HomeMy WebLinkAboutContracts & Agreements_91-2022FIRST AMENDMENT TO AGREEMENT TO PERFORM NON-PROFESSIONAL
SERVICES FOR IMPROVEMENT TO PUBLIC BUILDINGS AND GROUNDS
This first amendment ("First Amendment") to the agreement for well and booster pump
maintenance ("Agreement") dated June 15, 2021, by and between the City of Redlands, a
municipal corporation ("City"), and General Pump Company, Inc., a California corporation
("Contractor"), is made and entered into this 7th day of June, 2022.
RECITALS
WHEREAS, it is the desire of the City and Contractor to amend their existing Agreement,
specifically to revise the Scope of Work to include additional well maintenance;
NOW, THEREFORE, City and Contractor agree as follows
AGREEMENT
Section 1. The scope of services performed by Contractor pursuant to Exhibit "A" of
the Agreement, titled "Scope of Services," is hereby amended to include the work that is identified
in Exhibit "1 "
Section 2. Section 4.2 of the Agreement, titled "Article 4 — Performance of Services,"
is hereby amended to read as follows
"4.2 The term of this Agreement shall be extended for a period of one (1) year from the Effective
Date of this Agreement (the "Initial Term") The City shall have the option to extend the
term of this Agreement by one (1) additional one-year term ("Extended Term"), on the
same terms and conditions, by providing written notice to Contractor at least thirty (30)
days prior to the expiration of the Initial Term and subsequently, at least thirty (30) days
before any Extended Term. The Initial Term and the Extended Terms are hereby
collectively referred to herein as the "Term" of this Agreement."
Section 3. Section 5 1 of the Agreement, titled "Article 5 — Payments to Contractor,"
is hereby amended to read as follows.
"5 1 Total compensation for Consultant's performance of Services shall not exceed the amount
of One Million Nine Hundred Eighty Nine Thousand Three Hundred Forty Nine Dollars
and Thirty Four Cents ($1,989,349.34) for the Services provided during the Initial term
and additional one-year term Should this Agreement be extended, the compensation for
Contractor's performance for the Services for the final additional one-year term shall not
exceed the amount of Six Hundred Forty One Thousand Two Hundred Twelve Dollars
($641,212) for such Extended Term, bringing the total possible amount of compensation
to a not -to -exceed amount of Two Million Six Hundred Thirty Thousand Five Hundred
Sixty One Dollars and Thirty Four Cents ($2,630,561.34) For the Initial Term and the
Extended Terms, City shall pay Contractor on a time and materials basis up to the not-to-
1
L:\ca\djm\Agreements\General Pump First Amendment.FY21-0128.docx.jn
exceed amount in accordance with the unit prices specified in Exhibit "C," titled Bidder's
Rate Sheet," which is attached hereto and incorporated herein by reference "
All other provisions of the Agreement shall remain unchanged by this First Amendment
and in effect
IN WITNESS WHEREOF, the parties have executed this First Amendment, to be effective
as of June 7, 2022
CITY OF REDLANDS
By
Paul T Barich, Mayor
ATTEST
e Donaldson, City Clerk
2
L \ca\dim\Agreements\General Pump First Amendment.FY21 0128.docx.in
GENERAL PUMP COMPANY, INC
Thomas A Nan hy, Sr Proj
Manager/Project Engineer
EXHIBIT "1"
SCOPE OF SERVICES
3
L.\ca\djm\Agreements\General Pump First Amendment.FY21-0128.docx.jn
159 N. ACACIA STREET * SAN DIMAS, CA 91773
PHONE (909) 599-9606 * FAX (909) 599-6238
CAMARILLO, CA 93010 * PHONE. (805) 482-1215
www genpump com
WELL & PUMP SERVICE SINCE 1952 Lic #496765
Serving Southern California and Central Coast
May 9, 2022 Via Email
City of Redlands
35 Cajon Street
Redlands, California 92373
Attn Paul Marascal
Subject • Muni Well (Expanded Scope)
General Pump Company performed a job walk with City personnel to review the site layout and discuss
an expanded scope of work outside of the line items found on task 3 4
The main items under the expanded scope focused mainly on replacing and resizing the main transition
discharge piping from the discharge head flange to the existing 14" butterfly valve The new piping will
be 12" steel, without coatings, 150# SOW flanges, with nut bolt, and gasket kits Additional materials and
labor to incorporate the additional pipe liner that runs to the west of the well that will be raised due to the
current height of the well pedestal The followmg is a takeoff of materials proposed, along with field
labor
Cost
Materials
• 400 HP USEM VHS Motor
• 12" flanged McCrometer FxF 4-20MA totalizer 100 cf
• Steel weld on flanges (6)
• 12" Stnd Blk A53B Pipe w/BxB end
• 12" 150# RF weld Neuc Flange
• 16" 150# RF s/o flange
• 16"x12" Stnd, CR
• 12" 150# Flanged swing check
• Pipe stands (2)
• Ultra -Sonic Level Transducer
• 2x4-6 THREDOLET (3)
• 1" Corp stop (2)
• 1" THREDOLET (6)
• 1 '/2" THREDOLET (2)
• lx3 3M THREDOLET (5)
• 12" Smith Blair flex coupling
• 12NB&K(5)
• Spool section for waste line
• Sample station
• 10" NB&6 set
Total Materials, Includes Freight and Sales Tax $76,778 59
GARREAL
im COMP NAY
Shop Labor
• Load equipment, piping valves
• Cutting supplies, welding matenals
Feld Labor
• Mobilize to site, conduct beef tailgate safety meeting
• Rig up crane, remove all shade structures
And store safely on site
• Remove existing piping, valves, spools that will be replaced
• Unload new materials
• Demobilize
Rotary Crane and 1 Man Crew @ $265/Hr
Service Truck, Pump Mechanic and Helper @ $303/Hr
Est 10 Hrs @ $573/Hr
Est OT 2 Hr @ $168/Hr
Cont.
• Mob to site, conduct brief safety meeting
• Fabricate spools with new piping, flanges
• Install all new spools, motor, check valve
• Bolt up & align to new discharge center line
• Fabricate new pipe stands
Service Truck with Welder and 1 Man Crew
Est 40 Hrs @ $185/Hr
Est OT 8 Hrs @ $60/Hr
Outside Service
• Program existing VFD panel for 400 HP motor
Paul Mariscal
City of Redlands
January 31, 2022
Page -2-
5,730 00
336 00
7,400 00
480 00
13.946 00
1,620 00
Additional Labor and Materials Total $93,104.59
If you have any questions or need additional information regarding the above, please do not
hesitate to contact us Thank you
GENERAL PUMP COMPANY, INC.
Tom Wanchy
Tom Nanchy
Sr Project Manager/ Project Engineer