HomeMy WebLinkAboutContracts & Agreements_26-2022AGREEMENT TO PERFORM NONPROFESSIONAL SERVICES
FOR EQUIPMENT AND SUPPLIES
This agreement for the provision of janitorial services ("Agreement") is made and entered
m this 1st day of March, 2022 ("Effective Date"), by and between the City of Redlands, a
municipal corporation ("City") and Genesis Staffing Firm ("Contractor") City and Contractor are
sometimes individually referred to herein as a "Party" and, together, as the "Parties." In
consideration of the mutual promises contained herein, City and Contractor agree as follows
ARTICLE 1— ENGAGEMENT OF CONTRACTOR
1 1 City hereby engages Contractor to perform janitorial services for City (the "Services")
1.2 The Services shall be performed by Contractor in a professional manner, and Contractor
represents that it has the skill and the professional expertise necessary to provide the
Services to City at a level of competency presently maintained by other practicing
professional Contractors in the industry providing like and similar types of Services
ARTICLE 2 — SERVICES OF CONTRACTOR
2.1 The Services that Contractor shall perform are more particularly described in Exhibit "A,"
titled "Scope of Services," which is attached hereto and incorporated herein by this
reference.
2.2 Contractor shall comply with applicable federal, state and local laws and regulations in the
performance of this agreement including, but not limited to, any applicable State prevailing
wage laws
ARTICLE 3 — RESPONSIBILITIES OF CITY
3 1 City shall make available to Contractor information in its possession that may reasonably
assist Contractor in performing the Services.
3.2 City designates Chris Boatman, Assistant City Manager, as City's representative with
respect to performance of the Services, and such person shall have the authority to transmit
instructions, receive information, interpret and define City's policies and decisions with
respect to performance of the Services.
ARTICLE 4 -- PERFORMANCE OF SERVICES
4 1 The Services shall commence immediately after the Effective Date of this Agreement.
Contractor shall perform and complete the Services in a prompt and diligent manner in
accordance with the schedule set forth in Exhibit "A."
4.2 The term of this Agreement shall be for a period of six months (6), commencing as of the
Effective Date, unless terminated earlier as provided herein.
1
L:\ca\djr\Agreements\Genesis Staffing Finn Agrcemcnt.NPS-2.1.17Y21-0076,docx.jn
ARTICLE 5 — PAYMENTS TO CONTRACTOR
5 1 Total compensation for Contractor' s performance of the Services shall not exceed the
amount of One Hundred Twenty Eight Thousand Dollars and Fifty One Cents
($128,404.51) City shall pay Contractor in accordance with Exhibit "B," titled "City -Wide
Janitorial Services Fee Schedule," which is attached hereto and incorporated herein by this
reference.
5.2 Contractor shall submit monthly invoices to City describing the Services performed during
the preceding month. Contractor's invoices shall include a brief description of the Services
performed, the dates the Services were performed, the number of hours spent and by whom,
and a description of reimbursable expenses related to the Services. City shall pay
Contractor no later than thirty (30) days after receipt and approval by City of Contractor's
invoice.
5.3 Any notice or other communication required, or which may be given, pursuant to this
Agreement, shall be in writing. Any such notice shall be deemed delivered (i) on the date
of delivery in person, (ii) five (5) days after deposit in first class registered mail, with return
receipt requested, (iii) on the actual delivery date if deposited with an overnight courier; or
(iv) on the date sent by facsimile or electronic mail transmission (including PDF), if
confirmed with a copy sent contemporaneously by first class, certified, registered or
express mail, in each case properly posted and fully prepaid to the appropriate address set
forth below, or such other address as a Party may provide notice in accordance with this
section.
CITY
City Clerk
City of Redlands
35 Cajon Street
P 0 Box 3005 (mailing)
Redlands, CA 92373
jdonaldson@cityofredlands.org
cityofredlands.org
Phone. (909) 798-7531
Fax. (909) 798-7535
CONTRACTOR
Pearl Blunt
Genesis Staffing Finn
24384 Sunnymead Blvd. Suite 222-D
Moreno Valley, CA 92553
Genesis staffing.firin@gmail.com
951-251-3471
ARTICLE 6 — INSURANCE AND INDEMNIFICATION
6 1 The following insurance coverage required by this Agreement shall be mamtarned by
Contractor for the duration of its performance of the Services Contractor shall not perform
any Services unless and until the required insurance listed below is obtained by Contractor
Contractor shall provide City with certificates of insurance and endorsements evidencing
such insurance prior to commencement of the Services. Insurance policies shall include a
provision prohibiting cancellation or modification of the policy except upon thirty (30)
days prior written notice to City
2
L:\ca\djm\Agreements\Genesis Staffing Finn Agreement.NPS-2.1.FY21-0076.docx jn
A. Workers' Compensation and Employer's Liability insurance in the amount that meets
statutory requirements with an insurance carrier acceptable to City, or certification to
City that Contractor is self -insured or exempt from the workers' compensation laws of
the State of Cahforma. Contractor shall execute and provide City with Exhibit "C,"
titled "Workers' Compensation Insurance Certification," which is attached hereto and
incorporated herein by this reference, prior to performance of the Services.
B Comprehensive General Liability insurance with carriers acceptable to City in the
minimum amount of One Million Dollars ($1,000,000) per occurrence and Two Million
Dollars ($2,000,000) aggregate, for public habihty, property damage and personal
injury is required. City shall be named as an additional insured and such insurance shall
be primary and non-contributing to any insurance or self-insurance maintained by City
C Business Auto Liability coverage, with mmnnum hmits of One Million Dollars
($1,000,000) per occurrence, combined single limit bodily injury liability and property
damage liability This coverage shall include all Contractor owned vehicles used in
connection with Contractor's provision of the Services, hired and non -owned vehicles,
and employee non -ownership vehicles City shall be named as an additional insured
and such insurance shall be primary and non-contributing to any insurance or self-
insurance maintained by City
6.2 Contractor shall defend, indemnify, and hold harmless City and its elected and appointed
officials, employees and agents from and against any and all claims, losses and liability,
including attorneys' fees, arising from injury or death to persons or damage to property
occasioned by any negligent act or omission by, or the willful misconduct of, Contractor,
or its officers, employees and agents in performing the Services
ARTICLE 7 — CONFLICTS OF INTEREST
7 1 Contractor covenants and represents that it does not have any investment or interest in any
real property that may be the subject of this Agreement or any other source of income,
interest in real property or investment that would be affected in any manner or degree by
the performance of Contractor's Services. Contractor further covenants and represents that
in the performance of its duties hereunder, no person having any such interest shall perform
any Services under this Agreement.
7.2 Contractor agrees it is not a designated employee within the meaning of the Political
Reform Act because Contractor
A. Does not make a governmental decision whether to
(i) approve a rate, rule or regulation, or adopt or enforce a City law,
(ii) issue, deny, suspend or revoke any City permit, license, application,
certification, approval, order or similar authorization or entitlement;
(iii) authorize City to enter into, modify or renew a contract;
3
L.\ca\djm\Agreernents\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx.jn
(iv) grant City approval to a contract that requires City approval and to which
City is a party, or to the specifications for such a contract;
(v) grant City approval to a plan, design, report, study or similar item,
(vi) adopt, or grant City approval of, policies, standards or guidelmes for City
or for any subdivision thereof.
B Does not serve in a staff capacity with City and, in that capacity, participate in making
a governmental decision or otherwise perform the same or substantially the same duties
for City that would otherwise be performed by an individual holding a position
specified in City's Conflict of Interest Code under Government Code section 87302
7.3 In the event City determines that Contractor must disclose its financial interests, Contractor
shall complete and file a Fair Political Practices Commission Form 700, Statement of
Economic Interests, with the City Clerk's office pursuant to the written instructions
provided by the City Clerk.
ARTICLE 8 — GENERAL CONSIDERATIONS
8 1 In the event any action is commenced to enforce or interpret any of the terms or conditions
of this Agreement the prevailing Party shall, in addition to any costs and other relief, be
entitled to the recovery of its reasonable attorneys' fees, including fees for the use of in-
house counsel by a Party
8.2 Contractor shall not assign any of the Services, except with the prior written approval of
City and in strict compliance with the terms and conditions of this Agreement. Any
assignment or attempted assignment without such prior written consent may, in the sole
discretion of City, results in City's immediate termination of this Agreement.
8 3 Contractor is for all purposes under this Agreement an independent contractor and shall
perform the Services as an independent contractor Neither City nor any of its agents shall
have control over the conduct of Contractor or Contractor's employees, except as herein
set forth. Contractor shall supply all necessary tools and instrumentalities required to
perform the Services. Assigned personnel employed by Contractor are for its account only,
and in no event shall Contractor or personnel retained by it be deemed to have been
employed by City or engaged by City for the account of, or on behalf of City Contractor
shall have no authority, express or implied, to act on behalf of City in any capacity
whatsoever as an agent, nor shall Contractor have any authority, express or implied, to bind
City to any obligation.
8 4 This Agreement may be terminated by City, in its sole discretion, by providing not less
than ten (10) days prior written notice to Contractor of City's intent to terminate. If this
Agreement is terminated by City, an adjustment to Contractor's compensation shall be
made, but (1) no amount shall be allowed for anticipated profit or unperformed Services,
and (2) any payment due Contractor at the time of termination may be adjusted to the extent
of any additional costs to City occasioned by any default by Contractor Upon receipt of a
4
L:\ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx.jn
termination notice, Contractor shall immediately discontinue its provision of the Services
and, within five (5) days of the date of the termination notice, deliver or otherwise make
available to City, copies (in both hard copy and electronic form, where applicable) of
project related data, drawings, specifications, reports, summanes and such other
information and materials as may have been accumulated by Contractor in performing the
Services Contractor shall be compensated on a pro-rata basis for Services completed up to
the date of termination
8 5 Contractor shall mamtam books, ledgers, invoices, accounts and other records and
documents evidencmg costs and expenses related to the Services for a penod of three (3)
years, or for any longer penod required by law, from the date of final payment to Contractor
pursuant to this Agreement Such books shall be available at reasonable times for
exammation by City at the office of Contractor
8 6 This Agreement, including the Exhibits incorporated herem by reference, represents the
entire agreement and understanding between the Parties as to the matters contained herem,
and any prior negotiations, wntten proposals or verbal agreements relating to such matters
are superseded by this Agreement Except as otherwise provided for herem, any
amendment to this Agreement shall be m wntmg, approved by City and signed by City and
Contractor
8 7 This Agreement shall be governed by and construed in accordance with the laws of the
State of California
8 8 If one or more of the sentences, clauses, paragraphs or sections contamed in this Agreement
is declared mvalid, void or unenforceable by a court of competent jurisdiction, the same
shall be deemed severable from the remainder of this Agreement and shall not affect,
impair or invandate the remaining sentences, clauses, paragraphs or sections contained
herein, unless to do so would deprave a Party of a material benefit of its bargain under this
Agreement
IN WITNESS WHEREOF, duly authonzed representatives of City and Contractor have
signed in confirmation of this Agreement
GENESIS STAFFING FIRM
By. c�X/ /�`� By
Paul T Barich, Mayor
ATTEST
le Donaldson, City Clerk
Pe rl Bluitt, Owner
5
L \ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2 1 FY21-0076.docx.in
EXHIBIT "A"
SCOPE OF SERVICES
A. Where work is to be performed in City facilities, Contractor shall have examined the site of work and
shall be responsible for having acquired full knowledge of the job and of any and all problems affecting
it. No variations or allowance from the cost breakdown for the Services will be made because of lack
of such examination.
B Damage to existing construction, equipment, planting, etc., by Contractor in the performance of the
Services shall be replaced or repaired and restored to original condition by and at the expense of
Contractor
C Contractor shall at all times, keep the facilities clean from accumulation of waste or recyclable materials
caused by employees or janitorial work and shall remove all resulting materials from site(s) where the
Services are performed.
D Contractor shall appoint an experienced supervisor to be responsible for all Services required and
performed under this Agreement. The Supervisor shall have the authority to receive on behalf of
Contractor any order or communication relating to the Services, and shall be readily accessible to staff
of the City at all times and have communication equipment (cell phone or pager) If a replacement
Supervisor is deemed necessary by Contractor, the replacement Supervisor shall be approved by City
prior to commencement of any Supervisory duties. Supervisor shall "walk" all buildings with a check
list and review janitorial work being performed by janitorial staff. Supervisor shall email said report
to City Staff every two weeks with findings and resolutions. Supervisor shall meet with individual City
site supervisors every two weeks during City business hours for quality control check in.
E. Contractor will correct, within 24 hours, deficiencies for any task labeled as daily, weekly, or monthly
Contractor will correct, within 48 hours, any deficiencies for any task labeled as semi-monthly,
quarterly, or annually City reserves the right to procure services for the correction of the deficiency
from other sources and hold Contractor responsible for any costs incurred. Failure to correct a notice
of deficient performance from City will constitute cause for termination of this Agreement.
F Invoices submitted must be itemized to include monthly costs for a given time period, and include
City's Purchase Order Number Any additional charges are required to be provided m writing with
detailed descriptions of work performed.
G City requires a comprehensive LIVESCAN background check clearance of all employees accessing
City property prior to their performing any work for the City Contractor shall provide evidence that all
employees engaged m providing the Services are covered under terms of Contractor's insurance policy
and have passed a thorough background check prior to submitting employees for a LIVESCAN
background check. Background checks are to be performed at the expense of the Contractor (if any)
and performed by the City of Redlands Police Department
H. Contractor is responsible for supplying, at its own expense, uniforms or identifying attire to all
employees, which will be unvarying in style. All employees are expected to be in "uniform" while on
duty, and the uniform is to be kept clean and in good condition. An example of uniform or identifying
attire would be a same colored collared shirt with the contractors name in clear view (logo). Badges
identified with the company name, photo and name of employee are required at all times janitors are at
a City facility
I. Contractor shall make available upon request the following:
• Health and Safety Plan for Workers
• Accident Record from the last 5 years, including details of Contractor's response, actions and
6
L:\ca\cljm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx.jn
outcomes
GENERAL REQUIREMENTS
A. All keys entrusted to Contractor for the fulfillment of this Agreement must be fully protected at all
times. In the event of any loss of key(s), it will be the responsibility of Contractor to cover the cost of
having the locks re -keyed. All rooms/buildings are to be secured after cleaning by ensuring all windows
are closed/locked and doors that are required to be locked are locked and that all alarms are set properly
B Upon completion and during the sequence of their duties, janitorial personnel will turn off all fights in
unoccupied areas unless otherwise directed.
C Prior to leaving the building each night, Contractor shall check to see that all outside doors are locked
and that the building is secure. Emergency phone numbers will be provided to Contractor and
Contractor shall notify the appropriate person in a timely manner of any difficulties in securing the
buildings. If City sites ongoing issues with Contractor staff not locking doors or setting alarms City
may seek financial compensation from Contractor
D Any conditions in the facilities that may require repair shall be reported to City in a timely manner
(e.g., dripping faucets, damaged walls, burned out lights, etc.)
RECYCLING
A. Contractor shall coordinate recycling activities with City's representative to minimize refuse disposal
and maximize recycling from City facilities.
B Contractor shall empty recyclable materials contained with designated recycling containers throughout
the facility This mcludes all blue, recycling desk -side containers and larger, blue 32-gallon recycling
containers Recyclable materials shall be emptied into the white recycling dumpster at the rear of the
City Hall off of Citrus Avenue.
C. Recyclable materials set aside should be collected and emptied into the white recycling dumpster This
includes office materials such as paper (e.g., boxes, blueprints, plans, files, etc) that may or not be
placed inside of a recycling container due to inadequate capacity but are clearly labeled "RECYCLE."
D Contractor shall contact City's representative if the janitorial staff or supervisor are in doubt regarding
the proper separation of materials.
E. Contractor will contact City's representative to apprise him of improper separation of materials by City
staff. Materials listed below should be separated for recycling by City office staff. Contractor shall
NOT collect recyclables for personal use.
Office Paper Junk Mail Envelopes Blueprints
Catalogs Computer Paper Colored Paper Aluminum Cans
Tin (steel) cans All Glass Bottles Flattened Cardboard Boxes
All other plastic bottles or containers
EQUIPMENT and SUPPLIES
A. Contractor will provide City with records to indicate the specifications, details and any other
information available concerning the supplies and equipment used at City facilities.
B. Supplies and materials used in performing the scope of services contained herein under this Agreement
shall conform to the following specifications hsted in the chart below. (any non -conforming specification
must be provided in the blank column for consideration and approval by City)
*For treatment of various types of flooring, carpeting, etc., only materials recommended and approved by the
7
L:\ca\djm\Agrcements\Genesis Staffing Finn Agreement.NPS-2.1.FY21-0076.docx jn
flooring manufacturers shall be used. It shall be the prime responsibility of the successful bidder to protect the
owner's property at all times, and to use only materials and treatments that will enhance the appearance of the
flooring, etc., and preserve the surface against deterioration
8
L\ca\djm\Agreements\Genesis Staffing Firm AgreementNPS-2.1.FY21-0076.docx.jn
DESCRIPTION OF ITEM
MIN REQUIRED SPECIFICATIONS
Heavy duty small trash can liners
Grainger, 500 count, 10 gallon, 24 x 23, black or approved functionally equivalent
Heavy duty medium trash can liner
Grainger, 250 count, 20-30 gallon, 30x36, black or grey, or approved fitnctionally equivalent
Toilet tissue, coreless roll
2-ply, 1000 sheets per roll, 36 rolls/case or approved functionally equivalent
Toilet tissue to match various dispensers
2-ply, white, Kleenex Cottonelle, or approved functionally equivalent
Paper towels, single fold to match
various dispensers
Must fit each specific dispenser at each location (to be noted during facility walk-through)
Toilet Seat Covers
Waxie, or equivalent, 250 count, 20 pack/case or approved functionally equivalent.
Paper Towels, EnMotion
10' x 800', 6 rolls/case, touchless roll or approved functionally equivalent
Glass Cleaner
Trigger spray bottle, non -streaking
Disinfectant Aerosol
Must be: pseudomoacidal, vircidal against HIV, salmonellacidal, bactericidal, fungicidal,
staphylocidal, tuberculocidal
Urinal Deodorizing Screens
Waxie, deluxe urinal deodorizing screen, 12/ea or approved functionally equivalent
Soap- Liquid I-Iand Cleaner
Gojo Castulian Ltn Soap
Hand Soap Push Pack
Waxie, push pack, pink lotion, 33,8 fl. Oz. or approved functionally equivalent
Hand Soap Medicated
Provon Medicated Lotion Soap with Chlovoxylenal, 33.8 ft. Oz. or approved fitnctionally
equivalent
Toilet Bowl Cleaner
Acid Base, Squeeze Bottle
Industrial Strength Disinfectant
Lysol or approved functionally equivalent
Furniture Polish
Pledge or approved functionally equivalent
Cleanser
Cornet or approved functionally equivalent cleaner with chlorinal
Room Deodorizer
Air Freshener, Airlift Aerosol, or approved functionally equivalent
Industrial Strength Bleach
Any Brand
Floor Stripper
Baseboard Stripper or approved functionally equivalent *
Carpet Stain Remover
Spray Bottle *
Mop Cleaner
Any Brand
Carpet Shampoo
For Carpet Cleaning Machines *
Floor Wax
TBD
9
L:\ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx jn
SENIOR CENTER AND COMMUNITY SENIOR CENTER
ITEM Al
111 W LUGONIA AVE
CLEANING SHALL BE PERFORMED BETWEEN THE HOURS OF
11 00 P M -6 00 A.M MONDAY, TUESDAY, WEDNESDAY, THURSDAY, FRIDAY, SATURDAY
COMMUNITY SENIOR CENTER
> Lobby, Hallways, Classrooms, and Multi -purpose room
Clean floor of dirt, dust, scuff marks and stains with cleaning product Six times weekly
Empty all trash receptacles and replace liners as necessary Six times weekly
Sweep Debris Six times weekly
Dust/sweep all hard surface floors with treated dust mop Six times weekly
Damp mop all hard surface areas with cleaning product Six times weekly
Vacuum mats clean at every doorway Six times weekly
Strap and apply adequate coatmgs of floor sealer/finish Once monthly
Apply uniform coat of self -polishing floor wash with clean synthetic mop,
allow time to dry, apply second coat, after allowing time for an overnight cure,
buff with white -fine polish pad with machine under 175 RPM Once monthly
➢ Senior Center Restrooms and Restrooms in the Nutrition Site Kitchen
Clean and sanitize fixtures, mirrors, counters, polish chrome Six times weekly
Mop floors completely with cleaning product Six times weekly
Refill all dispensers (toilet, paper towels and soap) Six times weekly
Empty all trash receptacles and replace liners as necessary Six times weekly
Remove all collected trash to designated area Six times weekly
Spot clean all walls, fight switches and doors with cleaning product Six times weekly
Spot wash all restroom partitions with cleaning product Six times weekly
Strip and apply adequate coatings of floor sealer/finish Once monthly
D Office and Classrooms
Empty all trash receptacles and replace liners as necessary Six times weekly
Vacuum carpet Six times weekly
10
L•\ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS 2 1 FY2I 0076.docxin
COMMUNITY CENTER
➢ Offices
Empty all trash receptacles and replace liners as necessary Six times weekly
Vacuum carpet
Six times weekly
➢ Community Center Restrooms
Clean and sanitize fixtures, mirrors, counters, polish chrome Six times weekly
Mop floors completely with cleaning product Six times weekly
Refill all dispensers (toilet, paper towels and soap) Six times weekly
Empty all trash receptacles and replace liners as necessary Six times weekly
Remove all collected trash to designated area Six times weekly
Spot clean all walls, light switches and doors with cleaning product Six times weekly
Spot wash all restroom partitions with cleaning product Six times weekly
Strip and apply adequate coatings of floor sealer/finish Once monthly
➢ Lobby, Game room, Classrooms, and Music Studio
Clean floors of dirt, dust, scuff marks and stains using cleaning product Six times weekly
Empty all trash receptacles and replace liners as necessary Six times weekly
Sweep Debris Six times weekly
Dust all hard surface floors with treated dust mop Six times weekly
Damp mop all hard surface areas with cleaning product Six times weekly
Vacuum mats clean at every doorway Six times weekly
Strip and apply adequate coatings of floor sealer/finish Once monthly
Apply uniform coat of self -polishing floor wash with clean synthetic mop,
allow time to dry, apply second coat, after allowing time for an overnight cure,
buff with white -fine polish pad with machine under 175 RPM Once monthly
➢ Hardwood Floors- Gymnasium, Dance Floor, Racquetball Courts and Multi -Purpose Room
******NEVER "WET MOP" THE WOOD FLOOR******
Excessive water causes natural wood to expand and may damage the flooring. Finishes are to protect the surface of
the wood and are not waterproofing products. Do not roll any carts, dollies, etc. Do not drag chairs across the floor
11
L:\ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx,jn
Dust mop with Hydroline Dust Mop Treatment and Maintainer Six times weekly
Dust Mop floor using cleaning product Six times weekly
Vacuum mats at every doorway Six times weeldy
Tack the floor using terrycloth towels with wrung out damp water Once weekly
Look for gum and candy on the floor and bleachers and remove Once weekly
**THE REST OF THIS PAGE LEFT INTENTIONALLY BLANK**
12
L:\caldjm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx.jn
ANIMAL SHELTER
ITEM A2
504 NORTH KANSAS STREET
CLEANING SHALL BE PERFORMED EVERY WEDNESDAY THROUGH SATURDAY
BETWEEN THE HOURS OF 5 30 P M AND 7 30 A M
➢ Tile Floor Care (Lobby, Hallways and Offices)
Dust mop all hard surface floors with treated or electrostatic dust mop Four times weekly
Wet mop entire area with cleaning product Four times weekly
Vacuum walk -off mats Four times weekly
Machine scrub hard surface floor and apply one coat of polish. allow time
to dry and then buff Once monthly
Strip hard surface floor and recoat with three coats of floor pohsh Twice yearly
➢ Reception
Dust all furniture, fixtures and equipment Four times weekly
Clean all walls, hght switches, doors and baseboards with cleaning product Four times weekly
Clean and vacuum air conditioning vents Twice monthly
➢ Restrooms
Refill dispensers, empty trash, clean and sanitize all restroom fixtures,
wipe down all counters, clean murors, wipe chrome, spot wipe partitions,
sweep and damp mop floors usmg a germicidal/soap cleaner
Six times per week
Clean Intenor & Extenor Wmdows Monthly
Clean & Sanitize Kitchen to include counter surfaces, sinks, floors and apphances Six times per week
Empty all trash cans and replace liners Four times per week
Clean & Sanitize care room with germicide to include counter surfaces, sinks, Foul. times Weekly
floors & appliances
13
L \ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2 1.FY21-0076.docx.jn
HILLSIDE MEMORIAL PARK
ITEM A3
1540 ALESSANDRO ROAD
CLEANING SHALL BE PERFORMED
AFTER 4 30 P M EVERY TUESDAY AND FRIDAY
➢ General Offices, Carpeted Areas and Vmyl Tiled Areas
Dust and spot clean all honzontal surfaces with germicidal cleanmg product
Spot clean all walls, fight switches and doors with cleaning product
Empty all trash receptacles and replace liners as necessary
Twice weekly
Remove all collected trash to designated area
Dust all chairs, table legs and rungs, baseboards, ledges moldings and
other low reaching areas
Dust all surfaces above normal reach including window sills,
ledges, moldmgs, shelves, door frames, pictures, etc
Sweep and wet mop laminate flooring areas
➢ Restrooms
Refill dispensers, empty trash, clean and sanitize all restroom fixtures,
wipe all counters, clean mirrors, wipe chrome, spot wipe partitions,
sweep and damp mop floors using a germicidal/soap cleaner
Scrub and sanitize sinks and toilets usmg germicidal/soap cleaner
Empty all trash receptacles and replace hners as necessary
Vacuum all ceiling vents, should coincide with window cleaning
➢ Mausoleums
Mop/Wax and buff terrazzo floors (Cleaning is to be performed end
of May before Memorial Day and mid -November)
➢ Break Room
Clean all counters, chairs and table
Clean and sanitize sink, and front of refrigerator
with cleaning product
Sweep and empty trash and recyclable matenal receptacles and replace liners
Sweep and wet mop lammate flooring areas
14
L \ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS 2 1 FY2I 0076.docx.jn
Once weekly
Once weekly
Twice weekly
Twice weekly
Twice a month
Once a month
Twice weekly
Five days per week
Five days per week
Five days per week
Twice yearly
Once Yearly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
POLICE ADMINISTRATIVE OFFICES
ITEM A4
30 CAJON STREET
CLEANING SHALL BE PERFORMED BETWEEN THE HOURS OF
3 00 P M AND 5 00 P M EVERY TUESDAY AND THURSDAY
➢ Main Floor Offices and Common Area
Empty all trash receptacles and replace liners as necessary Twice weekly
Empty all blue recycling containers into recycling dumpster or cart Twice weekly
Remove all collected trash and recyclable material to designated areas Twice weekly
Clean, disinfect and polish all drinking fountains, removing water marks, scale
and splash marks on the sides and front Twice weekly
Dust mop all hard surface floors with treated or electrostatic mop Twice weekly
Damp mop the entire area using cleaning product Once weekly
Vacuum all carpeted areas Twice weekly
Clean both sets of glass doors with cleaning product Twice weekly
Using approved spotter, spot clean carpeted areas Once weekly
Dust mop stairs, dust railings, ledges and spot clean Once weekly
Dust all furniture, fixtures, equipment and accessones Once weekly
Dust high and low areas, i e , pictures, clocks, partition tops, etc Once a month
Clean and vacuum air conditionmg vents Once a month
➢ Second Floor
Empty all trash and recyclable material receptacles and replace hners
as necessary Twice weekly
Empty all blue recycling containers into recycling dumpster or cart Twice weekly
Remove all collected trash and recyclable material to designated area Twice weekly
Clean and polish all drinking fountains, removing water marks, scale and
splash marks from the sides and front Twice weekly
Vacuum all carpeted areas Twice weekly
Dust mop all hard surface floors with treated or electrostatic mop Twice weekly
Damp mop entire area using cleaning product Once weekly
15
L \ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2 1 FY21-0076.docx.jn
Using approved spotter, spot clean carpeted areas Once weekly
Dust all furniture, fixtures, equipment and accessories Once weekly
Dust high and low areas, i.e., pictures, clocks, partition tops, etc. Once monthly
Machine scrub hard surface floors and apply one coat of polish,
allow time to dry, then buff Once monthly
Strip hard surface floors and recoat with three coats of floor polish Once yearly
(Restrooms — All Three Floors)
Refill dispensers, empty trash, clean and sanitize all restroom
fixtures, wipe all counters, clean mirrors, wipe chrome, spot wipe
partitions, sweep and damp mop floors using a germicidal cleaner Five Days per Week
Clean/scrub toilets using a germicidal/soap cleaner Five Days per Week
Clean and vacuum air conditioning vents Once monthly
➢ Basement and Kitchen
Clean kitchen counter & appliances with cleaning product Five Days per Week
Empty all trash and recyclable material receptacles and replace liners Five Days per Week
Empty all blue recycling containers into recycling dumpster or cart Five Days per Week
Remove all collected trash and recyclable material to designated area Five Days per Week
Vacuum all carpeted areas/walk-off mats Five Days per Week
Dust mop all hard surface floors with treated or electrostatic dust mop Five Days per Week
Sweep and damp mop using approved cleaning product Five Days per Week
Using approved spotter, spot clean carpeted areas Five Days per Week
Machine scrub hard surface floors and apply one coat of polish,
allow time to dry, then buff Every 4 months
**THE REST OF THIS PAGE LEFT INTENTIONALLY BLANK**
16
L:\ca\djm\Agreements\Gcnesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx jn
MUNICIPAL AIRPORT
ITEM A5
1745 SESSUMS DRIVE
CLEANING SHALL BE PERFORMED
TUESDAY AND FRIDAY AFTER 5 30 P M
➢ Lobby Area, Carpeted Areas and Vinyl Tiled Areas
Dust and spot clean all honzontal surfaces with cleaning product Once weekly
Spot clean all walls, fight switches and doors with cleaning product Twice weekly
Empty all trash and recyclable matenal receptacles and replace liners as Twice weekly
Empty all blue recycling containers into recycling dumpster or cart Twice weekly
Remove all collected trash to designated area Twice weekly
Vacuum all carpeted areas Twice weekly
Using approved spotter, spot clean carpet areas as needed Twice weekly
Dust all chairs, table legs and rungs, baseboards, ledges, moldings and
Other low-reachmg areas Twice monthly
Dust all surfaces above normal reach, mcludmg window sills, ledges, moldings,
shelves, door frames, pictures, etc Once monthly
➢ Restrooms
Refill dispensers, empty trash, clean and sanitize all restroom fixtures, wipe all
counters, clean mirrors, wipe chrome, spot wipe partitions, sweep and mop floors
using a germicidal cleaner Twice weekly
Scrub and sanitize smks and toilets usmg germicidal cleaner Once weekly
Empty all trash and recyclable material receptacles and replace liners Twice weekly
Empty all blue recyclmg containers mto recycling dumpster or cart Twice weekly
Vacuum all ceiling vents (coincides with window cleaning) Twice yearly
➢ Breakroom
Clean all counters, chairs and tables with cleaning product Twice weekly
Clean and sanitize sink and front of refrigerator with cleaning product Twice weekly
Sweep Twice weekly
17
L \ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS 2 1 FY21 0076.docx.jn
Empty all trash and recyclable material receptacles and replace liners Twice weekly
Empty all blue recycling containers into recycling dumpster or cart Twice weekly
Damp mop hard surface floors with cleaning product Once weekly
**THE REST OF THIS PAGE LEFT INTENTIONALLY BLANK**
18
L:\ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx.jn
CIVIC CENTER
ITEM A6
35 CAJON STREET
EVERY LOCATION EXCEPT TREASURER'S OFFICE CLEANING SHALL BE PERFORMED BETWEEN
THE HOURS OF 6 00 P M AND 6 00 A.M EVERY TUESDAY AND THURSDAY
ALL BATHROOMS ARE TO BE CLEANED/DISINFECTED MONDAY THROUGH FRIDAY (5 DAYS PER
WEEK)
THE TREASURER'S OFFICE —TO BE CLEANED BETWEEN
5 00 P M and 6 00 P M ON TUESDAY AND THURSDAY
➢ Lobbies
Sweep and damp mop entry flooring
Empty all trash and recyclable material receptacles and replace liners
as necessary
Empty all blue recycling containers into recycling dumpster or cart
Remove all collected trash to designated area
Vacuum all carpeted areas/walk-off mats
Clean intenor and extenor of all glass doors with appropriate cleaning product
Dust all hard surface floors with treated dust mop using approved spotter, spot clean
carpeted areas
Dust all chair, table legs and rungs, baseboards, ledges, moldings and other
low -reaching areas
Brush furniture
Dust all surfaces above normal reach including window sills,
ledges, moldings, shelves, door frames, pictures, etc
➢ Corridors
Dust all hard surface floors with treated dust mop
Damp mop all hard surface floors with cleaning product
Fully vacuum all carpets from wall to wall
Spot clean all walls, light switches and doors with cleaning product
Clean, disinfect and polish all drinkmg fountains
Usmg approved spotter, spot clean carpeted area
19
L \ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS 2 1 FY21-0076.docx.jn
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
➢ General Offices, Carpeted Areas and Vinyl Tiled Areas
Empty all trash and recyclable material receptacles and replace liners Twice weekly
Empty all blue recycling containers into recycling dumpster or cart Twice weekly
Remove all collected trash to designated area Twice weekly
Dust and spot clean all horizontal surfaces Twice weekly
Spot clean all walls, light switches and doors with cleaning product Twice weekly
Vacuum all carpeted areas Twice weekly
Buff all hard surface floors Once monthly
Dust mop all hard surface floors with treated dust mop Twice weekly
Clean both sides of all glass doors with cleaning product Twice weekly
Using approved spotter, spot clean carpeted areas Twice weekly
Dust all chair, table legs and rungs, baseboards, ledges,
moldings and other low -reaching areas Once a month
Damp mop entire hard surface areas with cleaning product Once a month
Dust all surfaces above normal reach including window sills,
ledges, moldings, shelves, door frames, pictures, etc. Once a month
Clean and vacuum air conditioning vents Once a month
➢ Stairwells (Interior, Exterior and Landings)
Sweep stairs Once weekly
Damp mop any spillage with cleaning product Once weekly
Dust rails and ledges Once weekly
Damp mop completely with cleaning product Once weekly
➢ Elevators
Clean and vacuum carpeted elevators completely Once monthly
Detail clean threshold plates, removing all visible spoil Once monthly
Clean and disinfect button panel Twice Weekly
➢ Restrooms
Clean and sanitize fixtures, mirrors, counters, polish chrome Five Days per Week
20
L.\ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx jn
Scrub and sanitize sinks and toilets using germicidal cleaner Five Days per Week
Sweep and mop hard surface floors with cleaning product Twice weekly
Refill dispensers (soap, paper towels, toilet paper) Five Days per Week
Empty all trash and recyclable material receptacles and replace liners Five Days per week
Remove all collected trash to designated area Twice weekly
Spot clean all walls, light switches and doors with cleaning product Once weekly
Spot wash all restroom partitions with cleaning product Once weekly
Wash all restroom partitions on both sides with sanitizing cleaning product Once Weekly
Machine scrub all restroom floors using a germicidal
detergent and recoat with two coats of sealer/finish Once monthly
Vacuum and clean air conditioning vents Once monthly
➢ Breakrooms
Clean sink, countertop and appliances with cleaning product Twice weekly
Damp wipe all cafeteria, lunchroom tables and vending machines Twice weekly
Empty all trash and recyclable maternal receptacles and replace liners Twice weekly
Empty all blue recycling containers into recycling dumpster or cart Twice weekly
Remove all collected trash to designated area Twice weekly
Dust mop all hard surface floors with treated dust mop Twice weekly
Mop all stains and spills from hard surface floors with cleaning product Twice weekly
Spot clean all walls, light switches and doors with cleaning product Twice weekly
Damp wipe chairs with cleaning product Twice weekly
➢ Floor Care Services
Machine polish, scrub or strip all vinyl, ceramic, or tile floors and apply
adequate coatings of floor sealer/finish to required floors Once a month
Machine scrub, apply approved wax and polish wood floor Once a month
**THE REST OF THIS PAGE LEFT INTENTIONALLY BLANK**
21
L:\ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx.jn
22
L:\ca\djm\Agrecments\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx.jn
POLICE SUB -STATION
ITEM A7
1150 BROOKSIDE, #J1A
➢ Lobby, Hallways, Offices, and Kitchens
Dust mop all hard surface floors with treated dust mop Twice weekly
Wet mop entire area with cleaning product Twice weekly
Vacuum all carpeted areas/walk-off mats Twice weekly
Using approved spotter, spot clean carpeted areas Twice weekly
Dust all furniture, fixtures, equipment and Accessones Twice weekly
Dust high and low areas, 1 e , pictures, clocks, partition tops, etc Twice weekly
Empty all trash and recyclable material receptacles and replace liners Twice weekly
Empty all blue recycling containers into recychng dumpster or cart Twice weekly
Damp mop entire area m kitchen with cleamng product Twice weekly
Clean and vacuum all ceiling vents Twice yearly
Machme scrub hard surface floor and apply one coat of pohsh, allow to dry, then buff Twice yearly
Shampoo carpet using rotary machine Twice yearly
Strip hard surface floor and recoat with three coats of floor pohsh Once yearly
➢ Restrooms
Refill dispensers, empty trash, clean and sanitize all restroom fixtures,
wipe all counters, clean mirrors, wipe chrome, spot wipe partitions,
sweep and damp mop floors using a germicidal cleaner Twice weekly
Empty all trash and recyclable matenal receptacles and replace liners Twice weekly
Empty all blue recycling containers mto recycling dumpster or cart Twice weekly
Machine scrub hard surface floor and apply one coat of pohsh, allow to dry, then buff Once monthly
Strip hard surface floor and recoat with three coats of floor polish Once yearly
➢ Breakrooms
Empty all trash and recyclable material receptacles and replace liners Twice weekly
Empty all blue recycling containers into recychng dumpster or cart Twice weekly
Wipe down and sanitize all horizontal surfaces Twice weekly
23
L \ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2 1 FY2I 0076.docx.jn
24
L:\ca\djm\Agreements\Genesis Staffing Firm Agrccment.NPS-2.1.FY21-0076.docx.jn
SMILEY LIBRARY
ITEM A9
125 W VINE STREET
LIBRARY CLEANING SUNDAY, MONDAY, TUESDAY, WEDNESDAY, THURSDAY, FRIDAY
BETWEEN THE HOURS OF 10 00 PM and 6 00 AM
> Lobbies
Clean entry to buildings Six times weekly
Empty all trash and recyclable material receptacles and replace Imers Six times weekly
Empty all blue recychng containers into recychng dumpster or cart Six times weekly
Remove all collected trash to designated area Six times weekly
Vacuum all carpeted areas/walk-off mats Six times weekly
Clean mtenor and exterior of all glass doors with cleaning product Six times weekly
Dust all hard surface floors with treated dust mop using approved
spotter, spot clean carpeted areas Six times weekly
Dust all chair, table legs and rungs, baseboards, ledges moldings, and other
low -reaching areas Once monthly
Dust all surfaces above normal reach, mcludmg wmdow sills, ledges,
moldings, shelves, door frames, pictures, etc Once monthly
Vacuum furniture Once monthly
> Corridors
Dust all hard surface floors with treated dust mop Six times weekly
Damp mop all hard surface floors with cleaning product Six times weekly
Fully vacuum all carpets, wall to wall Six times weekly
Spot clean all walls, light switches and doors with cleaning product Six times weekly
Empty and damp wipe ashtray outside entry way Six times weekly
Clean and pohsh all drinking fountains with cleaning product Six times weekly
Usmg approved spotter, spot clean carpeted areas Six times weekly
➢ General Offices, All Areas
Empty all trash and recyclable material receptacles and replace Imers Six times weekly
Empty all blue recycling containers into recycling dumpster or cart Six times weekly
25
L \ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS 2 1 FY21-0076.docx.jn
Remove all collected trash to designated areas Six times weekly
Dust and spot clean all horizontal surfaces Six times weekly
Spot clean all walls, light switches and doors with cleaning product Six times weekly
Vacuum all carpeted areas/walk-off mats Six times weekly
Dust mop all hard surface floors with treated dust mop Six times weekly
Mop all stains and spillage with cleaning product Six dines weekly
Using approved spotter, spot clean carpeted areas Six times weekly
Damp mop entire hard surface areas with cleaning product Once weekly
Dust all chair, table legs and rungs, baseboards, ledges, moldings,
and other low -reaching areas Once monthly
Dust all surfaces above normal reach, including window sills,
ledges, moldings, shelves, door fraines, pictures, etc. Once monthly
Vacuum and clean air conditioning vents Once monthly
➢ Stairwells (Interior, Exterior and Landings)
Sweep stairs Six times weekly
Damp mop any spillage with cleaning product Six tunes weekly
Dust rails and ledges Once weekly
Damp mop completely with cleaning product Once weekly
➢ Elevators
Clean and vacuum carpeted elevators completely Six times weekly
Using approved spotter, spot clean carpeted areas Six times weeldy
Detail clean threshold plates, removing all visible spoil Six times weekly
Wipe down and sanitize button panel Six dines weekly
➢ Restrooms
Clean and sanitize fixtures, mirrors, counters, and polish chrome Six times weekly
Mop floors completely with cleaning product Six times weekly
Refill dispensers Six times weekly
Empty all trash and recyclable material receptacles and replace Six times weekly
26
L.\ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx.jn
Empty all blue recycling containers into recycling dumpster or cart Six times weekly
Remove collected trash to designated area Six times weekly
Spot clean walls, light switches and doors with cleaning product Twice weekly
Wash and Sanitize restroom partitions on both sides Twice weekly
Vacuum and clean air conditioning vents Twice a month
Machine scrub all restroom floors using a germicidal detergent and recoat
with two coats of sealer/finish Once monthly
➢ Breakroom
Clean sink, countertop and appliances with cleaning product Three tunes Weekly
Damp wipe all cafeteria, lunchroom tables and vending machines Three tines Weekly
Empty all trash and recyclable material receptacles and replace liners Three times Weekly
Empty all blue recycling containers into recycling dumpster or cart Three times Weekly
Remove all trash collected to designated area Three times Weekly
Dust mop all hard surface floors with treated dust mop Three times Weekly
Mop all stains and spills from hard surface floors with cleaning product Three times Weekly
Spot clean all walls, light switches and doors with cleaning product Three tunes Weekly
Damp wipe chairs with cleaning product Once weekly
➢ Floor Care Services
Machine polish, scrub or strip vinyl, ceramic, or tile floors and apply
adequate coatings of floor sealer/finish to required floors Once monthly
**THE REST OF THIS PAGE LEFT INTENTIONALLY BLANK**
27
L:\caldjm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx jn
CORPORATE YARD
ITEM A10
1270 W PARK AVENUE
BUILDINGS A, B, E, I, J, M
CLEANING SHALL BE PERFORMED EVERY TUESDAY AND THURSDAY AFTER 4.30 P.M.
EXCEPT FOR BUILDING "A" PURCHASING DEPT WHICH IS TO BE CLEANED BETWEEN THE
HOURS OF 7.30 A.M. AND 4.30 P M
AND THE GAS ISLAND RESTROOMS WHICH ARE TO BE
CLEANED EVERY SUNDAY, TUESDAY AND THURSDAY AFTER 4 30 P M
➢ General Offices, Carpeted Areas and Vmyl Tiled Areas
Empty all trash and recyclable material receptacles and replace liners as necessary Twice weekly
Empty all blue recycling containers into recycling dumpster or cart Twice weekly
Remove all collected trash to designated area Twice weekly
Dust and spot clean all honzontal surfaces Once weekly
Spot clean all walls, hght switches and doors with cleaning product Once weekly
Vacuum all carpeted areas Once week
Dust mop all hard surface floors with treated dust mop Twice weekly
Mop all stains and spillage with cleanmg product Twice weekly
Using approved spotter, spot clean carpeted areas Twice weekly
Dust all chair, table legs and rungs, baseboards, ledges, moldings and other
low -reaching areas Twice weekly
Damp mop entire hard surface areas with cleaning product Once weekly
Vacuum walk -off mats Once weekly
Dust all surfaces above normal reach including window sills, ledges, moldings,
shelves, dooi frames, etc Twice weekly
Machine scrub hard surface floor and apply one coat
of polish, allow time to dry, then buff Once monthly
Strap hard surface floor and recoat with three coats of floor pohsh Once a year
➢ Kitchen/Bath/Restroom
Dust mop all hard surface floors with treated dust mop Once weekly
Mop all stams and spillage with cleaning product Once weekly
Damp mop entire hard surface areas with cleaning product Once weekly
78
L \ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS 2 1 FY21 0076.docx..in
Scrub toilets using sanitizer/disinfectant Once weekly
Clean sink, countertop and appliances with cleaning product Once weekly
Damp wipe all lunchroom tables and vending machines with cleaning product Once weekly
Empty all trash and recyclable material receptacles and replace liners as necessary Twice weekly
Empty all blue recycling containers into recycling dumpster or cart Twice weekly
Remove all collected trash to designated area Twice weekly
Dust mop all hard surface floors with treated dust mop Twice weekly
Mop all stains and spills from hard surface floors with cleaning product Twice weekly
Spot clean all walls, light switches and doors with cleaning product Once weekly
Damp wipe chairs with cleaning product Once weekly
Restrooms and Locker Rooms all buildings as necessary
Restrooms in Building "A" (Cleaned between 7.30 a.m.- 5 00 p.m.) Five Days per Week
Restrooms in Building "B," "E" & "M" Five Days per Week
Restrooms in Building "D" (Gas Island) Seven Days per Week
Fully clean all showers with cleaning product Five Days per Week
All. Refill dispensers, waterproof sand paper on water mineral in sinks empty trash, Twice weekly
clean and sanitize all restroom fixtures, wipe all counters, clean mirrors, wipe chrome,
spot wipe partitions, sweep and damp mop floors using a germicidal cleaner/scrub/sanitize sinks
Toilets scrub using sanitizer/disinfectant Twice weekly
Empty all trash and recyclable material receptacles and replace liners as necessary Twice weekly
Clean and seal grout Twice yearly
Dust high and low areas. i.e., pictures, clocks, partition tops, etc. Once monthly
Machine scrub hard surface floor and apply one coat of polish, allow time to dry,
then buff Once monthly
Strip hard surface floor and recoat with three coats of floor polish Once yearly
Breakrooms
Wipe down and sanitize all horizontal surfaces Twice Weekly
Wipe down and sanitize sinks, faucets, refrigerator handles and cabinets Twice Weekly
ADDITIONAL
➢ Building A - Purchasing
29
L:\ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx.jn
Sweep Storeroom area and dispose of dust/debris Once monthly
Wipe down appliances in kitchen area and clean flat surfaces using cleaning product Twice weekly
30
L;\ea\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx.jn
WASTE WATER TREATMENT PLANT
ITEM All
1950 NEVADA STREET
CLEANING SHALL BE PERFORMED SUNDAY, TUESDAY AND THURSDAY AFTER 7 00 PM
➢ General Offices, Carpeted Areas and Vmyl Tiled Areas
Dust and spot clean all horizontal surfaces Every Tuesday
Spot clean all walls, light switches and doors with cleaning product Three times Weekly
Empty all trash receptacles and replace liners as necessary Three times Weekly
Empty all blue recycling contamers into recyclmg dumpster or cart Three times Weekly
Remove all collected trash to designated area Three times Weekly
Vacuum all carpeted areas Three times Weekly
Using approved spotter, spot clean carpet areas as needed Three times Weekly
Dust all chairs, table legs and rungs, baseboards, ledges, moldings and
other low -reaching areas Three times Weekly
Dust all surfaces above normal reach, including window sills, ledges,
moldings, shelves, door frames, pictures, etc Once monthly
➢ Restrooms
Refill dispensers, empty trash, clean and sanitize all restroom fixtures,
wipe all counters, clean mirrors, wipe chrome, spot wipe partitions,
sweep and damp mop floors usmg a germicidal cleaner Three times Weekly
Scrub and sanitize sinks and toilets using germicidal cleaner Three times Weekly
Empty all trash receptacles and replace liners as necessary Three times Weekly
Empty all blue recycling containers into recychng dumpster or cart Three times Weekly
Clean and vacuum air conditioning vents Three times Weekly
➢ Break Room
Clean all counters, vendmg machines, chairs and tables with cleaning product Three times Weekly
Clean and sanitize sink, drmktng fountams and front of refrigerator Three times Weekly
Sweep and empty trash, replace hners Three times Weekly
Empty all blue recycling containers into recycling dumpster or cart Three times Weekly
Damp mop hard surface floors with cleaning product Three times Weekly
31
L•\ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2 1 FY21-0076.docx.jn
➢ Windows
Interior and exterior of windows shall be cleaned between the end of May
before Memorial Day & again in mid -November) Twice yearly
➢ Carpets
Carpets shall be shampooed (Cleaning is to be performed
At the end of May before Memorial Day and again in mid -November) Twice yearly
➢ Tiled Floors
Tiled floors shall be waxed (Cleaning is to be performed at the
End of May before Memorial Day and again in mid -November) Twice yearly
**THE REST OF THIS PAGE LEFT INTENTIONALLY BLANK**
32
L:\ea\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx.jn
WATER PRODUCTION AND OPERATIONS
ITEM Al2
955 PARKFORD DRIVE
CLEANING SHALL BE PERFORMED SUNDAY AND WEDNESDAY AF
➢ General Offices, Carpeted Areas and Vinyl Tded Areas
Dust and spot clean all horizontal surfaces
Spot clean all walls, fight switches and doors with cleaning product
Empty all trash receptacles and replace liners as necessary
Empty all blue recycling containers into recycling dumpster or cart
Remove all collected trash to designated area
Vacuum all carpeted areas
Using approved spotter, spot clean carpet areas as needed
Dust all chairs, table legs and rungs, baseboards, ledges, moldings and
other low -reaching areas
Dust all surfaces above normal reach, mcludmg window sills, ledges,
moldings, shelves, door frames, pictures, etc
➢ Restrooms
Refill dispensers, empty trash, clean and sanitize all restroom fixtures, wipe all counters,
clean mirrors, wipe chrome, spot wipe partitions, sweep and damp mop floors
Scrub and sanitize sinks and toilets using germicidal cleaner
Empty all trash receptacles and replace liners as necessary
Empty all blue recycling containers into recycling dumpster or cart
Vacuum and clean all ceiling vents
➢ Break Room
Clean all counters, vendmg machines, chairs and tables with cleaning product
Clean and sanitize sink, drinking fountain and front of refrigerator
Sweep and empty trash replace liners as necessary or at least Twice weekly
Empty all blue recycling containers into recycling dumpster or cart
Damp mop hard surface floors with cleaning product
➢ Windows
33
L \ca\djm\Agreements\Genesis Staffmg Firm Agreement.NPS 2 1 FY21 0076.docx.jn
TER 7 00 PM
Every Sunday
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Once monthly
Once monthly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Twice weekly
Interior and exterior of windows shall be cleaned at the end of May before Memorial Day
& again in mid -November) Twice yearly
➢ Tiled Floors
Tiled Floors shall be waxed (Cleaning is to be performed Twice yearly
at the end of May before Memorial Day & again in mid -November
**THE REST OF THIS PAGE LEFT INTENTIONALLY BLANK**
34
L:\ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx jn
PARK AVENUE POLICE STATION/JAIL
ITEM A13
1270 W PARK AVE
CLEANING SHALL BE PERFORMED BETWEEN THE HOURS OF 7 00 AM AND 5 00 PM
7 DAYS A WEEK — MONDAY, TUESDAY, WEDNESDAY, THURSDAY & FRIDAY, SATURDAY, SUNDAY
INCLUDES DISPATCH AND RECORDS DEPARTMENT
Clean entry to building with cleaning product Seven times Weekly
Empty all trash and recyclable matenal receptacles and replace liners
as necessary Seven times Weekly
Empty all blue recycling contamers mto recycling dumpster or cart Seven times Weekly
Remove all collected trash and recyclable matenal to designated area Seven times Weekly
Vacuum carpeted areas Seven times Weekly
Clean both sides of all glass doors with cleaning product Seven times Weekly
Dust all hard surface floors with treated dust mop Seven times Weekly
Using approved spotter, spot clean carpeted areas Seven times Weekly
amp mop all hard surface areas with cleaning product Seven times Weekly
Dust all chairs, table legs and rungs, baseboards, ledges, moldings
and low -reaching areas Five times Weekly
Brush furniture Five times Weekly
Dust all surfaces above normal reach, including
window sills, ledges, moldings, shelves, door frames, pictures, etc Twice Monthly
Vacuum furniture Twice Monthly
Clean and vacuum air conditioning vents Twice Monthly
➢ Corridors
Dust all hard surface floors with treated dust mop Seven Times Weekly
Damp mop all hard surface floors with cleaning product Seven Times Weekly
Spot clean all walls, light switches and doors with cleaning product Seven Times Weekly
Clean and pohsh all dnnlung fountains with cleamng product Seven Times Weekly
Using approved spotter, spot clean carpeted area Seven Times Weekly
Clean translucent panels that cover ceiling fight fixtures Twice yearly
Clean and vacuum air conditioning vents Once monthly
35
L \ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2 1 FY21 0076.docx jn
Clean exterior & interior glass doors Seven Times Weekly
Clean exterior glass windows Twice Monthly
➢ General Offices, Carpeted Areas and Vinyl Tiled Areas
Empty all trash and recyclable material receptacles and replace
liners as necessary Seven times weekly
Empty all blue recycling containers into recycling dumpster or cart Seven times weekly
Remove all collected trash and recyclable material to designated area Seven times weekly
Empty and damp wipe ashtrays located outside building entrances Seven times weekly
Dust and spot clean all horizontal surfaces Seven times weekly
Spot clean all walls, light switches and doors with cleaning product Seven times weekly
Vacuum carpeted areas Seven times weekly
Dust mop all hard surface floors with treated dust mop Seven times weekly
Mop stains and spillage with cleaning product Seven times weekly
Using approved spotter, spot clean carpeted areas Seven times weekly
Dust all chair, table legs and rungs, baseboards, ledges, molding and
other low -reaching areas Five times weekly
Damp mop entire hard surface areas Five times weekly
Dust all surfaces above normal reach, including window sills, ledges,
moldings, shelves, door frames, pictures, etc. Twice monthly
Clean air conditioning vents Twice monthly
Clean translucent panels covering ceiling light fixtures Twice yearly
➢ Restrooms
Clean and sanitize fixtures, mirror, counters, polish chrome and toilets Seven times weekly
Mop floors completely with cleaning product Seven times weekly
Refill dispensers Seven times weekly
Empty all trash and recyclable material receptacles and replace liners as
necessary Seven times weekly
Empty all blue recycling containers into recycling dumpster or cart Seven times weekly
Remove all collected trash and recyclable material to designated area Seven tunes weekly
Spot clean walls, light switches and doors with cleaning product Seven times weekly
36
L:\ea\djm\Agreements\Genesis Stuffing Firm Agreement.NPS-2,1.FY21-0076.docx.jn
Spot wash all restroom partitions and doors with cleaning product
Wash all restroom partitions on both sides with cleaning product
Clean air conditioning vents
Clean/Sanitize shower stations and Locker Rooms with cleaning product
Machine scrub all restroom floors using a germicidal Detergent
➢ Kitchen
Clean sink, countertop and appliances with cleaning product
Damp wipe all cafeteria counter areas with cleaning product
Empty all trash and recyclable material receptacles and replace liners
Remove all collected trash and recyclable material to designated area
Dust mop all hard surface floors with treated dust mop
Mop all stains and spills from hard surface floors with cleaning product
Spot clean all walls, light switches and doors with cleaning product
Damp wipe chairs with cleaning product
Clean and vacuum air conditioning vents
Clean translucent panels that cover ceiling light fixtures
Machine scrub hard surface floors and apply one coat of polish,
allow time to dry, then buff
Strip hard surface floors and recoat with three coats of floor polish
➢ Floor Care Services
Machine polish, scrub or strip all vinyl, ceramic, or tile floors and apply
adequate coatings of floor sealer/finish to required floors
Clean exterior and interior glass doors
Twice monthly
Once weekly
Once monthly
Twice monthly
Seven times weekly
Once monthly
Seven times weekly
Seven times weeldy
Seven times weekly
Seven times weekly
Seven times weekly
Seven times weekly
Seven times weekly
Once weekly
Twice monthly
Twice yearly
Once monthly
Once yearly
Once monthly
Seven times weeldy
**THE REST OF THIS PAGE LEFT INTENTIONALLY BLAND.**
37
L:\ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx,jn
CALIFORNIA STREET LANDFILL TRAILER
ITEM A14
2151 NEVADA STREET
CLEANING SHALL BE PERFORMED BETWEEN THE HOURS OF 7 00 AM AND 5 00 PM
2 DAYS A WEEK — TUESDAY, THURSDAY
➢ Restrooms
Refill dispensers, empty trash, clean and sanitize all restroom fixtures, wipe all
counters, clean mirrors, wipe chrome, spot wipe partitions, sweep and
damp mop floors using a germicidal cleaner Twice weekly
Scrub and sanitize sinks and toilets using samtizer/disinfectant Twice weekly
Empty all trash receptacles and replace liners as necessary Twice weekly
Empty all blue recycling containers mto recyclmg dumpster or cart Twice weekly
Machine scrub hard surface floor and apply one coat of polish,
allow time to dry, then buff Once monthly
Strip hard surface floor and recoat with three coats of floor polish Once yearly
Damp mop all hard surfaces using cleaning solution Twice weekly
➢ Offices
Empty all trash and recyclable material receptacles and replace liners as
necessary Twice weekly
Empty all blue recycling containers into recycling dumpster or cart Twice weekly
Remove all collected trash and recyclable material to designated area Twice weekly
Empty and damp wipe ashtrays located outside building entrances Twice weekly
Dust and spot clean all honzontal surfaces Twice weekly
Spot clean all walls, light switches and doors with cleaning product Twice weekly
Vacuum carpeted areas Twice weekly
Using approved spotter, spot clean carpeted areas Twice weekly
Dust all chair, table legs and rungs, baseboards, ledges, molding and
other low -reaching areas Twice weekly
Damp mop entire hard surface areas Twice weekly
Clean translucent panels covering ceiling fight fixtures Twice yearly
Dust all surfaces above normal reach, mcludmg window sills, ledges,
moldings, shelves, door frames, pictures, etc Once monthly
Clean air conditioning vents Once monthly
38
L \ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS 2 1 FY21 0076.docx
39
L.\ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx.jn
JOSLYN SENIOR CENTER
ITEM A15
21 GRANT STREET
CLEANING SHALL BE PERFORMED BETWEENT HE HOURS OF 7 00 PM AND 6 00 AM
5 DAYS A WEEK — MONDAY, TUESDAY, WEDNESDAY, THURSDAY & FRIDAY
➢ Lobby
Clean entry to building with cleaning product Three tunes Weekly
Empty all trash and recyclable matenal receptacles and replace hners as
necessary Three times Weekly
Empty all blue recycling containers into recycling dumpster or cart Three times Weekly
Remove all collected trash and recyclable matenal to designated area Three times Weekly
Vacuum carpeted areas Three times Weekly
Clean both sides of all glass doors with cleaning product Three times Weekly
Dust all hard surface floors with treated dust mop Three times Weekly
Using approved spotter, spot clean carpeted areas Three times Weekly
Damp mop all hard surface areas with cleaning product with cleaning product Three times Weekly
Dust all chairs, table legs and rungs, baseboards, ledges, moldings,
and low -reaching areas Once weekly
Brush furniture Once weekly
Dust all surfaces above normal reach, including window sills, ledges,
moldings, shelves, door frames, pictures, etc Once monthly
Vacuum furniture Once monthly
Clean and vacuum air conditioning vents Once monthly
> Corridors
Dust all hard surface floors with treated dust mop Three times Weekly
Damp mop all hard surface floors with cleaning product Three times Weekly
Spot clean all walls, hght switches and doors with cleaning product Three times Weekly
Clean and polish all drinking fountains Three times Weekly
Using approved spotter, spot clean carpeted area Three times Weekly
Clean translucent panels that cover ceiling light fixtures Twice yearly
Clean and vacuum air conditioning vents Once monthly
40
L \ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS 2 1 FY21-0076.docx jn
➢ General Offices, Carpeted Areas and Vinyl Tiled Areas
Empty all trash and recyclable material receptacles and replace liners Five times Weeldy
Empty all blue recycling containers into recycling dumpster or cart Five times Weekly
Remove all collected trash and recyclable material to designated area Five times Weekly
Empty and damp wipe ashtrays located outside building entrances Three times Weekly
Dust and spot clean all horizontal surfaces with cleaning product Three times Weekly
Spot clean all walls, light switches and doors with cleaning product Three times Weekly
Vacuum carpeted areas Three times Weekly
Dust mop all hard surface floors with treated dust mop Three times Weekly
Mop stains and spillage with cleaning product Three tunes Weekly
Using approved spotter, spot clean carpeted areas Three times Weekly
Dust all chair, table lets and rungs, baseboards, ledges, molding and
other low -reaching areas Once weekly
Damp mop entire hard surface areas with cleaning product Three times Weekly
Dust all surfaces above normal reach, including window sills,
Ledges, moldings, shelves, door frames, pictures, etc. Once monthly
Clean air conditioning vents Once monthly
Clean translucent panels covering ceiling light fixtures Twice yearly
Restrooms
Clean and sanitize fixtures, mirrors, counters, polish chrome and toilets Five times Weeldy
Mop floors completely with cleaning product Five times Weekly
Refill all dispensers Five times Weekly
Empty all trash and recyclable material receptacles and replace liners as necessary Five times Weekly
Empty all blue recycling containers into recycling dumpster or cart Five times Weekly
Remove all collected trash and recyclable material to designated area Five times Weekly
Spot clean walls, light switches and doors with cleaning product Five times Weekly
Spot wash all restroom partitions and doors with cleaning product Five times Weekly
Wash all restroom partitions on both sides with cleaning product Once monthly
41
L:\ca\djm\Agrcements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx.jn
Vacuum and clean air conditioning vents Once monthly
Machine scrub all restroom floors using a germicidal detergent Once monthly
> Kitchens
Clean sink countertop and appliances with cleaning product Three times Weekly
Damp wipe all cafeteria counter areas with cleaning product Three times Weeldy
Empty all trash and recyclable material receptacles and replace liners Five times Weekly
Empty all blue recycling containers into recycling dumpster or cart Five times Weekly
Remove all collected trash and recyclable material to designated area Five times Weeldy
Dust mop all hard surface floors with treated dust mop Three times Weekly
Mop all stains and spills from hard surface areas with cleaning product Three times Weeldy
Spot clean all walls, light switches and doors with cleaning product Three times Weeldy
Damp wipe chairs with cleaning product Once weeldy
Clean and vacuum air conditioning vents Once monthly
Clean translucent panels that cover ceiling light fixtures Twice yearly
Machine scrub hard surface floors and apply one coat of polish
Allow time to dry then buff Once yearly
Strip hard surface floors and recoat with three coats of floor polish Once yearly
> Floor Care Services (move all furniture to clean - when done, move back)
Machine polish, scrub or strip all vinyl, ceramic, or tile floors and apply,
Adequate coatings of floor sealer/finish to required floors Once monthly
> Window Cleaning Services
Interior and exterior of windows shall be cleaned between March 151
and April 30th and between Sep lit and Oct. 31" Twice yearly
**THE REST OF THIS PAGE LEFT INTENTIONALLY BLAND.**
42
L:\ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx.jn
CARRIAGE HOUSE
ITEM A16
1325 Prospect Drive Lane
AS NEEDED ONLY SERVICES
➢ Kitchen
Clean sink countertop and appliances with cleaning product
Damp wipe all cafeteria counter areas with cleaning product
Empty all trash and recyclable material receptacles and replace liners
Empty all blue recycling containers into recycling dumpster or cart
Remove all collected trash and recyclable material to designated area
Dust mop all hard surface floors with treated dust mop
Mop all stains and spills from hard surface areas with cleaning product
Spot clean all walls, fight switches and doors with cleaning product
Damp wipe chairs with cleaning product
Clean and vacuum au conditioning vents
Clean translucent panels that cover ceilmg light fixtures
Machine scrub hard surface floors and apply one coat of polish
Allow time to dry then buff
➢ Bathrooms
Clean and sanitize fixtures, mirrors, counters, pohsh chrome and toilets
Mop floors completely with cleaning product
Refill all dispensers (soap, paper towels, toilet paper)
Empty all trash and recyclable material receptacles and replace Liners as necessary
Empty all blue recycling containers into recycling dumpster or cart
Remove all collected trash and recyclable material to designated area
Spot clean walls, fight switches and doors with cleaning product
Spot wash all restroom partitions and doors with cleanmg product
Wash all restroom partitions on both sides with cleaning product
Vacuum and clean air conditioning vents
Machine scrub all restroom floors using a germicidal detergent
43
L \ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2 1 FY21-0076.docx jn
➢ Main Room, Stairs
Empty all trash and recyclable material receptacles and replace liners
Empty all blue recycling containers into recycling dumpster or cart
Remove all collected trash and recyclable material to designated area
Empty and damp wipe ashtrays located outside building entrances
Dust and spot clean all horizontal surfaces with cleaning product
Spot clean all walls, light switches and doors with cleaning product
Vacuum carpeted areas
Dust mop all hard surface floors with treated dust mop
Using approved spotter, spot clean carpeted areas
Dust all chair, table lets and rungs, baseboards, ledges, molding and other low -reaching areas
Damp mop entire hard surface areas with cleaning product
Dust all surfaces above normal reach, including window sills, ledges, moldings, shelves, door frames, pictures, etc.
Vacuum and clean air conditioning vents
➢ Hardwood Floors- Multi -Purpose Room
******NEVER "WET MOP" THE WOOD FLOOR******
Excessive water causes natural wood to expand and may damage the flooring. Finishes are to protect the surface of
the wood and are not waterproofing products. Do not roll any carts, dollies, etc. Do not drag chairs across the floor.
Dust mop with Hydroline Dust Mop Treatment and Maintainer
Dust Mop floor using cleaning product
Vacuum mats at every doorway
**THE REST OF THIS PAGE LEFT INTENTIONALLY BLAND**
44
L:\ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx.jn
CONTEMPORARY CLUB
ITEM A17
173 S Eureka Street
CLEANING SHALL BE PERFORMED WEEKLY BETWEEN THE HOURS OF 10 00 PM
and 6 00 AM EVERY WEDNESDAY
➢ Lobby
Clean entry to building with cleaning product Once weekly
Empty all trash and recyclable material receptacles and replace liners as necessary Once weekly
Empty all blue recychng contamers into recycling dumpster or cart Once weekly
Remove all collected trash and recyclable material to designated area Once weekly
Vacuum carpeted areas Once weekly
Clean both sides of all glass doors with cleaning product Once weekly
Dust all hard surface floors with treated dust mop Once weekly
Using approved spotter, spot clean carpeted areas Once weekly
Damp mop all hard surface areas with cleaning product with cleanmg product Once weekly
Dust all chairs, table legs and rungs, baseboards, ledges, moldings,
and low -reaching areas Once weekly
Brush furniture Once weekly
Dust all surfaces above normal reach, including window sills, ledges, moldings, shelves,
door frames, pictures, etc Once monthly
Vacuum furniture Once monthly
Clean and vacuum air conditioning vents Once monthly
➢ Corridors
Dust all hard surface floors with treated dust mop Once weekly
Damp mop all hard surface floors with cleaning product Once weekly
Spot clean all walls, hght switches and doors with cleaning product Once weekly
Clean and polish all drinking fountains Once weekly
Usmg approved spotter, spot clean carpeted area Once weekly
Clean translucent panels that cover ceiling light fixtures Twice yearly
Clean and vacuum air conditioning vents Once monthly
45
L•\ca\djm\Agreements\Genesis Staffing Firm AgreementNPS 21 FY21-0076.docx.in
46
L:\ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx jn
Offices, Carpeted Areas and Vinyl Tiled Areas
Empty all trash and recyclable material receptacles and replace liners
Empty all blue recycling containers into recycling dumpster or cart
Remove all collected trash and recyclable material to designated area
Empty and damp wipe ashtrays located outside building entrances
Dust and spot clean all horizontal surfaces with cleaning product
Spot clean all walls, light switches and doors with cleaning product
Vacuum carpeted areas
Dust mop all hard surface floors with treated dust mop
Mop stains and spillage with cleaning product
Using approved spotter, spot clean carpeted areas
Fust all chair, table lets and rungs, baseboards, ledges, molding and other low -reaching
areas
Damp mop entire hard surface areas with cleaning product
Dust all surfaces above normal reach, including window sills,
Ledges, moldings, shelves, door frames, pictures, etc.
Clean air conditioning vents
Clean translucent panels covering ceiling light fixtures
A Restrooms
Clean and sanitize fixtures, mirrors, counters, polish chrome and toilets
Mop flo.ors completely with cleaning product
Refill all dispensers
Empty all trash and recyclable material receptacles and replace Liners as necessary
Empty all blue recycling containers into recycling dumpster or cart
Remove all collected trash and recyclable material to designated area
Spot clean walls, light switches and doors with cleaning product
Spot wash all restroom partitions and doors with cleaning product
Wash all restroom partitions on both sides with cleaning product
Vacuum and clean air conditioning vents
Machine scrub all restroom floors using a germicidal detergent
47
L.\ca\djm\Agreements\Genesis Staffing Firm Agrecmcnt.NPS-2.1.FY21-0076.docx.jn
Once weekly
Once weekly
Once weekly
Once weekly
Once weekly
Once weekly
Once Weekly
Once weekly
Once weekly
Once weekly
Once weekly
Once weekly
Once monthly
Once monthly
Twice yearly
Once weekly
Once weekly
Once weekly
Once weekly
Once weekly
Once weekly
Once weekly
Once weekly
Once monthly
Once monthly
Once monthly
> Kitchen
Clean sink countertop and appliances with cleaning product Once weekly
Damp wipe all cafeteria counter areas with cleaning product Once weekly
Empty all trash and recyclable material receptacles and replace liners Once weekly
Empty all blue recycling containers into recycling dumpster or cart Once weekly
Remove all collected trash and recyclable material to designated area Once weeldy
Dust mop all hard surface floors with treated dust mop Once weekly
Mop all stains and spills from hard surface areas with cleaning product Once weekly
Spot clean all walls, light switches and doors with cleaning product Once weekly
Damp wipe chairs with cleaning product Once weekly
Clean and vacuum air conditioning vents Once monthly
Clean translucent panels that cover ceiling light fixtures Twice yearly
Machine scrub hard surface floors and apply one coat of polish
Allow time to dry then buff Once yearly
Strip hard surface floors and recoat with three coats of floor polish Once yearly
> Floor Care Services — Multipurpose Room (move all furniture to clean and when done, return)
Machine polish, scrub or strip all vinyl, ceramic, or tile floors and applies adequate
coatings of floor sealer/finish Once monthly
➢ Window Cleaning Services
Interior and exterior of windows shall be cleaned between March 1st and
April 30th and between Sep 1st and Oct. 31" Twice yearly
48
L:\ca\djm\Agrcemcnts\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx.jn
EXHIBIT "B"
CITY-WIDE JANITORIAL SERVICES FEE SCHEDULE
Item No.
A. Location
B.
Price Per Month
C.
Total Price
(6 months)
Al
Animal Sheltei
$ 560 00
$ 3360 00
A2
Hillside Cemetery
$1120 00
$ 6720 00
A3
Police Admmistrative Offices
$2016 00
$12096 00
A4
Airport
$1120 00
$ 6720 00
A5
Civic Center
$2089 77
$12538 62
A6
Police Sub Station #J1A
$ 224 00
$ 1344 00
A7
Library and Lincoln Shrine
$2902 98
$17417 88
A8
Corporate Yard All B
$1120 00
$ 6720 00
A9
Community Center and Semor Center
$4032 00
$24192 00
A10
Waste Water Treatment Plant
$ 672 00
$ 4032 00
A 11
Water Production & Operations
$ 244 00
$ 1464 00
Al2
Park Avenue Police Station/Jail/Bldg C
$3920 00
$23520 00
A 13
Cahforma Street Landfill Trailers
$ 224 00
$ 1344 00
A14
Joslyn Senior Center
$ 672 00
$ 4032 00
A15
Carnage House
$ 280 00
$1680 00
A16
Contemporary Club
$ 244 00
$1464 00
A TOTAL PRICE TO CITY FOR A SIX MONTH PERIOD
$128,404 51
49
L \ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2 1 FY21-0076.docx.jn
EXHIBIT "C
WORKERS' COMPENSATION INSURANCE CERTIFICATION
Every employer, except the State, shall secure the payment of compensation m one or more of the
following ways
(a) By being insured against liability to pay compensation by one or more insurers duly
authorized to write compensation insurance m this State.
(b) By securing from the Director of Industrial Relations, a certificate of consent to
self -insure, either as an individual employer, or as one employer in a group of
employers, which may be given upon filrnishmg proof satisfactory to the Director
of Industrial Relations of ability to self -insure and to pay any compensation that
may become due to his or her employees.
CHECK ONE
I am aware of the provisions of Section 3700 of the Labor Code which requires every
employer to be insured against liability for Workers' Compensation or to undertake self-insurance
m accordance with the provisions of that Code, and I will comply with such provisions before
commencing the performance of the work and activities required or permitted under this
Agreement. (Labor Code § 1861)
I affirm that at all times, in performing the work and activities required or permitted under
this Agreement, I shall not employ any person in any manner such that I become subject to the
workers' compensation laws of California. However, at any time, if I employ any person such that
I become subject to the workers' compensation laws of Cahforma, immediately I shall provide the
City with a certificate of consent to self -insure, or a certification of workers' compensation
insurance.
I certify under penalty of perjury under the laws of the State of California that the information and
representations made in this certificate are true and correct.
GENESIS STAFFING FIRM
By.
Pea1 Bluitt, Owner
50
L.\ca\djm\Agreements\Genesis Staffing Firm Agreement.NPS-2.1.FY21-0076.docx.jn
Date. 2_2'-,2, ..