
309
191
496
Const Battery Systems
100%
309
231
497
Const Compressed Gases
100%
309
231
498
Const Cryogenic fluids
100%
309
231
499
Const - Alarm and detection systems/equip sprinklers monitoring only
100%
154
191
500
Const - Alarm and detection systems/equip 10 or less initiating devices
100%
309
191
501
Const - Alarm and detection systems/equip 11-20 initiating devices
100%
619
231
502
Const Alarm and detection systems/equip 20 or more devices
100%
927
311
503
Const Fire pumps and related equipment
100%
619
311
504
Const Flammable and combustible liquids
100%
309
231
505
Const Hazardous Materials
100%
619
311
506
Const - Industrial ovens
100%
309
191
12
Exhibit A of Resolution No 8045 Fee Schedule.xlsx
Fees as of 7/17/2018
Fees as of 7/16/2019
LEGEND
adjusted for 1 9% CPI increase
adjusted for 2.8% CPI increase
Fee Added
Resolution No 7892
Resolution No xxxx
No Change in Fee
Service Name
% Recovery
Fee Year 6
Fee Year 7
Fee Deleted
507
Const LP gas
100%
309
191
508
Const Pnvate fire hydrants
100%
463
191
509
Const Spraying or dipping
100%
463
231
510
Const - Standpipe systems
100%
463
191
511
Const - Temporary membrane structures and tents
100%
154
183
512
High Fire Hazard Area Landscaping
100%
125
271
513 First Responder Fee (Engine/Truck) (non-residents only)
100%
-
514
514 First Responder Fee (Paramedic Squad) (non-residents only)
100%
-
380
515 Const- Emergency responder radio coverage systems
100%
203
516 Const Gates/Barricades
100%
191
517 Const Smoke Control/Exhaust
100%
391
518 Const - Solar- Photovoltaic
100%
40
519 Building Occupant Safety Survey (BOSS)
100%
-
111
FACILITIES & COMMUNITY SERVICES DEPARTMENT
520 Small Cell Site Applications (pass -through costs) 100%
-
Contract Cost
519 Annual License Fee for Use of City Facilities Statute
270
per year
520
Vacant, abandoned property registration
100%
90
93
521
Street Tree Permit Street Tree Removal
50%
83
85
522
Street Tree Permit Street Tree Trimming
50%
69
71
523
Street Tree Permit Street Tree Planting
50%
79
81
524
Street Tree Permit Street Tree Relocation
50%
137
141
525
Street Tree Permit Processing Fee
50%
39
40
526
Rental Dwelling Permit < 1 acre
100%
82
80
527
Rental Dwelling Permit 1 3 acres
100%
96
94
528
Rental Dwelling Permit , 3.01 5 acres
100%
108
106
529
Rental Dwelling Permit , > 5.01 acres
100%
118
116
530
Rental Dwelling Permit Reinspection
100%
42
40
531 Street Banner Permit
100%
- 25
PARKS DIVISION
PARK RESERVATION RATES
532
Park Reservation Rates
Prospect Park Sign
61
63
Redlands Bowl
118
121
Stage (outdoor area of Posellis only) - 20 /hour
Prosellis (includes stage area) - 25 /hour
Bowl - 25 /hour
Mandatory Park Attendant - 50 /hour
IAvice Meeker Sewall Theatre 1 1 118 I 121
Apron (full stage not available) - 20 /hour
Mandatory Park Attendant 50 /hour
!Sylvan Park 1 118 121
Section A (Group Picnic) Tables 1 through 8 (seats 128) - 30
Section A (Group Picnic) Tables 9 through 17 (seats 64) - 30
13
Exhibit A of Resolution No 8045 Fee Schedule.xlsx
Fees as of 7/17/2018
Fees as of 7/16/2019
LEGEND
adjusted for 1 9% CPI increase
adjusted for 2.8% CPI increase
Fee Added
Resolution No. 7892
Resolution No xxxx
No Change in Fee
Service Name
% Recovery
Fee Year 6
Fee Year 7
Fee Deleted
Section A (Group Picnic) Tables 17 through 25 (seats 64)
- 30
,
Section C (Group Picnic) Tables 1 through 7 (seats 65)
- 30
,
Rose Garden
25
Covered Picnic Area (Shelter Area)
- 40
Gazebo
- 40
All Other Parks
91
94
-,
533
Clean up deposit (refundable)
up to 50 persons
-
100
50 to 150 persons
-
200
150 or more persons
300
,
RECREATION
DIVISION
F
FIELD RENTAL RATES
Rental Fields.
Texonia Park (Texas Street and Lugonia Ave.)
Community Park (Church Street and San Bemardino Ave.)
Brookside Park (Brookside Avenue)
Crofton Park nde endence Avenue
■
Clement School Ball Fields and Tennis Courts *(Pennsylvania Avenue)
Orangewood School ( Stuart Avenue)
Joint Use Agreement with Redlands Unified School District
cUser Creaps
zed -
Rental Rates ■
GROUP 2
Field Use $ 10 /hour per field /hour per field
Field Lighting $ 4hour /hour
534
GROUP 3 ALL GROUPS
Field Use
$20 / hour per field
21
/hour per field
Field Lighting
$ 30 / hour
32
/hour
* Field Lighting at Crafton Park and Community Park is paid directly to
utility provider by user
535
Miscellaneous Staff Call Out fee shall be assessed when city staff is called to a field for
any of the following reasons. confirm field reservations tum lighting on/off clean
garbage /debris left by users resolve complaints and/make repairs resulting from abuse
by user
$ 40 per hour
43
/hour
RECREATION DIVISION Continued
FACILITY RENTAL RATES
Facilities
Redlands Community Center (111 W Lugonia Avenue)
Redlands Senior Center (111 W Lugonia Avenue)
14
Exhibit A of Resolution No 8045 Fee Schedule.xlsx
Fees as of 7/17/2018
Fees as of 7/16/2019
LEGEND
adjusted for 1 9% CPI increase
adjusted for 2.8% CPI increase
Fee Added
Resolution No 7892
Resolution No. xxxx
No Change in Fee
Service Name
Y. Recovery
Fee Year 6
Fee Year 7
Fee Deleted
Joslyn Senior Center (21 Grant Avenue)
536
2 ALL GROUPS Facility / Room Rates $200 deposit required
Gym
$ 61 / hour
65
/hour
Racquetball Court
$ 20 / hour
21
/hour
Multipurpose Rooms
$ 25 / hour
27
/hour
Kitchens
$ 51 flat fee
54
Computer Class Room
$ 30 / hour
32
/hour
Conference Room
$ 15 hour
16
/hour
Game Room (CC)
$ 25 hour
27
/hour
Building (1-4 hours)
$ 707 1-4 hours *
752
Building (each additional hour)
* $51 each additional hr
54
/hour
537
Tennis Court Lighting
2.50 2.50
/hour
538
Tennis Machine Rental
10 10
/hour
539
Miscellaneous Charges for All Groups
Refundable Cleaning Deposit 200 200
Attendant / Staff Supervision Fee 20 20 /hour per attendant
Fees shall be prepaid to guarantee reservation
Refunds will be issued less a 10% administrative fee.
A processing fee of $10 shall be assessed when applicants and/or participants request
deviation from the standard processing time of five business days
All user groups shall comply with the City's established field and facility rental policies
Rental agreements may be negotiated for continuous use of the fields and/or facilities
The rates contained in these agreements may vary from the structure presented above,
and shall be approved by City Council
RECREATION DIVISION continued
ADULT SERVICES, PROGRAMS AND ACTIVITIES (18 and over)
540 Adult Open gym - resident 1 1 /person per day
Adult Open gym - non-resident 2 2 /person per day
541 Adult Open Racquetball - resident 1 1 / hour per person
Adult Open Racquetball - non-resident 2 2 / hour per person
Adult Open Racquetball -Annual Pass - resident 25 25
Adult Open Racquetball - Annual Pass - non-resident 35 35
542 Adult Classes Fee Set By Independent Contractor Fee Set By Independent Contractor
543 Adult Family Trips 100% Cost of Trip 100% Cost of Trip
15
Exhibit A of Resolution No 8045 Fee Schedule.xlsx
Fees as of 7/17/2018
Fees as of 7/16/2019
LEGEND
adjusted for 1 9% CPI increase
adjusted for 2.8% CPI increase
Fee Added
Resolution No 7892
Resolution No xxxx
No Change in Fee
S
Service Name
% Recovery
Fee Year 6
Fee Year 7
Fee Deleted
544
Annual Pass - resdident
I.D. Game Room, Gym Usage,
Racquetball and Tennis Courts
25 25
/person
Annual Pass non resdident
I.D., Game Room, Gym Usage
Racquetball and Tennis Courts
35 35
/person
Annual Pass adult group homes
I.D., Game Room, Gym Usage,
Racquetball and Tennis Courts
50 50
/group home
S
SENIOR SERVICES, -PROGRAMS AND ACTIVITIES
545
I
Bingo
0.50 0.50 /card
546
Bingo Tournaments
Per Person
20 20 /person per toumament
Per Team
100 100 /person per team
547
Senior Classes
Fee Set By Independent Contractor Fee Set By Independent Contractor
548
Trips
100% cost of trip 100% cost of trip
549
Senior Transportation Program :Bus Pass
$ 1 75 / person each way $ 1 75 / person each way
$17 50 for 10 one-way trips $17.50 for 10 one-way trips
Senior Patron - A Patron is any senior making a voluntary donation in excess of $ 20 per
senior center Patrons shall receive identification cards and shall save $ 5 on senior services
and activities.
year to either
programs
YOUTH SERVICES, PROGRAMS AND ACTIVITIES
Scholarships are available for all youth services programs and activities. To qualify scholarship recipients shall meet income requirements as established
Urban Development for San Bemardino County Not applicable with any other discounts
by the Department of Housing and
550
Youth Annual Pass for use at Community Center No Charge
No Charge
551 Annual Pass - group homes 50
I.D. Game Room Gym Usage
Racquetball and Tennis Courts
50 /group home
552 Teen Dances $ 3 / person
$ 3 / person
553 i Teen Trips 100% cost of trip
100% cost of trip
RECREATION DIVISION Continued
MISCELLANEOUS
554 Contract Classes Fee Set By Independent Contractor Fee Set By Independent Contractor
555 Special Events 100% cost of event 100% cost of event
556 $10 / day per space without table $10 / day per space without table
Boutique Spaces
$20/ day per space with table $20/ day per space with table
557
Smiley Gardens $20/ year per plot Smiley Gardens $20/ year per plot
Garden Plot Spaces Clement Gardens $30/ year per plot Clement Gardens $30/ year per plot
Lugonia Gardens $35/ year per plot Lugonia Gardens $35/ year per plot
558 Program Attendant Fee $20 / hour per employee $20 / hour per employee
559 10% discount for individuals and teams registering a minimum of 30 days prior to the close of registration (applies to all Youth
Early Registration" Adult, or Senior classes or pgrograms requiring registration.)
16
Exhibit A of Resolution No 8045 Fee Schedule.xlsx
Fees as of 7/17/2018
Fees as of 7/16/2019
LEGEND
adjusted for 1 9% CPI increase
adjusted for 2.8% CPI increase
Fee Added
Resolution No 7892
Resolution No xxxx
No Change in Fee
Service Name
% Recovery
Fee Year 6
Fee Year 7
Fee Deleted
560
Multiple Registration"
10% discount for multiple family members
or pgrograms requiring registration.)
registering in the same class or program (applies
to all Youth, Adult, or Senior classes
FINANCE
DEPARTMENT
561
Business License - new
100%
71
46
562
Business License - renewal
100%
23
20
563
Yard Sale Permit
100%
4
4
564
Retumed Check
100%
42
43
565
Dog licensing
100%
23
24
566 Dog licensing -spay/neutered
50%
12
12
567 Dog licensing - replacement tag
100%
17
17
568 State CASp Svc Fee*
Statute
4
4
* Effective 1/1/2018, SB 1186 Disability Access Legislation (Chpt 383, Statutes of 2012) was revised by
AB
1379 (Chpt. 667 Statutes 2017) to increase
the $1 00 State fee on applicants for new
and renewal
business licenses to $4, with 70% retained by the City and 30% remitted to the State
LIBRARY SERVICES
569 Reservation of library materials
26%
0.75 0.75 /item
570 Non-resident fee
96%
30 30 annually
I
OFFICE OF THE CITY CLERK
571 Passport Execution Fee (Set by State Department) 100% 25 25
572 Passport Photo Fee 100% 15 15
17 Exhibit A of Resolution No 8045 Fee Schedule.xlsx
57
57
57
575 1
575.2
CITY OF REDLANDS
Building Department
Schedule of New Construction Fees
PLAN CHECK & INSPECTION FEES COMBINED
Kesolution
No 8045- 2 8% CPI Adjustment
Construction Type
IA, IB
Construction Type
IIA, IIB, II A, IIIB, IV
Construction Type
VA, VB
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base Cost @
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost @
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost @
Threshold
Size
Cost for
Each
Additional
100 sf *
3 A-1
Assembly uses, usually with fixed seating,
2,000
$7,433
$5 44
$6,319
$4 97
$5,206
$4 51
Greater
intended for the production and
10,000
$7,867
$13 11
$6,717
$11 07
$5,566
$9 02
Than 50
viewing of the performing arts or
20,000
$9,179
$4 27
$7,823
$3 63
$6,469
$2 98
Occupant
motion pictures
40,000
$10,033
$4 67
$8,548
$3 93
$7,065
$3 19
-
-
-
100,000
$12 832
$1 62
$10 907
$1 38
$8 981
$1 14
-
200,000
$14 457
$7 03
$12 287
$5 94
$10,117
$4 86
i A-2
Assembly uses intended for food and/or
1,000
$10 634
$15 31
$9,012
$14 06
$7,389
$12 81
-
drink consumption
5,000
$11,248
$34 70
$9,574
$29 25
$7,901
$23 81
-
-
10,000
$12,982
$12 25
$11,037
$10 35
$9,092
$8.46
-
Restaurant
20 000
$14,207
$13 06
$12,072
$11 01
$9 937
$8 95
-
-
50,000
$18,125
$4.42
$15 373
$3 75
$12 623
$3 09
-
-
100,000
$20,336
$19 93
$17,251
$16 84
$14,166
$13 76
i A-3 A-4
__ . _._._.__..............
-
Assembly uses intended for worship
1,000
$10 157
$14 50
$8 609
$13 31
$7,061
$12 11
Assembly uses intended for viewing
5,000
$10 737
$33 19
$9,141
$27 99
$7,546
$22.79
-
of outdoor sporting events and activities with
10,000
$12 397
$11 72
$10,541
$9 91
$8,685
$8 10
-
spectator seating
20,000
$13,568
$12 45
$11,532
$10 49
$9,495
$8 52
-
-
50,000
$17,302
$4 23
$14,677
$3 59
$12 052
$2 96
-
-
100 000
$19,416
$19 01
$16 474
$16 07
$13,532
$13 12
A-4
See Above
500
$8,206
$23 17
$6,968
$21 25
$5,730
$19 34
-
-
2,500
$8 670
$53 16
$7,393
$44 84
$6,117
$36 53
-
-
5,000
$9,999
$18 73
$8,514
$15 84
$7 030
$12 94
-
-
10,000
$10,936
$19 94
$9,307
$16 80
$7 677
$13 67
-
-
25 000
$13,926
$6 75
$11 826
$5 73
$9,728
$4 72
-
-
50,000
$15,614
$30 42
$13,261
$25 71
$10,907
$21 00
A-5
Assembly -Outdoor Activities
1,500
$10,470
$9 99
$8,870
$9 14
$7,269
$8.28
-
Amusement Park, Bleacher Stadium
7,500
$11 069
$23 79
$9,418
$20 05
$7,766
$16 31
-
-
15 000
$12,853
$8 04
$10 922
$6 79
$8,990
$5.55
-
-
30,000
$14 059
$8 74
$11,940
$7 36
$9,822
$5 98
-
-
75,000
$17,992
$2 92
$15,253
$2 47
$12 514
$2 03
18
Exhibit A of Resolution No 8045 Fee Schedule.xlsx
575.
57
57
57
57
580
Resolution No 8045- 2 8% CPI Adjustment
Construction Type
IA, IB
Construction Type
IIA, JIB, II A, IIIB, IV
Construction Type
VA, VB
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base Cost @
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost @
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost @
Threshold
Size
Cost for
Each
Additional
100 sf *
-
-
150,000
$20 182
$13 18
$17,109
$11 13
$14 034
$9 09
3 A
A Occupancy Tenant Improvements
1,000
$8,394
$8 79
$7,100
$7 82
$5 807
$6 84
-
-
5,000
$8,745
$26 90
$7,413
$22.68
$6,082
$18 45
-
-
10,000
$10,090
$9.86
$8,547
$8 35
$7,004
$6.84
-
-
20 000
$11,077
$9 99
$9,382
$8 38
$7,688
$6 76
-
-
50 000
$14,075
$3.42
$11,895
$2 90
$9,715
$2 38
-
-
100,000
$15 785
$15 38
$13,345
$12 94
$10,907
$10 50
3 B
Business -Professional Office
1 000
$8,999
$13 95
$7,651
$12 93
$6,304
$11 91
-
Buildings or spaces for office professional
5,000
$9,558
$28 61
$8,169
$24 21
$6,781
$19 81
-
or service type transactions including
10,000
$10 987
$10 41
$9,379
$8 83
$7 771
$7 26
-
storage of records and accounts,
20 000
$12,029
$10 85
$10,262
$9 17
$8,497
$7 49
-
Restaurants w/ less than 50 occupants
50,000
$15,285
$3.74
$13 014
$3 20
$10,742
$2 65
-
-
100,000
$17,157
$16 75
$14,613
$14 21
$12,068
$11 66
' B
B Occupancy Tenant Improvements
1,000
$7 539
$8 17
$6,388
$7 30
$5 238
$6 43
-
Buildings or spaces for office professional
5,000
$7,866
$24.29
$6,681
$20 50
$5,495
$16 71
-
or service type transactions including
10,000
$9,080
$8.86
$7 705
$7 51
$6,330
$6 17
-
storage of records and accounts,
20,000
$9 966
$8 93
$8,457
$7 49
$6,948
$6 05
-
Restaurants w/ less than 50 occupants
50 000
$12,646
$3 11
$10,704
$2 65
$8 763
$2 18
-
-
100,000
$14,204
$13 80
$12 028
$11 62
$9,852
$9 45
E
Educational
500
$8,324
$22 87
$7 067
$20 96
$5,809
$19 05
-
Buildings or rooms used by more than 6
2 500
$8 782
$52 37
$7,486
$44 09
$6,190
$35 81
-
persons for educational purposes up to the
5,000
$10,091
$18 74
$8,588
$15 80
$7 085
$12 86
-
12th grade
10,000
$11,027
$20 01
$9 378
$16 86
$7,729
$13 70
-
Day care for 6 or more children older than
25,000
$14,029
$6 75
$11 906
$5 73
$9,783
$4 71
-
2 5 years of age
50 000
$15 716
$30 58
$13,338
$25 82
$10,960
$21 07
E
E Occupancy Tenant Improvements
1,000
$7,643
$8 02
$6,479
$7 17
$5 313
$6 32
-
Buildings or rooms used by more than 6
5,000
$7,964
$23 35
$6,765
$19 72
$5 566
$16 08
-
persons for educational purposes up to the
10,000
$9,132
$8 99
$7 751
$7 62
$6,371
$6.26
-
12th grade
20 000
$10 030
$8 84
$8,513
$7 41
$6,996
$5 99
-
-
Day care for 6 or more children older than
2 5 years of age
50,000
$12,682
$3 05
$10,737
$2 59
$8 793
$2 14
100,000
$14 206
$13 78
$12,033
$11 61
$9,860
$9.43
F-1
Factory Industrial -Moderate Hazard
20,000
$8,407
$3 85
$7,190
$3 32
$5 973
$2 79
-
Factory and industrial uses that include the
50,000
$9,562
$3.41
$8,186
$2 91
$6 810
$2 41
-
fabrication or manufacturing of Moderate
100,000
$11,266
$1 21
$9 639
$1 02
$8,013
$0 84
-
and Low Hazard materials
250,000
$13 080
$1 10
$11,176
$0 93
$9,271
$0.75
-
-
500 000
$15 823
$0 93
$13,489
$0 78
$11,154
$0 63
19
Exhibit A of Resolution No 8045 Fee Schedule.xlsx
Resolution No 8045- 2 8% CPI Adjustment
Construction Type
IA, IB
Construction Type
IIA, IIB, II A, IIIB, IV
Construction Type
VA, VB
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base Cost @
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost @
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost @
Threshold
Size
Cost for
Each
Additional
100 sf *
-
-
1 000 000
$20,471
$2 01
$17 394
$1 71
$14,317
$1 40
1 F
F Occupancy Tenant Improvements
2,000
$4,918
$5 34
$4,226
$5 02
$3 535
$4 69
-
Factory and industrial uses that include the
10,000
$5,346
$9 86
$4,627
$8 39
$3,910
$6 92
-
fabrication or manufacturing of Moderate
20,000
$6,331
$2 89
$5,466
$2 49
$4,601
$2 09
-
and Low Hazard materials
40,000
$6,910
$3 26
$5 965
$2 77
$5,020
$2.28
-
-
100,000
$8,865
$1.20
$7,625
$1 03
$6,386
$0 86
-
-
200,000
$10 065
$4 87
$8,658
$4 16
$7,251
$3.46
2 H-1, H-2
High Hazard Detonation Hazard,
1,000
$5,124
$10 00
$4 383
$9 25
$3,641
$8 51
H-3, H-4
Deflagration hazard or hazard from
5,000
$5 524
$21 88
$4,753
$18.47
$3 982
$15 06
H-5
accelerated burning Materials that readily
10,000
$6 618
$5 68
$5,676
$4 83
$4,735
$3 98
-
support combustion, Materials that are
20 000
$7,186
$7 11
$6,159
$6 01
$5,133
$4 91
-
health hazards
50,000
$9,320
$2.57
$7 962
$2 19
$6,606
$1 82
-
-
100,000
$10 605
$10 27
$9,059
$8.73
$7 515
$7 18
3 H
-
See Above
-
1,000
$5,231
$11 00
$4,483
$10 27
$3,735
$9 54
5,000
$5,671
$21.61
$4 894
$18 29
$4,116
$14.97
-
-
10,000
$6 751
$5 85
$5,808
$4 99
$4 865
$4 13
-
-
20 000
$7,336
$7 14
$6,308
$6.05
$5,278
$4 96
-
-
50,000
$9,478
$2 59
$8,122
$2.22
$6,767
$1 85
-
-
100,000
$10,775
$10 44
$9 235
$8 90
$7,694
$7.36
1-1
Housing of clients on a 24-hour basis in a
1,000
$6,730
$12 25
$5,732
$11 32
$4,735
$10 38
-
supervised residential environment providing
5 000
$7 221
$27 18
$6,185
$22 93
$5 150
$18 68
-
personal care services
10,000
$8,580
$7 60
$7 332
$6 45
$6,084
$5 30
-
-
20,000
$9,339
$9 13
$7,977
$7 71
$6,614
$6.29
-
-
50 000
$12 079
$3 25
$10,290
$2 77
$8,501
$2.29
-
-
100,000
$13,706
$13 37
$11,677
$11.35
$9 648
$9 32
1-2, 1-3
Medical, surgical, psychiatric, nursing or
1,000
$8,330
$15 32
$7,083
$14 15
$5,835
$12 97
-
custodial care on a 24-hour basis for more
5,000
$8,943
$33 97
$7 649
$28 66
$6,355
$23.35
-
than 6 persons, facilities where persons are
10,000
$10 641
$9 50
$9,082
$8 07
$7,522
$6.63
-
restrained
20,000
$11,592
$11 41
$9,888
$9.64
$8 185
$7 86
-
-
50,000
$15,016
$4 07
$12 780
$3 47
$10,543
$2 87
-
-
100 000
$17 050
$16 72
$14,513
$14 18
$11,977
$11 65
1-4
Day care operations of more than 6 people
1,000
$7,837
$14 63
$6,672
$13 57
$5 507
$12 52
-
of any age where the care is for less than
5,000
$8,423
$30.66
$7 214
$25 90
$6,007
$21 15
-
24 hours a day
10,000
$9 956
$8 94
$8 510
$7 60
$7,065
$6.25
-
-
20 000
$10,850
$10 53
$9,269
$8 90
$7 690
$7 27
-
-
50,000
$14,007
$3 73
$11,939
$3 18
$9,871
$2 64
20
Exhibit A of Resolution No 8045 Fee Schedule.xlsx
Resolution No 8045- 2 8% CPI Adjustment
Construction Type
IA, IB
Construction Type
IIA, IIB, II A, IIIB, IV
Construction Type
VA, VB
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base Cost @
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost @
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost @
Threshold
Size
Cost for
Each
Additional
100 sf *
-
-
100,000
$15,872
$15 54
$13,532
$13 20
$11 192
$10 86
7 I
I Occupancy Tenant Improvements
1,000
$4 851
$10 40
$4,166
$9 77
$3,481
$9 14
-
-
5 000
$5,266
$18 72
$4 557
$15.88
$3,847
$13.04
-
-
10 000
$6,202
$5.45
$5 351
$4 66
$4 499
$3 86
-
-
20,000
$6,748
$6 37
$5,817
$5 41
$4,885
$4.45
-
-
50,000
$8,658
$2 32
$7 439
$2 00
$6,220
$1 67
-
-
100,000
$9,820
$9 49
$8 439
$8 11
$7,057
$6 73
3 M
Display and sale of merchandise accessible
1,000
$7 214
$14 09
$6,154
$13 12
$5,092
$12 16
-
to the public
5,000
$7 778
$28 24
$6,679
$23 89
$5,578
$19 53
-
-
10 000
$9,191
$8 23
$7 873
$7 00
$6,555
$5 78
-
-
20,000
$10,014
$9 66
$8,573
$8 17
$7 133
$6 69
-
-
50,000
$12 910
$3 44
$11,025
$2 94
$9,139
$2.45
-
-
100,000
$14,629
$14 30
$12,496
$12 16
$10,363
$10 03
M
-
M Occupancy Tenant Improvements
-
1,000
$6,836
$13 79
$5,837
$12.88
$4,839
$11 96
5,000
$7,388
$26 90
$6,353
$22 77
$5 318
$18 64
-
-
10,000
$8 732
$7 78
$7,491
$6 63
$6,249
$5.48
-
-
20 000
$9,510
$9 18
$8 154
$7 78
$6,797
$6 37
-
-
50,000
$12,264
$3.28
$10,487
$2 81
$8,709
$2 34
-
-
100,000
$13 903
$13 57
$11,891
$11 56
$9 879
$9 55
I R-1, R-2
Transient and nontransient lodging including
2 000
$9,994
$0 64
$8,508
$0 53
$7,021
$0.42
-
hotels, motels, apartments and boarding
10,000
$10,046
$15 93
$8 551
$13 27
$7,055
$10.62
-
houses
20,000
$11 638
$3 76
$9,878
$3 13
$8 117
$2 51
-
-
40 000
$12,390
$3 71
$10,504
$3 09
$8,618
$2.47
-
-
100,000
$14,614
$1 92
$12,358
$1 60
$10,101
$1 28
-
-
200,000
$16,534
$7 73
$13,958
$6 44
$11,381
$5 15
R-3, R-3
One and two-family homes Residentially
1,000
$6,618
$5 10
$5,648
$4.25
$4,679
$3.40
R-4
based 24-hour facility for 6 or fewer clients
2 000
$6 669
$71 78
$5,691
$59 82
$4,713
$47 85
-
of any age, Residential care/assisted living
3,000
$7,387
$42 09
$6,289
$35 07
$5,192
$28.06
-
for more than 6 ambulatory clients
4,000
$7,807
$112 80
$6 640
$94 00
$5,472
$75.20
-
-
5,000
$8,936
$16 62
$7,580
$13 85
$6,224
$11 08
-
-
10 000
$9,766
$89 66
$8,272
$74.72
$6,778
$59 77
R-3
REPEAT OF MODEL
1,000
$4,906
$3 91
$4 221
$3 25
$3,537
$2 60
-
One and two family homes
2,000
$4,944
$44 67
$4,254
$37 22
$3,563
$29 78
-
Repeat plan check set at 50% of initial plan
3 000
$5,391
$28 43
$4,626
$23 69
$3,861
$18 96
-
check, per current Master Fee Schedule
4,000
$5,676
$73 54
$4 863
$61 28
$4,050
$49 02
-
-
5,000
$6,411
$10 15
$5 476
$8 46
$4,541
$6 77
21
Exhibit A of Resolution No 8045 Fee Schedule.xlsx
Resolution No 8045- 2 8% CPI Adjustment
Construction Type
IA, IB
Construction Type
IIA, IIB, II A, IIIB, IV
Construction Type
VA, VB
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base Cost @
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost @
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost @
Threshold
Size
Cost for
Each
Additional
100 sf *
-
-
10,000
$6,919
$61 18
$5,899
$50 98
$4,879
$40 78
3 S-1
Storage -Moderate Hazard, Repair Garage
500
$4 701
$14 16
$4,011
$12 93
$3,319
$11 70
-
Motor Vehicles (not High Hazard)
2 500
$4,985
$35 00
$4,269
$29.49
$3 552
$23 98
-
-
5,000
$5,860
$10 42
$5,006
$8 82
$4,152
$7 22
-
-
10,000
$6 381
$12 08
$5,447
$10 18
$4,513
$8.28
-
-
25 000
$8,193
$4.26
$6 973
$3 63
$5,755
$2 99
-
-
50 000
$9,258
$17 85
$7,880
$15 10
$6 502
$12.34
1. S-2
Storage -Low Hazard Storage
500
$5,770
$17 55
$4,909
$16 04
$4,049
$14 53
-
-
2 500
$6,120
$42 93
$5 230
$36 17
$4,340
$29 42
-
-
5 000
$7,194
$12 99
$6 134
$11 00
$5 075
$9 00
-
-
10,000
$7,843
$14 93
$6,684
$12 58
$5,525
$10 23
-
-
25,000
$10 083
$5 24
$8,571
$4 46
$7,060
$3 68
-
-
50 000
$11,393
$22 12
$9 687
$18 71
$7,980
$15 30
5 S
S Occupancy Tenant Improvements
1,000
$4,856
$8.23
$4,148
$7 57
$3,439
$6 90
-
-
5,000
$5 185
$19 27
$4,451
$16.26
$3,716
$13.25
-
-
10 000
$6,148
$5.44
$5,264
$4 62
$4,379
$3 81
-
-
20,000
$6,693
$6 44
$5,725
$5 43
$4 759
$4.43
-
-
50,000
$8,626
$2 36
$7,356
$2.02
$6,087
$1 68
-
-
100,000
$9,804
$9 47
$8,364
$8 03
$6,926
$6.59
U
Accessory and miscellaneous structure not
1 000
$4,948
$7 89
$4 230
$7 31
$3,511
$6 72
-
specifically classified
5,000
$5,264
$17 02
$4,522
$14.47
$3 780
$11 91
-
-
10,000
$6,115
$5 84
$5,246
$5 01
$4,376
$4 17
-
-
20,000
$6,699
$6 02
$5 746
$5 08
$4,794
$4 15
-
-
50,000
$8,504
$2 18
$7,271
$1 87
$6 039
$1 57
-
-
100,000
$9 594
$9 26
$8,208
$7 88
$6 824
$6 49
SHELL BUILDINGS
B, M, S
All Shell Buildings
5,000
$5,432
$2 20
$4,659
$2 07
$3,887
$1 93
-
-
25,000
$5,873
$4.22
$5 072
$3 60
$4,273
$2.97
-
-
50,000
$6,928
$1 29
$5,972
$1 11
$5 015
$0 93
-
-
100 000
$7,574
$1 41
$6,528
$1.20
$5,482
$0 98
-
-
250,000
$9,691
$0 57
$8 325
$0 49
$6,958
$0.42
-
-
500,000
$11,111
$2 16
$9,562
$1 85
$8 013
$1 54
Each additional 100 square feet or portion thereof up to the next highest project size threshold
22
Exhibit A of Resolution No 8045 Fee Schedule.xlsx
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
CITY OF REDLANDS - Building & Safety
MISCELLANEOUS ITEMS PERMIT FEES
Resolution No 8045 - 2.8% CPI Adjustment
Work Item
Unit
Fee Adopted
7/16/2019
Standard Hourly Rate
$ 12770
k 1 _0,-.,,-
.._y„i. .a.�.-�nk- 'Aa,!_..__�..:i�.:_., ..h._•_P { ',).-%i. �.-_ .,.`�:+�_',t-. �:r, -_",+:,.+"�'.[�."„.�'tf �:.fid. ?'�, ti5'r:�isr+-h'.*fi :..'I SvH.i���.-si' _ •:,sY..,..
i
.-, _.FY•'[e.,.>
..%vt
.. �+ch��
t., #,•.i� ...,fl�.i..�"...3--'.'
Equipment Container any size
each
_v'��._.
$ 383.10
Cellular/Mobile Phone, free-standing
each
$ 446.95
Cellular/Mobile Phone, co -location
each
$ 383.10
Balcony addition
each
$ 510.80
Carport MINOR (< or = 200 sq ft.)
each
$ 319.25
Carport MAJOR (> 200 sq ft,)
each
$ 446.95
Change of Occupancy
each
7%4:'u,e.,i'�r:•''�e�,;=+:-v.Y\-<- e�f,r , u.. ...... -r . .,. .,r.. -
i � �{ h�... � '.v .,� T
Q;;1�.S`,:'%rei�: t,.Z7:=Ql ..-, �;�.,.
�yry , ..
�.. >,1 r-s��,c_,..yn,�:'i,;
�
55
Interior wall
each
$ 255.40
Exterior wall
each
$ 383.10
Commercial Coach (per unit)
each unit
$
Compliance Inspections/Reinspections
each
$ 510.80
Deck (wood) up to 200 sq ft.
each
$ 319.25
Each additional 100 sq ft.
each 100 sf
$ 255.40
Deck (wood) (with calcs) - up to 200 sq ft.
each
$ 383.10
Over 200 sq ft.
each
$ 446.95
Demolition Single Family Dwelling
each
$ 255.40
Demolition Multi Family/ Commercial
each
$ 383.10
..°r,' ';e,.- �„ s, ... ,>�• ��y :, .,':,:v
r�I�yPd:^ ._T'v x - ,,, ,,., `-x!
t-,.M�r,_.............t4P:�,nt,._Mw?S.•a ......r....; .st.,• ,. :v .. ' off',',`,,"},3:a '.� �,., ..m.w ., ., _,....7�Maci,•;.k,_Sr,..,trr..,.,,-a'k._,..,,�2�.,.,i'16!3d�:5u,,,..A.:1s>,
....,.
_..,.. _ ,:_.� - y,ri' ,-gyp • -'r
'. �a,ae+;'-�•.;�;s,.e�-
�3�;;� Psi`
New door (residential)
.ewez
each
tJ9
$ 319.25
New door (Commercial/ Industrial)
.'.�.. ':Y;map•,
each
$
,jG.,,}+, v,; 2�", k,�, t ;:$ ' • ,'flv MSS- i^ 2a'� _
el- 1onma.§,
'GPe _
- ':t `h'`� •v;;i: i
Any Size
_!_ r _ - a - rY.2"a
pWy��y j �y w �.,t; .; .ti ; :.
'��:*rjCi.1.1V �,Q �I Si6.,.lP �I A;. ry� ,�5„� y�� ''.l', 'jai`„�,.i•
;M1•11.m,�� <.._�.�-., x, n x ¢¢, r� aa.��aru�.. t7 �. i:IJ - - 'L-
' � � �, �o- S�<� ,�,i �t�! 1 ._...__..<.?x't -.;i'>;'.,,,..� nr..'c.�.... ,. �_..-... ..-__,,.-.�.,,:�it ='v...,-
.-.. L� v, y .�.,'.''i`�'€:
.,e, ,_
�R.,.. 3l
,''K"
........,-:.;5i:�'s5�. �'�'Ja�-•:*;:§;.
,.v..1. ,C c
- F
..>.k3 <:.. .i;�-YR_,
T: Yf,.
„��'..-�u`.',��d;`-�� tHe�'» 2zr...
Masonry, (6-8 feet high) pre-engineered
..
up to 100 If
$ 383.10
Each additional 100 If
each 100 If
$ 63.85
Masonry Special Design (6-10' high)
up to 100 If
$ 574.65
Each additional 100 If
each 100 If
$ 191.55
Masonry Special Design (over 10' high)
up to 100 If
$ 574.65
Each additional 100 If
each 100 If
$ 191.55
-.,_ =.v. _...-,,; �s,,: ,,..,. .. ...... .. ..:.._.... _:..-..,..,.�.. _.-._-._.,.
, ::,... _�.• e.z�fiv,...._t_...,
Pre -Fabricated / Metal
__:
each
$ 255.40
Flag pole (over 30 feet in height)
each
iiir)g-(Cti tfid;, il1): ram.. " ._ai;,._ .r-. , ;a
0-100 Cubic Yards (Cut and Fill)
each
$ 191.55
101-1 000 CY
each
255.40
1 000 10 000 CY
each
$ 383.10
10,001 - 100 000 CY
each
$ 446.95
100 001 200,000 CY
each
$ 638.50
Each Add' 10,000 CY or portion thereof
each
$ 76.62
Lighting Pole
each
$ 255.40
23
Exhibit A of Resolution No. 8045 Fee Schedule.xlsx
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
Resolution No. 8045 2.8% CPI Adjustment
Work Item
Unit
Fee Adopted
7/16/2019
� .,:•'�-.,::rs. ....:s..`..-.-.�'` .:.,.i• '�'; y_a y �*,' `"�z �" -�<e�,se- "'
�. ::.i'.: tc{,. A -=.;yam .�„-�;�'s3Yo:'"`-�[�✓+;,
iti h; 'Come ,E . L; _ ;? , ` k._ _ : .: ., _ ; xN Y
� �-. - � .��,.. ��s , .r::,�,:�'`� N__...t�- � .;� r �r� .r. » � . }_'sx''r..�
- .u. -.. _.. .,, .5s;
_ate='Na„t•{.:r�•,3er-•
fit.. '
' �`%�i 35 Yr .x ?�s.
t. r8g+v $,���.- Yam, v�i-=c*, L^','
S':cCJ='�li,o
y.�i-,,'s,
Interior (up to 30 I.f)
up to 30 I.f
.';;�•�'�;3;t
$ 255.40
Additional partition
127 70
f: �.t;4z�.��tcrr
0 io CoverAwning, C0 '0 ,1 ', h p..; r x
.,....r-,_ .� .... el sand Ar o `s
' ", , „ Y ° • �
� 4
r :
Wood frame (City Standard)
up to 300 s.f
$ 255.40
Wood frame (with calcs)
up to 300 s.f
$ 319.25
Other frame
up to 300 s.f
$ 319.25
Additional Patio
up to 300 s.f
$ 127 70
Enclosure
each
$ 319.25
t�;<°,.„,.
''.i 7,v yyy�,� ...,. s. .....8 . _ ",, =;?"' •mot? '� i e':: ,Ys
, `Sx`:+.G. .. ,,.•, .- . . r......,,,i:.....,,...,a.,.. ,.., `.,,......,.,- n-,,._,.n...,.- „-,...0 _...,.G,..,_U,.,....,.
i
.,..-...<.s�Y'.., �,....2...w
°i:;€ ya:,.,
5,..,,'.s i ,,,,
Residential 0-10 kW
., .., d,,�s`
.etas,.,
$ 446.9500
Residential each additional kW> 10kW
12.7700
Non -Residential 0-50 kW
1,000.00
Non -Residential 51-250 kW**
Ea KW
$ 7.00
Non -Residential >250kW**
Ea KW
$ 5.00
Stucco Applications
up to 400 s.f
$ 191.55
Additional Stucco Application
each 400 s.f
$ 127 70
a � � � .,
,n ep}}�, g £.- ,. is F•, r,t, .ue .t , ,er ,,. ,a--,, s. m. .. :.N u,_ .. ,
,r „ .i , - n- ., ,,. M
� �° ,:¢., 'F. •.a
...v`v. udi.
r: ? , aT , .;
7"
`;�`. .�y� tz��,�,`'`,sdF��a�„
a °h G, .',`i¢ry
For Fire, Water Decay & Pests
.a;tY,..�;�
<$10 000
.-�4;.,• ti,
$ 766.20
For Fire, Water Decay & Pests
$10 000 - 25 000
$ 766.20
For Fire, Water Decay & Pests
$25,001 - 100,000
$ 1,021.60
For Fire, Water Decay & Pests
> $100 000
1 149.30
u,
, ., ., % .,,- :lame?: -..: � ., ,,:? ._. , ...--.Cti�' - _ �:a?���Y-'- -
$. in ;Wall concr.-a#e or_mas.o
*`3'31�'yvStr �r. t..e'-.,�., �s
= - .r a^,,.ne_.'+�_t�.;�.rttis,:�,,,.�a
First 50 If
up to 50 I.f
$ 383.10
Additional retaining wall
each 50 I.f
$ 63.85
Special Design 3-10' high (up to 50 If)
up to 50 I.f
$ 446.95
Additional retaining wall
each 50 I.f
$ 63.85
Special Design over 10' high (up to 50 If)
up to 50 I.f
$ 702.35
Additional retaining wall
each 50 I.f.
$ 63.85
r-
o�rtb Resfdehtfal, „
< ;":s3
500 s.f Single Story
up to 500 s.f
$ 638.50
501 1 000 s.f
501 to 1 000 s.f
$ 702.35
Additional remodel (each add'I 500 sq ft)
„n...
each 500 s.f
$ 255.40
yy pV
d ,o f. I 0 amr 'Dw 1 .. ; ,
.M TA' .4, .� £
.. ?.C._ ... �:, ,Y,_, g.11n.9_/ pip
9ASc _ ..,.._.. ,. ,>r =. .' :..�.-.r t'-_.,..:: •+3.:? rs.-_�:a.+ - ,... i:�'i� ?'"_.. :-R .....
...
Any Size
.......`_ ,n. ..
up to 200 s.f.
$ 383.10
-roof:Mult'-F.=.a _ i y/,Gornm:/lnctj.• ,,,
,;t, zYs .=
. •3 „,
Minor Repair < 500 sq ft
up to 500 s.f
$ 191.55
501 3,000 sq ft
501 to 3,000 s f
$ 319.25
3,001 10 000 sq ft
3,001 to 10k s.f
$ 446.95
> 10 001 sq ft
Each 1,000 sq ft
$ 63.85
Roof Structure Replacement
up to 500 s.f
$ 638.50
Additional roof structure replacement
each 500 s.f.
es de t IAd itiotis' r_
g h,,, ..f,�
...sue;
One Story
up to 500 s.f
$ 574.65
One Story
501 1,000 s.f
$ 766.20
One Story
> 1,000 s.f each
500 sqft
$ 95.78
24
Exhibit A of Resolution No. 8045 Fee Schedule.xlsx
665
666
670
671
672
673
678
679
60
681
682
683
684
685
686
687
688
689
690
Resolution No. 8O45'2.8%CPI Adjustment
Work Item
Unit
Fee Adopted
7n6m09
RwKt
fi
Stone and Brick Veneer (interior orexterior)
upto4OOa.f
$ 255.40
Additional siding
Each add 4OOu.f
$ 9578
M.
Monument
each
$ 510.80
VVa||'mnuntedFhxtupu
each
$ 255.40
Free-standing
each
* 319.25
�m�,-��.~.-~��
Any Size
each
$ 255.40
-��-��----`*'n�--- —�
AW'"2�w�.��<��a�J������
each
$ 319.25
In -ground Private
gh '�'~-~~�~~~`^�-�-�����-^~'��«'-^~^��^'—~'^^��'���_.����°�~.-ji�~������~��
first 1UO|[
Any Height (up 0m 10010
$ 383.10
each additional 100|f
each 100|f
$ 31.93
- - VW! _--__
Private
<8OOo.f
$ 838.60
Private
>8OUo.f
$ 766.20
Heater
$ 95.m
Temporary OU| Occupancy
$ 1e770
e8 _0eWIPW`"2,������"--��'����-'�ao��"��^�'��k�./��'._�_����
,
Residential Replacement
qty14
$ 191.55
Residential Replacement
qty 5ormore ea
add
$ 31.83
New Window (non structural)
each
$ 255.40
Service Required inExcess ofStandard
per hour
$ 12770
Re -inspection
porhour
$ 12770
P|unRa'Chonk
per hour
$ 12770
Research
perhour
$ 12/70
Residential Building Reports
each
* n».00
Off -hours inspection (min 3hours)
First hour orportion
$ 383.10
Off -hours inspection (min 3hours)
EaAdd Hour
$ 191a5
Landscaping
$ onoao
Strong -Motion Instrumentation and Seismic Hazards Mapping Feel
Group ROccupancies: one bnthree stories excluding hotels/motels
valuation ^X
*00001
All other buildings
*000021
A||000uponoioo-minimumfeu
$050
California Health & Safety Code Section 18O810building permit fee
vu|uotion2X
$000004
Minimum fee
$1
General Plan Maintenance Fee
$010u.f of new
construction or
additions ^50%nf
existing floor area
25
Exhibit Aof Resolution No. o04oFee Schodule.xlm
Resolution No 8045 - 2.8% CPI Adjustment
Work Item
Unit
Fee Adopted
7/16/2019
Microfilm/Scanning
$10 + $2/page
1 Pursuant to Californa Public Resources Code Section 2705
2 In accordance with the January 1, 1996 Valuation Data
*Effective 1/1/2018, Solar Energy System permit fee maximums were established by AB 1414
**Indicates these fees have reach maximum threshold as of 1/1/2018
checksums $ 32,100 57
26 Exhibit A of Resolution No. 8045 Fee Schedule.xlsx
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
CITY OF REDLANDS - Building & Safety
MECHANICAL, ELECTRICAL & PLUMBING PERMIT FEES
Resolution No. 8045 2.8% CPI Adjustment
FEE TYPES
FEE DESCRIPTION
!ADMINISTRATIVE AND MISC. FEES
Permit Issuance
Permit Issuance
MECHANICAL PERMIT FEES
Fee Adopted
7/16/2019
63,85
Stand Alone Mechanical Plan Check (hourly
rate)
Stand Alone Mechanical Plan Check (hourly rate)
$ 127 70
UNIT FEES:
NC, Residential (each)
Install/Relocate forced air or gravity -type furnace or burner (including
attached ducts and vents) up to and including 100,000 Btu/h (each)
$ 191.55
Heater (Wall)
Install/Relocate floor furnace, including vent (each)
$ 191.55
Appliance Vent/Chimney (only)
Install/Relocate suspended heater recessed wall heater or floor
mounted unit heater (each)
$ 191.55
Boiler
Repair/Alter/Add heating appliance, refrigeration unit, cooling unit,
absorption unit, or each heating, cooling, absorption, or evaporative
cooling system, including installation of controls (each)
$ 191.55
Chiller
Install/Relocate boiler or compressor up to and including 3HP or
absorption system up to and Including 100,000 Btu/h (each)
$ 510.80
Evaporative Cooler
Air -handling unit, including attached ducts. (Note: this fee shall not apply
to an air -handling unit that is a portion of a factory -assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a permit Is
required elsewhere) (each)
$ 191.55
Moisture Exhaust Duct (Clothes Dryer)
Evaporative cooler other than portable type (each)
$ 191.55
Vent Fan, Single Duct (each)
Ventilation fan connected to a single duct (each)
$ 191.55
Vent System
Ventilation system that is not a portion of any heating or air-conditioning
system authorized by a permit (each)
$ 383.10
Exhaust Hood and Duct (Residential)
Hood installation that is served by mechanical exhaust, including the
ducts for such hood (each)
$ 383.10
Non -Residential Incinerator
Install/Relocate commercial or industrial -type incinerator (each)
$ 255.40
Appliance or piece of equipment not classed in other appliance
categories, or for which no other fee is listed (each)
$ 191.55
OTHER FEES:
OTHER FEES:
Installation or relocation of any duct system
$ 191.55
For Each Process Piping System of 1 to 2 Outlets
$ 127 70
Other Mechanical Inspections (per half hour)
For each additional process piping outlet
$ 63.85
Other Mechanical Inspections (per hour)
$ 127 70
PLUMBING/GAS PERMIT FEES
Permit Issuance ( one time fee for each plumbing permit issued)
Stand Alone Plumbing Plan Check (hourly rate)
Stand Alone Plumbing Plan Check (hourly rate)
UNIT FEES:
UNIT FEES:
Plumbing fixture or trap or set of fixtures on one trap, including water
drainage piping, and backflow protection (each)
PLUMBING/GAS PERMIT FEES Continued
Building or trailer park sewer (each)
Rainwater system inside building (per drain)
Private sewage disposal system (each xhihit A of Re olution No 80
63.85
$
127 70
$ 191.55
$ 191.55
$ 191.55
5 $ 191.55
27
71
717
718
719
720
721
722
723
724
725
726
727
728
72
73
731
73
73
734
735
736
737
738
739
FEE TYPES FEE DESCRIPTION
Fee Adopted
7/16/2019
Water Heater (no issuance fee assessed)
$ 191.55
Industrial waste pretreatment interceptor including its trap and vent,
excepting kitchen -type grease interceptors functioning as fixture traps
(each)
$ 574.65
Underground utilities (sewer storm, water) Exception: Single Family
Dwellings
$ 191.55
OTHER FEES:
OTHER FEES:
Install/Alter/Repair water piping and/or water treating equipment (each)
$ 191.55
For repair or alteration of drainage or vent piping, each fixture
$ 191.55
For each lawn sprinkler system on any one meter including backflow
protection devices therefor
$ 191.55
For atmospheric -type vacuum breakers
$ 191.55
1
1 to 5
$ 63.85
over 5 (each)
$ 38.31
For each backflow protective device other than atmospheric -type
vacuum breakers:
$ 191.55
For each gas piping system of one to four outlets
$ 191.55
For each gas piping system of five or more outlets
$ 191.55
Other Plumbing and Gas Inspections (per half
hour)
Other Plumbing and Gas Inspections (per hour)
$ 127 70
ELECTRICAL PERMIT FEES
Stand Alone Electrical Plan Check (hourly rate)
Permit Issuance (one time fee for each electrical permit issued)
Stand Alone Electrical Plan Check
Swimming pools, therapeutic whirlpools, spas and alterations to existing
swimming
pools. Use unit fee schedule for itemized work.
Temporary power (ea); Temporary power to a permanent location (ea);
Temporary service power pole or pedestal including all pole or pedestal -
mounted receptacle outlets and appurtenances (ea)
For a temporary distribution system and temporary lighting and
receptacle outlets for construction sites, decorative light, Christmas tree
lots, firework stands, etc.
UNIT FEES:
Receptacle, Switch, and Light Outlets
Receptacle, switch, lighting or other outlets at which current is used or
controlled, except services, feeders and meters: First 20
Each Additional 20 Outlets
Lighting Fixtures
For lighting fixtures, sockets or other lamp -holding devices First 20
Each Additional Outlet
For pole or platform -mounted lighting fixtures
For theatrical -type lighting fixtures or assemblies
$
63.85
127 70
$ 191.55
$ 191.55
191.55
$ 191.55
$ 63.85
191.55
63.85
63.85
127 70
ELECTRICAL PERMIT FEES Continued
Residential Appliances
28 Exhibit A of Resolution No. 8045 Fee Schedule.xlsx
74
741
74
74
74
74
74
747
748
749
750
751
752
753
FEE TYPES FEE DESCRIPTION
Fee Adopted
7/16/2019
For fixed residential appliances or receptacle outlets for same, Including
wall -mounted electric ovens; counter -mounted cooking tops; electrical
ranges, self-contained room, console, or through -wall air conditioners;
space heaters, food waste grinders, dishwashers; washing machines;
water heaters; clothes dryers or other motor -operated appliances not
exceeding 1 horsepower (HP) in rating each. For other types of air
conditioners and other motor -driven appliances having large electrical
rating, see POWER APPARATUS.
$ 191.55
Non -Residential Appliances
For residential appliances and self-contained factory -wired, non-
residential appliances not exceeding 1 horsepower (HP), kilowatt
(KW), or kilovolt -ampere (KVA), in rating including medical and dental
devices; food, beverage, and ice cream cabinets; illuminated show
cases; drinking fountains; vending machines; laundry machines, or
other similar types of equipment, each. For other types of air
conditioners and other motor -driven appliances having large electrical
rating, see POWER APPARATUS
$
Power Apparatus
For motors, generators, transformers, rectifiers, synchronous converters,
capacitors, industrial heating, air conditioners and heat pumps, cooking
or baking equipment and other apparatus, as follows: Rating in
horsepower (HP), kilowatts (KW), kilovolt- amperes (KVA), or kilovolt -
amperes -reactive (KVAR):
Up to and including 1
$ 191.55
Over 1 and not over 10
$ 191.55
Over 10 and not over 50
$ 255.40
Over 50 and not over 100
$ 383.10
Over 100, each
$ 446.95
P
Paneiboards
Installation or relocation of panelboard (ea)
$ 191.55
Busways
For trolley and plug -in -type busways, each 100 feet or fraction thereof
An additional fee will be required for lighting fixtures, motors and other
appliances that are connected to trolley and plug -in -type busways. No
fee is required for portable tools
$ 191.55
Signs, Outline Lighting, and Marquees
For signs, outline lighting systems or marquees supplies from one
branch circuit, each
$ 191.55
Electrical Services
For services of 600 volts or less, up to 1,000amperes in rating, each
$ 191.55
For services over 600 volts or over 1,000 amperes in rating, each
$ 510.80
OTHER FEES:
For electrical apparatus, conduits and conductors for which a permit is
required but for which no fee is herein set forth. This fee is not applicable
when a fee is paid for one or more services, outlets, fixtures,
appliances, power apparatus, busways, signs or other equipment.
$ 191.55
Other Electrical Inspections (per hour)
$ 127 70
Note: This table would be used if, for example, someone wants a permit for just a water heater or electrical panel.
29
$ 11,978.26
Exhibit A of Resolution No 8045 Fee Schedule.xlsx