HomeMy WebLinkAboutContracts & Agreements_135B-2022FIRST AMENDMENT TO AGREEMENT TO PERFORM PROFESSIONAL
ENVIRONMENTAL CONSULTING SERVICES
This first amendment ("First Amendment") to the agreement for professional
environmental consulting services for the ("Agreement") dated December 13, 2021, by and
between the City of Redlands, a municipal corporation ("City"), and Kimley-Horn ("Consultant"),
is made and entered into this 1st day of July, 2022.
RECITALS
WHEREAS, it is the desire of the City and Consultant to amend their existing Agreement
effective July 1, 2022 and to extend the time for completion of the services to March 31, 2023.
NOW, THEREFORE, City and Consultant agree as follows:
AGREEMENT
Section 1. Section 4.1 of the Agreement, titled "Performance of Services," is hereby
amended to read as follows:
"4.1 Consultant shall perform and complete the Services on the Effective Date of this
Agreement and complete the Services by March 31, 2023, unless the Services are
terminated earlier as provided for herein."
Section 2. Exhibit "A" of the Agreement is hereby deleted in its entirety, and
substituted with a new Exhibit "A" which is attached hereto and incorporated by reference herein
as Attachment 1.
Section 3. All other provisions of the Agreement shall remain unchanged by this First
Amendment and in effect.
Section 4. This Amendment may be executed in counterparts, each of which shall be
deemed an original, but all of which, together, shall constitute one and the same instrument.
[Signatures on Next Page]
1
L:\ca\Agreements\Kimley-Horn First Amend.FY21-0171.docx.jn
IN WITNESS WHEREOF, the parties have executed this First Amendment, to be effective
as of July 1, 2022.
CITY OF REDLANDS
A74�
Charles M. Duggan, Jr., Cif)/ Hamer
ATTEST:
Jea
onaldson, City Clerk
2
KIMLEY-H
B
Chas Phil , Vice President
ATTEST:
Brian Gillis, Vice President Olt (1�020
L:\ca\Agreements\Kimley-Horn First Amend.FY21-0171.docx.jn
ATTACHMENT 1
EXHIBIT "A"
SCOPE OF SERVICES
SCOPE OF SERVICES
All tasks below will be billed on a time and materials basis.
Task 1. Mobilization
The Kimley-Horn environmental team will review available Project information, plans and studies, as well
as other available relevant information. Kimley-Horn will confirm the overall approach and schedule with
the City. Kimley-Horn will conduct a site visit to review existing conditions on the properties and
surrounding environment. This task also assumes attendance at a kickoff meeting with City staff and the
applicant. This task assumes 26 hours total of staff time.
Task 2. Prepare Project Description
The Kimley-Horn environmental team will use information obtained in Task 1 and work closely with City
staff to prepare a draft Project Description for the California Environmental Quality Act (CEQA) document.
The Project Description will be prepared to the level of detail required by the City for the entitlement
approvals being sought. The draft Project Description will be sent to the City for review and will be used
as the basis for the IS Checklist, MND, and related technical studies. This task assumes a total of 9 hours
of staff time.
Task 3. Complete CEQA Technical Studies
Kimley-Horn will prepare and/or peer review the following technical studies to support the IS/MND
prepared for the Project. Kimley-Horn will also utilize, to the extent practical, available reference
documents and prior CEQA documents, including the City's General Plan Environmental Impact Report
(EIR). For each technical study, this proposal allows for two rounds of staff review, assuming that for all
submittal reviews staff comments are consolidated into one comment set, and subsequent comments
focus on the adequacy of addressing prior comments and do not raise new issues. Each round of City staff
review would be two weeks in length.
A) CEQA LEVEL ADEQUACY PEER REVIEW- Kimley-Horn will peer review the following technical
studies prepared by the applicant:
• Biological Resources Assessment
• Noise Assessment
• Geotechnical Study
• Air Quality Study
• Greenhouse Gas Study
• Health Risk Assessment
• Energy Assessment
3
L:\ca\Agreements\Kimley-Horn First Amend.FY21-0171.docx.jn
The Reports will be peer -reviewed for accuracy as well as compliance with CEQA Threshold requirements.
No memorandums are expected to be prepared for this CEQA level review, unless major issues are
identified during the CEQA level review.
A) Cultural Resources Assessment - Kimley-Horn has retained the services of BCR
Consulting, LLC (BCR) to conduct a Cultural Resources Assessment for the proposed
Project.
Sub -Task 1 - Research
The records search for cultural resources (archaeological and historical) will be conducted through
the South Central Coastal Information Center (SCCIC) at California State University, Fullerton. This
research will characterize the status and extent of previous cultural resource studies completed in the
project area (including a 1/2 mile radius), and will review the status of any local historical resources.
Sub -Task 2 - Field Survey
BCR Consulting field staff will perform a pedestrian cultural resources survey of the project site.
Professional archaeologists will walk a parallel transects at 15-meter intervals across 100 percent of
the accessible project site. All soil exposures will be carefully inspected for evidence of cultural
resources. This fieldwork will be completed under the supervision of a cultural resource professional
that meets the United States Secretary of the Interior's Professional Qualifications Standards for
Architectural History, and for Archaeology. The goal of this task will be to identify any cultural
resources within the development portion of the project site, and to produce or update the necessary
site records. For the purposes of this proposal, a maximum of four minor archaeological resources are
anticipated.
Sub -Task 3 - Report
A cultural resources report will be produced consistent with CEQA requirements, in a
format acceptable to the City. The report will include a project description, cultural
setting, methods, results, and recommendations sections. Relevant maps and
photographs will be included and Department of Park and Recreation (DPR) 523 forms
will be appended as necessary.
Sub -Task 4 - Paleontological Overview
BCR Consulting will initiate a paleontological overview for the project with the
Western Science Center for the project. This overview will review previous
paleontological resource studies completed in the area to assess potential for the project
to impact any important fossils, and to make necessary recommendations for any
preservation or mitigation efforts. The resulting report will be appended to the cultural
resources report.
Sub -Task S — Native American Heritage Commission Sacred Lands File Search
During this task BCR Consulting will contact the Native American Heritage Commission (NAHC) to
request a Sacred Lands File (SLF) Search. Results of the SLF Search will be appended to the report. The
City will perform Assembly Bill (AB) 52 Consultation with the appropriate tribes. If requested to
participate, BCR Consulting will be available to discuss any tribal concerns during one conference call.
4