This second amendment ("Second Amendment") to the agreement for engineering services
for to the Live Oak Canyon Creek and Oakmont Park restoration project dated October 15, 2019
("Agreement") by and between the City of Redlands, a municipal corporation ("City"), and Huitt-
Zollars, Inc ("Consultant"), is made and entered into this 17th day of May, 2022
RECITALS
WHEREAS, it is the desire of City and Consultant to amend their existing Agreement,
specifically to revise the Scope of Services to include final engineering plans, specifications and
construction cost estimates,
NOW, THEREFORE, City and Consultant agree as follows
AGREEMENT
Section 1. The scope of work performed by Consultant pursuant to Exhibit "A" of the
Agreement, titled "Scope of Services," is hereby amended to include the work that is identified in
Exhibit "1 "
Section 2 Section 5 1 of the Agreement, titled "Payments to Consultant," is hereby
amended to read as follows
``5 1 Total compensation for Consultant's performance of the Services shall not exceed the
amount of Three Hundred Seventy Two Thousand Two Hundred Twenty Two Dollars and
Fifty Two Cents ($372,222 52) City shall pay Consultant on a time and materials basis in
accordance with the hourly rates set forth in Exhibit "C," titled "Cost Proposal," attached
hereto and incorporated herein by reference "
All other provisions of the Agreement shall remain unchanged by this Second Amendment
and in effect.
IN WITNESS WHEREOF, the parties have executed this Second Amendment, to be
effective as of May 17, 2022
,CTrY OONREDLANDS
Paul T Barich, Mayor
ATTEST
eanne Donaldson, City Clerk
1
L \ca\djm\Agreements\Huitt-Zollars Second Amendment.FY21-0111 docx
HUITT-ZOLLARS, INC
5/10/2022
Vice President
EXHIBIT "1"
ADDITIONAL SCOPE OF SERVICES
2
L.\ca\djm\Agreements\I-Iuitt-Zollars Second Amendment.FY21-0111.docx
H1 ll 7O1 !A PS
HURT ZOLLARS INC i 3990 Concours i Suite 330 i Ontario CA 91764 7970 i 909 941 7799 phone i 909 941 7789 fax i huitf-zallars.com
March 31, 2022
City of Redlands
35 Cajon Street, Suite 22
Redlands, CA 92373
Re
Oakmont Park Channel Rehabilitation
Live Oak Canyon Creek Geological Assessment Project
Scope Modification for Construction Documents
City of Redlands, CA
HZ Project R310845 01
Mr John Harris
Huitt-Zollars appreciates the opportunity to provide this proposal to the City of Redlands for
professional services required to deliver construction documents (PS&Es — Plans, Specifications
and Estimates) for the rehabilitation of the channel at Oakmont Park It is our understanding that
the environmental regulatory permitting phase recommends a design level of approximately 60%
design The primary goal of the 60% design will be to define an environmental impact boundary
that encompasses the aesthetic and erosive goals for the project In this phase we will continue to
consider the project's hydraulics and scouring (h/s) study as necessary to arrive at less erosive
flow velocities and coordinate the details necessary to deliver the desirable aesthetics We are
focusing our effort on a design that looks natural, addresses unstable conditions, promotes self -
healing, and most importantly aligns a final design the City's ultimate objective
In the preliminary phase our team evaluated the hydraulics and scour analysis to provide some
initial recommendations It was determined that the use of check dams, practical slope armoring,
and slope cut backs of 2 1 would address the existing erosive conditions The design also
reviewed the use of culverts to provide pedestrian crossings and to help protect oak tree's in
proximity of the channel We detailed non -grouted rip -rap, gabions, and geotextiles that we
considered minimally acceptable to reduce flow velocities The City requested that the design
provide the aesthetic appeal of a recreational park and that the team consider larger riprap slabs
with subtle entry into the channel, as seen in pictures that were provided They have further
expressed that protection of slope be considered in both east and west banks to equalize the feel
of the channel To deliver construction documents that builds from the preliminary design with an
intent to refine the h/s study, details, and proposes alternatives to address aesthetics we are
requesting support from in house leads in landscape and structural design We are also
recommending that the project engage the geotechnical engineer to evaluate the soil conditions
and provide geotechnical recommendations within the project boundary
The following scope for preparation of construction documents for the Oakmont Park Channel
Rehabilitation is based solely upon the scope of services, compensation, schedule, terms and
conditions as specifically detailed herein
ADVANCEDESIGN"
Mr John Harris
Oakmont Park Channel Rehabilitation — Construction Documents
March 31,2022
HUITFZOLLARS
SCOPE OF SERVICES.
1 0 Engineering Services As described above the scope of services in all task below is
limited to analysis of a portion of the channel at Oakmont Park More specifically limits
that begin at an upstream end with the outlets at Sutherland Drive and extend
approximately 800 linear feet downstream, as shown in our preliminary design drawings
1 1 Channel Design Provide drawings (plan and profile) for 100°/0 design of the
Oakmont Park channel The design will continue to identify locations along the
channel for application of specific erosive reduction measures such as check
dams, slope armoring, culverts, gabions, and grading to stabilize the channel's
erosion Availability of materials with local quarries will be verified A rough
grading plan will be generated to establish the anticipated limits of work, as well
as construction entrance(s) to the bottom of the channel More specifically HZ will
provide an evaluation of the design revisions related to the landscape design
This includes changes to slope and application of rip -rap through the channel
We will develop details and cross sections to deliver on the city's goal for
aesthetics The plans will provide sufficient information for an engineer's estimate
of probable cost
Deliverable
70% Progress Design and Engineer's Estimate Only
90% PS&Es
100% (Final Design) PS&Es
1 2 Hydraulic and Scour Evaluation• Update the hydraulic model for the proposed
design to reflect the 100% design Our current preliminary analysis will be used
to provide recommendations for 100% design for the Oakmont Park channel and
then modified to match the deliverable at 70% and 90% design The final
hydraulic study will include a hydraulic model for the extents of the project, sizing
of the bank repairs, check dams, pedestrian culvert crossing, and rip -rap aprons
1 3 Landscape Support. Huitt-Zollars' landscape architect will coordinate with the
city and research local stone quarries to determine the type of boulders or
boulder slabs available in the area The landscape design team will then work
closely with the civil engineer to develop the detail and cross sections that deliver
on the city's goal(s) for aesthetics
Separate landscaping and irrigation plans are excluded and if required a
separate scope and fee will be provided to the CLIENT for review and approval
1.4 Structural Support The design will require structural support to evaluate the
stability of large boulders or boulder slabs and other erosive measure Our
structural team will work closely with the design team to provide supporting
calculations
Page 12
Mr John Harris
Oakmont Park Channel Rehabilitation — Construction Documents
March 31,2022
HUITLZOLLARS
1 5 Geotechnical Engineering To access the stability of soils, determine structural
parameters, and provide recommendations to protect from further erosion
damage Our geotechnical consultant will conduct a field investigation and
prepare a report which includes
• Project Setup
Geotech will determine and field mark boring locations
Notify Underground Service Alert (USA)
Engage a drill rig to sample the subsurface soils
• Field Investigation
Plan for three (3) borings along the channel
Approximate depth of 25 feet
Drilled with a track -mounted rig equipped (hollow -stem augers)
Backfill with loose soil cuttings
City shall monitor and backfill settlement as necessary, if
construction is delayed
• Laboratory Testing
In -place moisture and density
Expansion index
Laboratory maximum density
Direct Shear
• Engineering Analysis and Report
Project description
Summary of conditions
Description of the field procedures
Discussion of materials encountered
Discussion of properties
Exploratory logs
Approximate depth of groundwater, if encountered
Discussion of lab test results
Location of active faults within 62 miles
Seismic coefficient based on 2016 CBC
Discussion of Liquefaction
Slope stability evaluation
Slope construction recommendations
Soils bearing capacity
Lateral earth pressures
1.6 Engineer's Estimate of Probable Cost. Huitt-Zollars will prepare an engineer's
estimate of probable cost at 70%, 90% and 100% design The opinion of
probable construction cost will use industry -standard unit costs, ENR
construction costs, and available City cost database
1.7 Specifications. Huitt-Zollars will prepare one set of project specifications
Specifications will be derived from city's boilerplate document and/or APWA
standard specifications Specification will be submitted at 90% and 100% design
Page 13
Mr John Harris
Oakmont Park Channel Rehabilitation — Construction Documents
March 31,2022
HUITLZOLLARS
2 0 Meeting and Project Management•
2 1 Meetings and Project Management This item includes time for meetings,
phone calls, conference calls, coordination, and other project managementtasks
2.2 ECORP's Meetings and Coordination This item includes time for Ecorp's
participation in meetings, phone calls, conference calls, coordination, and other
project tasks
II COMPENSATION
All services provided for this project will be billed monthly on a time and materials (T&M) based
on 2022 hourly rates (See Attachment A)
1.0 Engineering Services
1.1 Channel Design $56,500
1 2 Hydraulic and Scour Evaluation $32,000
1 3 Landscape Support $30,000
1 4 Structural Support $19,500
1 5 Geotechnical Engineering $20,500
1 6 Engineer's Estimate $ 9,000
1.7 Specifications $10,500
Sub Total for Engineering Services $178,000
2 0 Meetings and Project Management
2 1 Meetings & Project Management
2 2 ECORP's Meeting and Coordination
Sub Total for Meetings and Project Management
3 0 Reimbursable Expenses
$16,000
$ 5,000
$21,000
3 1 Reimbursable expenses are estimated at $500 which include deliveries, mileage,
and production of bidding and construction documents Expenses shall be
compensated as agreed upon in the original contract
The total estimated budget for all above items. $199,500
Page I 4
Mr John Harris
Oakmont Park Channel Rehabilitation — Construction Documents
March 31,2022
HUITT-ZOLLARS
III DELIVERABLE.
Updated Hydraulics Analysis Report
Details and Cross -Sections (2 Sheets)
Oakmont Park Channel Design
Plan and Profile (2 Sheets)
Rough Grading (2 Sheets)
Final Grading (2 Sheets)
Storm Drain (1 Sheet)
Landscape Details (2 Sheets)
Quantities
Geotechnical Report
Structural Calculations
Sheet Format
24"x36" Sheets
1" = 20' Horizontal Scale
1" = 8' Vertical Scale
IV EXCLUDED SERVICES.
Surveying Tree Surveys
Topography Task not set forth in Scope
Third Party Fees
V CLIENT PROVIDED ITEMS.
Client shall provide Huitt-Zollars with the following
1 Written Notice to Proceed (WNTP)
2 Boilerplate Specifications, if available
VI SCHEDULE.
Following receipt of a written notice to proceed we anticipate requiring 40 working days for
geotechnical studies and approximately 160 working days to complete final design A
detailed milestone schedule that includes dates for 70%, 90% and 100% will be provided
after NTP
Page 15
Mr John Harris
Oakmont Park Channel Rehabilitation — Construction Documents
March 31,2022
HLIITTZOLLARS
VII TERMS & CONDITIONS
The originally agreed to Terms and Conditions for the Live Oak Canyon and Oakmont
Park restoration project dated October 15, 2019 between the City of Redlands and Huitt-
Zollars with a revised scope and fee as provided herein will apply to this Project
We are ready to begin work as soon as we receive authorization via the Written Notice
to Proceed If you have any questions about any aspect of this proposal, please do not
hesitate to give us a call
Sincerely,
HUITT-ZOLLARS, INC
J`ohnny Murad(P E , QSD/P
Vice president / Managing Principal
C67512
Miguel Angel Hernandez, P.E., P.L.S , QSD/P
Senior Project Manager
C61378
Page 1 6
EXHIBIT "2"
COST PROPOSAL
3
L:\ca\djm\Agreements\Huitt-Zollars Second Amendment.FY21-0111.docx
Engineering/Architecture
Principal
Sr Project Manager
Design Principal
QA Manager
Project Manager
Sr Civil Engineer
Sr Structural Engineer
Sr Mechanical Engineer
Sr Electrical Engineer
Civil Engineer
Structural Engineer
Mechanical Engineer
Electrical Engineer
Plumbing Engineer
EIT
Sr Architect
Architect
Architect Intern 3
Architect Intern 2
Architect Intern 1
Sr Designer
Designer
Sr CADD Technician
CADD Technician
Interior Design
Sr. Interior Designer
Interior Designer
Southern California
2022
HOURLY RATE SHEET
$ 280 00
$ 250 00
$ 220 00
$ 220 00
$ 215 00
$ 215 00
$ 205 00
$ 185 00
$ 190 00
$ 160 00
$ 170 00
$ 170 00
$ 170 00
$ 170 00
$ 145 00
$ 215 00
$ 200 00
$ 165.00
$ 135 00
$ 120 00
$ 185 00
$ 160 00
$ 145 00
$ 115 00
$ 170 00
$ 120 00
Hourly rates are subject to annual adjustment
Survey
Survey Manager
Sr Project Surveyor
Project Surveyor
Survey Technician
Survey Crews
1-Person Survey Crew
2-Person Survey Crew
3-Person Survey Crew
Construction
Construction Manager
Resident Engineer
Inspector/Owner's Representative
Sr Project Representative
Resident Project Representative
Administrative
Sr Project Support
Project Support
$ 220 00
$ 185 00
$ 155 00
$ 125 00
$ 165 00
$ 250 00
$ 315 00
$ 180 00
$ 165 00
$ 130 00
$ 125.00
$ 100 00
$ 110 00
$ 85 00
Reimbursable Expenses
Consultants Cost + 10%
Other Direct Costs Cost + 10%
Mileage IRS Standard Business Mileage Rate